GENERAL DECISION: CO20080014 08/07/2009 CO14

Date: August 7, 2009 General Decision Number: CO20080014 08/07/2009

Superseded General Decision Number: CO20070014

State: Colorado

Construction Type: Highway

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 05/02/2008 3 06/06/2008 4 07/04/2008 5 10/03/2008 6 10/24/2008 7 03/20/2009 8 05/01/2009 9 06/05/2009 10 08/07/2009

ELEC0012-005 06/01/2009

PUEBLO COUNTY

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation) Electrical work where the total cost is $150,000 or less........................$ 22.85 10.79 Electrical work where the total cost is over $150,000.$ 27.00 10.91

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ELEC0068-012 06/01/2009

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON, LARIMER AND WELD COUNTIES

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation).....$ 31.00 11.40

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ELEC0113-005 06/01/2009

EL PASO COUNTY

Rates Fringes

ELECTRICIAN......................$ 28.80 3%+13.10

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou

Denver - Ellsworth Avenue & Broadway

Ft. Collins - Prospect & College

Grand Junction - 12th & North Avenue

Pueblo - I-25 & Highway 50

All work outside of these areas shall be paid Zone 2 rates.

ELEC0969-005 06/01/2007

MESA COUNTY

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation).....$ 20.31 8.56

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ENGI0009-002 05/01/2009

Rates Fringes

Power equipment operators:

Asphalt Screed..............$ 23.67 9.22 Bituminous or Asphalt Spreader/Laydown Machine....$ 23.67 9.22 Bulldozer...................$ 23.67 9.22 Crane: 50 tons and under...$ 23.82 9.22 Crane: 51 to 90 tons.......$ 23.97 9.22 Crane: 91 to 140 tons......$ 24.12 9.22 Crane: 141 tons and over....$ 24.88 9.22 Drill Operator: William MF/Watson 2500 only.........$ 23.97 9.22 Grader/Blade: Finish........$ 23.97 9.22 Grader/Blade: Rough.........$ 23.67 9.22 Loader: Barber Green, etc.

& Up to and including 6 cubic yards.................$ 23.67 9.22 Loader: Mechanic/Welder (heavy duty)................$ 23.97 9.22 Loader: Over 6 cubic yards..$ 23.82 9.22 Mechanic and/or Welder (Includes heavy duty & combination mechanic and welder):....................$ 23.82 9.22 Oiler.......................$ 22.97 9.22 Power Broom: 70 HP and over.$ 23.67 9.22 Power Broom: Under 70 HP....$ 22.97 9.22 Roller (excluding dirt & soil compaction): Self-propelled, all types over 5 tons......................$ 23.67 9.22 Roller (excluding dirt & soil compaction): Self-propelled, rubber tires under 5 tons................$ 23.32 9.22 Scraper: Single bowl including pups 40 cubic yards and tandem bowls and over........................$ 23.97 9.22 Scraper: Single bowl under 40 cubic yards..............$ 23.82 9.22 Trackhoe....................$ 23.82 9.22

* LABO0086-002 05/01/2009

Rates Fringes

Laborers:

Asphalt Laborer/Raker, Common Laborer & Concrete Laborer/Mason Tender........$ 18.68 6.78

SUCO2001-003 12/20/2001

Rates Fringes

BRICKLAYER.......................$ 15.55 2.85

Carpenters:

Form Work (Excluding Curbs & Gutters).................$ 16.54 3.90 All Other Work..............$ 16.61 3.88

Concrete Finisher/Cement Mason...$ 16.05 3.00

Ironworkers:

Bridge Rail (Excludes Guardrail)..................$ 18.22 6.01 Reinforcing.................$ 16.69 5.45

Laborers:

Fence Erector (Includes fencing on bridges).........$ 13.02 3.20 Form Work (Curbs & Gutters only)...............$ 11.85 3.45 Guardrail Erector (Excludes bridgerail)......$ 12.89 3.20 Landscape and Irrigation Laborer.....................$ 12.26 3.16 Pipelayer...................$ 13.55 2.41 Striping Laborer (Pre-form layout and removal of pavement markings)..........$ 12.62 3.21 Traffic and Sign Laborer (Sets up barricades and cones, and installs permanent signs)............$ 12.43 3.22 Traffic Director/Flagger....$ 9.55 3.05

Painters:

Brush.......................$ 16.94 2.10 Spray.......................$ 16.99 2.87

Power equipment operators:

Backhoes....................$ 16.54 4.24 Bobcat/Skid Loader..........$ 15.37 4.28 Compactor - Dirt & Soil Only........................$ 16.70 3.30 Concrete Pump Operator......$ 16.52 4.30 Drill Operator: All except William MF/ Watson 2500.....$ 16.74 2.66 Forklift....................$ 15.91 4.09 Post Driver/Punch Machine...$ 16.07 4.41 Rotomill Operator...........$ 16.22 4.41 Tractor.....................$ 13.13 2.95

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Groundman Class C....................$ 11.44 3.25

Truck drivers:

Floats-Semi Truck...........$ 14.86 3.08 Multipurpose Truck- Specialty & Hoisting........$ 14.35 3.49 Pickup Truck (Includes Pilot and Sign/Barricade Truck)......................$ 13.93 3.68 Single Axle Truck...........$ 14.24 3.77 Truck Mechanic..............$ 16.91 3.01

TEAM0435-002 05/01/2000

Rates Fringes

Truck drivers:

Distributor Truck...........$ 15.80 5.27 Dump Truck: Over 14 cubic yards to and including 29 cubic yards.................$ 15.27 5.27 Dump Truck: Over 29 cubic yards to and including 79 cubic yards.................$ 15.80 5.27 Dump Truck: Over 79 cubic yards.......................$ 16.45 5.27 Dump Truck: To and including 6 cubic yards & over 6 cubic yards to and including 14 cubic yards;

Water Truck.................$ 14.93 5.27 Low Boy Truck...............$ 17.25 5.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

File Type Posted
331111-Water_Supply_Design_Construction.pdf PDF
311000_Clearing_Grubbing_REV Amd 2.doc DOC document
WS Demo - Aframe tank 1.JPG JPG image
033000_Cast-in-place_concrete.pdf PDF
U9_WELL-DETAILS.pdf PDF
Optional Bid Item 12 Amend 2.doc DOC document
WS Demo - culvert.JPG JPG image
U1-UTIL-PLAN.pdf PDF
U4_UTILITY-DETAILS.pdf PDF
Revised Schedule of Items Amend 2.xls XLS spreadsheet
312316_Struct_Excavation_Backfill.pdf PDF
LOST_LAKE_CG_WS_SPEC_INDEX.pdf PDF
U6_TREATMENT-BLDG-PLAN.pdf PDF
017700_closeout_procedures.pdf PDF
WS Demo - Aframe tank 2.JPG JPG image
013300_submittal_procedures.pdf PDF
331219-Water-hydrant.pdf PDF
011100_summary_of_work.pdf PDF
016400_government_furnished_mats.pdf PDF
T1_TITLE_SHEET.pdf PDF
011100_summary_of_work_REV09_03_09.pdf PDF
311100_Clearing_Grubbing.pdf PDF
T1_TITLE_SHEET-SIGNATURES.pdf PDF
WS Demo - Spring and piping.JPG JPG image
U8_TYP_SPUR_UTIL_DET.pdf PDF
011419_use_of_site.pdf PDF
331116-Water-distribution.pdf PDF
U7_TREATMENT-BLDG-PLUMBING.pdf PDF
U5-HYDRANT-DETAILS.pdf PDF
U2-UTIL-PLAN-PROFILE.pdf PDF
SF 30 AMEND 2.PDF PDF
017419_constr_waste_management_disposal.pdf PDF
332110_Water_Supply_Wells.pdf PDF
312317_Trenching_Utilities.pdf PDF
012200_definition_bid_items_REV09_03_09.pdf PDF
100perc_FINAL_Lost_Lake_CG_Spec_Index_REV09_03_09.pdf PDF
012200_definition_bid_items.pdf PDF
wage determination.txt TXT text file
024113_selective_site_demolition.pdf PDF
U3-UTIL-PLAN-PROFILE.pdf PDF
Amendment 001 to Solicitation AG.doc DOC document
Amendment 001 —
AG-82B1-S-09-0057.pdf PDF
sf 1442.pdf PDF
lost-lake-dwgs.pdf PDF
sf24_f.pdf PDF
lost-lake-specs.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .