A07 ATTACHMENT 0065 TE 7.6 Major Components of Sanitary Sewer System.pdf
PDF 586 KB Posted
- Solicitation number
- W52P1J-21-R-5001
About this file
This document contains technical exhibits describing the major components of the sanitary sewer system at Rock Island Arsenal in Rock Island, Illinois. It lists the location, equipment, manufacturer, and capacity or quantity of various lift stations, pumps, motors, generators, flow meters, and other sewer system infrastructure components.
The related federal contract opportunity is solicitation number W52P1J-21-R-5001 for base operations support services at Rock Island Arsenal. Services required include grounds maintenance, pavement clearance, facility maintenance for buildings and Army Family Housing, pest management, hydroelectric plant operations and maintenance, bridge operations and maintenance, and unscheduled services. The proposed contract will be for one base year and four option years, with a six month option to extend services. The solicitation is open to all responsible sources and was issued by the Department of the Army Materiel Command Joint Munitions Command.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 7.6
MAJOR COMPONENTS OF THE SANITARY SEWAGE SYSTEM
Location Equipment Manufacturer Capacity Quantity
Lift St #49 Pumps American Bowser 300 GPM 2
Lift St #49 Motors U.S 7 1/2 HP 2
Lift St #49 Sump Pump Flow Tech Unknown 1
Prov Grounds Submersible Zoeller 800 GPM 1
Lift Station Pump 5 HP 2
Motor
Prov Grounds Submersible GE Unknown 2
Pump & Control
Switches
Bldg 32 Submersible Unknown Unknown 1
Pump & Control for Proving
Grounds
New Quarters Pump Unknown 100 GPM 46' 2
Dynamic Head
New Quarters Motor Reuland 5 HP 2
New Quarters Vacuum Pumps Gast 1/6 HP 2
Lift St #150 Mono-ject Lift Smith & Loveless 300 GPM 1
Station
Lift St #150 Compressor Quincy 2 HP 2
Lift St #150 Motors Unknown Unknown 2
Lift St #345 Du-O-Ject Lift Smith & Loveless 4800 GHP 1
Station
Lift St #345 Compressors Quincy 5 HP 2
Commissary Submersible Weil 3 HP 2
Pump & Controls
TE 7.6 MAJOR COMPONENTS OF THE SANITARY SEWAGE SYSTEM
TECHNICAL EXHIBIT 7.6
Location Equipment Manufacturer Capacity Quantity
Bldg 204 Pumps Allis Chalmers 1750 GPM 3
Bldg 204 Motor US Electrical 40 HP 2
Bldg 204 Motor GE 40 HP 1
Bldg 204 Sump Pump Flow Tech 50 GPM 1
Bldg 204 Water Seal Tank Marathon 2,1 HP Ele Pump Unknown
Bldg 204 Flow Meter More Industries Unknown 1 w/chart LED Meter Bristol
Babcock w/12"
Circular Chart
Bldg 204 Sewage Sampler ISCO Model 1580 Unknown 1
Bldg 204 Emergency Onan Model 125 Unknown 1
Generator & DOYD-15R/20427H
Controls
Bldg 204 High Level Alarm Unknown Unknown 1
(Mercury Float)
Bldg 204 Pressure Unknown Unknown 4
Controlled Level
Valve
(Mercury Float)
Bldg 204 Sump Pump Flow Tech 50 GPM 1
Bldg 204 Comminutor Clow 25M 1
TE 7.6 MAJOR COMPONENTS OF THE SANITARY SEWAGE SYSTEM
File details come from the government source that posted it. Updated .