A07 Att 10 Bridge Operations and Maintenance JV_Final 2020121.pdf
PDF 153 KB Posted
- Solicitation number
- W52P1J-21-R-5001
About this file
This attachment to a solicitation provides requirements for the operation and maintenance of bridges at Rock Island Arsenal in Illinois. Services include staffing and operating a historic swing-span bridge over the Mississippi River 24 hours a day during the navigation season, as well as preventative and emergency maintenance, cleaning, sealing, and repairs for multiple vehicular bridges. Personnel must meet strict qualifications including experience levels, medical standards, and drug testing. They are also subject to regulatory guidance from the Coast Guard, Corps of Engineers, and Federal Railroad Administration regarding work hours and communications. Reporting requirements and technical specifications are outlined for tasks such as locking/unlocking the swing bridge seasonally, semi-annual maintenance, and handling emergency situations.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 10 – Bridges – Operations and Maintenance i
Attachment 10
Bridges – Operations and Maintenance
Base Operations and Maintenance
Rock Island Arsenal, Illinois
21 January 2021 ii
Table of Contents
1.0 General Information
1.1 Description
1.2 Personnel Qualifications and Requirements
1.2.1 Minimum Personnel Qualifications
1.2.2 Personnel Requirements
2.0 Description of Services
2.1 General Scope, Swing Span Bridge Operations and Preventative Maintenance. . 4
2.2 Specific Operational Tasks
2.2.1 Navigation Season Requirements
2.2.2 Bridge Turning Operations
2.2.3 Bridge to River Traffic Signals
2.2.4 Turning Operations Timing
2.2.5 Rush Hour Operations
2.2.6 Emergency Bridge Operations
2.2.7 Excessive Wind Operations
2.2.8 Power Failure
2.3 Specific Preventive Maintenance Services
2.3.1 Maintenance Tasks
2.3.2 Cyclic Preventative Maintenance
2.3.3 Bridge Locking/Unlocking
2.3.4 Semi-Annual and Annual Maintenance
2.4 Preventative Maintenance for All Bridge Surfaces
2.4.1 Bridge Cleaning
2.4.2 Deck Drain Cleaning
2.4.3 Bridge Sealing
2.5 Repairs
2.5.1 Emergency Repairs
2.5.2 Non-Emergency Repairs
3.0 Work Capability Levels- N/A
4.0 Reporting Requirements
4.1 Operating Logs
4.2 River Traffic Report
4.3 Navigation Season Closure Request
4.4 Bridge Operator Time Sheets
4.5 Hours of Service Report
5.0 References
iii
5.1 Technical Exhibits
5.2 Regulatory Guidance
1.0 General Information
1.1 Description.
The Contractor shall operate and maintain the RIA Bridges, to include the Moline Bridge (Structure 48), the Rock Island Viaduct (structure 275) and Government Swing Span Bridge, (Structure 320).
The swing span bridge is a unique bridge built in 1896 and connects the west end of the Arsenal Island with Davenport, Iowa. This bridge is listed on the National Register of Historic Places as a contributing element of the Rock Island Arsenal (RIA) Historic District. Modifications to the bridge's appearance or functionality must be approved by the KO/COR prior to implementation in order to conduct consultation in accordance with (IAW) 36 Code of Federal Regulations (CFR) Part 800. The swing-span bridge is used by automobile, pedestrian, and railroad traffic and is opened and closed to allow river traffic to pass. There are communication and high voltage electrical distribution lines extending the length of the bridge. A list of the major components related to the swing-span portion of the Government Swing Span Bridge is included in Technical Exhibit (TE) 10.1.
1.2 Personnel Qualifications and Requirements.
1.2.1 Minimum Personnel Qualifications.
The Contractor shall use licensed journeyman craftspersons or manufacturer certified craftspersons to conduct maintenance tasks as required. The minimum personnel qualifications for the Government Swing Span Bridge operation are strictly described below due to the complex nature of the requirement and to ensure the safety of personnel and property. Personnel shall adhere to Federal Railroad Administration (FRA) regulations and Coast Guard regulations as applied to railroad operations personnel and personnel involved in river navigation operations.
1.2.1.1 Grounds Person.
Grounds personnel shall have capability to complete mechanical maintenance.
1.2.1.2 Intermediate Bridge Operator.
The Intermediate Bridge Operator position is intended to allow the Contractor to train/apprentice personnel on this unique facility. Intermediate Bridge Operators shall meet the following requirements:
a. Intermediate Bridge Operators (apprentice) shall have worked (at a minimum) two (2) years as a Grounds Person.
b. Intermediate Bridge Operators shall then be instructed by the Bridge Foreman or other certified Bridge Operator for (at a minimum) another two (2) years.
Instruction shall include training the prospective apprentice operator of the specific requirements and responsibilities of the position including all emergency backup equipment and procedures.
c. Intermediate Bridge Operators shall have demonstrated their aptitude with hands on swing-span turning skills under the direct supervision of the Bridge Forman.
1.2.1.3 Bridge Operator.
The operation of the swing-span bridge is a critical function for the RIA. Bridge Operator errors could result in multi-million dollar losses to the government and/or loss of life. To insure that suitable emphasis is placed on the responsible and conscientious operation of the swing-span bridge, all Bridge Operators and the Bridge Foreman shall be certified as Bridge Operators. The Contractor shall develop and implement a certification process no later than 30 days after Contract Award to insure that only fully qualified, trained, responsible and conscientious individuals operate the bridge swing-span.
Bridge Operators shall meet the following minimum requirements for certification:
a. Personnel shall have 4 years of experience as a Swing-span Bridge Operator of the Government Swing Span Bridge or similar swing-span bridge or have met the Intermediate Bridge Operator requirements
b. Demonstrated and applied knowledge of all aspects of swing-span operational procedures, rules, regulations, and laws.
c. Demonstrated and applied knowledge of marine and radio communication rules and rail manual interlocking rules.
d. Demonstrated and applied knowledge of the duties of the Grounds Person.
e. Demonstrated and applied knowledge of all emergency backup procedures, operations and equipment.
f. Demonstrated and applied experience in operator maintenance requirements and annual operator requirements.
1.2.1.4 Bridge Foreman.
The Government Swing Span Bridge Foreman shall be a Certified Bridge Operator and have five (5) years of experience as a full time bridge operator on the Government Swing Span Bridge or similar swing-span bridge. The Bridge Foreman shall have documented experience in management of operations and maintenance requirements.
1.2.2 Personnel Requirements.
1.2.2.1 Drug and Alcohol Testing of Personnel.
The Contractor’s drug and alcohol policy shall specifically address all Federal Railroad Administration requirements applied to Government Swing Span Bridge personnel as follows:
a. All Bridge Personnel shall be subject to unannounced on site random drug and alcohol testing.
b. All Bridge Personnel will be included in the same test pool as local operating railroad personnel.
c. Employees who fail the test shall be removed from service IAW applicable laws and regulations.
For information on FRA Drug and Alcohol policies see:
https://cms8.fra.dot.gov/divisions/partnerships-programs/drug-and-alcohol
1.2.2.2 Physical/Medical Requirements of Personnel.
The Contractor shall ensure that all Government Swing Span Bridge personnel receive a physical evaluation prior to assumption of bridge operations and every 24 months thereafter. These physical evaluations shall be performed by a qualified physician and certify that the employees general health, vision and hearing are sufficient to allow the employee to provide safe bridge operation as well as emergency operation measures as required.
1.2.2.3 Personnel Approval.
The Contractor shall provide a list of the personnel serving in the capacities listed above no later than 30 days after Contract Award. The Contracting Officer/Contracting Officer Representative (KO/COR) shall approve this list within five (5) business days. The KO/ COR certification approval maybe revoked for Contractor employee negligence, unsafe bridge operation, falsification of records, employee health issues or actions which the Government determines to represent a liability or threat to public safety. In the event the Government revokes an operator certification the Contractor will not be reimbursed for any costs associated with the revocation, including but not limited to overtime costs, new employee hiring costs or training costs.
1.2.2.4 Personnel Restrictive Working Hours.
The Contractor shall not work a Bridge Operator for more than nine (9) hours in any consecutive 24 hour period. The Contractor shall schedule Bridge Operators with a minimum of 15 hours of rest prior to the scheduled start time except in time of emergencies as defined by FRA statutes. If Contractor personnel violate this rule the https://cms8.fra.dot.gov/divisions/partnerships-programs/drug-and-alcohol
Contractor shall immediately notify the FRA and the KO/COR IAW Section 4.0 Reporting Requirements.
2.0 Description of Services.
2.1 General Scope, Swing Span Bridge Operations and Preventative Maintenance.
The Contractor shall operate the swing-span 24 hours a day, seven (7) days per week, during the Mississippi River navigation season. The Operation of the Government Swing Span Bridge requires adherence to Coast Guard Navigation regulations, FRA regulations and coordination with the U.S. Army Corps of Engineers Lock and Dam 15.
The regulatory guidance from the agencies above affect bridge operator work hours and timekeeping, radio use rules and drug and alcohol policy. The Contractor shall maintain the Government Bridge, Structure 320 as specified in Section 2.3. The Contractor shall prepare and submit an Operating Plan for Swing Span Bridge IAW Section 6.1, Overarching PWS. The Contractor shall include in the plan all information necessary to complete the Scope and Specific Operations Tasks as described in this part.
2.2 Specific Operational Tasks.
2.2.1 Navigation Season Requirements.
The Contractor shall staff and operate the Government Swing Span Bridge 24 hours per day during the navigation season. The actual navigation season for bridge operations will be determined by a combination of the United States (U.S.) Coast Guard and Corps of Engineers Lock and Dam #15 guidance. The KO/COR will give final approval of a date for navigation season shutdown. Navigation shutdown shall result in only local navigation traffic and limited hours of operation for Lock and Dam #15.
The Contractor shall assume turning operation requirements for the bridge based on navigation season shutdown lasting on average 75 calendar days each year. The navigation season shutdown typically begins in December and ends in March. The navigation season shutdown time period does not include time required to lock and unlock the bridge and conduct shutdown/start-up maintenance. Details for the procedure to lock and unlock the bridge are included in TE 10.2. The Contractor shall submit a request in writing for approval by the KO/COR of the date for navigation season closure.
The Contractor shall plan to staff the bridge for only first shift (matching the Lock and Dam operation times) during navigation season shutdown. Requirements for turning the bridge outside of first shift shall be coordinated with the KO/COR and a Demand Maintenance Order (DMO) will be issued to support any additional labor/overtime requirements.
The Contractor shall maintain daily logs of bridge operations. The log shall include:
date, operator information, rail traffic including time, direction of travel and number of engines and cars, river traffic including tow boat name, number of barges, direction of travel, open and closed times, river gauge at mid shift for each shift, air temperature at mid shift for each shift and notation for any out of the ordinary activity including time and description. The log shall be maintained and available for Government review for the life of the Contract.
The Contractor shall submit monthly a summary of the river and rail traffic information recorded in the daily log. This report shall be due by the fifth (5th) business day of the month.
2.2.2 Bridge Turning Operations.
The Contractor shall have a Bridge Operator in the bridge control tower at all times during bridge turning operations. Details for a normal procedure for turning the bridge are included in TE 10.2. During the turning operation, the Bridge Operator in the control tower and the Grounds Person shall have a means of communication. The Grounds Person shall monitor the bridge turning mechanisms during turning operations. The Bridge Operator shall turn the swing-span only when it has been determined that there is sufficient clearance between the bridge and the top of a vessel.
Bridge Operators shall be required to fill out time sheets daily to ensure operators are meeting FRA regulations. The Contractor shall develop the form and submit to the KO/COR for approval. The Contractor shall maintain time sheets for Bridge Operators for the current month plus the previous 24 months for Government review.
The Contractor shall submit a report any time a Bridge Operator works a longer than allowed shift or does not receive the mandated rest period. This report shall be due within two (2) business days after the statute violation occurred.
2.2.3 Bridge to River Traffic Signals.
The Bridge Operator will be signaled by one of the following means when a vessel is ready to pass:
a. Lock 15 sounds a whistle indicating locks are ready to allow entrance or exit of vessel.
b. Lock 15 calls Bridge Operator by 2-way radio.
c. Vessel operator calls Bridge Operator by 2-way radio, or signals by whistle.
The Bridge Operator shall respond to signal(s) to open the swing-span so as not to delay river traffic.
2.2.4 Turning Operations Timing.
The Bridge Operator shall open the swing-span promptly, and leave it open just long enough to allow the vessel to pass. During a double-locking, the Bridge Operator shall close the swing-span while the first half of a barge tow is being locked through. The Bridge Operator shall control bridge swing-span open time to ensure that the average monthly open time does not exceed 13 minutes per opening, and that not more than 5% of all monthly turns exceed 30 minutes per opening. The Contractor’s operation of the bridge shall at no time unnecessarily delay vehicle traffic.
2.2.5 Rush Hour Operations.
During RIA traffic rush hours, currently 0530 to 0800 and 1430 to 1700, the Bridge Operator shall request boat operators to wait for passage. The Contractor has an obligation to RIA employees to minimize open time during rush hours. If the boat operator insists the swing-span be opened, the Bridge Operator shall open the swing-span and so note on the daily traffic record (See Logs 4.1). River traffic has right-of-way over vehicular or rail bridge traffic.
2.2.6 Emergency Bridge Operations.
Bridge Operators shall be observant of potential emergency situations involving the swing-span operation, the Government Swing Span Bridge, and the Mississippi River.
The Contractor shall immediately report any emergency situations, and/or operating problems to the KO/COR. The Contractor shall immediately notify the RIA Police Department to report any automobile accidents and/or emergency situations and then notify the KO/COR. In the case of runaway barges upstream of the Government Swing Span Bridge, Bridge Operators shall immediately notify the Lock and Dam 15 operators and then the RIA Police Department and KO/COR.
2.2.7 Excessive Wind Operations.
For safety reasons, the Contractor shall not operate the swing-span whenever the prevailing wind velocity exceeds 35 Miles per Hour (MPH). On these occasions, the Contractor shall notify the KO/COR immediately at time of bridge shut-down, and again at the time of swing-span reactivation.
2.2.8 Power Failure.
If an electrical outage occurs, the Contractor shall connect alternate power from the Lock and Dam #15 power source within one (1) hour. The Contractor shall coordinate the electrical change-over with Lock and Dam #15 personnel. The instructions for this procedure shall be posted in the bridge control tower and are provided in TE 10.2. The Contractor shall notify the KO/COR of a power outage within 30 minutes of its occurrence and shall again notify the KO/COR when the swing-span is operational under alternate power. The Contractor shall reconnect to the main power supply, when it is restored, and notify the KO/COR when the swing-span is again operational under normal power.
2.3 Specific Preventive Maintenance Services.
2.3.1 Maintenance Tasks.
All equipment shall be maintained and calibrated IAW manufacturer’s recommendations unless otherwise noted in TE 10.3.
2.3.2 Cyclic Preventative Maintenance.
The Contractor shall perform preventative maintenance as outlined in TE 10.3 daily, weekly or monthly as required.
2.3.3 Bridge Locking/Unlocking.
The Contractor shall perform bridge locking and unlocking in coordination with the local operating railroad. The Contractor shall notify the KO/COR each time the bridge is locked or unlocked.
The Contractor shall conduct bridge locking procedure as part of the navigation season shutdown detailed in TE 10.3 or during navigation season shutdown as required. This procedure shall be completed prior to conducting semi-annual and annual maintenance.
All exterior mechanical equipment shall be sprayed with a petroleum-based preservative to prevent corrosion after locking the bridge. Procedures for locking the bridge are outlined in TE 10.2.
The Contractor shall conduct bridge unlocking procedure as part of the navigation season startup detailed in TE 10.3 or during navigation season shutdown as required.
All equipment and machinery shall be cleaned of preservatives and greased or oiled as appropriate prior to being placed in service. Procedures for unlocking the bridge are outlined in TE 10.2. Anytime the bridge is unlocked, the bridge shall be manned.
2.3.4 Semi-Annual and Annual Maintenance.
The Contractor shall perform semi-annual and annual maintenance as required in TE
10.3. The Contractor shall perform these maintenance requirements of the bridge during navigation season shutdown unless otherwise noted. The Government will conduct significant repair activities to coincide with navigation season shutdown to limit impacts to navigation requiring coordination to ensure repair and maintenance are successful.
The U.S. Coast Guard requires the bridge to be operational within six (6) hours of notification during the annual shut-down, unless extraordinary maintenance and repair conditions exist.
2.4 Preventative Maintenance for All Bridge Surfaces.
The Contractor shall conduct bridge surface maintenance for all vehicular bridges (Structures 48, 275, 276 and 320). The Contractor shall maintain the free flow of traffic, (even during one (1) lane bridge closures), using appropriate traffic control methods and devices. The Contractor shall schedule surface maintenance after normal duty hours or on weekends to minimize disruption of normal RIA traffic flow patterns. The Contractor shall coordinate with and request the approval of the KO/COR at least 15 business days in advance of any detours or potential disruption of traffic flow patterns.
2.4.1 Bridge Cleaning.
The Contractor shall clean the Rock Island Viaduct, (Structure 275), viaduct bike path and the Government Bridge (Structure 320) and the Moline Bridge (Structure 48) annually in April or May and IAW TE 10.3 and 10.4.
2.4.2 Deck Drain Cleaning.
The Contractor shall clean bridge deck drains with water under pressure, (not less than 100 psi), on the Rock Island Viaduct and the Government Bridge quarterly, (January, April, July, October). The Contractor shall clean the deck drains on the Moline Bridge (Structure 48) annually (October). Deck drains shall be flushed with water under pressure, (not less than 100 psi). The Contractor shall submit the cleaning method to the KO/COR for approval 30 days prior to planned use.
2.4.3 Bridge Sealing.
The Contractor shall seal the bridge surfaces (to include paved road, deck, walk, and parapet) of the Rock Island Viaduct, the Government Bridge swing-span and Structure 48 annually April or May IAW TE 10.4. Bridges shall be cleaned prior to being sealed.
Sealant shall be dry before traffic is allowed on the bridge surfaces.
2.5 Repairs.
Repairs not associated with required preventative maintenance tasks listed in Sections
2.3 through 2.4.3 shall be conducted by DMO, Project Work Order (PWO) or separate contract. Repairs shall be categorized as emergency or non-emergency as defined below and coordinated accordingly.
2.5.1 Emergency Repairs.
Emergency repairs shall consist of any repairs that will disrupt the normal operation of the bridge for river navigation, vehicular traffic and/or rail traffic or repairs to imminent safety hazards. The Contractor shall be responsible, in coordination with the KO/COR, to notify the U.S. Coast Guard and local operating railroad of the repair necessity, probable length of disruption and upon completion of repairs. Emergency repairs requiring more than six (6) hours will be coordinated by the Government.
2.5.2 Non-Emergency Repairs.
Non-emergency repairs are all repairs not meeting the emergency repair requirements.
Non-emergency repairs shall be scheduled after normal duty hours, on weekends or during navigation season shutdown to minimize disruption of river navigation, vehicular traffic and/or rail traffic. The Contractor shall be responsible, in coordination with the KO/COR, to notify the U.S. Coast Guard and local operating railroad of the repair necessity, probable length of disruption and upon completion of repairs. The Contractor shall coordinate with and request the approval of the KO/COR at least 15 business days in advance of any detours or potential disruption of traffic flow patterns if repairs are by
DMO/PWO.
3.0 Work Capability Levels- N/A
4.0 Reporting Requirements
4.1 Operating Logs.
4.2 River Traffic Report.
4.3 Navigation Season Closure Request.
4.4 Bridge Operator Time Sheets.
4.5 Hours of Service Report.
5.0 References
5.1 Technical Exhibits
a. TE 10.1 Major Components of Government Bridge System
b. TE 10.2 Bridge Operating Procedures (SOP)
c. TE 10.3 Bridge Maintenance Procedures (SOP)
d. TE 10.4 Bridge Cleaning and Sealing
5.2 Regulatory Guidance
a. 40 CFR, Protection of the Environment (Reference Section C, para 6.0).
b. 33 CFR Navigation and Navigable Waters, Chapter 1 U.S. Coast Guard, Department of Homeland Security, Subchapter J Bridges, Part 117 Drawbridge Operation Regulations.
c. 33 CFR 117.671 and 117.1103 Drawbridge Operations Regulations Subpart B Specific Requirements, Upper Mississippi River
d. 49 CFR 219, Control of Alcohol and Drug Use
e. 49 CFR 228, Chapter 11, Hours of Service of Railroad Employees
f. Federal Railroad Administration (FRA), Railroad Operating Rules.
| 1.0 General Information |
| 1.1 Description. |
| 1.2 Personnel Qualifications and Requirements. |
| 1.2.1 Minimum Personnel Qualifications. |
| 1.2.1.1 Grounds Person. |
| 1.2.1.2 Intermediate Bridge Operator. |
| 1.2.1.3 Bridge Operator. |
| 1.2.1.4 Bridge Foreman. |
| 1.2.2 Personnel Requirements. |
| 1.2.2.2 Physical/Medical Requirements of Personnel. |
| 1.2.2.3 Personnel Approval. |
| 1.2.2.4 Personnel Restrictive Working Hours. |
| 2.0 Description of Services. |
| 2.1 General Scope, Swing Span Bridge Operations and Preventative Maintenance. |
| 2.2 Specific Operational Tasks. |
| 2.2.1 Navigation Season Requirements. |
| 2.2.2 Bridge Turning Operations. |
| 2.2.3 Bridge to River Traffic Signals. |
| 2.2.4 Turning Operations Timing. |
| 2.2.5 Rush Hour Operations. |
| 2.2.6 Emergency Bridge Operations. |
| 2.2.7 Excessive Wind Operations. |
| 2.2.8 Power Failure. |
| 2.3 Specific Preventive Maintenance Services. |
| 2.3.1 Maintenance Tasks. |
| 2.3.2 Cyclic Preventative Maintenance. |
| 2.3.3 Bridge Locking/Unlocking. |
| 2.3.4 Semi-Annual and Annual Maintenance. |
| 2.4 Preventative Maintenance for All Bridge Surfaces. |
| 2.4.1 Bridge Cleaning. |
| 2.4.2 Deck Drain Cleaning. |
| 2.4.3 Bridge Sealing. |
| 2.5 Repairs. |
| 2.5.1 Emergency Repairs. |
| 2.5.2 Non-Emergency Repairs. |
| 3.0 Work Capability Levels- N/A |
| 4.0 Reporting Requirements |
| 5.0 References |
| 5.1 Technical Exhibits |
| 5.2 Regulatory Guidance |