A07 ATTACHMENT 0063 TE 7.1 Major Components of Water System.pdf

PDF 948 KB Posted

Attached to
Base Operations Support Services on the Rock Island Arsenal, Rock Island, Illinois
Solicitation number
W52P1J-21-R-5001
Issued by

About this file

This document provides details on major water system components located at various buildings on a federal facility, as well as information on a related federal contract opportunity for base operations support services. Key components of the water system include pumps, generators, chlorinators, feed machines, meters, mixers, filters, tanks and related equipment. The federal contract opportunity is for base operations support services on the Rock Island Arsenal in Illinois over one base year and four option years, with a potential six month extension. Services include grounds maintenance, pavement clearance, facility maintenance for both buildings and Army family housing, pest management, hydroelectric plant operations and maintenance, and bridge operations and maintenance.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00006.pdf PDF
Amendment 00007.pdf PDF
A07 A RIA Overarching (OA) PWS BASEOPS_20210210.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev K 11 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00005.pdf PDF
Pricing Matrix RIA Base OpsRev J 08 Feb 2021.xlsx XLSX spreadsheet
A07 Att 4 Facility Maintenance Vertical JV_20210208.pdf PDF
A07 Amendment 0004.pdf PDF
A07 TE 4.21 Cranes and Crane Rails_20210208.pdf PDF
Amendment 0003.pdf PDF
A07 DB WAGE DETERMINATION BUILDING revised 21 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy Highway revised 01 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy revised 15 January 2021.pdf PDF
A07 Att 6 Facility Maint Horizontal JV_IGSA Rev 20210121.pdf PDF
A07-Amendment 0002.pdf PDF
A07 CONFORMED COPY WITH ALL AMENDMENTS.pdf PDF
A07 Att 10 Bridge Operations and Maintenance JV_Final 2020121.pdf PDF
A07 PWS OA and All Attachments 20210126.pdf PDF
A07 ATTACHMENT 0007 Pricing Matrix 11 January 2020.xlsx XLSX spreadsheet
A07 ATTACHMENT 0009 Past Performance Questionnaire 12 Jan 2021.docx DOCX document
A RIA Overarching (OA) PWS 12 January 2021.pdf PDF
A07 TE 5.10 Family Housing Inventory Items rev.xlsx XLSX spreadsheet
CBA 2018-2023 .pdf PDF
AMENDMENT 0001.pdf PDF
A07 ATTACHMENT 0074 TE 7.20 Stormwater Observation Report.pdf PDF
A07 ATTACHMENT 0012 TE 1.2 Estimated Workload Data DETAIL rev.xlsx XLSX spreadsheet
A07 ATTACHMENT 0005 TE List.docx DOCX document
A07 ATTACHMENT 0027 TE 4.6 Overhead Doors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0072 TE 7.18 Flood Pump Information.pdf PDF
A07 ATTACHMENT 0080 TE 9.1 Elect Distrib Sytm Mjr Components HydroPlant.xlsx XLSX spreadsheet
A07 ATTACHMENT 0013 TE 1.2 Estimated Workload Data Summary.pdf PDF
A07 ATTACHMENT 0054 TE 6.1 Outage Log.xlsx XLSX spreadsheet
A01 ATTACHMENT 0001 PWS Att 2 Grounds Maintenance.pdf PDF
A07 ATTACHMENT 0081 TE 9.2 SCADA Reporting Elements.pdf PDF
A07 ATTACHMENT 0028 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0038 TE 4.17 Mass Notification Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0037 TE 4.16 Fire Suppression Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0014 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 ATTACHMENT 0057 TE 6.4 Sign Replacement Requirements.pdf PDF
A07 ATTACHMENT 0039 TE 4.18 Playground Equipment.pdf PDF
A07 ATTACHMENT 0017 TE 1.7 Government Furnished Facilities 20200807.pdf PDF
A07 ATTACHMENT 0031 TE 4.10 Grease Trap.xlsx XLSX spreadsheet
A07 ATTACHMENT 0041 TE 4.20 Meter Reading Form.xlsx XLSX spreadsheet
A01 ATTACHMENT 0001 PWS RIA Overarching (OA) PWS.pdf PDF
A07 ATTACHMENT 0067 TE 7.10 Water Distribution Valves.pdf PDF
A07 ATTACHMENT 0050 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 ATTACHMENT 0042 TE 4.21 Cranes and Crane Rails.pdf PDF
A07 ATTACHMENT 0034 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 7.1 Major Components of Water System

MAJOR COMPONENTS OF WATER SYSTEM

LOCATION EQUIPMENT MANUFACTURER CAPACITY QUANTITY

BLDG 9 Pump Flygt 1500 GPM 1

BLDG 9 Pump Flygt 1000 GPM 1

BLDG 9 Emergency Pump Ingersoll-Rand 1500 GPM 1

BLDG 9 Emergency Motor/ General Motors 100 HP 1

Diesel

BLDG 9 Battery Charger Onan 12 Volt/10 Amp 1

BLDG 9 Carbon Machine 55 lbs/day 1

BLDG 9 Hoist Reading Chain & 1 Ton 1

Block Corp.

BLDG 9 Hoist Triplex 2 Ton 1

BLDG 50 Chlorinator Wallace & Tiernan 400 lbs/day 1

BLDG 50 Chlorinator Wallace & Tiernan 200 lbs/day 1

BLDG 50 Scales Scaletron 500 lbs 8

BLDG 50 Dry Chemical

Feed Machines

Wallace & Tiernan 100 lbs/hour 3

BLDG 50 Raw & Settled Dayton Motors 1/3 HP 2

Water Sample Pumps

BLDG 50 Hot Water Heater

Electric

Crane 30 Gal 1

BLDG 50 SCADA Computer Dell 1

BLDG 50 Compressor Ingersoll-Rand 3 HP 1

BLDG 50 Refrigifilter

Evaporator

Hankison Corp. 1/2 HP 1

BLDG 50 Compressor Curtis 3HP/30 Gal 1

BLDG 50 High Service Pump American-Marsh Pumps 1050 GPM/75 HP 1

BLDG 50 High Service Pump Peerless Pump 2100 GPM/150 HP 1

BLDG 50 Battery Charger MCS Model MBC6 24V/10 Amp 1

BLDG 50 Automatic Bypass

Valve

Clay-Valve 5 inch 1

TE 7.1 Major Component of Water System

MAJOR COMPONENTS OF WATER SYSTEM

LOCATION EQUIPMENT MANUFACTURER CAPACITY QUANTITY

BLDG 50 Pump Dayton Dowd w/ 3128 GPM 1

Caterpillar Diesel 250 HP

BLDG 50 Control Panel

Motor

Westinghouse 600A/460 V 1

BLDG 50 Auto Vacuum Gast 1.5 HP Electric 1

System Motor/8 HP Gas

Engine (Kohler)

BLDG 50 Condensation Wagner Electric Co. 1/2 HP 2

BLDG 50

Pumps

Transfer Pump Westinghouse 10 HP 2

BLDG 50 Raw Meter Sparling Model 760 12 in. Circular 1

Chart Recorder

BLDG 50 High Tank Water Sparling Model 760 14 in Circular 1

Level Indicator Chart Recorder

BLDG 50 Backwash Meter BIF Model 0303-01 ----------- 1

BLDG 50 Mixing Basins Concrete Const. 15,600 Gal 4

BLDG 50 Settling Basins Concrete Const. 250,000 Gal 2

BLDG 50 Clear Well Concrete Const. 750,000 Gal 1

BLDG 42 Sludge Drying Beds Concrete Const. 7,500 sq. ft. 2

BLDG 50 Filter Tables BIF ------------- 4

BLDG 50 Level Gauge BIF ------------- 1

BLDG 50 Mixer Motors Linkbelt 3 HP 5

BLDG 71

Sludge

House

Water

Pump

& Sludge General Electric 5 HP 4

BLDG 71 Mercury Float Consolidated 5 1/2 in. dia. 2

Sludge Switches Electric Co.

House

BLDG 71 Sump Pump Flo-Tech 1/4 HP 1

Sludge

House

BLDG 236 High Tank ------------ 500,000 Gal 1

Cathodic Protector

BLDG 236 AltitudeTransmitter-Rosemont ------------- -

MAJOR COMPONENTS OF WATER SYSTEM

LOCATION EQUIPMENT MANUFACTURER CAPACITY QUANTITY

Lab Bacteriological (3'x3'x4')

BLDG 50 Electric Despatch Model 100 18 Cu. Ft. 1

Sterilizer (2'x3'x3') 400 1/2

BLDG 50 Ammonia Feeder Capitol Controls 1

BLDG 50 NH3 Gas Detector Wallace/Tiernan 1

BLDG 50 Water Softener Culligan 1

BLDG 50 Exhaust Fan Greenheck 1

BLDG 50 Unit Heater Modine 1

BLDG 50 Backflow Preventer Wilkins 1

BLDG 50 Mini Power Center Westinghouse 1

BLDG 50 Safety Switches Westinghouse 1

BLDG 50 Chemplex HeatTrace Raychem 1

BLDG 50 Comparator Heluge-Daylitz 1

BLDG 50 Turbidmeter Hach Model 2100A 1

BLDG 50 pH Tester Cole Parmer --------- 1

BLDG 50 Microscope Bausch & Laumb --------- 1

BLDG 50 Analytical Scale Fisher 0-100 Grams 1

BLDG 50 Lab Mixer Phipps & Bird 6 paddle 1

BLDG 50 Sterilimatic Market Forge --------- 1

BLDG 50 Still Corning Mega-Pure 3 liter/hour 1

BLDG 50 Hot Plate Edwin Wiegand -------- 1

BLDG 50 A/C Freidrich 12500 BTU/HR 1

BLDG 50 Refrigerator GE 9 CU Ft 1

WATER FILTRATION PLANT, BUILDING 50, EQUIPMENT LISTING

DESCRIPTION LOCATION MANUFACTURE

R

QUANTITY MODEL #'s SERIAL #'s CHARACTERISTICS

Air compressor Basement, E sector, E wall

Ingersoll Rand 1 242D3 288774 type 30; tank 450814, 1969; motor-

Century, 6-322454-01, 3 HP, 1,745 RPM, S#8J

Air compressor Basement, E sector, E wall

Curtis

Compressor

1 3087-9261 motor-Crocker-Wheeler, .75 HP, 1,730

RPM,

220-440, S#1083569 Air dryer Basement, E sector E wall

Pioneer 1 F30A 59256D4A17

Air eliminator Basement, ceiling, SW of

E sector

Enhanced Air

Separator

1 EAS-1H59 112105 1"

Backflow preventor Basement, SW of E sector

Febco 1 825Y BL3122 size 3/4"

Bypass valve Basement, SW of E sector

Clayton 1 5", steam regulating diaphragm valve

Bypass valve Basement, NE of E sector

Spence 1

Chlorine analyzer Basement SW of E sector

EIT 2 51T 1724 & 1725 Overflow cell assembly, P/N 096-1072, inlet flow 8-25 GPH

Diesel engine for emergency pump

Basement, S of E sector Caterpillar 1 3406D1 90U12924 Arrangement #6N4997

Differential pressure meter Basement, SW of E sector

Bailey 1 44392PIZ BCN2421515

Jan-91

Emergency pump Basement, S of E sector Dayton-Doud 1 10A-20 55506 3,128 GPM; 1,200 RPM; 138.5 ft TDH

Filter backwash control valves

Basement, west corridor Dresser 4 450 58-0450-02-

0810-73

Filter backwash valve positioners

Basement, west corridor 4 Series 3600 12134910

12134910 body; type 9500, 12" actuator; action

PDTO, type 1052

Filter effluent valves and rate controllers

Basement, west corridor Bailey 4 UP10A0000

AV112100

WS800691C

WS800692C

WS800693C

WS800694C

150 psi

Filter influent control valves

Basement, west corridor BIF 4

Filter to waste control valves

Basement, west corridor BIF 4

High service pump motor Basement, E sector Baldor 1 B671732 B67173 20-0100

75 HP

High service pump Basement, E sector Peerless 1 5200 387141 size 4AD-14; 1,050 GPM; 1,750 RPM; 175

TDH

High service pump motor Basement, E sector 1 444TS 1745058 150 HP; 460 v; 60 HZ; 1,780 RPM

High service pump Basement, E sector Peerless 1 5200 387142 size 8AD-13 1/2; 2,100 GPM; 1,750

RPM; 175 TDH

Loss of head & rate of flow Basement, west corridor Rosemount 4 LT-400 & FT

30242, 30243, 30244, 30245, 30246, 30247, 30248, 30249

Meter Basement, SW of E sector

Dwyer 1 0-25 GPH

Meter Basement, south meter room

Sparling 1 11938-1

Residual chlorine monitor Basement, SW of E sector

EIT 2 8451 138 & 140 140 monitors filter #3 outlet & 138 monitors finished water

Rewash control valves for filters

Basement, west corridor Bettis 4 400-15-04-

02-004 brake

018752, 021677, 021678, 021676

Thrall-Plymouth autothon & velan valve

Surface wash control valves

Basement, west corridor BIF 4

Total free chlorine analyzer Basement, SW of E sector

Swan 1 F4351 J94 On finished water

Turbidimeter Basement, SW of E sector

Rosemount

Analytical

1 T-2120, DB-2120

J94 On finished water

Turbidimeter readout Basement, SW of E sector

Rosemount

Analytical

1 SCL-T-

2120-

M2

51975 On finished water

Turbidimeter Basement, west corridor Great Lakes 4 95 & 8220 9407016, 9406704, 9407731, 9406703

On effluent of each filter

Vacuum system motor Basement, E sector, E wall

Westinghouse 1 1168723-13 67744 1.5 HP, 220 v, 60/50 cycles, 3 phase, 1,725-

1,435 RPM, Vacuum system gas engine

Basement, E sector, E wall

Kohler 1 25671 engine mounted on Yeoman Bros Co.

frame

Vacuum system pump Basement, E sector, E wall

Gast 1 2565-V54 186