FINAL_Bid_Sch_09_03_09
| Lost Lake Campground and Trailhead - Base Bid & Optional Bid Items | ||||||
| PAY ITEM | DESCRIPTION | METHOD OF MEASUREMENT | PAY UNIT | UNIT COST | QUANTITY | TOTAL COST |
| BASE BID - CAMPGROUND AND BECKWITH HORSE TRAILHEAD | ||||||
| GENERAL REQUIREMENTS | ||||||
| 1 | Mobilization | LSQ | LS | $ | 1 | $ |
| 2 | Quality Control | LSQ | LS | $ | 1 | $ |
| 3 | Construction Survey & Staking | LSQ | LS | $ | 1 | $ |
| 4 | Construction Signing | LSQ | LS | $ | 1 | $ |
| 5 | Temporary Erosion & Sedimentation Control | LSQ | LS | $ | 1 | $ |
| 6 | As-Built Drawings (Electronic) | LSQ | LS | $ | 1 | $ |
| SITEWORK | ||||||
| 7 | Excavation & Embankment Roads, Method 4 | AQ | CY | $ | 1000 | $ |
| 8 | Excavation & Embankment Beckwith Horse | AQ | CY | $ | 150 | $ |
| Trailhead, Method 4 | ||||||
| 9 | Borrow Fill Haul, Placement, Beckwith Horse | AQ | CY | $ | 500 | $ |
| Trailhead, Method 4 | ||||||
| 10 | Crushed Aggregate Base, | AQ | CY | $ | 1143 | $ |
| Compaction B, 6" Thick, for Roads, Haul, Placement, Plasticity Index = 8 | ||||||
| 11 | Crushed Aggregate Base, | AQ | CY | $ | 572 | $ |
| Compaction B, 6" Thick, Beckwith Horse Trailhead, Haul, Placement, Plasticity Index = 8 | ||||||
| 12A | Single Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation) | LSQ | EACH | $ | 5 | $ |
| 12B | Double Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation) | LSQ | EACH | $ | 4 | $ |
| 12C | Camping Pull-Thru or Turn-Out (Earthwork, Haul. Place Aggregate & Wheelstop Installation) | LSQ | EACH | $ | 5 | $ |
| 13A | Single Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation) | LSQ | EACH | $ | 9 | $ |
| 13B | Double with 10 Foot Table Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation) | LSQ | EACH | $ | 2 | $ |
| 13C | Double with Two 8 Foot Table Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring , Table Installation) | LSQ | EACH | $ | 3 | $ |
| 14 | 2" Minus Washed Stone at 4" Depth For Boat Launch Trail/Ramp, Haul, Placement | AQ | CY | $ | 11 | $ |
| 15 | Obliteration of Abandoned Roadways | LSQ | LS | $ | 1 | $ |
| 16 | Barrier Rock Re-Location, Approx. 60+- | LSQ | LS | $ | 1 | $ |
| 17 | Barrier Rocks for Host Holding Tank, 3 Foot | LSQ | LS | $ | 4 | $ |
| Diameter, Re-Located | ||||||
| 18 | Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, Campground | LSQ | LS | $ | 1 | $ |
| 19 | Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, Beckwith Horse Trailhead | LSQ | LS | $ | 1 | $ |
| 20 | Metal Gate, 25 Ft. Installation at Campground Entrance' | LSQ | LS | $ | 1 | $ |
| 21 | Culvert, 18" Diameter, Galvanized with | AQ | LF | $ | 45 | $ |
| End Sections (Campground Entrance Round-A-Bout) | ||||||
| 22 | Metal Fee Tube Re-Location and Installation | LSQ | LS | $ | 1 | $ |
| 23 | ReLocate Cattleguard, Beckwith Horse Trailhead - FDR# 706 | LSQ | LS | $ | 1 | $ |
| 24 | Double Concrete Dumpster Pad | LSQ | LS | $ | 1 | $ |
| 25 | Timber Steps (Campground) | LSQ | LS | $ | 25 | $ |
| 26 | Site Identification Sign, Installation with Posts | LSQ | LS | $ | 1 | $ |
| and Hardware | ||||||
| WASTE WATER SYSTEM | ||||||
| 27 | Waste Water System - Lost Lake CG | LSQ | LS | $ | 1 | $ |
| Host Holding Tank | ||||||
| TOTAL BASE BID ITEMS 1 THROUGH 27 | $0.00 | |||||
| OPTIONAL BID ITEMS | ||||||
| 1 | OPTIONAL BID ITEM | |||||
| HANDPUMP | ||||||
| WATER SYSTEM | ||||||
| 1 | Handpump | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 1 | $0.00 | |||||
| 2 | OPTIONAL BID ITEM | |||||
| DAY USE AREA/TRAILHEAD/HORSE | ||||||
| CAMPSITES AND WELL ABANDONMENT | ||||||
| 1 | Excavation & Embankment Roads and | AQ | CY | $ | 1000 | $ |
| Parking, Method 4 | ||||||
| 2 | Borrow Fill Haul, Placement, Roads and | AQ | CY | $ | 1000 | $ |
| Parking, Method 4 | ||||||
| 3 | Crushed Aggregate Base, | AQ | CY | $ | 1393 | $ |
| Compaction B, 6" Thick, for Roads, Haul, Placement, Plasticity Index = 8 | ||||||
| 4 | Construction of Double Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation) | LSQ | EACH | $ | 5 | $ |
| 5 | Single Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation) | LSQ | EACH | $ | 5 | $ |
| 6 | Barrier Rock Re-Location, Approx. 60+- | LSQ | LS | $ | 1 | $ |
| 7 | Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, Day Use/Trailhead/Horse Campsites | LSQ | LS | $ | 1 | $ |
| 8 | Obliteration and Demolition of Facilities, Septic Tank, Hydrant, Valves, Pipe Caps, Wiring and Posts | LSQ | LS | $ | 1 | $ |
| 9 | Metal Gate, 25 Ft. Installation at Day Use/Trailhead Entrance | LSQ | LS | $ | 1 | $ |
| 10 | Culvert, 18" Diameter, Galvanized with | AQ | LF | $ | 30 | $ |
| End Sections (Trailhead Turn-Around) | ||||||
| 11 | Double Concrete Dumpster Pad | LSQ | LS | $ | 1 | $ |
| 12 | Tubular Steel Bulletin Board with Double Panel, Water Station/Trailhead Information Station | LSQ | LS | $ | 1 | $ |
| 13 | Tubular SteelHorse Hitch Rails in Concrete Footings | AQ | EACH | $ | 4 | $ |
| 14 | Well Abandonment and HandPump Removal | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 2 | $0.00 | |||||
| 3 | OPTIONAL BID ITEM | |||||
| BECKWITH HORSE TRAILHEAD | ||||||
| (ADDITIONAL WORK) | ||||||
| 1 | Tubular Steel Bulletin Board with Single Panel, Trailhead Information Station | LSQ | LS | $ | 1 | $ |
| 2 | Traffic Sign Post and Installation | AQ | EACH | $ | 4 | $ |
| 3 | Site and Traffic Sign Panels | AQ | EACH | $ | 5 | $ |
| 4 | Tubular SteelHorse Hitch Rails in Concrete Footings | AQ | EACH | $ | 3 | $ |
| TOTAL OPTIONAL BID ITEM NO. 3 | $0.00 | |||||
| 4 | OPTIONAL BID ITEM | |||||
| TRAFFIC SIGNS AND POSTS | ||||||
| (BASE BID CAMPGROUND) | ||||||
| 1 | Traffic Sign Post and Installation, Campground | AQ | EACH | $ | 11 | $ |
| 2 | Site and Traffic Sign Panels | AQ | EACH | $ | 13 | $ |
| TOTAL OPTIONAL BID ITEM NO. 4 | $0.00 | |||||
| 5 | OPTIONAL BID ITEM | |||||
| TRAFFIC SIGNS AND POSTS | ||||||
| (BID OPTION DAY USE/TRAILHEAD/HORSE TRAILER CAMPSITES) | ||||||
| 1 | Traffic Sign Post and Installation, | AQ | EACH | $ | 13 | $ |
| Day Use/Trailhead/Horse Trailer Campsites | ||||||
| 2 | Site and Traffic Sign Panels, | AQ | EACH | $ | 17 | $ |
| Day Use/Trailhead/Horse Trailer Campsites | ||||||
| TOTAL OPTIONAL BID ITEM NO. 5 | $0.00 | |||||
| 6 | OPTIONAL BID ITEM | |||||
| FEE STATION BULLETIN BOARD, KIOSK | ||||||
| (BASE BID CAMPGROUND) | ||||||
| 1 | Tubular Steel Bulletin Board with Triple Panels, Fee Station, Government Furnished Panels, Contractor Furnished Posts, Concrete and Installed | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 6 | $0.00 | |||||
| 7 | OPTIONAL BID ITEM | |||||
| BOAT LAUNCH RAMP WITH | ||||||
| CONCRETE PLANKS | ||||||
| 1 | Washed Stone, Grading 3" Minus Size, Boat Ramp SubGrade @ 6" Depth for Concrete Planks Boat Launch Ramp Shoulders, Government Furnished, Contractor Hauls, Places | AQ | CY | $ | 15 | $ |
| 2 | PreCast Concrete Slab Planks | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 7 | $0.00 | |||||
| 8 | OPTIONAL BID ITEM | |||||
| SEEDING | ||||||
| 1 | Seeding | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 8 | $0.00 | |||||
| 9 | OPTIONAL BID ITEM | |||||
| CONNECTOR TRAIL BECKWITH | ||||||
| HORSE TRAILHEAD TO HORSE | ||||||
| TRAILER CAMPSITES | ||||||
| 1 | Clearing and Grubbing, Individual Tree Removal, Stump Removal and Backfill, Slash Removal - Connector Trail 4' Width | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 9 | $0.00 | |||||
| 10 | OPTIONAL BID ITEM | |||||
| CAMPGROUND DOUBLE VAULT | ||||||
| TOILET | ||||||
| 1 | 2-Unit Concrete SST Toilet and Vault Contractor Furnished and Installed. Double Cascadian Model Building with Service Room Chase. | LSQ | LS | $ | 1 | $ |
| 2 | Demolition and Removal of Existing Split | LSQ | LS | $ | 1 | $ |
| Concrete Block Double Toilet, Including Vault | ||||||
| and Concrete Slab | ||||||
| 3 | Rock Rip-Rap Retinaing Wall, for Vault Toilet | AQ | SF | $ | 80 | $ |
| Installation, Campground | ||||||
| 4 | Geotextile Underlayerment for Retaining Wall, For Vault Toilet Installation, Campground | AQ | SY | $ | 39 | $ |
| 5 | Concrete Toilet Entry Apron, 5' x 20' Fiber Reinforced, 6" Thick | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 10 | $0.00 | |||||
| 11 | OPTIONAL BID ITEM | |||||
| DAY USE/TRAILHEAD/HORSE TRAILER | ||||||
| CAMPSITES DOUBLE VAULT TOILET | ||||||
| 1 | 2-Unit Concrete SST Toilet and Vault Contractor Furnished and Installed. Double Cascadian Model Building with Service Room Chase. | LSQ | LS | $ | 1 | $ |
| 2 | Concrete Toilet Entry Apron, 5' x 20' Fiber Reinforced, 6" Thick | LSQ | LS | $ | 1 | $ |
| TOTAL OPTIONAL BID ITEM NO. 11 | $0.00 | |||||
| 12 | OPTIONAL BID ITEM | |||||
| LOST LAKE CAMPGROUND WATER | ||||||
| SYSTEM CONSTRUCTION | ||||||
| 1 | Demolition, Design Solar System, Treatment | LSQ | LS | $ | 1 | $ |
| Building with Appurtenances, Installation of | ||||||
| Solar System, Waterlines, Storage Tank and | ||||||
| Hydrants with Concrete Pads | ||||||
| TOTAL OPTIONAL BID ITEM NO. 12 | $0.00 | |||||
| TOTAL OF ALL OPTIONAL BID ITEMS 1 THROUGH 12 | $ | |||||
| TOTAL OF BASE BID AND ALL OPTIONAL BID ITEMS | $ |
&L&"Arial,Bold"CONFIDENTIAL&C&"Arial,Bold"&12ENGINEER'S ESTIMATE LOST LAKE RECREATION AREA&RJ. Rehmer/C.Palazzolo &CPage &P of &N