012200_definition_bid_items_REV09_03_09.pdf
PDF 47 KB Posted
- Solicitation number
- AG-82B1-S-09-0057
About this file
docs
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-1
DEFINITION OF BID ITEMS
SECTION 012200
DEFINITION OF BID ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general; what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in the Base Bid
Item Schedule and Optional Bid Item Schedule.
B. Work:
1. Furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.
2. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, as shown on the drawings, and as staked in the field.
3. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.
1.2 DETERMINATION OF QUANTITIES
A. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.
B. Quantity Measurements:
1. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Lump Sum Quantity
(LSQ).
2. The contractor shall compute the quantities for periodic progress payments; the
Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.
3. All Contractor measurements are subject to verification.
4. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.
5. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
C. The following measurements and calculations are used to determine contract quantities.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-2
unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three dimensional methods.
3. Structures shall be measured according to neat lines shown on the drawings or as altered by the Contracting Officer, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, and under drains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipes shall be measured along center of invert.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items—such as fence, wire, plates, rolled shapes, pipe conduits—identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions.
Unless controlled by tolerances in cited specifications, manufacturer’s tolerances shall be accepted.
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
B. Acre: 43,560 square feet. Make longitudinal and transverse measurements for all computations horizontally. Do not make deductions from the area computation for individual exclusions having an area of 500 square feet or less.
C. Cubic Yard: A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
3. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.
Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
D. Each: One complete unit, which may consist of one or more parts.
E. Linear Foot: Linear feet measured horizontally.
F. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-3
G. Square Yard: 9 square feet. Longitudinal and transverse measurements for area computations will be made horizontally. Do not make deductions from the area computation for individual fixtures having an area of 9 square feet or less.
H. Ton: 2000 pounds. No adjustment in contract price will be made for variations in quantity due to differences in the specific gravity or moisture content. Use net certified scale weights, or weights based on certified volumes.
I. Where tolerances are shown in the contract, they are intended to define reasonably close conformity. Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed roadway sections and to balance earthwork. Such adjustments shall not be considered as “Changes.”
PART 2 - METHOD OF MEASUREMENT
2.1 GENERAL
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
B. ACTUAL QUANTITIES (AQ)
1. These estimated quantities are determined from actual measurements of completed work.
C. LUMP SUM QUANTITIES (LSQ)
1. These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall be measured complete and in-place.
PART 3 – DEFINITION OF BID ITEMS
3.1 SCHEDULE OF ITEMS
A. The project Schedule of Items includes several sections to organize the bid items into
Base Bid Items and Optional Bid Items. Contractor shall provide item pricing for all items listed in the Schedule of Items. Contract award will be made for all Base Bid
Items. Those items listed as Optional Bid Items will be awarded based on available project funding. The Optional Bid Items are not listed in priority order and may be awarded in any combination of individual items.
3.2 DESCRIPTION OF BASE BID LABOR AND EQUIPMENT ITEMS
A. Bid Item No. 1 – Mobilization
1. This bid item consists of all preparatory work and operations necessary for the movement of personnel, equipment, and incidentals to the project site, and for
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-4
all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
2. Payment shall be made at the contract lump-sum price.
3. Progress payment shall be made as follows:
a. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent or the original contract amount, whichever is less, shall be paid.
b. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, shall be paid.
c. Upon completion of all work on the project, any unpaid amount for mobilization shall be paid.
d. The total of all payments, including bonding, shall not exceed the original contract amount for this item.
B. Bid Item No. 2 – Quality Control
1. This item consists of all quality control and quantity measurements and all quality control testing as required in the specifications.
2. Payment shall be made at the contract lump-sum price.
C. Bid Item No. 3 – Construction Surveying and Staking
1. This bid item consists of all survey work and construction staking necessary to adequately control the work and set horizontal and vertical alignments.
2. Payment shall be made at the contract lump-sum price.
D. Bid Item No. 4 – Construction Signing
1. This work includes construction closure signing along County Road 12 and
National Forest System Road No. 706 and maintaining barricade(s) at the campground entrances to close the site to the public. Additional temporary fencing barricades for public closure at the staging/landing area adjacent to the campground entrance are considered incidental to this item.
2. Payment shall be made at the contract lump-sum price.
E. Bid Item No. 5 – Temporary Erosion & Sedimentation Control
1. This item consists of furnishing, installing and maintaining temporary erosion and sedimentation controls for the duration of the contract to ensure that storm water drainage passes through a filter system before being discharged.
2. Payment shall be made at the contract lump-sum price.
F. Bid Item No. 6 – As-Built Drawings
1. This item includes all materials, equipment, labor and incidentals required to produce all required electronic and hard copy as-built deliverables.
2. Payment shall be made at the contract lump-sum price.
G. Bid Item No. 7 –Excavation and Embankment - Campground
1. This bid item includes excavation and fill placement for Lost Lake Campground
Road reconstruction, entrance turn-around, boat parking areas, and all Base Bid
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-5
units including spurs or pull-thrus, unit use pads, tent pads, and campground unit trails as shown on the drawings and as described in the specifications. Site grading is incidental to this item. It shall be measured as a design quantity
(DQ). Excavation and embankment for Optional Bid Items is included in those items.
2. Payment shall be made at the contract unit price per cubic yard. Payment is for excavation; embankment is considered incidental to this pay item.
H. Bid Item No. 8 –Excavation and Embankment – Beckwith Horse Trailhead
1. This bid item includes excavation and fill placement for Beckwith Horse
Trailhead area, entrance road reconstruction and trailhead as shown on the drawings and as described in the specifications. Site grading is incidental to this item. It shall be measured as a design quantity (DQ). Excavation and embankment for Optional Bid Items is included in those items.
2. Payment shall be made at the contract unit price per cubic yard. Payment is for excavation; embankment is considered incidental to this pay item.
I. Bid Item No. 9 – Borrow Fill - Beckwith Horse Trailhead
1. This bid item includes furnishing, hauling, placing and compacting borrow material for the Beckwith Horse Trailhead area, entrance road and trailhead as shown on the drawings and as described in the specifications.
2. Payment shall be made at the contract unit price per cubic yard.
J. Bid Item No. 10 – Crushed Aggregate Base, CDOT Class 6 gradation plus Plasticity
Index of 8, Compaction B, 6” Thick, for Campground Roads
1. This bid item includes hauling, placing and compacting Government Furnished aggregate base complete in place as shown on drawings and as described in the specifications. Site grading is incidental to this item. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract unit price per cubic yard.
K. Bid Item No. 11 – Crushed Aggregate Base, CDOT Class 6 gradation plus Plasticity
Index of 8, Compaction B, 6” Thick, for Beckwith Horse Trailhead
1. This bid item includes hauling, placing and compacting Government Furnished aggregate base complete in place as shown on drawings and as described in the specifications. Material included here is for all Beckwith Horse Trailhead area parking, entrance road and trailhead reconstruction. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract unit price per cubic yard.
L. Bid Item No. 12A – Construction of Single Camping Spurs with Crushed Aggregate
Base, CDOT Class 6 gradation plus Plasticity Index of 8, Compaction B, 6” Thick
1. This bid item includes hauling, placing and compacting Government Furnished aggregate base complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 3, 4, 6, 12 and 13. Site excavation and embankment, grading and installation of Government Furnished wheelstops is incidental to this item. Material included here is for all Lost Lake
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-6
Campground single spur reconstruction. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
M. Bid Item No. 12B – Construction of Double Camping Spurs with Crushed Aggregate
Base, CDOT Class 6 gradation plus Plasticity Index of 8, Compaction B, 6” Thick
1. This bid item includes hauling, placing and compacting Government Furnished aggregate base complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 1- Host, 2, 11 and 14.
Site excavation and embankment, grading and installation of Government
Furnished wheelstops is incidental to this item. Material included here is for all
Lost Lake Campground double spur reconstruction. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
N. Bid Item No. 12C – Construction of Camping Pull-Thru or Turn-outs with Crushed
Aggregate Base, CDOT Class 6 gradation plus Plasticity Index of 8, Compaction B, 6” Thick
1. This bid item includes hauling, placing and compacting Government Furnished aggregate base complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 5, 7, 8, 9 and 10. Site excavation and embankment, grading and installation are incidental to this item.
Material included here is for all Lost Lake Campground pull-thru or turn-out reconstruction. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
O. Bid Items No. 13A – Single Use Pad, Tent Pad and Trails with Crusher Fines
Surfacing with Soil Solidifier, 4” Thick, Plasticity Index = 8 (+/- 4)
1. This bid item includes furnishing, hauling, placing and compacting Government
Furnished crusher fines surfacing complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 3, 4, 5, 6, 7, 8, 10, 12 and 13. Work also includes application of a Contracting
Officer approved soil solidifier to harden the surfaces, furnishing and installing timber borders and Government Furnished unit markers, fire rings and 8 foot tables. Site excavation and embankment, grading and installation are incidental to this item. Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
P. Bid Items No. 13B – Double Use Pad with 10 ft. table, Tent Pads and Trails with
Crusher Fines Surfacing with Soil Solidifier, 4” Thick, Plasticity Index = 8 (+/- 4)
1. This bid item includes furnishing, hauling, placing and compacting Government
Furnished crusher fines surfacing complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 1-
Host and 2. Work also includes application of a Contracting Officer approved soil solidifier to harden the surfaces, furnishing and installing timber borders
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-7
and Government Furnished unit markers, fire rings and 10 Foot table. Site excavation and embankment, grading and installation are incidental to this item.
Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
Q. Bid Items No. 13C – Double Use Pad with two 8 foot tables, Tent Pads and Trails with Crusher Fines Surfacing with Soil Solidifier, 4” Thick, Plasticity Index = 8 (+/-
4)
1. This bid item includes furnishing, hauling, placing and compacting Government
Furnished crusher fines surfacing complete in place as shown on drawings and as described in the specifications for construction of Campground Units # 9, 11 and 14. Work also includes application of a Contracting Officer approved soil solidifier to harden the surfaces, furnishing and installing timber borders and
Government Furnished unit markers, fire rings and 8 foot tables. Site excavation and embankment, grading and installation is incidental to this item.
Aggregate of the same size not used in this application shall be incidental to another pay item.
2. Payment shall be made at the contract lump-sum price per each.
R. Bid Item No. 14 – 2” Minus Washed Stone at 4” Depth Plasticity Index = +/- 4 for
Boat Launch Trail and Ramp – Lost Lake Slough
1. This bid item includes hauling, placing and compacting Government Furnished
2 inch minus washed stone surfacing for a boat ramp trail or ramp complete in place as shown on drawings and as described in the specifications. Work also includes application of a soil solidifier to harden the surface as approved by the
Contracting Officer. Aggregate of the same size not used in these applications shall be incidental to another pay item.
2. Payment shall be made at the contract unit price per cubic yard.
S. Bid Item No. 15 – Obliteration of Abandoned Roadways, Spurs and Use Areas
1. This bid item includes obliteration of abandoned campground roads, spurs, unit pads and use areas as shown on the drawings and as approved by the
Contracting Officer.
2. Work includes obliteration, ripping, plowing, and scarifying to promote restoration of abandoned roadways, spurs, and unit pads as shown on the drawings.
3. Payment shall be made at the contract lump-sum price.
T. Bid Item No. 16 – Barrier Rock Relocation
1. This bid item includes relocation of existing on-site barrier rocks or suitable excavated rock to new barrier rock locations as shown on the drawings and as approved by the Contracting Officer.
2. Work includes excavation, hauling, stockpiling, placement, backfilling and compaction as shown on the drawings and described in the specifications.
3. Payment shall be made at the contract lump-sum price.
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-8
U. Bid Item No. 17 – Barrier Rocks for Host Holding Tank – 3 Foot Diameter Size
1. This bid item includes relocation of existing on-site barrier rocks or suitable excavated rock to new barrier rock locations at the Host Unit Holding Tank as shown on the drawings and as approved by the Contracting Officer.
2. Work includes excavation, hauling, stockpiling, placement, backfilling and compaction as shown on the drawings and described in the specifications.
3. Payment shall be made at the contract lump-sum price.
V. Bid Items No. 18 – Clearing and Grubbing, Individual Tree, Stump and Slash
Removal – Campground and Entrance Turn-around
1. These bid items includes clearing, grubbing, trimming, removing and disposing of trees, slash and stumps within the new construction areas on the site.
Designated stumps and slash are to be disposed of by methods described in the specifications and as approved on the ground by the Contracting Officer.
2. Payment shall be made at the contract lump-sum price.
W. Bid Items No. 19 – Clearing and Grubbing, Individual Tree, Stump and Slash
Removal – Beckwith Horse Trailhead
1. These bid items includes clearing, grubbing, trimming, removing and disposing of trees, slash and stumps within the new Beckwith Horse Trailhead area.
Designated stumps and slash are to be disposed of by methods described in the specifications and as approved on the ground by the Contracting Officer.
2. Payment shall be made at the contract lump-sum price.
X. Bid Item No.20 – Metal Gate, 25 Foot, Installation at Campground Entrance
1. This bid item includes installation of a Government Furnished metal gate at the campground entrance as shown on the drawings, described in the specifications and at location as approved by the Contracting Officer. Work includes excavation, backfill, concrete footings, assembly and final grading.
2. Payment shall be made at the contract lump sum price.
Y. Bid Item No. 21 – Culvert, 18” Diameter, Galvanized With End Sections -
Campground Entrance Turn-around
1. This bid item includes supplying and installing the 18” diameter corrugated metal pipe culvert as shown on the drawing and as described in the specifications. Work shall include excavation, bedding, backfilling, and constructing a drainage outlet from the culverts where required.
2. Payment shall be made at the contract unit price per linear foot.
Z. Bid Item No.22 – Metal Fee Tube Re-location and Installation
1. This bid item includes installation of a Government Furnished metal fee tube at the campground fee station as shown on the drawings, described in the specifications and as approved by the Contracting Officer. Work includes excavation, backfill, concrete footer, and final grading.
2. Payment shall be made at the contract lump sum price.
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-9
AA. Bid Item No. 23 – Cattleguard Re-location and Installation – Beckwith Horse
Trailhead and Forest Development Road # 706
1. This bid item includes relocation and re-installation of a Government Furnished cattleguard at the entrance to the Beckwith Horse Trailhead and re-located on
National Forest System Road No. 706 as shown on the drawings, described in the specifications and as approved by the Contracting Officer. Work includes excavation, backfill, concrete foundation, and final grading.
2. Payment shall be made at the contract lump sum price.
BB. Bid Item No. 24 – Double Concrete Dumpster Pad
1. This bid item includes furnishing and installing an 8” thick double-sized (unless contractor wants to double the amount of fiber in the pour) fiber reinforced concrete dumpster pad as shown on the drawings and as described in the specifications. Work includes excavation, aggregate base and final grading.
2. Payment shall be made at the contract lump-sum price.
CC. Bid Item No. 25 – Timber Steps Campground Units
1. This bid item includes installation of pressure treated timber steps or stairs in the campground as shown on the drawings or staked in the field and as described in the specifications. Work shall include site clearing, excavation, installation of timbers, sleepers, rebar pins, landings, final site grading and cleanup.
2. Payment shall be made at the contract lump-sum price.
DD. Bid Item No. 26 – Site Identification Sign, Installation with Posts and Hardware
1. This bid item includes installation of Government Furnished Sign Panel, Plaque and Shield on pressure treated timber timbers as shown on the drawings, described in the specifications and staked as approved by the Contracting
Officer. Work shall include site clearing, excavation, backfill, installation of timbers, hardware, final site grading and cleanup.
2. Payment shall be made at the contract lump-sum price.
EE. Bid Item No. 27 – Host Site Sewage Holding Tank – Lost Lake Campground
1. This bid item includes supplying and installing all components of the host waste system including the host hook-up, piping, holding tank and water level indicator. Work shall include unclassified excavation, bedding, backfill, final site grading and cleanup.
2. Payment shall be made at the contract lump-sum price.
3.3 DESCRIPTION OF OPTIONAL BID ITEMS – (LOST LAKE CAMPGROUND
AND TRAILHEAD AREA)
The following are optional bid items and will only be included in the contract if funds are available and determined in the best interest of the Government.
A. Optional Bid Item No. 1 – Handpump
1. This optional bid item includes supplying and installing a handpump on a new well as shown on the drawings and as described in the specifications. Work
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-10
includes installation of above ground and below ground components and includes a flange cover and matching concrete pad surface to crusher fine trail surfaces on all sides. Work items also include excavation, aggregate base, concrete, backfill, and final grading.
2. Payment shall be made at the contract lump-sum price.
B. Optional Bid Item No. 2 – Complete Construction of the Entrance Road, Day Use
Area Parking with Picnic Pads, Trailhead Parking Area, Turn-around, Horse Trailer
Campsites with Spurs and Handpump Well Abandonment in Lost Lake Campground
1. This bid item includes complete construction of the west side facilities including: Site excavation and embankment for roads, parking, spurs and use pads; furnishing, hauling, placing and compacting borrow material for roads, parking, spurs and use pads; placing and compacting Government Furnished aggregate CDOT Class 6 Plasticity Index = 8, Compaction B, 6” Thick base complete in place as shown on drawings and as described in the specifications including Government Furnished wheelstops which are incidental to this item;
placing and compacting Government Furnished crusher fines surfacing complete in place as shown on drawings and as described in the specifications for construction of Horse Trailer Campsites Units # 1 thru 5 and two picnic use pads. Work also includes application of a Contracting Officer approved soil solidifier to harden the surfaces, furnishing and installing timber borders and
Government Furnished metal gate on entrance road, unit markers, fire rings and
8 foot tables; barrier rock relocation and installation; clearing, grubbing, trimming, removing and disposing of trees, slash and stumps with disposal by methods described in the specifications and as approved on the ground by the
Contracting Officer; obliteration, demolition and disposal of septic tanks, hydrant, piping, valves, wiring and posts; supplying and installing the 18” diameter corrugated metal pipe culvert as shown on the drawing and as described in the specifications. Work shall include excavation, bedding, backfilling, and constructing a drainage outlet from the culverts where required;
furnishing and installing an 8” thick double-sized (unless contractor wants to double the amount of fiber in the pour) fiber reinforced concrete dumpster pad as shown on the drawings and as described in the specifications. Work includes excavation, aggregate base and final grading; furnishing and installing a double tubular steel information kiosk; and fabricating and installing tubular steel horse hitch rails in concrete footings as shown on the drawings and described in the specifications.
2. Work also includes demolition, removal and abandonment with the State of
Colorado of the existing handpump well in the Lost Lake Campground.
3. Payment shall be made at the contract lump-sum price.
C. Optional Bid Item No. 3 –Additional Facilities – Beckwith Horse Trailhead
1. This bid item includes furnishing and installing: A single tubular steel information kiosk, traffic or directional signs and posts with panels, and tubular steel horse hitch rails in concrete footings as shown on the drawings and as described in the specifications. Site grading, excavation and embankment, backfill and concrete are incidental to this item.
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-11
2. Payment shall be made at the contract lump-sum price.
D. Optional Bid Item No. 4 – Traffic and Directional Signs and Posts for Campground, Entrance Road and Turn-Around
1. This bid item includes furnishing and installing: signs and posts with panels as shown on the drawings and described in the specifications for the Campground, entrance road and turnaround. Excavation, backfill and hardware are incidental to this item.
2. Payment shall be made at the contract lump-sum price.
E. Optional Bid Item No. 5 – Traffic and Directional Signs and Posts for Day Use, Trailhead Parking and Horse Trailer Campsites
1. This bid item includes furnishing and installing: signs and posts with panels as shown on the drawings and described in the specifications for the Day Use
Area, Trailhead parking, Turnarounds and Horse trailer campsites. Excavation backfill and hardware are incidental to this item.
2. Payment shall be made at the contract lump-sum price.
F. Optional Bid Item No. 6 – Fee Station Three Panel Kiosk for Campground Entrance
1. This bid item includes furnishing and installing: A triple panel tubular steel information kiosk in concrete footings as shown on the drawings and as described in the specifications. The Panels are Government Furnished. Site grading is incidental to this item. Aggregate, excavation, backfill, concrete and hardware are considered incidental to this item.
2. Payment shall be made at the contract lump-sum price.
G. Optional Bid Item No. 7 – Pre-cast Concrete Plank Boat Ramp with 3” Minus Washed
Stone Base and Shoulders
1. This bid item includes construction of a pre-cast concrete plank boat ramp including survey and layout, excavation and embankment, supply and installation of concrete planks with metal cable or hardware anchors, perimeter backfill with 3” minus washed stone, and final grading.
2. Polyfiber geotextile fabic and placement of washed stone base are considered incidental to this item. 3” Minus Washed Stone is Government Furnished.
Contractor hauls,places and compacts washed stone.
3. Payment shall be made at the contract lump-sum price.
H. Optional Bid Item No. 8 - Seeding
1. This bid item includes furnishing, spreading and placing native seed by methods as described in the specifications. This is for the restoration of areas over abandoned roads, spurs campsite areas and other facilities or construction areas to be obliterated and removed.
2. Payment shall be made at the contract lump-sum price.
I. Bid Items No. 9 – Clearing and Grubbing Individual Tree, Stump and Slash Removal–
Connector Trail from Beckwith Horse Trailhead to Horse Trailer Campsites including
Excavation and Embankment
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-12
1. These bid items includes clearing, grubbing, trimming, removing and disposing of trees, slash and stumps including trail construction by methods described in the specifications and on the ground as approved by the Contracting Officer.
Site grading including excavation and embankment is considered incidental to the construction of the new 4 ft. width trail alignment.
2. Payment shall be made at the contract lump-sum price.
J. Optional Bid Item No. 10 – Double Concrete Vault SST Toilet Installation Lost Lake
Campground including Demolition of the Existing Concrete Block Vault Toilet, Rock
Retaining Wall with Geotextile and Concrete Toilet Entry Apron
1. This optional bid item includes furnishing and installing a double unit vault toilet with service room as shown on the drawings and as described in the specifications. Construct a rock retaining wall with geotextile underlayerment and concrete entry apron slab as shown on the drawings, described in the specifications and at location approved by the Contracting Officer. Site
Grading, excavation and embankment, backfill and drainage are considered incidental to this item. Coordinate delivery and follow all manufacturer installation instructions.
2. Work includes removing, demolishing and disposing of the existing Concrete
Vault Toilet with concrete slab as shown on the drawings and described in the specifications. Backfill is considered incidental to this item.
3. Work includes furnishing and installing rock riprap retaining wall for excavated slope at the rear of the new toilet. Work includes hauling rock from off-site sources, on-site excavation as required, and placement as shown on the drawings. Poly fiber geotextile fabric and aggregate base are considered incidental to this item.
4. This bid item includes furnishing and installing a 6” thick fiber reinforced concrete entry slab adjacent to the new toilet as shown on the drawings and as described in the specifications. Work includes excavation, aggregate base, final grading and thickened edge on one side with campground loop road.
5. Payment shall be made at the contract lump-sum price.
K. Optional Bid Item No. 11– Double Concrete Vault SST Toilet Installation Lost Lake
Day Use Trailhead Area including Concrete Toilet Entry Apron
1. This optional bid item includes furnishing and installing a double unit vault toilet with service room as shown on the drawings and as described in the specifications. Locate and construct a concrete entry apron slab as shown on the drawings, described in the specifications and at location approved by the
Contracting Officer.
Site Grading, excavation and embankment, backfill and drainage are considered incidental to this item. Coordinate delivery and follow all manufacturer installation instructions.
2. This bid item includes furnishing and installing a 6” thick fiber reinforced concrete entry slab adjacent to the new toilet as shown on the drawings and as described in the specifications. Work includes excavation, aggregate base, final grading and thickened edge on one side with campground loop road.
3. Payment shall be made at the contract lump-sum price.
LOST LAKE CAMPGROUND AND TRAILHEAD 012200-13
L. Optional Bid Item No. 12 – Lost Lake Campground Water System Construction
1. Major items of work include the following:
a. Demolition and removal of existing above ground piping, culvert pipe, spring collection system, wood “A” frame structure and a tank located immediately adjacent to the water storage tank location.
b. Engineering Design services for a new solar powered potable water system as described in Section 331111and design of a new water storage tank or as directed by the CO. This item also includes producing construction documents including: drawings, specifications, schedule of items and cost estimates both as electronic and hard copies.
c. Materials and work required to install a Government furnished treatment building as shown on the Drawings including plumbing, meter, valves, gauges, chlorinator; chlorine tank; control panels; other miscellaneous appurtenances; underground utilities within 10 ft of the building.
Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
d. Materials and work necessary for installation of a solar powered potable water supply including solar panels; support poles and foundations;
underground power and signal wires; control panels; submersible pump, drop pipe, wiring, and pitless adapter, switches and connections, valves and switches. Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
e. Materials and work necessary for installation of 1” and 2” HDPE water line and valves as shown on the drawings or as staked in the field.
Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
f. Materials and work necessary for installation of campground and host hydrants as shown on the Drawings including curb valves, hydrant pads, riprap, splash pads, and valve pads. Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
g. Materials and work necessary for installation of 2” curb valves as shown on the Drawings. Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
h. Installation of a new potable water storage tank including overflow line, drain, vents, manway, valves and miscellaneous appurtenances.
Excavation, bedding, backfill and compaction are included in the work and will not be measured separately.
2. Payment shall be made at the contract lump sum price
END OF SECTION
File details come from the government source that posted it. Updated .