013300_submittal_procedures.pdf

PDF 17 KB Posted

Attached to
RECOVERY - Lost Lake Campground - Grand Mesa, Uncompahgre and Gunnison NFs
Solicitation number
AG-82B1-S-09-0057
Issued by

About this file

docs

View the file

Other files

File Type Posted
331111-Water_Supply_Design_Construction.pdf PDF
311000_Clearing_Grubbing_REV Amd 2.doc DOC document
WS Demo - Aframe tank 1.JPG JPG image
033000_Cast-in-place_concrete.pdf PDF
U9_WELL-DETAILS.pdf PDF
Optional Bid Item 12 Amend 2.doc DOC document
WS Demo - culvert.JPG JPG image
U1-UTIL-PLAN.pdf PDF
U4_UTILITY-DETAILS.pdf PDF
Revised Schedule of Items Amend 2.xls XLS spreadsheet
312316_Struct_Excavation_Backfill.pdf PDF
LOST_LAKE_CG_WS_SPEC_INDEX.pdf PDF
U6_TREATMENT-BLDG-PLAN.pdf PDF
017700_closeout_procedures.pdf PDF
WS Demo - Aframe tank 2.JPG JPG image
331219-Water-hydrant.pdf PDF
011100_summary_of_work.pdf PDF
016400_government_furnished_mats.pdf PDF
T1_TITLE_SHEET.pdf PDF
011100_summary_of_work_REV09_03_09.pdf PDF
311100_Clearing_Grubbing.pdf PDF
T1_TITLE_SHEET-SIGNATURES.pdf PDF
WS Demo - Spring and piping.JPG JPG image
U8_TYP_SPUR_UTIL_DET.pdf PDF
011419_use_of_site.pdf PDF
331116-Water-distribution.pdf PDF
U7_TREATMENT-BLDG-PLUMBING.pdf PDF
U5-HYDRANT-DETAILS.pdf PDF
U2-UTIL-PLAN-PROFILE.pdf PDF
SF 30 AMEND 2.PDF PDF
017419_constr_waste_management_disposal.pdf PDF
332110_Water_Supply_Wells.pdf PDF
312317_Trenching_Utilities.pdf PDF
012200_definition_bid_items_REV09_03_09.pdf PDF
100perc_FINAL_Lost_Lake_CG_Spec_Index_REV09_03_09.pdf PDF
012200_definition_bid_items.pdf PDF
wage determination.txt TXT text file
024113_selective_site_demolition.pdf PDF
U3-UTIL-PLAN-PROFILE.pdf PDF
Amendment 001 to Solicitation AG.doc DOC document
Amendment 001 —
AG-82B1-S-09-0057.pdf PDF
sf 1442.pdf PDF
lost-lake-dwgs.pdf PDF
sf24_f.pdf PDF
lost-lake-specs.pdf PDF
wage determination.txt TXT text file
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOST LAKE CAMPGROUND 013300-1

WATER SYSTEM SUBMITTAL PROCEDURES

SECTION 013300

SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section shall consist of submittal requirements.

1.2 REQUIREMENTS

A. It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work that involves the item. Contractor shall allow 10 calendar days for processing of submittals by the Government.

B. The following submittals are required following award of contract for review and approval pursuant to contract provisions:

Item Description Copies

Required

References

1. Cost breakdown schedule listing main types of work and totaling amount of contract.

1 FAR 52.232-

2. A written Safety Plan, outlining necessary measures to be taken to provide protection to the public during all construction operations.

3. Quality Control Plan 1

4. Contract Schedule – Updated on an On-going

Basis

5. As-Built Drawings. 3 paper, 1 electronic 4 See Spec.

Section

017700

6. Certification Required in Contract and Test

Results

1.3 MANUFACTURER'S LITERATURE AND SHOP DRAWINGS

A. Submit two (2) copies to the Contracting Officer for approval on the items required herein. Literature which is not marked or otherwise designated to show the exact model, size, etc., the Contractor proposed to use, will be returned by the Contracting

Officer "without action." Circle or check items on submittals. Highlighter pens may print black or not at all when copied.

LOST LAKE CAMPGROUND 013300-2

WATER SYSTEM SUBMITTAL PROCEDURES

B. Information must be adequate to determine compliance with specifications.

C. Submit three (3) copies of materials that cannot reasonably be copied on typical copy machines. One (1) copy of all submittals will be returned to the Contractor.

D. Submittals which are received from sources other than through Contractor's office will be returned by the Contracting Officer "without action."

1.4 SAMPLES

A. Submit two samples of each color, stain, style, etc. One sample of selected color, etc., will be retained. All other samples and all hardware samples will be returned.

PART 2 – PRODUCTS (NOT APPLICABLE)

PART 3 – EXECUTION (NOT APPLICABLE)

END OF SECTION