Pricing Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Demo B5276 & B8129 Amendment 0001
Solicitation number
FA466126Q0065
Issued by

About this file

This is a Pricing Worksheet template for submission in response to Air Force RFQ FA466126Q0065 for Demo B5276 & B8129. The worksheet serves as a pricing template for offerors to complete and submit as part of their quotation to the Department of the Air Force Global Strike Command. Offerors must submit completed pricing information via email to matthew.viana@us.af.mil and jesse.wisowaty@us.af.mil no later than 29 July 2026 at 2:00 P.M. CDT. The pricing submission must be accompanied by a signed Page 2 of the RFQ (or contractor equivalent) and technical specifications addressing how quoted products meet salient characteristics.

No specific pricing terms, fee structures, or product line items are detailed in this file as it functions as a blank template for offeror completion. Offerors are encouraged to attend an optional site visit on 15 July 2026 at 1:00 P.M. CDT at location B8129, and may submit questions regarding the solicitation through 21 July 2026 at 1:00 P.M. CDT. Award is contingent upon fund availability, and the Government reserves the right to cancel the solicitation at any time with no obligation for reimbursement of offeror costs.

View the file

Other files

File Type Posted
Solicitation Amendment FA466126Q00650001 SF 30.pdf PDF
Wage Determination.pdf PDF
AF Form 3065.xlsx XLSX spreadsheet
Statement of Work.pdf PDF
Solicitation - FA466126Q0065.pdf PDF
AF Form 3064.xlsx XLSX spreadsheet
Pricing Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT C
PRICE BREAKDOWN BY DIVISIONContractor:
Date:
Dyess AFB, TX
FNWZ 15-0059 & 25-0129Color Legend:Pricing AreasFormula Areas
Division Line Items Include the Items Below:
0001-Base Pricing, Item 1 – FNWZ 15-0059 – Demo Building 5276
CONTRACTOR PRICEDivision 1: typically bonds, general liability, builders risk, O&P
(529 Funds)LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of EstNotes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc.
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage,

bulletin board, plan sets, temporary fencing, cleanup, etc.

Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc.
Division 3 - Concrete$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor
Division 4 - Masonry$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 4: masonry, grout, labor
Division 5 - Metals$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control
Division 6 - Woods & Plastic$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 6: rough & finish carpentry, casework
Division 7 - Thermal/Moisture$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers
Division 8 - Doors & Windows$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing
Division 9 - Finishes$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings
Division 10 - Miscellaneous Specialties$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage
Division 12 - Furnishings$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 11: loading dock equipment, residential equipment
Division 15 - Plumbing & HVAC$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 12: manufactured casework
Division 16 - Electrical, Communication, & Fire Alarm$ - 0$ - 0$ - 0$ - 0$ - 00.00%Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control,
100.00%Division 14: elevator and associated equipment
LABORMATERIALEQUIPMENTSUBCONTRACTTOTALDivision 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing
0001-Base Pricing, Item 1 – FNWZ 15-0059 – Demo Building 5276 Totals:2.000.000.000.00$ 2.00Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications
0002-Base Pricing, Item 2 – FNWZ 25-0129 – Demo Building 8129
CONTRACTOR PRICE
(529 Funds)LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL% of Est
Division 1 - General Conditions$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%
Division 2 - Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 3 - Concrete$ 1.00$ - 0$ - 0$ - 0$ 1.0050.00%
Division 4 - Masonry$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 5 - Metals$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 6 - Woods & Plastic$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 7 - Thermal/Moisture$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 8 - Doors & Windows$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 9 - Finishes$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 10 - Miscellaneous Specialties$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 12 - Furnishings$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 15 - Plumbing & HVAC$ - 0$ - 0$ - 0$ - 0$ - 00.00%
Division 16 - Electrical, Communication, & Fire Alarm$ - 0$ - 0$ - 0$ - 0$ - 00.00%
100.00%
LABORMATERIALEQUIPMENTSUBCONTRACTTOTAL
0002-Base Pricing, Item 2 – FNWZ 25-0129 – Demo Building 8129 Totals:2.000.000.000.00$ 2.00

Total Construction Cost: $ 2.00

File details come from the government source that posted it. Updated .