wage determination.txt

TXT text file 13 KB Posted

Attached to
RECOVERY - Lost Lake Campground - Grand Mesa, Uncompahgre and Gunnison NFs
Solicitation number
AG-82B1-S-09-0057
Issued by

About this file

wage determination

Text of this file

GENERAL DECISION: CO20080015 06/05/2009 CO15

Date: June 5, 2009 General Decision Number: CO20080015 06/05/2009

Superseded General Decision Number: CO20070015

State: Colorado

Construction Type: Highway

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 05/02/2008 3 06/06/2008 4 10/03/2008 5 03/20/2009 6 05/01/2009 7 06/05/2009

* ELEC0012-006 06/01/2009

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREEMONT, HUERFANO, KIOWA, LAS ANIMAS,

MINERAL, OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Rates Fringes

ELECTRICIAN

Electrical work where the total cost is $150,000 or less........................$ 22.85 10.79 Electrical work where the total cost is over $150,000.$ 27.00 10.91

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

* ELEC0068-013 06/01/2009

CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON,LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation).....$ 31.00 11.40

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

* ELEC0113-006 06/01/2009

CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 28.80 3%+13.10

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou

Denver - Ellsworth Avenue & Broadway

Ft. Collins - Prospect & College

Grand Junction - 12th & North Avenue

Pueblo - I-25 & Highway 50

All work outside of these areas shall be paid Zone 2 rates.

ELEC0969-006 06/01/2007

DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,

MONTEZUMA, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN

MIGUEL COUNTIES

Rates Fringes

ELECTRICIAN......................$ 28.06 8.76

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ELEC0969-011 06/01/2007

DELTA AND MONTROSE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 20.31 8.56

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ENGI0009-006 05/01/2009

Rates Fringes

Power equipment operators:

Bituminous or Asphalt Spreader/Laydown Machine....$ 23.67 9.22 Bulldozer...................$ 23.67 9.22 Crane: 50 tons and under...$ 23.82 9.22 Crane: 51 to 90 tons.......$ 23.97 9.22 Crane: 91 to 140 tons......$ 24.12 9.22 Crane: 141 tons and over....$ 24.88 9.22 Grade Checker...............$ 23.82 9.22 Loader: Barber Green etc.

& Up to and including 6 cubic yards.................$ 23.67 9.22 Loader: Over 6 cubic yards..$ 23.82 9.22 Oiler.......................$ 22.97 9.22 Roller (excluding dirt & soil compaction): Self-propelled all types over 5 tons........................$ 23.67 9.22 Roller (excluding dirt & soil compaction): Self-propelled rubber tires under 5 tons................$ 23.32 9.22 Trackhoe....................$ 23.82 9.22 Water Wagon.................$ 23.82 9.22

SUCO2001-016 12/20/2001

Rates Fringes

Carpenters:

Form Building & Setting (Excluding curbs and gutters)....................$ 15.92 5.38 All Other Work..............$ 16.30 3.71

Concrete Finisher/Cement Mason...$ 15.55 2.85

Groundman (Traffic Signalization).....$ 11.57 3.50

Ironworkers:

Bridgerail (Excluding Guardrail)..................$ 16.76 6.01 Reinforcing.................$ 16.94 6.77

Laborers:

Asphalt/Raker...............$ 12.40 2.92 Common......................$ 12.44 3.53 Concrete Laborer/MasonTender.........$ 12.44 3.10 Formwork (Curbs and gutters only)...............$ 12.92 4.54 Guardrail (Excludes bridgerail).................$ 12.78 3.31 Landscape Laborer (Including Irrigation Work).......................$ 12.21 3.16 Striping-Paint Laborer (Pre-form layout and removal of pavement markings)...................$ 12.90 3.07 Traffic Director/Flagger....$ 9.42 3.21 Traffic/Sign Laborer (Sets cones and barricades, installs permanent signs)..$ 12.39 3.20

PAINTER: Spray Only.............$ 17.54 3.52

Power equipment operators:

Asphalt Plant...............$ 17.23 1.20 Asphalt Screed..............$ 16.21 3.76 Backhoe.....................$ 16.42 4.42 Compactor - Dirt & Soil Only........................$ 16.52 3.13 Grader/Blade................$ 16.39 4.20 Mechanic and or Welder (Includes heavy duty and combination mechanic and welder).....................$ 16.74 4.20 Post Driver/Punch Machine...$ 16.07 4.41 Rotomill Operator...........$ 16.28 4.41 Scraper.....................$ 17.62 3.16

Truck drivers:

Dump........................$ 14.15 3.83 Low Boy.....................$ 15.07 4.56 MultipurposeTruck- Specialty & Hoisting.......$ 14.60 3.49 Pickup (Including Pilot Car)........................$ 14.04 3.49 Truck Mechanic..............$ 15.97 4.61 Water Truck.................$ 14.88 2.07

TEAM0435-003 05/01/2000

Rates Fringes

Truck drivers:

Distributor.................$ 15.80 5.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

File Type Posted
331111-Water_Supply_Design_Construction.pdf PDF
311000_Clearing_Grubbing_REV Amd 2.doc DOC document
WS Demo - Aframe tank 1.JPG JPG image
033000_Cast-in-place_concrete.pdf PDF
U9_WELL-DETAILS.pdf PDF
Optional Bid Item 12 Amend 2.doc DOC document
WS Demo - culvert.JPG JPG image
U1-UTIL-PLAN.pdf PDF
U4_UTILITY-DETAILS.pdf PDF
Revised Schedule of Items Amend 2.xls XLS spreadsheet
312316_Struct_Excavation_Backfill.pdf PDF
LOST_LAKE_CG_WS_SPEC_INDEX.pdf PDF
U6_TREATMENT-BLDG-PLAN.pdf PDF
017700_closeout_procedures.pdf PDF
WS Demo - Aframe tank 2.JPG JPG image
013300_submittal_procedures.pdf PDF
331219-Water-hydrant.pdf PDF
011100_summary_of_work.pdf PDF
016400_government_furnished_mats.pdf PDF
T1_TITLE_SHEET.pdf PDF
011100_summary_of_work_REV09_03_09.pdf PDF
311100_Clearing_Grubbing.pdf PDF
T1_TITLE_SHEET-SIGNATURES.pdf PDF
WS Demo - Spring and piping.JPG JPG image
U8_TYP_SPUR_UTIL_DET.pdf PDF
011419_use_of_site.pdf PDF
331116-Water-distribution.pdf PDF
U7_TREATMENT-BLDG-PLUMBING.pdf PDF
U5-HYDRANT-DETAILS.pdf PDF
U2-UTIL-PLAN-PROFILE.pdf PDF
SF 30 AMEND 2.PDF PDF
017419_constr_waste_management_disposal.pdf PDF
332110_Water_Supply_Wells.pdf PDF
312317_Trenching_Utilities.pdf PDF
012200_definition_bid_items_REV09_03_09.pdf PDF
100perc_FINAL_Lost_Lake_CG_Spec_Index_REV09_03_09.pdf PDF
012200_definition_bid_items.pdf PDF
024113_selective_site_demolition.pdf PDF
U3-UTIL-PLAN-PROFILE.pdf PDF
Amendment 001 to Solicitation AG.doc DOC document
Amendment 001 —
AG-82B1-S-09-0057.pdf PDF
sf 1442.pdf PDF
lost-lake-dwgs.pdf PDF
sf24_f.pdf PDF
lost-lake-specs.pdf PDF
wage determination.txt TXT text file
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .