About this file

This appendix document from Pinellas County, Florida, outlines the permits requirements for the Cross Bayou Athletic Association Complex Improvements Design-Build project. The Design-Build team is responsible for obtaining all required permits necessary for the reconstruction of the baseball park located at 102nd Avenue and 98th Street North in Seminole, Florida. The project scope includes demolition and reconstruction of seven athletic fields, two prefabricated buildings (a 1,120-square-foot restroom/concession facility and a 1,200-square-foot maintenance building), four batting cages, bleachers, dugouts, backstops, site lighting, irrigation systems, stormwater management infrastructure, and utility connections. The Design-Build firm must coordinate with Duke Energy, TECO People's Gas, Charter Communications, and Frontier Communications for utility connections and ensure compliance with FEMA flood zone requirements, Florida Building Code, Pinellas County ordinances, and FDOT specifications. A mandatory site visit is scheduled for February 25, 2026 at 9:00 AM, written questions are due by March 3, 2026 at 3:00 PM Eastern Time, and all submittals must be uploaded to the OpenGov procurement platform by March 12, 2026 at 3:00 PM Eastern Time. Phase 1 requires completion of 100% construction documents within 190 calendar days of Notice to Proceed, while Phase 2 encompasses construction completion and Certificate of Occupancy issuance within 455 calendar days.

The Guaranteed Maximum Price for Phase 2 construction services cannot exceed $10,000,000, with the Design-Build firm's fixed lump sum compensation including a profit markup not exceeding 5%. Approximately 10 percent of project work is set aside for Pinellas County Small Business Enterprise (SBE) subcontractors in areas including survey, erosion control, clearing and grubbing, grading, sidewalk installation, fencing, sodding, irrigation, and landscaping. The Design-Build team must provide a bid bond of 5% of the Phase 2 base bid and Performance and Payment Bonds equal to 100% of the agreement amount, with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), and Professional Liability ($2,000,000 per occurrence/$2,000,000 aggregate). Funding is provided through the Penny for Pinellas capital improvement sales surtax approved for the Local Infrastructure Sales Surtax program, with 5% of monthly payments retained by the County during construction and liquidated damages assessed for failure to achieve Substantial Completion within the contract timeframe.

View the file

Other files

File Type Posted
25-0036-RFQ-DB_2-4-26.pdf PDF
APPENDIX_1_-_PERMITS_rev1_corrected.pdf PDF
Approved_RUP_24-00009.pdf PDF
Approved_RUP_24-00008.pdf PDF
Approved_RUP_24-00007.pdf PDF
Approved_RUP_24-00006.pdf PDF
Approved_STP_24-00002.pdf PDF
AREHNA_Geotech_Report_06-02-2023.pdf PDF
UTV_Summary_Report.pdf PDF
Topographic_Survey_Signed.pdf PDF
SWFWMD_Permit_43047961.0000_2025-02-24.pdf PDF
SWFWMD_Drainage_Report_Narrative_FD.pdf PDF
BDRS_Conditional_Approval_Letter.pdf PDF
Plans_Electrical.pdf PDF
Pinellas_County_-_Conveyance_Report.pdf PDF
Location_Map.pdf PDF
Flood_Plans.pdf PDF
Ecological_Assessment_Report.pdf PDF
Cross_Bayou_Ballfields.pdf PDF
Design_Criteria_Package_rev_01-20-2026_(2).pdf PDF
Sample_Agreement.pdf PDF
OKApproved-STP-24-00002.pdf PDF
Approved-RUP-24-00008.pdf PDF
Approved-RUP-24-00007.pdf PDF
Approved-RUP-24-00006.pdf PDF
Approved-RUP-24-00009.pdf PDF
Cross_Bayou_O&M_Manual.pdf PDF
OKCross_Bayou_Ball_Fields_GAI.pdf PDF
OKSWFWMD_Drainage_Report_04.18.25.pdf PDF
25-0036-REQ_Cross_Bayou_Topographic_Survey_Signed.pdf PDF
Cross_Bayou_SWFWMD_Financial_Capability_Certification.pdf PDF
PID_04556B_Cross_Bayou_Fixed_Price_Design-Build_RFP_12-09-2025.pdf PDF
OKR220415.01-Cross_Bayou_Little_League-EAR-20230818_FS.pdf PDF
Design_Criteria_Package_rev_01-20-2026.pdf PDF
OK004556B-FLOOD_Plans.pdf PDF
PID_04556B_DRAFT_Cross_Bayou_Fixed_Price_Design-Build_RFP_02-09-2024.docx DOCX document
TY2-23-15_Conditional_Apprvl_Ltr.pdf PDF
Email_re_Edits_to_DCP_for_04556B-Cross_Bayou_2026-1-16(Internal_Review_Only).pdf PDF
OKCross_Bayou_Conveyance_Report_09.27.2024.pdf PDF
OK43047961.000.pdf PDF
APPENDIX_1_PERMITS-rev1_corrected.pdf PDF
25-0036-REQ_AREHNA-Geotech_Report-06-02-2023.pdf PDF
25-0036-REQ_Plans-Electrical.pdf PDF
25-0036-REQ_Project_Location_Map.pdf PDF
OKCost_Estimate_60%.xlsx XLSX spreadsheet
25-0036-REQ_FY24_SeminoleRecreationFacilities_PFO.pdf PDF
25-0036-REQ_Request_for_ITB_CCNA_RFP-9-11-24.docx DOCX document
25-0036-REQ_SBE_Letter-from_EOR.pdf PDF
ADD-UTV_Summary_Report.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

������������������������������ ����� �����!���"#��$��"#��%�"�!�����!���!���������!��&�'����(��)*+,-.�-/0*1�

23*/45� )*+,-.�/67� )*+,-.�8**�9�:.;*+�)<=>??@A�46B=CD�)6C@E?>�F@C>G�@=H�+>I?@<J>H�K@C>G�L6G�-GG<M@C<6=�)>GJ<CA� 0>A<M=�NB<?H�8<GJ�C6�@OO?D�L6G�)<=>??@A�46B=CD�)>GJ<CA� 0>A<M=�NB<?H�8<GJ�C6�O@D�O>GJ<C�L>>A�)<=>??@A�46B=CD�PC<?<C<>A�)>GJ<C�L6G�Q>GR<I>�46==>IC<6=�SA@=<C@GD�A>F>GT� 0>A<M=�NB<?H�8<GJ�C6�@OO?D�L6G�)<=>??@A�46B=CD�Q>GR<I>�46==>IC<6=�O>GJ<C� 0>A<M=�NB<?H�8<GJ�C6�O@D�O>GJ<C�L>>A�)<=>??@A�46B=CD�NB<?H<=M�+>R<>F�Q>GR<I>A� .6�E>�H>C>GJ<=>H�@C�CU>�C<J>�6L�@OO?<I@C<6=� 0>A<M=�NB<?H�8<GJ�C6�O@D�O>GJ<C�L>>A�Q6BCUF>AC�8?6G<H@�K@C>G�,@=@M>J>=C�0<ACG<IC�SQK8K,0T� )>GJ<C�/67�VVVV�SO>=H<=MT� /92�8?6G<H@�0>O@GCJ>=C�6L�*=R<G6=J>=C@?�)G6C>IC<6=�S80*)TW�K@AC>F@C>G�)>GJ<C�@=H�)6C@E?>�K@C>G�)>GJ<C� 0>A<M=�NB<?H�8<GJ�C6�@IXB<G>�F@AC>F@C>G�O>GJ<C� �0>A<M=�NB<?H�8<GJ�C6�O@D�O>GJ<C�L>>A�)<=>??@A�46B=CD�;@E<C@C�,@=@M>J>=C�)>GJ<C�W�4:/.+24.:+�Q;2YY�:N.2-/� -AAB>H�C6�0>A<M=�NB<?H�8<GJ�@C�)G>ZI6=ACGBIC<6=�J>>C<=M�<L�@OO?<I@E?>�6G�@A�H<G>IC>H�ED�CU>�46B=CD7� � /6�O>GJ<C�IU@GM>�0>F@C>G<=M�)>GJ<C�W�4:/.+24.:+�Q;2YY�:N.2-/� -AAB>H�C6�0>A<M=�NB<?H�8<GJ�L6??6F<=M�CU>�)G>ZI6=ACGBIC<6=�J>>C<=M�<L�@OO?<I@E?>�6G�@A�H<G>IC>H�ED�CU>�46B=CD� /6�O>GJ<C�IU@GM>�/)0*Q�W�46=ACGBIC<6=�3>=>G<I�)>GJ<C� .U>�0>A<M=�NB<?H�8<GJ�AU@??�6EC@<=�CU<A�O>GJ<C�W�G>L>G�C6[�UCCOA[99L?6G<H@H>O7M6R9F@C>G9AC6GJF@C>G9I6=C>=C9I6=ACGBIC<6=Z@IC<R<CD�� Y@GM>�46=ACGBIC<6=�S\]�@IG>AT�_̂̀ 7̀̀̀ ��QJ@??�46=ACGBIC<6=�SaZ]�@IG>AT�b̂]̀7̀̀ �Y<=c�C6�<=L6GJ@C<6=�G>M@GH<=M�)<=>??@A�46B=CDdA�)>GJ<CC<=M�3B<H>�@=H�2II>AA�)6GC@?[��UCCOA[99O<=>??@A7M6R9O>GJ<CC<=MZMB<H>9��

File details come from the government source that posted it. Updated .