016400_government_furnished_mats.pdf

PDF 14 KB Posted

Attached to
RECOVERY - Lost Lake Campground - Grand Mesa, Uncompahgre and Gunnison NFs
Solicitation number
AG-82B1-S-09-0057
Issued by

About this file

docs

View the file

Other files

File Type Posted
331111-Water_Supply_Design_Construction.pdf PDF
311000_Clearing_Grubbing_REV Amd 2.doc DOC document
WS Demo - Aframe tank 1.JPG JPG image
033000_Cast-in-place_concrete.pdf PDF
U9_WELL-DETAILS.pdf PDF
Optional Bid Item 12 Amend 2.doc DOC document
WS Demo - culvert.JPG JPG image
U1-UTIL-PLAN.pdf PDF
U4_UTILITY-DETAILS.pdf PDF
Revised Schedule of Items Amend 2.xls XLS spreadsheet
312316_Struct_Excavation_Backfill.pdf PDF
LOST_LAKE_CG_WS_SPEC_INDEX.pdf PDF
U6_TREATMENT-BLDG-PLAN.pdf PDF
017700_closeout_procedures.pdf PDF
WS Demo - Aframe tank 2.JPG JPG image
013300_submittal_procedures.pdf PDF
331219-Water-hydrant.pdf PDF
011100_summary_of_work.pdf PDF
T1_TITLE_SHEET.pdf PDF
011100_summary_of_work_REV09_03_09.pdf PDF
311100_Clearing_Grubbing.pdf PDF
T1_TITLE_SHEET-SIGNATURES.pdf PDF
WS Demo - Spring and piping.JPG JPG image
U8_TYP_SPUR_UTIL_DET.pdf PDF
011419_use_of_site.pdf PDF
331116-Water-distribution.pdf PDF
U7_TREATMENT-BLDG-PLUMBING.pdf PDF
U5-HYDRANT-DETAILS.pdf PDF
U2-UTIL-PLAN-PROFILE.pdf PDF
SF 30 AMEND 2.PDF PDF
017419_constr_waste_management_disposal.pdf PDF
332110_Water_Supply_Wells.pdf PDF
312317_Trenching_Utilities.pdf PDF
012200_definition_bid_items_REV09_03_09.pdf PDF
100perc_FINAL_Lost_Lake_CG_Spec_Index_REV09_03_09.pdf PDF
012200_definition_bid_items.pdf PDF
wage determination.txt TXT text file
024113_selective_site_demolition.pdf PDF
U3-UTIL-PLAN-PROFILE.pdf PDF
Amendment 001 to Solicitation AG.doc DOC document
Amendment 001 —
AG-82B1-S-09-0057.pdf PDF
sf 1442.pdf PDF
lost-lake-dwgs.pdf PDF
sf24_f.pdf PDF
lost-lake-specs.pdf PDF
wage determination.txt TXT text file
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOST LAKE CAMPGROUND 016400-1

WATER SYSTEM GOVERNMENT FURNISHED MATERIALS

SECTION 016400

GOVERNMENT FURNISHED MATERIALS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section applies to materials that shall be provided by the Government and installed by the Contractor. Contractor shall be responsible for labor and equipment, and incidentals necessary to acquire these materials and for placement in accordance with the plans and specifications.

1.2 INSPECTION

A. The Contractor shall notify the Contracting Officer at least 5 calendar days prior to picking up or returning Government-furnished materials.

B. The Contractor and the Contracting Officer shall jointly inspect all materials during the loading operation at the storage area, and at the project site.

1.3 LIABILITY

A. The Contractor's liability for Government-furnished material shall start at the time he accepts the materials at the storage area, and shall terminate upon completion and final acceptance of the work.

1. It shall be implied that the Contractor has accepted Government-furnished materials prior to the materials being loaded and ready for transportation from the storage area to the worksite.

2. The Contractor shall provide all labor, equipment, and incidentals necessary to load, unload, and transport Government furnished materials between the worksite and the specified storage area.

1.4 REPLACEMENT AND/OR SUPPLEMENTAL MATERIALS

A. Any defective materials discovered prior to the Contractor's acceptance of the materials will be replaced by the Government.

B. If the quantity of Government-furnished material accepted by the Contractor is insufficient to complete the specified work, supplemental materials complying with these specifications shall be provided by the Government at no expense to the

Contractor.

C. The Government shall not replace any materials that, in the opinion of the Contracting

Officer, are damaged or lost due to the Contractor's negligence after the Contractor accepts the materials. Such materials shall be replaced at the Contractor's expense.

LOST LAKE CAMPGROUND 016400-2

WATER SYSTEM GOVERNMENT FURNISHED MATERIALS

1.5 SURPLUS MATERIAL

A. After completion and final acceptance of the work, surplus Government-furnished materials shall be returned to the specified storage area in the same mechanical and physical condition as originally accepted.

B. Damaged surplus materials shall be replaced at the Contractor's expense.

C. The Contractor's liability for surplus materials shall terminate upon unloading at the storage area.

PART 2 – PRODUCTS

2.1 GOVERNMENT-FURNISHED MATERIALS

A. Government-furnished materials that the Contractor will relocate and install:

a. Prefabricated concrete Treatment Building

1) The building is currently located approximately 46 miles from the project site at:

Doughty Steel & Machine Inc.

685 Hwy 92, Delta CO 81418

970-874-7518

PART 3 - EXECUTION

4.1 GENERAL

A. Installation and testing of Government-furnished materials shall comply with the applicable contract specifications covering work requiring the use of such materials.

END OF SECTION

File details come from the government source that posted it. Updated .