Atch 19 - 00 01 10 TOC.pdf
PDF 145 KB Posted
- Solicitation number
- 36C26026R0080
About this file
This document is a Table of Contents for VHA Master Specifications applicable to Project No. 687-24-101, the Demolish and Regrade Connecting Corridor project at Johnathan M. Wainwright Memorial VAMC, dated 28 April 2026. The specifications are organized into 14 divisions covering general requirements, existing conditions, construction trades, and systems installation standards. Division 00 includes special sections such as drawing sheets and facility data requirements. Division 01 encompasses general requirements including project schedules for small design/bid/build projects, shop drawing submissions, safety requirements, quality control, testing and laboratory services, temporary environmental controls, construction waste management, and closeout procedures. Division 02 addresses existing conditions including site surveys, demolition work, asbestos abatement, and lead-based paint removal with corresponding hazardous materials reports.
The remaining divisions specify technical standards for masonry work (Division 04), metals fabrications (Division 05), carpentry (Division 06), thermal and moisture protection including roofing, flashing, and sealants (Division 07), openings such as doors and hardware (Division 08), finishes including painting and drywall (Division 09), fire suppression systems (Division 21), plumbing and general-duty valves (Division 22), HVAC systems (Division 23), electrical installations and lighting (Division 26), communications systems (Division 27), electronic safety and security including video surveillance and fire detection (Division 28), earthwork (Division 31), and exterior improvements including concrete work and planting (Division 32). Each specification section includes an associated date indicating the version or revision date of that standard.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BD Submittal Project No. 687-24-101
Johnathan M. Wainwright Memorial VAMC 28 April 2026
Demolish and Regrade Connecting Corridor
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 00 00
01B
Rule of the Station
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 01-24
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 35 26 Safety Requirement
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing & Laboratory Services 11-18
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
01 78 00 Closeout Submittal
01 78 23 Operation and Maintenance Data
01 78 24.00
Facility Data Requirements
01 78 24.00
Facility Data Workbook (FDW)
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 11.1 Hazardous Materials Report
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
02 83
33.13.1
Lead-Based Paint Report
DIVISION 04 – MASONRY
04 01 20 Maintenance of Unit Masonry
04 01 40 Maintenance of Stone Assemblies
04 01 40.61 Stone Repair
04 01 40.62 Stone Repointing
04 03 10 Historic Masonry Cleaning
04 03 22 Historic Brick Unit Masonry Repair
04 03 23 Historic Brick Unit Masonry Repointing
04 05 13 Masonry Mortaring 10-17
00 01 10-2
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 31 13 Asphalt Shingles 02-21
07 60 00 Flashing and Sheet Metal 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 71 00 Door Hardware 03-24
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 91 00 Painting 01-21
DIVISION 21- FIRE SUPPRESSION
21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 22 – PLUMBING
22 05 23 General-Duty Valves for Plumbing Piping 09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 23 00 Refrigerant Piping 03-24
23 81 43 Air Source Unitary Heat Pump
00 01 10-3
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway And Boxes For Electrical Systems
26 05 41 Underground Electrical Construction 11-22
26 05 73 Overcurrent Protective Device Coordination Study
26 09 23 Lighting Controls 11-22
26 32 13 Engine Generators
26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 23 00 Video Surveillance
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earth Moving 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 84 00 Planting Irrigation 08-16
32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
File details come from the government source that posted it. Updated .