A07 ATTACHMENT 0074 TE 7.20 Stormwater Observation Report.pdf
PDF 854 KB Posted
- Solicitation number
- W52P1J-21-R-5001
About this file
This document contains a quarterly stormwater observation report and details of a related federal contract opportunity for base operations support services. The stormwater observation report lists 14 outfall locations and details requirements to observe each representative outfall once per quarter from a storm event greater than 0.1 inches of rainfall. Observations must be made during daylight hours and within one hour of the runoff event, with a minimum of 72 hours between rain events. An annual report is due to the Illinois Environmental Protection Agency by 31 October each year.
The federal contract opportunity is solicitation number W52P1J-21-R-5001 for base operations support services on the Rock Island Arsenal in Rock Island, Illinois. The proposed contract will be for one base year and four option years, with a six month option to extend services. Services include grounds maintenance, pavement clearance, facility maintenance for vertical structures, Army family housing, and horizontal structures, pest management operations, hydroelectric plant operations and maintenance, bridges operation and maintenance, and unscheduled services. The soliciting agency is the Department of the Army Materiel Command Joint Munitions Command.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Code Time
Discharge Name (Associated Structures)
1 Outfall D93 (Manhole D93)
2 Outfall D92 (Manhole D92)
3 Outfall D98 (Manhole D98)
4 Outfal D105
5 Oufall F14 (Catch Basin)
6 Outfall 295 (Sluice Gate)
7 Pump Station 295
8 Outfall E56
9 Outfall 127 (Manhole 127)
10 Outfall C39 (Manhole C39)
11 Outfall C45 (Manhole C45)
12 Sluice Gate #3 at Test Track
13 Sluice Gate and Catch Basin SE of Building 40
14 Sluice Gate and Outfall at Building 25
Code Description
R Runoff
N No water present
O Odor
Sn Snow
C Clarity
F Foam
OS Oil Sheen
Se Settled Solids
Co Color
SS Suspended Solids
Notes:
- Must observe each representative outfall once per quarter from a storm event greater than 0.1 inches rainfall
-Observation must be made during daylight hours and within 1 hour of the runoff event
-Observation must be a minimum of 72 hours between rain events
-Annual report of quarterly observations due to IL EPA by 31 October of each calendar year
- IAW Permit No.: ILR001154
Location of Rain Gauge:
Reading at Rain Gauge (in inches):
Observations taken by:
Signature:
Outfall ID Notes
Date:
Stormwater Observation Report (Technical Exhibit 7.20)
Quarter/ Fiscal Year:
TE 7.20 Stormwater Observation Report
TE 7.20 Stormwater Observation Report 1
File details come from the government source that posted it. Updated .