About this file

This is a geotechnical exploration report prepared by AREHNA Engineering, Inc. for Pinellas County, Florida regarding pavement improvements at the Beach Access Parks in Madeira Beach. The report documents the subsurface and pavement conditions at 14400 Gulf Boulevard in Madeira Beach and provides recommendations for parking lot improvements including pavement resurfacing, wheel stops, striping, and ADA compliance work. AREHNA performed eight pavement cores using a 4-inch diameter core bit and accompanying hand auger borings to depths of approximately one foot below the pavement surface at each location to assess existing pavement thickness, base material integrity, and subgrade conditions. The pavement cores were laboratory-examined, measured, and photographed by a professional engineer. Field exploration was conducted in accordance with ASTM D-1452 standards for soil sampling by auger boring.

The report reveals that the parking lot pavement is in fair to poor condition with asphalt thickness ranging from 1.5 to 3.0 inches and a soil-cement base ranging from 1.4 to 7.0 inches. The underlying subgrade consists of light gray fine sand (A-3 classification). Full-depth cracking indicative of fatigue failure was observed at most locations, with three core locations (MB-2, MB-10, and MB-11) exhibiting substandard base layer thicknesses of 2 inches or less. While the County's preference is simple resurfacing, the report recommends milling and replacing 1.5 to 2.0 inches of asphalt with application of a separation membrane over exposed cracks to reduce reflective cracking, or full-depth removal and reconstruction where base material is insufficient. Specific milling depth recommendations for each core location are provided in Table 2, with consideration for increased future maintenance requirements in areas with inadequate base material. The report was sealed and certified by professional engineers Jordan Fox and Kevin M. Hill on August 8, 2025.

View the file

Other files

File Type Posted
Infrastructure_Repair_Work_Order_Contract.pdf PDF
Common_Carrier_Attestation_02.05.2025.pdf PDF
Human_Trafficking_Affidavit_02.05.2025_(3).pdf PDF
Foreign_Countries_of_Concern_Affidavit_02.05.2025_(1).pdf PDF
Appendix_6_Anderson_Blvd_Repair_Geotech_Services_Report_(2)_S&S.pdf PDF
Appendix_6_Indian_Rocks_Beach_Geotech_report.pdf PDF
Appendix_6_Sand_Key_Park_100%_Plans.pdf PDF
Appendix_6_Sand_Key_Park_Geotech_report.pdf PDF
Appendix_6_Anderson_Blvd_Repair_Pavement_Memo.pdf PDF
Appendix_6_IndianShores-Tiki_Garden_Geotechnical_Report.pdf PDF
Appendix_6_Redington_Shores_Geotech_report.pdf PDF
Appendix_6_-_Anderson_Blvd_Repair_Geotech_Services_Report__S&S.pdf PDF
SBE_Compliance_Form.pdf PDF
Sample_Agreement_-_26-0208.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Pricing_Proposal_26-0208(reference_only).pdf PDF
Special_Provisions.pdf PDF
Specifications.pdf PDF
Plans-Standard_Detail_S&S.pdf PDF
Sample_Change_Order.pdf PDF
APPENDIX_1-Permits_(4).pdf PDF
Sample_Application_for_Payment.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Appendix_4_-_Special_Notices_5.28.pdf PDF
Appendix_6_Maderia_Beach_Access__90%_PLANS.pdf PDF
Appendix_6_Redington_Shores_Beach_Access_100%_Plans.pdf PDF
QUALIFICATION_SUBMITTAL_FORM_4.26.pdf PDF
Appendix_6_Anderson_Blvd_Repair_100%_Plans_(1).pdf PDF
APPENDIX_6-Example_Projects.pdf PDF
Appendix_6_Indian_Shores-Tiki_Gardens_100%_Plans.pdf PDF
26-0208_Infrastructure_Estimate_5.22_(For_review_only).xlsx XLSX spreadsheet
4.26.Performance_and_Payment_Bonds.pdf PDF
Appendix_6_Indian_Rocks_Beach_100%_Plans.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
E-Verify_Affidavit.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.arehna.com

5012 West Lemon Street Tampa, Florida 33609 Ph 813.944.3464 │ Fax 813.944.4959

August 8, 2025

Mr. Matthew R Ivie, P.E.

Ayres Associates, Inc.

8875 Hidden River Parkway, Suite 200 Tampa, Florida 33637

Subject: Report of Geotechnical Exploration Beach Access Parks – Pavement Improvements Task 01 – Madeira Beach Pinellas County, Florida AREHNA Project B-20-034.01

AREHNA Engineering, Inc. (AREHNA) is pleased to submit this report of our geotechnical exploration for the proposed project. Services were conducted in general accordance with AREHNA Proposal B.Prop-24-048e, dated June 20, 2025. The purpose of our geotechnical study was to obtain information on the general pavement and subsurface conditions at the subject site.

This report presents our understanding of the project, outlines our exploratory procedures, documents the field data obtained, and includes our recommendations for the proposed improvements.

AREHNA appreciates the opportunity to have assisted you on this project. Should you have any questions with regards to this report, or if we can be of any further assistance, please contact this office.

Best Regards, AREHNA ENGINEERING, INC.

FLORIDA BOARD OF PROFESSIONAL ENGINEERS CERTIFICATE OF AUTHORIZATION NO. 28410

Jordan Fox, P.E. Kevin M. Hill, P.E.

Senior Geotechnical Engineer Senior Geotechnical Engineer Florida Registration 87472 Florida Registration 72949 On the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed, and the signature must be verified on any electronic copies

Distribution: 1 – Addressee - Electronic 1 – File

Attachments: Sheet 1 – Coring Location Plan

Table 1 - Pavement Evaluation Coring and Condition Data Table 2 - General Milling Depth Recommendations Pavement Core Photographs

Beach Access Parks – Pavement Improvement August 8, 2025 Task 01 – Madeira Beach AREHNA Project B-20-034.01 Pinellas County, Florida

1 | P a g e

PROJECT INFORMATION

The project site is located at 14400 Gulf Boulevard in Madeira Beach, Florida. The project consists of parking lot improvements including pavement resurfacing, wheel stops, striping, and establishing compliance with ADA requirements.

The purpose of our geotechnical study was to obtain pavement and subsurface information at the project site and to provide general resurfacing recommendations.

SCOPE OF SERVICES

The following services were performed to achieve the above-outlined objective:

Performed a site reconnaissance and marked coring locations.

Requested utility location services from Sunshine811.

Performed 8 Pavement Cores with shallow hand auger borings to identify the subgrade material at areas of pavement distress.

Visually classified and stratified the soil samples in the laboratory using the American Association of

State Highway and Transportation Officials (AASHTO) Soil Classification System.

Reported the results of the field exploration and engineering analysis. The results of the subsurface exploration are presented in this report signed and sealed by a professional engineer specializing in geotechnical engineering.

FIELD EXPLORATION

Eight (8) pavement cores were performed to document the condition and measure the existing pavement thickness at the project site. The pavement cores were extracted with a 4-inch inside diameter core bit.

Upon completion, the pavement cores were removed and transported to our laboratory where they were further examined, measured and photographed by an engineer.

At each core location a shallow hand auger boring was advanced to a depth of approximately 1-foot below the existing pavement surface to collect samples of the base and subgrade materials for classification and laboratory testing, if needed. The hand auger borings were performed by manually advancing a 3-inch diameter, 6-inch-long sampler into the soil. Soil sampling was performed in general accordance with ASTM Test Designation D-1452, entitled “Soil Investigation and Sampling by Auger Borings”. Once completed, the boreholes were backfilled with soil cuttings and the pavement surface was restored with asphalt cold patch.

The approximate pavement core and hand auger locations are shown on the Core Location Plan presented on Sheet 1 in the Attachments.

2 | P a g e

PAVEMENT AND SUBSURFACE CONDITIONS

AREHNA performed a visual inspection of the pavement surface and observed numerous locations with longitudinal, transverse, and block cracking throughout the parking lot. The pavement is generally in fair to poor condition.

The asphalt thickness ranged from approximately 1.5 to 3.0 inches. The base material was a soil cement consisting of a cemented mix of sand, shell, and limerock constituents. The base ranged from approximately

1.4 to 7.0 inches in thickness. The underlying subgrade material consisted of light gray, fine sand (A-3).

Pavement section data at each core location is summarized in Table 1 - Pavement Evaluation Coring and Condition Data presented in the Attachments. Photographs of the pavement cores are also presented.

EVALUATION AND RECOMMENDATIONS

We understand that the County’s preference is to resurface the subject parking lot. However, three (3) of the eight (8) core locations (MB-2, MB-10, and MB-11) had substandard base layer thicknesses (2 inches or less). Inadequate base thickness at these locations is likely contributing to the poor condition of the pavement surface.

At most pavement core locations, where cracking (longitudinal, transverse, and/or block) was observed, the cracks fully penetrated the pavement. This type of distress is indicative of fatigue cracking, which is the cracking of the pavement surface as a result of repetitive loading which can be governed by the inherent fatigue resistance of the surface asphalt layer and/or magnitude of the cyclic tensile strains at the bottom layer (generally caused by low stiffness or insufficient thickness of the base layer). The majority of the core locations appear to be experiencing fatigue cracking due to the integrity of the asphalt properties as well as general wear and tear over time, with exceptions at core locations noted above where minimal base material was encountered below the asphalt.

Resurfacing may be the most economical option and generally sufficient to address the existing surficial pavement issues observed, however, it may not address some of the underlying problems causing cracking.

Additionally, the majority of the pavement cores encountered full depth cracks. Milling and resurfacing will temporarily resolve the issue, however the new asphalt will experience reflective cracking as the repeated traffic loads stress the asphalt overlay causing it to crack over existing weaknesses in the underlying pavement. The result will be pavement that will crack more quickly and will require more frequent patching.

Our recommendation would be to remove all of the asphalt, expose the base, and lay new asphalt a minimum of 1.5 inches thick where full depth cracking was encountered. Consideration for reconstruction may be necessary where the base is thin. However, as previously mentioned, we understand that resurfacing is preferred by the County. Thus, we recommend milling and replacing 1.5 to 2.0 inches of asphalt and

3 | P a g e applying a separation membrane or similar material over exposed cracks after milling before placing new pavement to help reduce the chance for reflective cracking.

We anticipate that at a few of these locations this milling may expose the base material but in other areas the milling may not fully penetrate the asphalt. Where the base material is exposed, asphalt should be placed no later than the next day after the surface was milled to prevent degradation from traffic and rain.

Note that milling and resurfacing will not fix underlying problems with the base material/thickness.

Increased maintenance of the roadway may be required in these areas (i.e., shorter pavement lifetime). Our general recommendations of milling depths for each location are presented in Table 2 - General Milling Depth Recommendations in the Attachments.

CERTIFICATIONS AND LIMITATIONS

The subsurface information presented in this report is based on the results and interpretations of the testing and/or data collection activities performed at the site, and the information available to AREHNA at the time the report was issued. AREHNA is not responsible for the conclusions, opinions, or recommendations made by others based on the data presented in this report. This report was prepared for the exclusive use of Ayres Associates, Inc. and Pinellas County. Use of this report by persons or groups without the permission of Ayres Associates, Inc. and Pinellas County, and AREHNA Engineering, Inc. is not authorized. AREHNA reserves the right to update this report should additional information become available.

Attachments

Fe et

N

M B-

M B-

M B-

M B-

M B-

M B-

M

B-

M B-

GULF

B

LV

D

4T

H AVE

5T

H AVE

3R

D AVE

D A

TE

A

PP

R

O

VE

D R

EV

IS

IO

N

S D

A

TE

N A

M E

SU

PE

R

VI

SE

D

B Y:

C H

EC

K

ED

B

Y:

D

R A

W N

B Y:

D

ES

IG

N

ED

B

Y:

En gi ne er in g, In c.

A

RE

HN

A

PR

EP

AR

ED

B Y:

N O

D

ES

C

R

IP

TI

O

N S

SH

EE

T N

O

PR

O

JE

C

T N

O

PR

O

JE

C

T N

A M

E

D:\1-Arehna\Projects\2020\B-20-034.01 - Madeira Beach\B-20-034.01.dwg (1-CLP) 613767 Aug 07, 2025 - 10:54pm

C O

R

IN

G L

O C

AT

IO

N P

LA

N

M

AD

EI

R

A

BE

AC

H

PI

N

EL

LA

S C

O U

N

TY

, F

LO

R

ID

A K ev in

M . H ill , P

.E

K H

D

GJF

B-

-0

.0

8/

8/

8/

SO

U

R C

E:

FD

O

T A

ER

IA

L.

LE

G

EN

D

A

PP

R O

XI

M

A

TE

L O

C A

TI

O

N O

F

PA

VE

M

EN

T

C O

R E

TE

ST

BA

SE

(I N

SO

IL

C

EM

EN

T(1

M B-

2.

1.

A-

2.

P

Fu ll de pt h cr ac k, tra ns ve rs e cr ac ki ng o bs er ve d.

M B-

1.

7.

A-

1.

P

Fu ll de pt h cr ac k, tra ns ve rs e, lo ng itu di na l, an d bl oc k cr ac ki ng o bs er ve d.

M B-

2.

7.

A-

2.

P

Fu ll de pt h cr ac k, tra ns ve rs e, lo ng itu di na l, an d bl oc k cr ac ki ng o bs er ve d.

M B-

2.

6.

A-

2.

P

Fu ll de pt h cr ac k, tra ns ve rs e, a nd lo ng itu di na l c ra ck in g ob se rv ed

M B-

2.

4.

A-

P Pa ve m en t d el am in at io n, tr an sv er se , l on gi tu di na l, an d bl oc k cr ac ki ng ob se rv ed

M B-

1.

2.

A-

1.

P

Fu ll de pt h cr ac k, pa ve m en t d el am in at io n, tr an sv er se

, l on gi tu di na l, an d bl oc k cr ac ki ng o bs er ve d.

M B-

2.

2.

A-

2.

P

Fu ll de pt h cr ac k, pa ve m en t d el am in at io n, tr an sv er se

, l on gi tu di na l, an d bl oc k cr ac ki ng o bs er ve d.

M B-

3.

5.

A-

3.

P

Fu ll de pt h cr ac k, pa ve m en t d el am in at io n, tr an sv er se

, l on gi tu di na l, an d bl oc k cr ac ki ng o bs er ve d.

N ot e

1:

B as e m at er ia l i s a c em en te d m ix w ith sa nd , s he ll, an d lim er oc k co ns tit ue nt s.

N ot e 2:

P av em en t C on di tio n

- G

G oo d, F

F ai r, P

Po or N ot e

3:

H an d au ge r b or in gs w er e pe rfo rm ed th ro ug h th e co re h ol e to d ep th s o f u p to

-fo ot b el ow th e ex ist in g pa ve m en t s ur fa ce a t e ac h pa ve m en t c or e lo ca tio n.

PA

VE

M

EN

T

CO

N D

IT

IO

N (2

SU

BG

RA

D E

M

AT

ER

IA

L

TA

BL

E

PA

VE

M

EN

T

EV

AL

U

AT

IO

N C

O

RI

N G

AN

D

C O

N D

IT

IO

N D

AT

A

CO

M

M

EN

T

BE

AC

H

AC

CE

SS

P

AR

KS

PA

VE

M

EN

T

IM

PR

O

VE

M

EN

T

- M

AD

EI

RA

B

EA

CH

PI

N

EL

LA

S

CO

UN

TY

, F

LO

RI

DA

AR

EH

N

A Pr oj ec t N um be r:

B-

-0

.0

CO

RE

N O

AS

PH

AL

T (A

C)

PA

VE

M

EN

T

(IN

CR

AC

K

D

EP

TH

(I

N

2.0 2.0 SP 12.5

1.9 1.5 SP 12.5

2.0 1.5 SP 12.5

2.9 2.0 SP 12.5

2.7 2.0 SP 12.5

1.5 1.5 SP 12.5

2.0 2.0 SP 12.5

3.0 2.0 SP 12.5

Note 1: No crack observed within the core.

Note 2:

Note 3:

TABLE 2

GENERAL MILLING DEPTH RECOMMENDATIONS

BEACH ACCESS PARKS - PAVEMENT IMPROVEMENT - MADEIRA BEACH

PINELLAS COUNTY, FLORIDA

AREHNA Project Number: B-20-034.01

MB-11(2)

MB-14(3)

Milling the full depth of pavement is recommended to eliminate the existing cracking.

This will expose the base and re-compaction following the recommendations in the report will be required prior to placing the new asphalt layer.

If cracks are exposed after milling a separation membrane or similar material should be placed over the cracks before placing new pavement to reduce the chance of reflective cracking.

CORE NO.

MB-2(2)

MB-4(3)

MB-5(3)

MB-7(3)

MB-8(1)

MB-10(2)

EXISTING PAVEMENT

THICKNESS (IN)

RECOMMENDED

ASPHALT TYPE

RECOMMENDED

MINIMUM MILLING

DEPTH (IN)

G ul f o f M ex ic o

G U

LF

B

O U

LE

VA

R D

M A

D

EI

R A

B

EA

C H

A C

C

ES

S

G ul f B ou le va rd M ad ei ra B ea ch

, F lo rid a

8-

Be ac h

EN

TR

AN

C

E

M

AP

N O

T

TO

S C

AL

E

R es tro om

Sh ow er s

Sw im m in g

L E

G E

N D

Pa rk in g

Fe e

C ha rg ed

N O

RT

H

Pr oj ec t N um be r:

8G

1- A3

File details come from the government source that posted it. Updated .