A07 CONFORMED COPY WITH ALL AMENDMENTS.pdf

PDF 2 MB Posted

Attached to
Base Operations Support Services on the Rock Island Arsenal, Rock Island, Illinois
Solicitation number
W52P1J-21-R-5001
Issued by

About this file

This request for proposal solicits base operations support services on Rock Island Arsenal in Rock Island, Illinois. The services include grounds maintenance, pavement clearance, vertical and horizontal facility maintenance, pest management, hydroelectric plant operations, bridge operations and unscheduled services. The proposed contract consists of a one year base period and four option years, with an additional six month option to extend services. Pricing is fixed price for most items with time and materials for unscheduled customer demand maintenance orders. The solicitation closes on January 28, 2021 with award anticipated thereafter. The Department of the Army Materiel Command Joint Munitions Command is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00006.pdf PDF
Amendment 00007.pdf PDF
A07 A RIA Overarching (OA) PWS BASEOPS_20210210.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev K 11 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00005.pdf PDF
Pricing Matrix RIA Base OpsRev J 08 Feb 2021.xlsx XLSX spreadsheet
A07 Att 4 Facility Maintenance Vertical JV_20210208.pdf PDF
A07 Amendment 0004.pdf PDF
A07 TE 4.21 Cranes and Crane Rails_20210208.pdf PDF
Amendment 0003.pdf PDF
A07 DB WAGE DETERMINATION BUILDING revised 21 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy Highway revised 01 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy revised 15 January 2021.pdf PDF
A07 Att 6 Facility Maint Horizontal JV_IGSA Rev 20210121.pdf PDF
A07-Amendment 0002.pdf PDF
A07 Att 10 Bridge Operations and Maintenance JV_Final 2020121.pdf PDF
A07 PWS OA and All Attachments 20210126.pdf PDF
A07 ATTACHMENT 0007 Pricing Matrix 11 January 2020.xlsx XLSX spreadsheet
A07 ATTACHMENT 0009 Past Performance Questionnaire 12 Jan 2021.docx DOCX document
A RIA Overarching (OA) PWS 12 January 2021.pdf PDF
A07 TE 5.10 Family Housing Inventory Items rev.xlsx XLSX spreadsheet
CBA 2018-2023 .pdf PDF
AMENDMENT 0001.pdf PDF
A07 ATTACHMENT 0074 TE 7.20 Stormwater Observation Report.pdf PDF
A07 ATTACHMENT 0012 TE 1.2 Estimated Workload Data DETAIL rev.xlsx XLSX spreadsheet
A07 ATTACHMENT 0005 TE List.docx DOCX document
A07 ATTACHMENT 0027 TE 4.6 Overhead Doors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0072 TE 7.18 Flood Pump Information.pdf PDF
A07 ATTACHMENT 0080 TE 9.1 Elect Distrib Sytm Mjr Components HydroPlant.xlsx XLSX spreadsheet
A07 ATTACHMENT 0013 TE 1.2 Estimated Workload Data Summary.pdf PDF
A07 ATTACHMENT 0054 TE 6.1 Outage Log.xlsx XLSX spreadsheet
A01 ATTACHMENT 0001 PWS Att 2 Grounds Maintenance.pdf PDF
A07 ATTACHMENT 0081 TE 9.2 SCADA Reporting Elements.pdf PDF
A07 ATTACHMENT 0028 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0038 TE 4.17 Mass Notification Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0037 TE 4.16 Fire Suppression Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0014 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 ATTACHMENT 0057 TE 6.4 Sign Replacement Requirements.pdf PDF
A07 ATTACHMENT 0039 TE 4.18 Playground Equipment.pdf PDF
A07 ATTACHMENT 0017 TE 1.7 Government Furnished Facilities 20200807.pdf PDF
A07 ATTACHMENT 0031 TE 4.10 Grease Trap.xlsx XLSX spreadsheet
A07 ATTACHMENT 0041 TE 4.20 Meter Reading Form.xlsx XLSX spreadsheet
A07 ATTACHMENT 0063 TE 7.1 Major Components of Water System.pdf PDF
A01 ATTACHMENT 0001 PWS RIA Overarching (OA) PWS.pdf PDF
A07 ATTACHMENT 0067 TE 7.10 Water Distribution Valves.pdf PDF
A07 ATTACHMENT 0050 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 ATTACHMENT 0042 TE 4.21 Cranes and Crane Rails.pdf PDF
A07 ATTACHMENT 0034 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 01:00 PM local time 12 Feb 2021

A X B

C D

EX

X G F 314 - 317

318 - 329 H 330 julie.k.culliton.civ@mail.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 336

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W52P1J 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JULIE CULLITON 309-782-5354

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 18 19 - 236

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

237 - 247 248 - 266

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

267 - 310

PART II - CONTRACT CLAUSES

ARMY CONTRACTING COMMAND ROCK ISLAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

311 - 313

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

14 Dec 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W52P1J21R5001

Section SF 30 - BLOCK 14 CONTINUATION PAGE

AMENDMENT 0001

The purpose for this Amendment is the following:

1. To incorporate the following Technical Exhibits

a. Technical Exhibit 1.3, integrated Cultural Resources Management Plan

b. Technical Exhibit 5.10, Family Housing Inventory Items

2. To incorporate revised Attachment 0009, dated 5 Jan 2021 with correct POC information. If you have sent in your Past Performance Questionnaire you do not need to resubmit.

3. To extend the contractor question cut off date from 1:00 pm CST, 14 January 2021 to 1:00 pm CST 20 January 2021.

4. To answer the following contractor questions Q1. Will the Government confirm that they require the GFEBS PM Coordinator Resume to be included in both Volume 1 – Factor, Subfactor A. GFEBS Operation, Key Point #3, and in Volume 2

– Factor 1, Subfactor H, Contract Management.

A1. The GFEBS-PM Coordinator Resume may be included in both locations or just in one and referenced in the other.

Q 2, L.2, Volume IV – Factor 3, Past Performance requires offerors to submit past performance information that describes their ability to perform and manage the following functional responsibilities:

1. Operation and Maintenance Electrical Distribution Systems

2. Maintain Vertical Facilities (including fire suppression, fire alarm, electrical, plumbing and structural systems, and asbestos maintenance)

3. Pavement Clearance (snow removal)

4. Conduct Pest Management Activities

5. Maintain Horizontal Facilities (including roads, parking lots and sidewalks)

6. Conduct Grounds Maintenance (including mowing, trimming, edging, tree trimming and tree removal)

However, Section M.6 does not include Operation and Maintenance Electrical Distribution Systems or Management, Operations and Maintenance of Army Family Housing. In addition, Section M.6 includes water, wastewater, and storm water, which is not included in Section L.2.

Will the Government please clarify the definition of a relevant contract and correct the functional areas that offerors should address in the past performance volume?

A2. Refer to updated definition of relevant in section M.6.

Q3. Section L.1states that “For each contract submitted for itself or a proposed subcontractor, the offeror may submit up to eight pages. The eight pages must include the Past Performance Evaluation Questionnaire (Attachment 0009)”

Page 310 of the solicitation directs POCs completing the Past Performance Evaluation Questionnaire to send the completed questionnaire directly to the Contracting Office. Offerors will not be able to include the completed questionnaires in their proposals because the contract POCs are sending them directly to the Contracting Office

In addition, the Past Performance Evaluation Questionnaire Form is five pages, leaving offerors only three pages to provide past performance information for each contract.

Will the Government remove the requirement to include Past Performance Evaluation Questionnaires in the proposal?

A3. Refer to revised section L.1. The Past Performance Questionnaire is not included in the eight pages.

Q4. Section L.1 limits past performance information to no more than three contracts for each functional area. Will the Government consider allowing offerors to include more than three contracts per functional area, as long as they do not exceed the total maximum pages for Volume IV?

A4. Yes

Q5. PWS 5.1 lists the following operating plans: Grounds Maintenance, Attachment 2; Pavement Clearance, Attachment 3; Pest Management, Attachment 8; Hydro-electric, Attachment 9;

Government Bridge, Attachment 10. PWS 5.1 also states that these “Plans shall be submitted with the Technical Proposal and finalized within 30 calendar days after award…”

Section L&M require offerors to provide plans to address Pavement Clearance, O&M of the Hydro- Electric Plant and Government Bridge; however, there is no requirement in Section L&M for offerors to provide a Grounds Maintenance or Pest Management operating plan.

Will the Government please clarify? Are offerors required to address Pest Management and Grounds Maintenance in Volumes 1 or 2 as part of their technical proposals? If not, will the Government please revise PWS 5.1.

A5. There are plans that are required by the PWS (are enduring living documents that will be managed and updated by the successful bidder and the Government to ensure effective operation base systems and infrastructure) and there are plans required for proposal review requirements that are descriptive narratives detailing how the contractor intends to accomplish the specific portion of scope. Please refer to revised OA, Section 5.1, dated 12 January 2021.

Q6. REF: Attachment 0009 Past Performance Questionnaire. Part IV Return Information states to return the completed Questionnaire to Megan Frost but Section L states to return the completed Questionnaire to Julie Culliton and Molly Lewis. Can the Government please clarify the correct

POC

A6. A corrected Attachment 0009, dated 12 January 2021 is uploaded with this Amendment.

Q7. REF: Section L.2. Volume II Key Point #2 requests an “Alternate General Manager” with 2 years of experience in managing facilities maintenance or construction supervision, but Overarching PWS 2.4.3.2 refers to an “O&M Superintendent”. Is the Alternate General Manager and O&M Superintendent the same individual?

A7. They may be the same.

Q8. REF: Section L.2. Volume V requirements list Section A and Section K but there is no mention of Section I clauses with fill-ins such as 52.204-26. Are these Section I clauses to be included in Volume V and are they included in the 10-page limit for Volume V?

A8. Section L.2, Volume V has been revised to include Section I. The 10 page limit for Volume V has been increased to 20 pages.

.Q9. REF: Section L.2. Is the completed Section B to be included in Volume III Cost/Price or in Volume V Solicitation, Offer and Award Documents? We would like to request the page limit of 10 pages for the appropriate volume be removed to accommodate the completed Section B.

A9. Section B will be utilized by ACC-RI when award is made. Attachment 007, Pricing Matrix is all that needs to be submitted at time of proposal in Volume III.

Q10. REF: Section L.1. Is front matter documentation (Title Page, Cover Letter, Table of Contents) excluded from page count for each volume?

A10. Front matter documentation is excluded from the page count for each volume.

Q11. REF: Section L.1. Page 305 of the solicitation states: “For each contract submitted for itself or a proposed subcontractor, the offeror may submit up to eight pages. The eight pages must include the Past Performance Evaluation Questionnaire (Attachment 0009)…” We would like to request that Attachment 0009 be removed from page count, as it is submitted directly to the Government and difficult to determine if the questionnaire respondent goes over the page count with any comments. If not, does the entire original page count of 5 pages for the Attachment 0009 count against our 8-page limit, effectively making the page limit for each contract narrative 3 pages?

A11. Refer to revised Section L.1. Attachment 0009 has been removed from the page count.

Q12. In order to comply with 48 CFR § 22.1008-2 - Successorship with incumbent contractor collective bargaining agreement, and 41 U.S.C. 6707(c), it is requested that the Government release the current CBA in place on the contract so that bidders may price accurately.

A12. The CBA is released with this Amendment.

Q13. For the DMO and OWO SLINs, Attachment 7 requires an annual price per SLIN. The Schedule B unit of issue for DMO and OWO SLINs is "Job". For a DMO or OWO, will the contractor invoice the Government per DMO and OWO or equal monthly billings? For example, under SLIN 001AC, if the amount entered into Attachment 0007 as the Base Year Price is $120, will the contractor invoice a monthly amount of $10 or will the contractor invoice $12 per environmental DMO up to 10 a year?

A13. The contractor may invoice as he sees fit as long as invoice methodology remains consistent throughout the year and methodology can be justified and successfully negotiated with the Government post contract award during the transition period

Q14. Will the Government order a capability level of DMO/OWO SLIN at the beginning of each contract period to allow the contractor to invoice in equal monthly increments?

A14. Yes

Q15. If the Government increases the capability level of a DMO/OWO SLIN after the start of the contract period, will the contractor retroactively invoice so the entire price entered in Attachment 0007 is recovered?

A15. The Government will not change capability levels without a negotiated modification. The KO will decide a fair and reasonable modification cost for any change.

Q16. If the Government decreases the capability level of a DMO/OWO SLIN after the start of the contract period, how will the contractor recover the costs of supporting a higher quantity for a portion of the year?

A16. The Government will not change capability levels without a negotiated modification. The KO

Q17. If the SLINs for DMO and OWO are invoiced per “Job” in accordance with Section B, are the CLINs incremental? For example, the first 10 environmental DMOs will be invoiced under SLIN 0001AC; the 11th environmental DMO is invoiced under SLIN 0001AD, the 16th environmental DMO is invoiced under SLIN 0001AE.

A17. The Government will not change capability levels without a negotiated modification. The KO

Q18. Will the Government please clarify if all they want to see in this volume subfactor is resumes and letters of commitment from the 5 Key Personnel identified in Key Points #1 - #5?

Furthermore, the Contract Management evaluation criteria (M.7) mentions a Contract Management Plan based on the PWS. Section L does not require it, nor provide instruction on to what the Government wants to see in this section. The words contract management plan could not be found anywhere else, except as mentioned in M.7, throughout the solicitation documentation.

Will the Government please clarify specifically what should be included in the Contract Management Section? Or point the offeror to where that instruction resides so they can respond adequately.

A18. Contract Management Plan consists of the offeror’s planned organization structure (flow chart) for management of the RIA BOS contract and the Resumes requested for the Key personnel as identified in L.2, Volume II, Subfactor H.

Q19. Section B, within the RFP, states that the CLIN Structure for CLIN 5 (Family Housing) is to price Sub- CLIN “AJ” and “AK” but the Pricing matrix (Attachment 7) states that the Sub-CLINS are “AI” and “AJ”, thus not matching. Can the Government please clarify whether Section B or the pricing matrix is the correct CLIN structure and can we expect an amendment for either Section B or the Pricing Matrix?

A10. A revised Attachment 0007, Pricing Matrix dated 11 January 2020 is incorporated with this Amendment.

Q20. Will the Government please clarify if all they want to see in this volume subfactor is resumes and letters of commitment from the 5 Key Personnel identified in Key Points #1-#5?

A20. The subfactor says that this portion of the proposal should have resumes and letters of commitment as a minimum. Offerors could supply information on how their contract management team will function.

Q21. Concerning the Summary Sheet (Tab 1), (P309) Please clarify the wording referencing the quantity of occurrences. Does this mean the number of occurrences will be by labor category? If there are no occurrences in the unscheduled Operational Work Orders or Demand Work Orders, how will the government evaluate these percentages?

A21. It is assumed there will not be zero occurrences. Section L has been updated to reflect this.

Contractors should price based on the max occurrences for each range. The number of occurrences will be based on number of work requests.

Q22. Would the Government clarify if it requires the offeror to include the organizational structure being proposed by the offeror to support the RIA BOS program to be compliant? If so, will the Government instruct the offeror where to include it.

A22. Yes, Offeror organizational structure is to be included in 1.2 Volume ll, Subfactor H submission.

Q23. How many hours per day do turning operations typically occupy? Does the contractor need to cover the operators when they are on lunch/break?

A23. Reference Attachment 10, Sections 1.2.2.4 and 2.1,2.2.1,2.2.2.

Q24. Attachment 7 suggests that only flood control operations exceeding 21' will warrant a DMO or PWO, however, TE 7.21 states that staffing for flood control operations is at the discretion of the DPW Director beginning at 19'. If staffing and response are at the discretion of the DPW director the workload cannot be determined ahead of time. Will the Government Issue a DMO or PWO for work requested by the DPW director for work not explicitly outlined in TE 7.21?

A24. DPW will issue a DMO or PWO for any work not explicitly outlined in TE 7.21 including any additional staffing requirements.

Q25. Attachment 7 states that the water treatment and distribution system is to be maintained by others. Section B CLIN 0007AA is for CLS 5002 Water Plant Ops OWO Scheduled. Who is responsible for operating the water treatment plant? If by others then what work is required for CLIN 0007AA Water Plant Operations?

A25. The water treatment plant and distribution system are maintained through another contract vehicle (the other contract vehicle handles the equivalent of PMOs only). The Base Operations Contractor will provide DMO and unscheduled OWO requirements support. “Scheduled” OWO requirements relate to the storm water/flood control portion of Attachment 7.

Q26. What type of work is required for an unscheduled OWO? Is there a limit to the number of work hours that may be applied to an OWO?

A26. Unscheduled OWO’s are generally service requirements for example additional testing requirements or hydrant flow testing. Unscheduled OWO’s should follow the same hour maximum as a DMO.

Q27. Will the government please specify what medium voltages are and what type of equipment they are maintaining?

A27. Medium Voltage is any voltage between 1 – 35 kV. Typical distribution system voltages on the installation are 2.4 kV and 13.8kV. See references in Attachment 4 and 6 and referenced equipment TEs for the electrical distribution equipment being serviced.

5. All other terms and conditions remain unchanged.

AMENDMENT 0002

The purpose for this Amendment is the following:

1. To extend the solicitation closing date and time to 1:00 PM CST, February 12, 2021.

2. To incorporate revised Attachment 6, dated 21 January 2021

3. To incorporate revised Attachment 10, dated 21 January 2021.

4. To incorporate revised Attachment 1, dated 26 January 2021

5. To remove TE7.12 from this requirement

6. To remove clause 52.236-13 and add 52.236-13, Alternate I

7. To revise Section A, #9 and #24.

8. To remove Key Point #3, Resumes, from Section L, Volume I, Subfactor A, GFEBS Operation

9. To add Key Point #2, Operations and Maintenance Superintendent, to Section L, Volume II, Subfactor H, Contract Management.

10. To revise Section L, Volume IV, Factor 3, Past Performance

11. To revise FAR Clause 52.233-2

12. To revise Section M.7, Factor 3, Past Performance

13. To provide a conformed copy of the solicitation and all amendments dated 28 January 2021.

14. To answer the following Contractor questions:

Q1. CLIN X013 is for DMO Unscheduled Labor and Material. However, CLINS X001 thru X002 (except X008) also have DMO Unscheduled SubCLINS (green cells). Are the green DMO Unscheduled SubCLINS X001 thru X002 (except X008) supposed to be PWOs Unscheduled? If yes, can you please revise the Price Matrix? If not, where should we include the costs for the PWOs Unscheduled in the Price Matrix? Will the Government provide a value for PWOs and provide a revised Price Matrix?

A1. There are no PWOs anywhere on the Price Matrix. PWOs are priced individually at time of execution. CLIN X013 is for Tenant Customer Unscheduled DMOs and is a Time and Material CLIN. All other Unscheduled DMO CLINs are fixed price.

Q2. The DMO and OWO Data does not identify the priority of each order. Can the Government provide the priority levels for the DMOs and OWOs within the Data tabs or at a minimum, an annual priority percentage for both order types -- DMO and OWOs?

A2. DMOs –

Priority 1 – 16% Priority 2 – 38% Priority 3 – 46%

OWOs –

Priority 1 – 2% Priority 2 – 2% Priority 3 – 96%

Customer –

Priority 1 – 3% Priority 2 – 6% Priority 3 – 91%

Q3. Reference Attachment 6, Relay Calibration Schedule –

"The Contractor shall submit the report once annually on the fifth (5th) business day prior to the end of the Base Year, Option Year 2 and Option Year" It seems the number 4 has been omitted. Will the Government please confirm that the last Option Year noted above is 4? The report for the relay calibration be submitted for Option Year 4 in addition to those mentioned. Will the Government please modify Attachment 6 to reflect the correct Option Year?

A3. The PWS has been updated to include “4”.

Q4. Will the Government please provide a conformed Solicitation to offerors to ensure that all items addressed during Q&A are incorporated into their proposal response?

A4. A conformed copy of the solicitation and all amendments is provided with Amendment 0002.

Q5. In questions and answers the Government stated: “2. To incorporate revised Attachment 0009, dated 5 Jan 2021 with correct POC information. If you have sent in your Past Performance Questionnaire you do not need to resubmit." In order to ensure that the Government has received the PPQEs, would the Government consider validating the receipt of those PPQEs sent before it was corrected to the offerors who have already sent notification of their referenced POCs? The offeror was told not to submit those PPQEs, but instruct the Government POCs to send directly to the KO/COR.

A5. Contractors may send an email to the POC listed on the bottom of Attachment 0009 to confirm receipt of PPQs submitted.

Q6. It is our understanding that a majority of the current personnel are Union employees. However, the Solicitation only included Wage Determinations? Is there an existing/current Collective Bargaining Agreement (CBA)? If yes, can you please provide a complete copy of the CBA along with a seniority listing by position/titles?

A6. The CBA was provided with Amendment 0001.

Q7. There is ACM storage on site. Are there qualified ACM remediation personnel that are part of the current staff or is the remediation bid to outside entities? Is there an EPA registered site on the Island?

A7. The PWS requires qualified ACM mediation personnel. The offeror may provide this on its own or through a subcontractor. There is no EPA registered disposal site on Island.

Q8. The requirement for adherence/compliance to AR 385-10 and EM 385-1-1 are called for in section 3 of this document. EM 385 it states, “Contractors must comply with applicable Federal, State, and local codes and standards, including Safety and Occupational Health (SOH) requirements, as well as any additional specific requirements invoked by the contract. These requirements are listed in, but not limited to: (1) DoD Instruction 6055.01, "DoD Safety and Occupational Health (SOH) Program," (2) Army Regulation 385–10, "The Army Safety Program," (3) Department of the Army Pamphlet 385–10, "Army Safety Program," (4) Occupational Safety and Health

Standards, 29 CFR 191, (5) Safety and Health Regulations for Construction, 29 CFR 1926, (6) U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385–1–1, and (7) Local Installation Safety and Health Regulations.”

Is a full time safety officer required on site? If so can this position perform more than just safety officer duties?

A8. Yes a safety officer is required on site and no they cannot perform more than safety officer duties.

Q9. AR 385-10 states the need for contractor personnel to provide is covered by Federal Acquisition Regulations and Defense Federal Acquisition Regulations. What FAR/DFAR clause covers the AR 385-10 and or EM 385-1-1 requirements?

A9. Refer to FAR clause 52.236-13, Alternate I. and to the OA, Section 2.16 for Safety requirements.

Q10/ We respectfully request a three (3) week extension to allow time for us to provide a complete and comprehensive proposal.

A10. The solicitation close date has been extended to 1:00 PM CST, 12 February 2021 per this Amendment.

Q11. Can you please confirm that the Contractor is not responsible for operating the Sewage Lift Station and Water Treatment Plant facilities as they are both operated by others? It is our understanding that we only provide maintenance support. Please Confirm?

A11. Operation of the Sewage Lift Station and Water Treatment Plant facilities is not part of this contract effort.

Maintenance and repairs will be done by DMO/OWO/PWO are a part of this contract scope per the PWS.

Q12. What is the current version and OEM for the SCADA systems throughout the site? Are all systems integrated?

A12. The current version is Rockwell Factory Talk. There are two SCADA systems, one for the Water/Waste water systems and one for the Hydroelectric Plant/ Electric Distribution System. The two are not integrated.

Q13. When was the last time either thermal-imaging or IR scanning was done for the electrical distribution system (15kV, 2400kV and 480kV breakers)? Also, when was the last time thermal-imaging was done for the insulators and connections at the substations?

A13. All of the above were last performed in 2020.

Q14. What are the qualifications of the people doing protective system relay testing with the equipment in the breaker house? When was the equipment used to do this testing last certified? What inspection frequency criteria is used to test the breaker relays? Has NFPA 70 E standards been met for all electrical distribution?

A 14.Q1 and 3 - Review Attachment 6 and Overarching Attachment of the PWS.

Q2 – This is unknown Q4 – The standard the Government is expected to meet are found in the relevant PWS attachments.

Q15. When was the last inspection of site overhead cabling conducted? What type of inspection was done? Who completed the inspection?

A15. Inspections are visual and are performed daily by the lineman.

Q16. In the hydroelectric building when was the last certification done on the 15 ton hoist?

A16. This is unknown as it is not currently being used.

Q17. When was the last load test of the 60 cell battery bank for the hydroelectric station? When was the last PM done on the Ad Tech charger and what was the scope of the inspection?

A17. Load testing is not performed in the manner the question suggests. The battery bank is, however, used under load daily (24/7). They provide 120 v DC to operate all generator controls and also provide excitation voltage for the generator coils. The batteries are immediately replaced upon failure. Battery PM is performed in accordance with requirements in TE 9.3

Q18. Typical 15kV breaker at the breaker house and 50/51 relays.

SCADA systems at breaker house, hydroelectric plant, pump house, lift station and BLDG 102.

Each name plate for the hydroelectric plant turbine and generators.

Basler/Voith control panel with relay.

Rexroth hydraulic control station and brake assembly.

Generator output breaker and any relays associated with the breaker

A18. A question was not provided with the above.

Q19. On May 6, 2020, Executive Order 13897, “Improving Federal Contractor Operations by Revoking Executive Order 13495” was implemented. This new EO deletes FAR subpart 22.12 in its entirety and the corresponding clause at FAR 52.222-17. Would the Government consider removing the requirement to adhere to FAR 52.222-17?

A19. FAR clause 52.222-17 has been removed.

Q20. RFP Section M.6 – Definitions, includes hydro-electric plant and bridge operations. Section L past performance instructions do not list hydro-electric plant and bridge operations. Please clarify this apparent conflict.

A20. The solicitation does not require past performance experience for the areas hydro-electric plant or bridge operations to be submitted for evaluation.

Q21. Who is the owner/generator of record for Asbestos containing material?

A21. Contractor generates the records (IAW Attachment 4.2.19). Government is the owner (IAW Attachment 4, section 3.0)

Q22. Can the Government provide historical costs for sod which has to be replace as a result of de-icing and snow activities?

A22. This information is not available.

Q23. Is there a limit to the number of inches of snow that the contractor will be responsible to remove before the Government would consider conversion to unscheduled OWO?

A23. This contract is a fixed price endeavor to remove all snow without stating and explicit quantity.

Q24. In what situation, other than snow or ice removal from a roof, would an unscheduled DMO be issued in Pavement Clearance?

A24. The Government does not currently or historically have other examples of unscheduled DMOs for pavement clearance.

Q25. In what situation would an unscheduled OWO be used in Pavement Clearance/

A25. An OWO for Pavement Clearance could be issued to clear areas that are currently outside of the fixed price contract requirement.

Q26. In what event would snow removal be a scheduled service?

A26. Snow removal is always covered by the fixed price portion of the contract, thus it is considered to be a scheduled service.

Q27. TE 7.12 provides a list of hydrants, however, this technical exhibit does not have any tasks associated with it.

Can the Government provide what tasks are to be performed for this list of equipment?

A27. TE 7.12 has been removed from this requirement. Please refer to Attachment 7, Stormwater Operations and Maintenance, Section 1.1. The contractor is expected to complete repairs or replacement of hydrants as a DMO or

PWO.

Q28. When was the last time crane rails were inspected/had PM performed?

A28. This information is unavailable.

Q29. Can the Government provide a quantity of exhaust systems and hoods that require Preventative maintenance?

A29. See TE 4.16

Q30. Can the Government please provide TE 5.2?

A30. This TE was provided with the solicitation. It is a controlled access so you must follow the directions to gain access.

Q31. What is the quantity of natural gas appliances?

A31. 251

Q32. Paragraph 2.4.1 references TE 10.4. Should this reference be 10.3 instead?

A32. Paragraph 2.4.1 should reference both TE10.3 and 10.4. The PWS has been updated.

Q33. Due to the COVID 19 pandemic, it is difficult for many contracting officers and CORs to answer PPQs as they are currently working remotely and may or may not have ready access to files held in their offices. Would the Government consider using CPARS in place of PPQs, as the CPARS are documents of record that can be pulled electronically?

A33. The requirement of PPQ will remain in the solicitation.

Q34. The Medium Voltage Electricians are currently CBA positions. By submitting resume’s for personnel other than the incumbent CBA employees a Contractor is locking ourselves into removing Union Employees. Would the Government consider removing this requirement?

A34. It is the Governments position the offeror can submit resumes of qualified candidates of their choosing. The requirement of resumes will remain in the solicitation.

Q35. The Government has provided an SCA Wage Determination with the final solicitation. We are award of an existing CBA between the incumbent contractor and Teamsters Local 371 covering the work performed under this follow on contract. The agreement is in full force and effect through September 30, 2023. When asked about a CBA during the draft stage of the procurement, the Government replied a CBA is not a requirement. Would not Successorship apply pursuant to FAR 22.1008-2 and 41 U.S.C. 6707(c)? Can the Government please clarify their intent in having contractors bid other than the CBA, and will the Government indemnify contractors who follow their directions is not bidding the CBA in the case of inevitable legal action by the Teamsters?

A35. The CBA has been released with Amendment 0001. Successorship does apply.

Q36. Reference Attachment 0054 TE 6.1, Outage Log - What period of time does the workload provided represent?

A36. TE 6.1 is an example of an outage log. It reflects how Annual Scheduled and Unscheduled outages should be documented. See Attachment 6 for scheduled outage requirements. Workload will vary based on each offeror’s approach to accomplishing scheduled requirements and the # of unscheduled events that occur during the period of performance.

Q37. Reference Attachment 0055, TE 6.2, Unpaved Roads Parking Areas – Will the TE be revised to include the amount of miles and square footage?

A37. No, Offeror are to review provided map files.

Q38. Reference Attachment 0056, TE 6.3, RIA Sign Inventory – All of the Inspection Dates are from 2018. Will this be updated?

A38. No this is the most current.

Q39. Reference Attachment 0058, TE 6.5, Electrical Distribution.

How many poles must be inspected in OY2 and 4?

How many Manholes are to be inspected annually?

How many medium voltage transformers and switchgear and breakers are to be done quarterly?

A39. Reference TE 6.6 for the numbers of poles and manholes. Reference TE 6.7 for medium voltage gear.

Q40. Will the Government consider allowing a Title or Cover Page on any of the electronic copies of each volume which would be considered outside of the page count?

A40. Offerors should follow the directions in Section L

Q41. Will the Government confirm that the Table of Contents for each Volume is outside of the page count for each Volume? \

A41. Refer to Amendment 001, Question 10.

Q42. The function of repairing exterior lighting systems and associated appurtenances is outside the scope of the current contract. Can the Government confirm that this is a new requirement?

A42. This is not a new requirement and is included in the current contract.

Q43. This function (repairing traffic signals and controllers) is outside the scope of the current contract. Can the Government confirm that this is a new requirement?

A43. This is not a new requirement and is included in the current contract.

Q44. The Government is requesting with our submission an Operating Plan for Grounds Maintenance and Pest Control. "Plans shall be submitted with the Technical Proposal and finalized within 30 calendar days after award."

Does the Government want the two plans, which are not a part of the required sub factors, to be submitted with our technical proposal response?

If so, where in the Technical Proposal would the Government request them to be submitted?

Would the Government consider that these two plans be excluded from page count and submitted as attachments to Sub factor H, Contract Management Submission?

A44. No the Government does not require an Operating Plan for Grounds Maintenance and Pest Control be submitted with the Technical Proposal. Those plans are required to be submitted within 5 days after Contract award.

The PWS OA Para 5.1 has been revised to read “Plans shall be submitted within 5 days after Contract award unless required for the Technical Proposal and finalized within 30 calendar days after contract award. Plans required as part of the Technical Proposal will be part of the page count.

Q45. Will the Government confirm that the work load costs shown for DMOs and OWOs included labor, material, supervision, QA, and record management (GFEBS) costs?

A45. Current contract costs are cost plus a fixed fee. The cost portion is labor, materials and equipment.

Q46. Will the Government consider extending the proposal submission to the 4th of Feb 2021, which will allow offerors to adequately respond and adjust proposal responses based on answers to questions?

A46. The closing date has been extended to 1:00 PM, CST 12 February 2021.

Q47. There is a discrepancy between key personnel labor categories listed in Section A, Section L and PWS Attachment 0001. Will the Government confirm the Key Personnel listed in Section 2.4.3 in Attachment 0001 are the positions offerors should present resumes for?

A47. Key personnel in section A has been revised to include the Operations and Maintenance Superintendent. The key personnel in sections A and L are required for proposal evaluation. Offerors are required to present the requested resumes. Requirements for Key Personnel requested in sections A & L are found in the PWS attachments OA, Section 2.4.3 and Attachment 6, Section 2.2.1.

Q48. If the key personnel labor categories listed in Section A are the positions offerors should present resumes for, this would give the incumbent a tremendous advantage being that the Medium Voltage Equipment Maintainers is a SCA wage rate employees and the incoming would have every intention of retaining these incumbents. Would the Government please adjust the key personnel listed in Section A to be consistent with Section L and PWS Attachment 0001?

A48. Section A is consistent with Section L and PWS, Attachment 0001.

Q49. Will the required Table of Contents for each volume count against the maximum pages allowed for those volumes?

Q49. Refer to Amendment 0001, question 10.

Q50. Will a cover page for each volume count against the maximum pages allowed for those volumes?

A50. Refer to Amendment 0001, question 10.

Q51. Will the Government define a major subcontractor in terms of scope and/or percentage?

A51. A major subcontractor will play a significant role in successful performance of the contract as stated on page 305 of the solicitation. They are not defined in terms of scope and/or percentage.

Q52. Instructions for preparing Volume V indicate we are to fill-in and sign Sections A and K. Are we instructed to omit the fill-ins and signatures in Section I, Contract Clauses (P254-299)?

A52. Refer to Amendment 0001, question 8

Q53. Please confirm if offerors are only required to submit Part 1 if the Past Performance Evaluation Questionnaire or a list of POCs questionnaires were sent to within Volume IV

A53. The PPQ should be submitted in accordance with the instructions in Paragraph L.1, Volume IV, Past Performance Questionnaire which states:

For all contracts identified, a Past Performance Questionnaire, Attachment 0009, must be completed and submitted.

The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to julie.k.culliton.civ@mail.mil and kathleen.m.ward20.civ@mail.mil. The Offeror shall e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows Table Format and include the following fields: Solicitation Number;

Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mailed to POC (month/day).

Q54. Reference Summary Sheet, Tab 1. Please clarify the wording referencing the quantity of occurrences. Does this mean the number of occurrences will be by labor category? If there are no occurrences in the unscheduled Operational Work Orders or Demand Work Orders, how will the Government evaluate these percentages?

A54. Refer to Amendment 0001, Question 21.

Q55. Request the Government provide historical workload data related to DMOs and OWOs by CLIN and classification of work.

A55. Reference TE 1.2

Q56. If historical workload data is not available, will the Government provide a minimum guarantee for DMOs and OWOs by CLIN and classification of work?

A56. Reference TE 1.2

Q57. Note 2 states “The Offeror shall submit past performance information for no more than three contracts for each functional area, but may submit past performance information for up to nine contracts to address all of the seven (7) functional responsibilities. For each contract submitted for itself or a proposed subcontractor, the offeror may submit up to eight pages. The eight pages must include the Past Performance Evaluation Questionnaire (Attachment 0009) and shall include narrative regarding the Offeror’s determination that a proposed major subcontractor will play a significant role in successful performance of the contract. The total maximum pages for Volume IV is 72 pages.”

The offeror is currently required to submit the 5 page PPEQ (Attachment 0009) and a narrative for major subcontractors, with a limit for each reference being 8 pages, would the Government consider removing the PPEQ from page count to allow for a more comprehensive PP Reference response?

Will the Government also confirm that we only need to include the PPEQ one time in the proposal response?

Would the Government consider that the major subcontractor narrative be excluded from the page count as well to allow for a more comprehensive response to why the team was selected?

A 57. Reference Amendment 0001, Q&A 3 for elimination of PPQ in page count.

The PPQ should be submitted in accordance with the instructions in Paragraph L.1, Volume IV, Past Performance Questionnaire which states:

For all contracts identified, a Past Performance Questionnaire, Attachment 0009, must be completed and submitted.

The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to julie.k.culliton.civ@mail.mil and kathleen.m.ward20.civ@mail.mil. The Offeror shall e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows Table Format and include the following fields: Solicitation Number;

Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mailed to POC (month/day).

The SubContractor requirement remains.

15. All other terms and conditions remain unchanged.

Section A - Solicitation/Contract Form

SOLICITATION NARRATIVE

SOLICITATION SUMMARY

1. The U.S. Army Contracting Command – Rock Island requests a proposal for the Base Operations Support Services on the Rock Island Arsenal (RIA), Rock, Island IL. All Contract Line Item Number (CLINs) will be firm fixed price, with the exception of unscheduled customer Demand Maintenance Orders (DMOs) and Unscheduled Emergency work. All work is to be done IAW the Overarching Performance Work Statement (OA-PWS) and all Attachments, dated August 10, 2020.

2. The proposed award will be for one 12 month base period, four subsequent 12 month option periods. The proposed award also provides for a six month extension in the event that Federal Acquisition Regulation (FAR) 52.217-8, Option to Extend Services is exercised.

The periods of performance are as follows:

Base Year Day 1 after issuance of Notice to Proceed (NTP) through Day 365 after issuance of NTP

Option Year One Day 366 after issuance of NTP through Day 730 after issuance of NTP

Option Year Two Day 731 after issuance of NTP through Day 1095after issuance of NTP

Option Year Three Day 1096 after issuance of NTP through Day 1460 after issuance of NTP

Option Year Four Day 1461 after issuance of NTP through Day 1825 after issuance of NTP

Six Month Option Day 1826 after issuance of NTP through Day 1826 after issuance of NTP to Extend

Please note the Base Period of Performance includes a 60 day transition in plan.

3. This Request for Proposal (RFP) is issued as a 100% competitive 8(a) Set-Aside.

4. Offeror questions regarding the solicitation and work contained in the OA-PWS and all Attachments are due to the POC no later 1:00 pm CT, January 14, 2021 in order to assure that all Offeror questions can be answered and posted for all Offerors knowledge prior to solicitation closing.

5. The closing date and time for receipt of offers is 3:00 pm CT, January 28, 2021..

6. Explicit access documents may be obtained by having an active Joint Certification Program (JCP) account.

You can obtain an active account by visiting:

https://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents.

When requesting access, provide your CAGE CODE in the “Reason for Request” block.

Once your account is active, you may request access to documents in beta.sam (https://beta.sam.gov).

*** PLEASE NOTE, THE PERSON APPROVED FOR YOUR BUSINESS IN JCP, MUST BE THE

SAME PERSON WHO REQUESTS ACCESS IN FBO OR YOU WILL BE DENIED. ***

7. Customer DMOs will be time and materials (T&M). For evaluation purposes, a ceiling amount is provided in the Price Matrix, Attachment 0007. This ceiling is not a guarantee of dollars to be awarded during any performance year.

8. Prices are required in accordance with the Price Matrix, Attachment 0007

9. If the awarded Contractor is unable to fill “Key Personnel” with the Individual whose resume and letter of commitment was submitted with their proposal, the Contractor shall submit for approval to the Contracting Officer a replacement that has equal or better qualifications. Key Personnel positions include:

Volume II – Factor 1, Subfactor H, Contract Management

General Manager Operations and Maintenance Superintendent Quality Control Manager Quality Control Inspectors General Fund Enterprise Business System Preventative Maintenance Coordinator

AND

Volume II – Factor 1, Subfactor E, Electrical Distribution Facilities Maintenance Horizontal

Medium Voltage Equipment Maintainers

10. The Government intends to award one contract pursuant to this solicitation. The award will be made to the offeror whose proposal offers the best overall value to the Government based on the integrated assessment of non-price and price evaluation factors. The evaluation factors include: technical, past performance, and price.

11. Offerors are cautioned to ensure their proposals are fully complete, including all fill-ins and blanks in the RFP. Any offeror submitting a proposal agrees by submission that its proposal and the prices contained therein will be valid for 90 days after receipt of proposals.

12. This solicitation is issued Subject to Availability of Funds. This solicitation is currently unfunded. Funds will be certified, subject to availability of funds (see FAR 52.232-18).

13. Please note that funding constraints require the Government to incorporate DFARS clause 252.232-7007, “Limitation of Government’s Obligation” (Apr 2014) to allow for incremental funding of the contract as necessary.

14. Evaluation of offers shall be IAW the evaluation guidelines and specific evaluation procedures in Section M of this solicitation. All offerors shall submit their proposals and any proposal revisions, if required, in strict accordance with the instructions set forth in the solicitation and any issued amendments. The Government must be able to access information along with any submitted changes within proposals readily and easily and will not be responsible for not being able to view necessary information that was not submitted IAW the instructions set forth in the solicitation.

15. Evaluation quantities and weights are included in the price matrix. The evaluation quantities and weights are estimates based on planning quantities at this time and are not obligatory under this contract. They are not binding and shall not be relied upon for execution purposes. Not meeting, or exceeding the evaluation quantities should be expected and will not constitute revision of the price matrix. If the Government requirements do not result in the estimated evaluation quantities, it shall not constitute the basis for an equitable price adjustment.

16. Offerors are cautioned to read Section L, Proposal Instructions, carefully to ensure that any proposal submitted in response to this solicitation and any issued amendments includes all technical, past performance, and price information required by the solicitation. Failure to provide the required supporting documentation may result in an offer being rejected.

17. The NAICS code for this solicitation is 561210.

18. Terms of the solicitation and specifications remain unchanged unless a formal amendment to the solicitation is issued.

19. Proposal is to be submitted in U. S. Dollars.

20. The Government may choose to use Digital Signatures generated from a Common Access Card. This has the same legal affect and binding authority as a hand signature.

21. An Offeror is required to be registered in the System for Award Management (SAM) database when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of any contract resulting from this solicitation.

SAM replaces CCR/FedReg, and ORCA. Contractors may obtain information on registration and annual confirmation requirements via the SAM accessed through https://www.sam.gov/SAM/ or by calling 866-606-8220.

22. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated into this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

23. The prevailing wage determinations will be incorporated each performance year of the resultant contract and will be in effect for that entire performance year. The most recent applicable wage determinations are:

DB Wage Decision: IL20200001- Building Date: 11-27-2020 https://www.wdol.gov/dba.aspx Attachment 0002

DB Wage Decision IL 20200012 -Heavy and Highway Date: 09-18/2020 https://www.wdol.gov/dba.aspx Attachment 0002

DB Wage Decision IL 20200048-Residential Date:10/2/2020 https://www.wdol.gov/dba.aspx Attachment 0002

SCA Wage Determination No. 15-5012 Revision No. 12 Date of Revision: 6/24/20 https://www.wdol.gov/sca.aspx Attachment 0003

24. This RFP should not be discussed with any Government…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .