Revised Schedule of Items Amend 2.xls

XLS spreadsheet 42 KB Posted

Attached to
RECOVERY - Lost Lake Campground - Grand Mesa, Uncompahgre and Gunnison NFs
Solicitation number
AG-82B1-S-09-0057
Issued by

About this file

Revised Schedule of Items

View the file

Other files

File Type Posted
331111-Water_Supply_Design_Construction.pdf PDF
311000_Clearing_Grubbing_REV Amd 2.doc DOC document
WS Demo - Aframe tank 1.JPG JPG image
033000_Cast-in-place_concrete.pdf PDF
U9_WELL-DETAILS.pdf PDF
Optional Bid Item 12 Amend 2.doc DOC document
WS Demo - culvert.JPG JPG image
U1-UTIL-PLAN.pdf PDF
U4_UTILITY-DETAILS.pdf PDF
312316_Struct_Excavation_Backfill.pdf PDF
LOST_LAKE_CG_WS_SPEC_INDEX.pdf PDF
U6_TREATMENT-BLDG-PLAN.pdf PDF
017700_closeout_procedures.pdf PDF
WS Demo - Aframe tank 2.JPG JPG image
013300_submittal_procedures.pdf PDF
331219-Water-hydrant.pdf PDF
011100_summary_of_work.pdf PDF
016400_government_furnished_mats.pdf PDF
T1_TITLE_SHEET.pdf PDF
011100_summary_of_work_REV09_03_09.pdf PDF
311100_Clearing_Grubbing.pdf PDF
T1_TITLE_SHEET-SIGNATURES.pdf PDF
WS Demo - Spring and piping.JPG JPG image
U8_TYP_SPUR_UTIL_DET.pdf PDF
011419_use_of_site.pdf PDF
331116-Water-distribution.pdf PDF
U7_TREATMENT-BLDG-PLUMBING.pdf PDF
U5-HYDRANT-DETAILS.pdf PDF
U2-UTIL-PLAN-PROFILE.pdf PDF
SF 30 AMEND 2.PDF PDF
017419_constr_waste_management_disposal.pdf PDF
332110_Water_Supply_Wells.pdf PDF
312317_Trenching_Utilities.pdf PDF
012200_definition_bid_items_REV09_03_09.pdf PDF
100perc_FINAL_Lost_Lake_CG_Spec_Index_REV09_03_09.pdf PDF
012200_definition_bid_items.pdf PDF
wage determination.txt TXT text file
024113_selective_site_demolition.pdf PDF
U3-UTIL-PLAN-PROFILE.pdf PDF
Amendment 001 to Solicitation AG.doc DOC document
Amendment 001 —
AG-82B1-S-09-0057.pdf PDF
sf 1442.pdf PDF
lost-lake-dwgs.pdf PDF
sf24_f.pdf PDF
lost-lake-specs.pdf PDF
wage determination.txt TXT text file
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL_Bid_Sch_09_03_09

Lost Lake Campground and Trailhead - Base Bid & Optional Bid Items
PAY ITEMDESCRIPTIONMETHOD OF MEASUREMENTPAY UNITUNIT COSTQUANTITYTOTAL COST
BASE BID - CAMPGROUND AND BECKWITH HORSE TRAILHEAD
GENERAL REQUIREMENTS
1MobilizationLSQLS$1$
2Quality ControlLSQLS$1$
3Construction Survey & StakingLSQLS$1$
4Construction SigningLSQLS$1$
5Temporary Erosion & Sedimentation ControlLSQLS$1$
6As-Built Drawings (Electronic)LSQLS$1$
SITEWORK
7Excavation & Embankment Roads, Method 4AQCY$1000$
8Excavation & Embankment Beckwith HorseAQCY$150$
Trailhead, Method 4
9Borrow Fill Haul, Placement, Beckwith HorseAQCY$500$
Trailhead, Method 4
10Crushed Aggregate Base,AQCY$1143$
Compaction B, 6" Thick, for Roads, Haul, Placement, Plasticity Index = 8
11Crushed Aggregate Base,AQCY$572$
Compaction B, 6" Thick, Beckwith Horse Trailhead, Haul, Placement, Plasticity Index = 8
12ASingle Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation)LSQEACH$5$
12BDouble Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation)LSQEACH$4$
12CCamping Pull-Thru or Turn-Out (Earthwork, Haul. Place Aggregate & Wheelstop Installation)LSQEACH$5$
13ASingle Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation)LSQEACH$9$
13BDouble with 10 Foot Table Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation)LSQEACH$2$
13CDouble with Two 8 Foot Table Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring , Table Installation)LSQEACH$3$
142" Minus Washed Stone at 4" Depth For Boat Launch Trail/Ramp, Haul, PlacementAQCY$11$
15Obliteration of Abandoned RoadwaysLSQLS$1$
16Barrier Rock Re-Location, Approx. 60+-LSQLS$1$
17Barrier Rocks for Host Holding Tank, 3 FootLSQLS$4$
Diameter, Re-Located
18Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, CampgroundLSQLS$1$
19Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, Beckwith Horse TrailheadLSQLS$1$
20Metal Gate, 25 Ft. Installation at Campground Entrance'LSQLS$1$
21Culvert, 18" Diameter, Galvanized withAQLF$45$
End Sections (Campground Entrance Round-A-Bout)
22Metal Fee Tube Re-Location and InstallationLSQLS$1$
23ReLocate Cattleguard, Beckwith Horse Trailhead - FDR# 706LSQLS$1$
24Double Concrete Dumpster PadLSQLS$1$
25Timber Steps (Campground)LSQLS$25$
26Site Identification Sign, Installation with PostsLSQLS$1$
and Hardware
WASTE WATER SYSTEM
27Waste Water System - Lost Lake CGLSQLS$1$
Host Holding Tank
TOTAL BASE BID ITEMS 1 THROUGH 27$0.00
OPTIONAL BID ITEMS
1OPTIONAL BID ITEM
HANDPUMP
WATER SYSTEM
1HandpumpLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 1$0.00
2OPTIONAL BID ITEM
DAY USE AREA/TRAILHEAD/HORSE
CAMPSITES AND WELL ABANDONMENT
1Excavation & Embankment Roads andAQCY$1000$
Parking, Method 4
2Borrow Fill Haul, Placement, Roads andAQCY$1000$
Parking, Method 4
3Crushed Aggregate Base,AQCY$1393$
Compaction B, 6" Thick, for Roads, Haul, Placement, Plasticity Index = 8
4Construction of Double Camping Spur (Earthwork, Haul, Place Aggregate & Wheelstop Installation)LSQEACH$5$
5Single Use Pad and Tent Pad (Earthwork, Timber Border, Haul, Place Crusher Fines, Unit Marker, Fire Ring, Table Installation)LSQEACH$5$
6Barrier Rock Re-Location, Approx. 60+-LSQLS$1$
7Clearing and Grubbing, Individual Tree and Stump Removal with Backfill, Slash Removal, Day Use/Trailhead/Horse CampsitesLSQLS$1$
8Obliteration and Demolition of Facilities, Septic Tank, Hydrant, Valves, Pipe Caps, Wiring and PostsLSQLS$1$
9Metal Gate, 25 Ft. Installation at Day Use/Trailhead EntranceLSQLS$1$
10Culvert, 18" Diameter, Galvanized withAQLF$30$
End Sections (Trailhead Turn-Around)
11Double Concrete Dumpster PadLSQLS$1$
12Tubular Steel Bulletin Board with Double Panel, Water Station/Trailhead Information StationLSQLS$1$
13Tubular SteelHorse Hitch Rails in Concrete FootingsAQEACH$4$
14Well Abandonment and HandPump RemovalLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 2$0.00
3OPTIONAL BID ITEM
BECKWITH HORSE TRAILHEAD
(ADDITIONAL WORK)
1Tubular Steel Bulletin Board with Single Panel, Trailhead Information StationLSQLS$1$
2Traffic Sign Post and InstallationAQEACH$4$
3Site and Traffic Sign PanelsAQEACH$5$
4Tubular SteelHorse Hitch Rails in Concrete FootingsAQEACH$3$
TOTAL OPTIONAL BID ITEM NO. 3$0.00
4OPTIONAL BID ITEM
TRAFFIC SIGNS AND POSTS
(BASE BID CAMPGROUND)
1Traffic Sign Post and Installation, CampgroundAQEACH$11$
2Site and Traffic Sign PanelsAQEACH$13$
TOTAL OPTIONAL BID ITEM NO. 4$0.00
5OPTIONAL BID ITEM
TRAFFIC SIGNS AND POSTS
(BID OPTION DAY USE/TRAILHEAD/HORSE TRAILER CAMPSITES)
1Traffic Sign Post and Installation,AQEACH$13$
Day Use/Trailhead/Horse Trailer Campsites
2Site and Traffic Sign Panels,AQEACH$17$
Day Use/Trailhead/Horse Trailer Campsites
TOTAL OPTIONAL BID ITEM NO. 5$0.00
6OPTIONAL BID ITEM
FEE STATION BULLETIN BOARD, KIOSK
(BASE BID CAMPGROUND)
1Tubular Steel Bulletin Board with Triple Panels, Fee Station, Government Furnished Panels, Contractor Furnished Posts, Concrete and InstalledLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 6$0.00
7OPTIONAL BID ITEM
BOAT LAUNCH RAMP WITH
CONCRETE PLANKS
1Washed Stone, Grading 3" Minus Size, Boat Ramp SubGrade @ 6" Depth for Concrete Planks Boat Launch Ramp Shoulders, Government Furnished, Contractor Hauls, PlacesAQCY$15$
2PreCast Concrete Slab PlanksLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 7$0.00
8OPTIONAL BID ITEM
SEEDING
1SeedingLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 8$0.00
9OPTIONAL BID ITEM
CONNECTOR TRAIL BECKWITH
HORSE TRAILHEAD TO HORSE
TRAILER CAMPSITES
1Clearing and Grubbing, Individual Tree Removal, Stump Removal and Backfill, Slash Removal - Connector Trail 4' WidthLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 9$0.00
10OPTIONAL BID ITEM
CAMPGROUND DOUBLE VAULT
TOILET
12-Unit Concrete SST Toilet and Vault Contractor Furnished and Installed. Double Cascadian Model Building with Service Room Chase.LSQLS$1$
2Demolition and Removal of Existing SplitLSQLS$1$
Concrete Block Double Toilet, Including Vault
and Concrete Slab
3Rock Rip-Rap Retinaing Wall, for Vault ToiletAQSF$80$
Installation, Campground
4Geotextile Underlayerment for Retaining Wall, For Vault Toilet Installation, CampgroundAQSY$39$
5Concrete Toilet Entry Apron, 5' x 20' Fiber Reinforced, 6" ThickLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 10$0.00
11OPTIONAL BID ITEM
DAY USE/TRAILHEAD/HORSE TRAILER
CAMPSITES DOUBLE VAULT TOILET
12-Unit Concrete SST Toilet and Vault Contractor Furnished and Installed. Double Cascadian Model Building with Service Room Chase.LSQLS$1$
2Concrete Toilet Entry Apron, 5' x 20' Fiber Reinforced, 6" ThickLSQLS$1$
TOTAL OPTIONAL BID ITEM NO. 11$0.00
12OPTIONAL BID ITEM
LOST LAKE CAMPGROUND WATER
SYSTEM CONSTRUCTION
1Demolition, Design Solar System, TreatmentLSQLS$1$
Building with Appurtenances, Installation of
Solar System, Waterlines, Storage Tank and
Hydrants with Concrete Pads
TOTAL OPTIONAL BID ITEM NO. 12$0.00
TOTAL OF ALL OPTIONAL BID ITEMS 1 THROUGH 12$
TOTAL OF BASE BID AND ALL OPTIONAL BID ITEMS$

&L&"Arial,Bold"CONFIDENTIAL&C&"Arial,Bold"&12ENGINEER'S ESTIMATE LOST LAKE RECREATION AREA&RJ. Rehmer/C.Palazzolo &CPage &P of &N