Appendix_6_Anderson_Blvd_Repair_100%_Plans_(1).pdf
PDF 5 MB Posted
- Attached to
- Infrastructure Repair Work Order Contract
- Solicitation number
- 26-0208-ITB-C
- Issued by
- Pinellas County, Florida
About this file
This file is a 100% design plan set for the Anderson Boulevard Repair project (PID 90018G1-A6) located at Fort DeSoto in Pinellas County, Florida, prepared under a work order contract for infrastructure repair. The plans document a pavement reconstruction project on Anderson Boulevard, including roadway rehabilitation, intersection details, and typical cross-sections. The design set comprises 17 sheets and includes key sheets, general notes, signature sheets, typical sections, project layout, roadway plans and profiles, intersection details, multiple cross-sections, and erosion control notes and details. The project involves pavement reconstruction with performance-based erosion and sedimentation control criteria requiring the contractor to employ measures such as silt fences and turbidity barriers to prevent soil runoff from the construction site. The plans were prepared by licensed professional engineers Leslie Wooten (License No. 93919) and Thomas R. Howell (License No. 96575) of the State of Florida, with the document dated December 3, 2025.
The erosion control plan specifies contractor responsibility for implementing best management practices (BMPs) including 10-inch minimum silt fencing and staked turbidity barriers, with requirements that contractors must employ additional procedures if the provided BMPs fail to prevent soil migration from the site. Traffic control measures are detailed on the plans, including road closures, one-way designations, yield signs, and FDOT Type III barricades. The plans reference the vegetation line and water's edge along Tampa Bay, indicating environmental sensitivity in the project area. This design package supports the broader Pinellas County infrastructure repair work order contract framework, which authorizes repairs including concrete work, milling and resurfacing, landscape work, fencing, sidewalk repairs, ADA ramps, and sheet pile installation.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 90018G1-A6
FORT DESOTO ANDERSON BOULEVARD
REPAIR
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
LES
LIE WOOTEN
FLORI'A
93919
LICENSE
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
TH
OMA
S R. HOWELL
FLORI'A
96575
LICENSE
D
D
D
400 80 160 Feet
E/P
E/C & PARKING METER
WATER'S EDGE
WATERS O) TAMPA BA<
E/P
E/P
E/P
E/P
B/C
VEGETATION
LINE
VEGETATION
LINE
YIELD
ROAD
CLOSED
ONE WAY
ONE WAY
LEGEND
PAVEMENT RECONSTRUCTION
200 40 80
Feet
TREE TO BE REMOVED
FDOT TYPE III BARRICADE
TRAFFIC DIRECTION
WATER'S EDGE
WATERS O) TAMPA BA<
E/P
E/P
E/P
E/P
B/C
VEGETATION
LINE
VEGETATION
LINE
LEGEND
PAVEMENT CROSS SLOPE
TRANSITION AREA
200 40 80
STAKED TURBIDITY BARRIER
CONTRACTOR'S RESPONSIBILITY
EROSION AND SEDIMENTATION CONTROLS ARE PERFORMANCE
BASED CRITERIA. IF THE BMPS PROVIDED DO NOT PREVENT SOILS
FROM LEAVING A CONSTRUCTION SITE, THEN THE CONTRACTOR IS
REQUIRED TO EMPLOY ADDITIONAL PROCEDURES TO PROVIDE CLEAN
RUNOFF FROM A SITE.
ATTACHING TWO SILT FENCES
10" (MIN.)
SILT FENCE
WATER'S EDGE
WATERS O) TAMPA BA<
E/P
E/P
E/P
E/P
B/C
VEGETATION
LINE
VEGETATION
LINE
LEGEND
SILT FENCE
200 40 80
STAKED TURBIDITY BARRIER
CROSS SECTIONAL VIEW OF HEADER CURB
U
1\ ca d\
P
ID
G1
\P la ns
\D w g\
P ro du ct io n\
8G 1-
W
AL
L.
dw g, D ec
3, 9:
am
| 1 KEY SHEET |
| KEY SHEET |
| 2 GENERAL NOTES |
| 2 GENERAL NOTES |
| 3 SIGNATURE SHEET |
| 3 SIGNATURE SHEET |
| 4 TYPICAL SECTION |
| 4 TYPICAL SECTION |
| 5 PROJECT LAYOUT |
| 5 PROJECT LAYOUT |
| 6 ROADWAY PLAN |
| ROADWAY PLAN |
| 7 ROADWAY PROFILE |
| 7 ROADWAY PROFILE |
| 8 INTERSECTION DETAIL |
| 8 INTERSECTION DETAIL |
| 9 CROSS SECTIONS (1) |
| 9 CROSS SECTIONS (1) |
| 10 CROSS SECTIONS (2) |
| 10 CROSS SECTIONS (2) |
| 11 CROSS SECTIONS (3) |
| 11 CROSS SECTIONS (3) |
| 12 CROSS SECTIONS (4) |
| 12 CROSS SECTIONS (4) |
| 13 CROSS SECTIONS (5) |
| 13 CROSS SECTIONS (5) |
| 14 EROSION CONTROL NOTES AND DETAILS |
| 14 EROSION CONTROL NOTES AND DETAILS |
| 15 EROSION CONTROL PLAN |
| 15 EROSION CONTROL PLAN |
| 16 SPECIAL DETAILS (1) |
| 16 SPECIAL DETAILS (1) |
| 17 SPECIAL DETALS (2) |
| 17 SPECIAL DETALS (2) |
File details come from the government source that posted it. Updated .