A07 ATTACHMENT 0012 TE 1.2 Estimated Workload Data DETAIL rev.xlsx

XLSX spreadsheet 6 MB Posted

Attached to
Base Operations Support Services on the Rock Island Arsenal, Rock Island, Illinois
Solicitation number
W52P1J-21-R-5001
Issued by

About this file

This document is a solicitation for base operations support services on the Rock Island Arsenal in Rock Island, Illinois. The solicitation is for one base year and four option years, with an additional six month option to extend services. Services include grounds maintenance, pavement clearance, facility maintenance for both vertical and horizontal structures as well as Army family housing, pest management operations, hydroelectric plant operations and maintenance, bridges operations and maintenance, and unscheduled services. The proposed contract would be awarded by the Department of the Army Materiel Command Joint Munitions Command.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00006.pdf PDF
Amendment 00007.pdf PDF
A07 A RIA Overarching (OA) PWS BASEOPS_20210210.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev K 11 Feb 2021.xlsx XLSX spreadsheet
A07 Amendment 00005.pdf PDF
Pricing Matrix RIA Base OpsRev J 08 Feb 2021.xlsx XLSX spreadsheet
A07 Att 4 Facility Maintenance Vertical JV_20210208.pdf PDF
A07 Amendment 0004.pdf PDF
A07 TE 4.21 Cranes and Crane Rails_20210208.pdf PDF
Amendment 0003.pdf PDF
A07 DB WAGE DETERMINATION BUILDING revised 21 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy Highway revised 01 January 2021.pdf PDF
A07 DB WAGE DETERMINATION Heavy revised 15 January 2021.pdf PDF
A07 Att 6 Facility Maint Horizontal JV_IGSA Rev 20210121.pdf PDF
A07-Amendment 0002.pdf PDF
A07 CONFORMED COPY WITH ALL AMENDMENTS.pdf PDF
A07 Att 10 Bridge Operations and Maintenance JV_Final 2020121.pdf PDF
A07 PWS OA and All Attachments 20210126.pdf PDF
A07 ATTACHMENT 0007 Pricing Matrix 11 January 2020.xlsx XLSX spreadsheet
A07 ATTACHMENT 0009 Past Performance Questionnaire 12 Jan 2021.docx DOCX document
A RIA Overarching (OA) PWS 12 January 2021.pdf PDF
A07 TE 5.10 Family Housing Inventory Items rev.xlsx XLSX spreadsheet
CBA 2018-2023 .pdf PDF
AMENDMENT 0001.pdf PDF
A07 ATTACHMENT 0074 TE 7.20 Stormwater Observation Report.pdf PDF
A07 ATTACHMENT 0005 TE List.docx DOCX document
A07 ATTACHMENT 0027 TE 4.6 Overhead Doors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0072 TE 7.18 Flood Pump Information.pdf PDF
A07 ATTACHMENT 0080 TE 9.1 Elect Distrib Sytm Mjr Components HydroPlant.xlsx XLSX spreadsheet
A07 ATTACHMENT 0013 TE 1.2 Estimated Workload Data Summary.pdf PDF
A07 ATTACHMENT 0054 TE 6.1 Outage Log.xlsx XLSX spreadsheet
A01 ATTACHMENT 0001 PWS Att 2 Grounds Maintenance.pdf PDF
A07 ATTACHMENT 0081 TE 9.2 SCADA Reporting Elements.pdf PDF
A07 ATTACHMENT 0028 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 ATTACHMENT 0038 TE 4.17 Mass Notification Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0037 TE 4.16 Fire Suppression Systems.xlsx XLSX spreadsheet
A07 ATTACHMENT 0014 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 ATTACHMENT 0057 TE 6.4 Sign Replacement Requirements.pdf PDF
A07 ATTACHMENT 0039 TE 4.18 Playground Equipment.pdf PDF
A07 ATTACHMENT 0017 TE 1.7 Government Furnished Facilities 20200807.pdf PDF
A07 ATTACHMENT 0031 TE 4.10 Grease Trap.xlsx XLSX spreadsheet
A07 ATTACHMENT 0041 TE 4.20 Meter Reading Form.xlsx XLSX spreadsheet
A07 ATTACHMENT 0063 TE 7.1 Major Components of Water System.pdf PDF
A01 ATTACHMENT 0001 PWS RIA Overarching (OA) PWS.pdf PDF
A07 ATTACHMENT 0067 TE 7.10 Water Distribution Valves.pdf PDF
A07 ATTACHMENT 0050 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 ATTACHMENT 0042 TE 4.21 Cranes and Crane Rails.pdf PDF
A07 ATTACHMENT 0034 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Explanation of TE 1.2 TE 1.2 Estimated Workload Data for Base Operations and Maintenance, Rock Island Arsenal, Illinois

This file contains 5 years of workload data. 2013-2018

The Tabs that areGolden colored
Contain Demand Maintenance Order (DMO) and Operational Work Orders (OWO) Data
Data differentiates between Garrison, Army Family Housing (AFH), & Customer and year of accomplishment.
All Garrison Work is associated with the Performance Work Statement (OA and Attachments) and is Firm Fixed Price
AFH Work is in relation to Attachment 5, Facility Maintenance Army Family Housing, and is Firm Fixed Price
Customer Work is billed as Time and Materials to individual Customers and Tenants
The Tab Labeled DMO & OWO DATA is the raw data containing 26,952 Records
The Three additional tabs are pivot tables based off of the raw data which summarizes the data
The Tabs that areGreen Colored
Contain Performance Work Order (PWO) Data commonly referred to as Individual Job Orders (IJOs)
PWOs are discussed in section 2.9 of the Overarching PWS

Technical Exnibit 1.2 &F & [Tab]

&P of &N &D

PWO Summary Data

Project Work Orders are for work Greater than $2,500.00
Average of 202 PWOs per Year
Annual Average of $5,849,566.31
Average PWO Cost $28,958.25
Price Range of Most PWOs
Nearly 75% of all PWOs are under $35,000
From $2,500 to $35,000

Technical Exnibit 1.2 &F & [Tab]

&P of &N &D

PWO DATA

Workload YearProject NumberProject DescriptionFinal CostGarrison or CustomerCustomerDate to ContractorAction Complete Date
20142014-61REMOVE DEAD TREE; OPEN & RESET FENCE F/ACCESS$ 9,493.00GarrisonPW-13110/9/1311/12/13
20142014-71INSTALL SIMPLEX READER, DOUBLE DOORS$ 121,200.00CustomerRICC10/11/138/14/14
20142014-72DOMESTIC WATER HEATER IS LEAKING SIGNIFICANTLY$ 3,961.85GarrisonPW-13210/11/1310/31/13
20142014-107WIRE TWO UNWIRED LIGHTS TO NEAREST LIGHTING CIRCUIT$ 4,368.00GarrisonPW-13210/16/131/14/14
20142014-112REPAIR/REPLACE DEFFICIENT BACKFLOW PREVENTERS$ 13,786.41GarrisonPW-13210/16/131/6/14
20142014-139INVESTIGATE AND REPAIR TURNSTILES AND MAN GATES$ 13,017.29GarrisonPW-13210/18/131/29/14
20142014-143IMPROVE TRAFFIC SIGNAGE ALONG BLUNT AND KING$ 5,027.00GarrisonPW-13210/18/134/28/14
20142014-216REPAIR/REPLACE HOT WATER HEATERS (NO HOT WATER IN ROOM 605)$ 8,569.36CustomerPW-13210/23/131/6/14
20142014-273INSTALL THREE LIGHT FIXTURES SOUTH OF BLDG$ 6,752.00GarrisonPW-13210/25/133/11/14
20142014-397RECONFIGURE FENCE/GATE AT WEST END OF B339$ 4,290.00CustomerJMTC11/4/134/3/14
20142014-416REPAIR 9 AREAS OF FAILING ROOF$ 46,167.00GarrisonPW-13211/5/133/25/14
20142014-558REPLACE WINDOW BLINDS$ 3,925.00AFH-GarrisonAFH11/14/132/3/14
20142014-636INSTALL 2 PEDESTRIAN TURNSTILES (PHASE 2)$ 149,378.00CustomerTARA11/19/1310/27/14
20142014-637BUILD OFFICE WALL/INSTALL DOORS$ 21,169.00CustomerCOE11/19/134/30/14
20142014-693NEW STACK (PERF) TEST F/SCRUBBER ON NEW PLATING LINE$ 14,736.00GarrisonTARA11/22/131/30/14
20142014-768CONNECT GAS LINES, WATER LINES & ELECTRICAL TO 2 STEAMERS$ 5,146.00GarrisonNAF11/26/133/24/14
20142014-921REMOVE 2 SECTIONS OF WALLS TO REPAIR DAMAGED SEWER STACK; REPAIR 2 SECTIONS OF WALLS$ 6,036.58AFH-GarrisonAFH12/6/131/7/14
20142014-1018REMEDIATION OF LEAD DUST HAZARDS$ 18,253.37AFH-GarrisonAFH12/11/133/20/14
20142014-1072REMOVE WET CARPET & EXTRACT WATER CONV F/SO #1072, NTE $13,500$ 13,268.84AFH-GarrisonAFH12/16/131/13/14
20142014-1166INSTALL NATURAL GAS SERVICE AND METER SET$ 117,971.00GarrisonCOE12/19/1311/13/14
20142014-1167UPGRADE ELECTRICAL SERVICE$ 8,614.00GarrisonPW-13212/20/136/12/14
20142014-1192BETWEEN OCCUPANCY; QTRS 96B$ 3,694.00AFH-GarrisonAFH12/23/133/13/14
20142014-1255MAKE ROOF REPAIRS AS NOTED ON WORK REQUEST AND ATTACHEMENTS$ 58,158.00GarrisonPW-13212/30/134/30/14
20142014-1279WATER MAIN BREAK - WHITMORE BEGINNING TO FLOOD - (EXCESSIVE COLD)$ 18,176.17GarrisonEMERGENCY12/30/134/14/14
20142014-1327REBUILD CEILING$ 13,726.00GarrisonPW-1321/3/144/29/14
20142014-1332REPAIR WATER DAMAGE$ 44,720.00AFH-GarrisonAFH1/3/1411/7/14
20142014-1426REPAIR WATER DAMAGE CONV TO EIJO, NTP NTE $50000$ 34,793.61GarrisonEMERGENCY1/7/142/20/14
20142014-1452REPAIR WATER DAMAGE$ 44,720.00AFH-GarrisonAFH1/7/1410/30/14
20142014-1563JET STORM LINES$ 26,425.00GarrisonPW-1321/13/141/13/15
20142014-1564SPRINKLER SYSTEM (SPRINKLER 124) WATER FLOW GOING TO BSMT$ 30,728.68GarrisonEMERGENCY1/13/143/17/14
20142014-1583REPAIR ROOF AS NOTED ON WORK REQUEST & ATTACHMENTS$ 11,151.00GarrisonPW-1321/13/145/16/14
20142014-1667REPLACE CRACKED BEARING HOUSING AND BEARINGS; REPLACE #1 UPPER GUILLOTINE DAMPER BEARING HOUSE$ 26,576.00GarrisonPW-1321/16/148/22/14
20142014-1818MAJOR WATER LEAK - BLDG 75/61/60 CONV FROM SO #1818$ 48,267.91GarrisonEMERGENCY1/27/145/1/14
20152014-1830SAUNA REPAIR$ 8,182.00GarrisonPW-1321/27/144/2/15
20142014-1845BUILD OFFICE$ 50,971.00CustomerASC1/28/149/2/14
20142014-1868REPLACE WINDOW SHADES WITH BLINDS$ 2,754.00AFH-GarrisonAFH1/28/143/20/14
20142014-1869CLEAN AND DISINFECT SURFACES W/MOLD$ 10,692.00GarrisonPW-1321/28/144/30/14
20142014-19312014 IMCOM TRAFFIC CONTROL STUDY$ 10,099.00GarrisonDES1/30/144/7/14
20142014-1979REPLACE 6 WINDOWS$ 46,122.00GarrisonPW-1322/3/1410/15/15
20142014-1980REPLACE WOODEN OVERHEAD DOOR$ 5,079.00GarrisonPW-1322/3/144/29/14
20142014-2240REPAIR WEST STEAM MAIN, MAIN STEAM METER$ 25,201.00GarrisonPW-1322/13/146/5/14
20142014-2248STACK (PERFORMANCE) TEST F/3-TON FURNACE/INDUCTION FURNACES$ - 0GarrisonJMTC2/13/146/4/14
20142014-2260PERFORM LIGHTNING PROTECTION SURVEY$ 36,337.00GarrisonPW-1322/13/1411/26/14
20142014-2352ROOF LEAKS AT POST G14 IN AMBULANCE LINE AND MAJOR LEAK BY POST D11, LEAK AT D11 DRIPPING ON VENDING MACHINE (HAS BEEN UNPLUGGED), SEVERAL BUCKETS HAVE BEEN PLACED TO CATCH LEAKS - ADDED: WATER LEAKS BETWEEN COLUMNS J1-G1 AND BETWEEN K1 AND J1$ 9,198.93CustomerEMERGENCY2/20/146/11/14
20142014-2361RE-ROOF BLDG 301 W/NEW EPDM ROOF SYSTEM AT 9 ROOFS$ 98,894.00GarrisonPW-1322/20/1410/1/14
20142014-2389BETWEEN OCCUPANCY$ 7,033.00AFH-GarrisonAFH2/20/144/10/14
20142014-2408ENVIRONMENTAL ASSESSMENT - NEW FAMILY HOUSING$ 34,171.00GarrisonPW-ENV2/21/1410/17/14
20142014-2454CREATE ARC FLASH LABELS & AFFIX TO EQUIP$ - 0CustomerJMTC2/25/149/22/14
20142014-2486BUILD 3 NEW OFFICES, INSTALL & RECONFIG WORKSTATIONS$ - 0CustomerCHRA2/26/149/4/14
20142014-2521REPAIR/REPL PUMP SHAFT & ASSOCIATED FLOATS$ 13,893.00GarrisonPW-1322/27/146/16/14
20142014-2522REPLACE SOFT START$ 9,820.00GarrisonPW-1322/27/144/7/14
20142014-2543RE-ROOF WIND DAMAGED WESTERN EDGE OF BLDG 208. APPROXIMATELY 19,500 SF OF EPDM MEMBRANE ROOF TO BE REPAIRED AND REPLACED$ 114,498.00GarrisonPW-1322/28/146/11/14
20142014-2562REPLACE REMAINING ADVANCE WARNING LIGHTS W/LED$ 53,325.00GarrisonPW-1323/3/149/22/14
20142014-2578INSTALL STORE FRONT WALL (DOUBLE DOOR)$ - 0GarrisonPW-1323/4/1410/17/14
20142014-2594WINDOW REPLACEMENT$ 140,439.00GarrisonPW-1323/4/145/7/15
20142014-2595WINDOW REPLACEMENT$ 137,349.00GarrisonPW-1323/4/145/7/15
20142014-2629REPAIR/REPLACEMENT OF NW STAIRS$ 72,636.00GarrisonPW-1323/6/1410/30/14
20142014-2667SCRAPE AND PAINT LOOSE PAINT THROUGHOUT ENTIRE FAC$ - 0GarrisonPW-1323/7/147/23/14
20142014-2672WATER MAIN BREAK CONV TO EIJO NTP NTE $11,521.64;$ 12,016.64GarrisonEMERGENCY3/10/144/9/14
20142014-2716REMOVE TREES FROM SPILLWAY$ 15,598.00GarrisonPW-1313/11/148/11/14
20142014-2755REPLACE CONCRETE SLABS AROUND BUS STOP$ 34,609.00GarrisonPW-1323/13/149/5/14
20142014-2781CLEAN WATER STAINED AREAS$ - 0GarrisonPW-1323/14/1411/13/14
20142014-2807REPAIR/REPLACE LEAKING WATER HEATER (SMALL, EASTERN-MOST), RUNNING ACROSS FLOOR CONV F/SO #2807$ 6,853.10GarrisonPW-1323/14/144/15/14
20142014-2809REPLACE SPENCE VALVE ON STEAM REDUCING STATION$ 9,171.00GarrisonPW-1323/14/145/22/14
20142014-2810REPAIR #2 BOILER REAR SHAFT BEARING (SUMMER '14)$ 38,995.00GarrisonPW-1323/14/1411/14/14
20142014-2811VAR HEAT PLANT SUMMER SHUTDOWN REPAIRS (SUMMER '14)$ 65,246.00GarrisonPW-1323/14/149/9/14
20142014-2812VAR HEAT PLANT SUMMER SHUTDOWN REPAIRS (2), (SUMMER '14)$ 49,925.00GarrisonPW-1323/14/147/24/14
20142014-2813REPLACE OBSOLETE HAYS ACTUATORS$ 115,153.00GarrisonPW-1323/14/1411/14/14
20142014-2836INSTALL 2 VEHICLE ROLLING GATES$ 104,435.00CustomerJMTC3/17/1410/27/14
20142014-2898INSTALL POWER CABLE F/BIOLOGICAL INTEGRATED DETECTION SYS$ - 0CustomerECBC3/20/149/2/14
20142014-2905SURVEY MONITORING WELL-HEADS$ 5,805.00GarrisonPW-ENV3/20/1410/30/14
20142014-2912ADD WALL W/BADGE ENTY DOOR, RELOCATE DOOR TO CONF RM$ 30,127.00CustomerASC3/20/1411/26/14
20142014-2931REMOVE FH256 FROM SERVICE$ 13,269.00GarrisonPW-1323/21/148/11/14
20162014-2948REPAIRS TO EXTERIOR AND REPAIR GARAGE DOORS$ 67,153.75GarrisonPW-1323/24/145/25/16
20142014-2961REPAIR/REPLACE GAS METER CONV F/SO #14-1689$ 7,917.18GarrisonPW-1323/24/149/8/14
20142014-3064REPLACE FLOORING$ 53,568.00GarrisonPW-1323/31/1411/14/14
20142014-3070REPAIR/REPLACE ROOF SECTIONS$ - 0GarrisonPW-1323/31/147/23/14
20142014-3091RETUBE BOILER TUBES$ 25,742.00GarrisonPW-1323/31/145/16/14
20142014-3124INSTALL 3RD EMERGENCY SERVICES DISPATCH CONSOLE (WORKSTATIONS)$ 47,505.00GarrisonDES4/2/1410/14/14
20142014-3151REPLACE EAST H/C RAMP$ 88,768.00GarrisonPW-1324/3/144/9/15
20142014-3163BETWEEN OCCUPANCY QTRS ARE VACANT$ 8,285.00AFH-GarrisonAFH4/3/146/18/14
20142014-3199DIG UP FIRE HYDRANT #32 AND REPACK VALVE CONV FROM SO #3199, EIJO NTP NTE 6K$ 9,778.46GarrisonEMERGENCY4/7/145/16/14
20142014-3210BETWEEN OCCUPANCY VACANT: 5/1/14$ 4,719.00AFH-GarrisonAFH4/8/146/9/14
20142014-3262UPDATE CCTV SYSTEM (INCLUDING CAMERA & MONITORS)$ 14,982.00CustomerASC4/10/148/13/14
20142014-3301WATER MAIN HOT TAP & BACK-FLOW PREVENTER$ - 0CustomerTARA4/11/149/5/14
20152014-3353UPGRADE PHYSICAL SECURITY IN VAR COMM CLOSETS$ 122,248.00CustomerPW-1324/15/145/6/16
20142014-3357INSTALL SIDEWALK AT BLDG 15 TO SIDEWALK BY EAST ST$ 22,009.00GarrisonPW-1324/15/149/5/14
20142014-3419SINK HOLE EAST SIDE OF TEST TRACK ALONG ROADWAY$ 17,382.46GarrisonPW-1324/18/1411/3/14
20152014-3430SUPERVISOR - FIRE PREVENTION OFFICE$ 11,781.00GarrisonPW-1324/18/144/6/15
20142014-3446INSTALL PLATFORM STAND-OFFS$ 27,214.00GarrisonPW-1314/21/143/18/15
20142014-3554ARCHAEOLOGICAL SURVEY F/FUTURE FAM HOUSING$ 31,761.00GarrisonPW-ENV4/25/1410/17/14
20142014-3557REPAIR PARKING LOT$ 146,563.00GarrisonPW-1324/25/146/10/15
20152014-3558REPAIR PARKING LOT 1B$ 140,393.00GarrisonPW-1324/25/147/31/15
20142014-3593BUILD AN OFFICE$ 36,779.00CustomerASC4/28/1410/1/14
20142014-3608TRI/TIER II/EPCRA PROGRAM REQUIREMENTS$ 6,469.00GarrisonPW-ENV4/29/142/6/15
20142014-3614PLACE GRAVEL IN STORAGE LOT I$ 49,405.00CustomerTARA4/29/1411/17/14
20142014-3630TAKE T200 GENERATOR OUT OF SERVICE AND PROVIDE TRUCK LOAD LIME FOR OIL$ - 0GarrisonEMERGENCY4/29/1410/17/14
20142014-3644REPAIR/REFINISH CLOCK TOWER MAIN ENTRANCE DOORS & SIDE PANELS$ 45,333.00CustomerCOE4/30/148/13/15
20142014-3657RUN 480 VOLT TO CONCESSION STAND$ 12,086.00GarrisonNAF5/1/149/9/14
20142014-3745REPLACE PORTIONS OF HORSESHOE SIDEWALK$ 12,428.00AFH-GarrisonAFH5/6/149/5/14
20142014-3753REPLACE 700 SERIES LAMPS WITH 800 SERIES FOR MID-AMERICAN ENERGY REBATE$ 6,460.00GarrisonENERGY QU5/7/149/10/14
20142014-3941CHECK ELECTRICAL CONNECTIONS AND SEQUENCING AT FLOOD STATION 330$ 5,894.93GarrisonEMERGENCY5/15/148/28/14
20142014-3989INSTALL FENCING$ 15,705.00GarrisonPW-1325/19/1411/14/14
20142014-3990INSTALL ELEC POWER & LIGHTING IN CARPORT (DAV ACP)$ 24,112.00GarrisonPW-1325/19/1411/26/14
20142014-3996REMOVE ASBESTOS ABANDONED STEAM HEATING PIPE$ - 0CustomerTARA5/19/148/11/14
20142014-4028INSTALL MARQUEE SIGN, PROVIDE FIBER & ELECTRICAL$ 34,204.00GarrisonPW-1315/20/149/18/14
20142014-4108PROVIDE MULCH$ 14,910.00AFH-GarrisonAFH5/23/148/13/14
20142014-4109PROVIDE MULCH$ 18,732.00AFH-GarrisonAFH5/23/148/25/14
20142014-4110MARK CIRCUIT BREAKERS$ 5,769.00CustomerARDEC5/23/1411/5/14
20142014-4114REPLACE TURNBUCKLE$ 36,461.00GarrisonPW-1325/23/1410/28/14
20142014-4121PURCHASE REPLACEMENT DISHWASHERS & WATER HEATERS$ 9,154.00AFH-GarrisonAFH5/23/149/8/14
20142014-4130REPAIR LIFT STATION 49 CONV F/SO #4130$ - 0GarrisonEMERGENCY5/27/1410/7/14
20142014-4196BOILER ALARM (HYDRO CALL 5/28/14 EVENING), SO TO IJO CONVERSION - REPLACE 220 BOILER CONTROLLER$ 6,070.76GarrisonEMERGENCY5/29/146/17/14
20162014-4206INSTALL PARKING FOR BLDG 85, REPAIR SLAB PREVIOUSLY INSTALLED$ 128,872.00GarrisonPW-1325/29/146/16/16
20142014-4293INSPECT ROOF DAMAGE, CREATE DAMAGE REPORT$ 34,194.00GarrisonPW-1316/3/1410/14/14
20142014-4308SEAL LIMESTONE ON NORTH (FRONT) SIDE OF HOUSE$ 27,755.00AFH-GarrisonAFH6/4/149/22/14
20142014-4309SEAL ASPHALT DRIVEWAYS$ 12,452.00AFH-GarrisonAFH6/4/149/11/14
20142014-4311REPAIR CONCRETE AND RAILING$ 89,717.00GarrisonJMC6/4/146/10/15
20142014-4312REPLACE STREET GUTTER$ 24,983.00GarrisonPW-1326/4/1410/30/14
20142014-4344WASH WINDOWS$ 104,924.00GarrisonPW-1316/5/149/3/15
20152014-4354REMOVE OLD BOOTHS AND INSTALL NEW UNITS$ 59,284.00GarrisonPW-1326/6/144/9/15
20142014-4388BETWEEN OCCUPANCY MAINTENANCE$ 21,479.00AFH-GarrisonAFH6/9/148/21/14
20142014-4392INVESTIGATE POOR STORM DRAINAGE (QUAD 3)$ 39,022.00GarrisonPW-1316/10/141/13/15
20152014-4417DOOR INSTALLATION$ 32,361.00GarrisonPW-1326/11/144/30/15
20142014-4426REMOVE SLUDGE, SEDIMENT & HAZARDOUS WASTE$ - 0CustomerTARA6/11/149/25/14
20142014-4545WASTE WATER TREATMENT TANK M-303 REPAIR$ 51,316.00GarrisonPW-ENV6/18/1410/14/14
20142014-4619MODULAR RESTROOMS FOR B299 ZONE 6$ 124,041.00CustomerJMTC6/23/146/10/15
20142014-46672014 ANNUAL ASBESTOS SURVEY UPDATE$ 55,936.00GarrisonPW-1316/24/1412/16/14
20142014-4668INSTALL SCAVENGER PUMPS ON PASSENGER ELEVATORS$ 9,247.00GarrisonPW-1326/24/1411/6/14
20142014-4685REPAIR AND REPAINT MACRO ARTIFACT -XM102 HOWITZER$ 9,350.00GarrisonCMH6/25/148/4/15
20142014-4690PROVIDE HVAC$ - 0CustomerJMTC6/25/144/9/15
20142014-4691PROVIDE ADEQUATE LIGHTING$ - 0CustomerJMTC6/25/144/9/15
20142014-4692PROVIDE INSULATION AND CONCRETE PAD$ - 0CustomerJMTC6/25/1412/19/14
20142014-4708REPLACE OBSOLETE HAYS ACTUATORS (3)$ 45,686.00GarrisonPW-1326/26/1411/14/14
20142014-4717GROUNDS MAINTENANCE & LANDSCAPING$ 125,116.00GarrisonPW-1316/27/146/10/15
20142014-4718TREE REMOVAL$ 76,414.00GarrisonPW-1316/27/1410/17/14
20142014-4745REPLACE MOTOR CONV FROM SO #4745$ - 0GarrisonEMERGENCY6/30/147/21/14
20142014-4756CONTAMINATED WOOD BRICK FLOORING$ 14,858.00GarrisonPW-ENV6/30/1410/1/14
20142014-4791REPLACE HYDRAULIC FLUID$ - 0GarrisonEMERGENCY7/1/149/2/14
20142014-4800PROVIDE FLOOD SUPPORT (SUMMER FY14)$ 35,334.33GarrisonPW-EMERGE7/1/149/11/14
20142014-4801STORM CLEAN UP AND REPAIRS$ 34,970.20GarrisonPW-EMERGE7/1/1411/26/14
20142014-4857WATER COMING IN (FLOOD SUPPORT F/NI INDUSTRIES) CONV FROM SO #4857$ 28,090.43GarrisonNI INDUST7/7/1411/14/14
20142014-4925SET UP/TEAR DOWN IN SUPPORT OF ASC CHANGE OF COMMAND$ 13,840.00CustomerASC7/9/148/26/14
20142014-4927BETWEEN OCCUPANCY$ 3,940.00AFH-GarrisonAFH7/9/149/8/14
20142014-4941SANDBLAST AND REPAINT PLANTERS$ 16,838.00GarrisonPW-1327/10/146/18/15
20142014-4945REPLACE LIGHT POLE BASES AND RESET LIGHTS$ 26,292.00GarrisonPW-1327/10/1411/10/14
20162014-4946REPLACE CAP$ 129,287.00GarrisonPW-1327/10/1410/20/16
20142014-4960INSTALL NEW SIGNS FOR BLDG 225 & 350$ 9,428.00GarrisonPW-1327/10/144/21/15
20142014-4961INSTALL NEW GUIDE SIGNS (ISLANDWIDE) - ROADP$ 28,801.00GarrisonPW-1327/10/144/22/15
20142014-5019CONVERT EXISTING SPRINKLER RISER TO COMBINATION STANDPIPE$ 9,019.00GarrisonPW-1327/15/1411/18/14
20142014-5044UPGRADE TRAINING ROOMS$ 14,117.00CustomerASC7/16/1411/26/14
20152014-5045REPLACE CLOSET DOORS$ 4,875.00GarrisonPW-1327/16/142/24/15
20142014-5047INSTALL OUTDOOR INTERCOM SPEAKERS$ 12,592.00GarrisonNAF7/16/1411/26/14
20152014-5048REPLACE PLEXIGLASS$ 4,438.00GarrisonPW-1327/16/145/5/15
20142014-5058REPLACE CURRENT LAMPS W/LED$ 10,434.00GarrisonPW-1327/17/1412/17/14
20142014-5072CUT VEGETATION TO ALLOW FOR SERVICE VEHICLE ACCESS$ 7,681.00GarrisonPW-1317/17/149/18/14
20142014-5088INSTALL HALLWAY FIRE RATE WALL TO ISOLATE RESTROOMS$ 32,874.00GarrisonPW-1327/19/145/5/15
20142014-5128GROUNDS MAINTENANCE AND LANDSCAPING (B23, 85, 90, 210, 301 AND 350)$ 79,984.00GarrisonPW-1317/22/1410/17/14
20142014-5136REPAIR PAVEMENT NORTH OF BLDG 103$ 96,589.00GarrisonPW-1327/22/147/14/15
20152014-5137REPAIR PARKING LOT 1D$ 149,697.00GarrisonPW-1327/22/149/9/15
20152014-5138REPAIR PARKING LOT 1E$ 149,662.00GarrisonPW-1327/22/145/26/16
20142014-5192REPLACE FAN ID #2 MOTOR BEARINGS W/CERAMIC BEARINGS$ - 0GarrisonPW-1327/24/1410/3/14
20142014-5199REPLACE LEAKING WATER HEATER$ - 0GarrisonEMERGENCY7/25/149/11/14
20142014-5212ENCLOSE OPENING WHERE DUCTWORK HAS BEEN REMOVED$ 9,085.00CustomerJMTC7/25/1410/27/14
20152014-5259RELOCATE DPW ITEMS$ 27,032.00GarrisonPW-1317/29/146/10/15
20142014-5268INSTALL 4 WINDOWS THAT WERE REMOVED$ 7,076.00CustomerTARA7/29/147/31/15
20152014-5295REPLACE HID W/LED LIGHTS$ 58,956.00GarrisonPW-1327/31/142/25/16
20152014-5296REPLACE HID W/LED LIGHTS$ 54,897.00GarrisonPW-1327/31/142/25/16
20152014-5300INSTALL EXHAUST FAN AND COUNTERTOP$ 19,563.00GarrisonPW-1327/31/141/20/15
20142014-5318BETWEEN OCCUPANCY MAINTENANCE$ 6,900.00AFH-GarrisonAFH8/1/149/25/14
20142014-5359INSTALL ELECTRICAL POWER AND LIGHTING IN THE CARPORT, PHASE II$ 23,529.00GarrisonPW-1328/5/141/12/15
20142014-5387SECURITY UPGRADES$ 125,032.00CustomerASC8/6/147/7/15
20142014-5410DOOR OPERATOR REPLACEMENT AND MISC STAIRWELL WORK$ 21,453.00CustomerASC8/6/143/5/15
20142014-5442SECURE RM 346$ 145,027.00CustomerJMC8/7/145/21/15
20142014-5443SECURE RM 346C (WORK INCLUDES BUT NOT LIMITED TO: WALL/DOORS & LOCKS, ELEC/LIGHTING)$ 149,331.00CustomerJMC8/7/145/6/15
20142014-5444REPLACE CARPET W/CARPET TILES AND ABATE ASBESTOS$ 5,630.00CustomerJMC8/7/141/12/15
20142014-5445REPLACE CARPET W/CARPET TILES$ 5,671.00CustomerJMC8/7/143/5/15
20142014-5454CARPET REPLACEMENT$ 131,811.00CustomerCHRA8/7/147/13/15
20142014-5455CARPET REPLACEMENT$ 122,642.00CustomerCHRA8/7/147/13/15
20142014-5456RENOVATE MENS RR$ 87,055.00CustomerCHRA8/7/142/25/15
20142014-5457RENOVATE WOMENS RESTROOM$ 75,626.00CustomerCHRA8/8/142/25/15
20152014-5538REPLACE EXTERIOR DOORS THAT ARE RUSTING AND BOWING$ 6,536.00GarrisonPW-1328/12/146/16/15
20142014-5539TREE & BRUSH CLEARING$ 89,565.00GarrisonPW-1318/13/1411/14/14
20142014-5559REPROGRAM LOC BUTTONS$ 24,923.00GarrisonGARRISON-8/14/142/18/15
20142014-5560REPLACE CARPET$ 61,684.00CustomerCHRA8/14/147/13/15
20142014-5581BETWEEN OCCUPANCY MAINTENANCE$ 5,936.00AFH-GarrisonAFH8/15/1412/31/14
20142014-5582BETWEEN OCCUPANCY MAINTENANCE$ 8,689.00AFH-GarrisonAFH8/15/1412/1/14
20152014-5609MOVE ITEMS (COAST GUARD)$ - 0GarrisonPW-1318/18/147/14/15
20152014-5636FORCE PROTECTION UPGRADES$ 45,574.40CustomerASC8/19/147/20/15
20152014-5662MOVE MACRO-ARTIFACTS$ 38,618.00GarrisonDPW-1318/20/147/14/15
20142014-5671REPLACE CHARGING UNIT F/EMERGENCY LIGHTING$ 57,056.00GarrisonPW-1328/21/141/28/15
20142014-5697NEW LETTERING FOR BLDG 390$ 4,348.00CustomerASC8/22/1412/8/14
20142014-5766REPAIR BROKEN ELECTRIC FEEDWATER PUMP$ 9,810.33GarrisonPW-1328/26/1410/14/14
20152014-5811CONSTRUCT GROUNDING CART$ 23,757.00GarrisonPW-1318/28/148/26/15
20152014-5891RENOVATE WAITE STATION$ 14,160.27GarrisonNAF9/2/148/11/15
20152014-6025DISPOSE OF LEAD PLATING MATL IN TANK #169$ 52,886.00GarrisonTARA9/8/141/28/15
20142014-6100PURCHASE AND INSTALL 3-PERSON WORKSTATION$ 11,606.00CustomerJMC9/11/1412/11/14
20142014-6120EMERGENCY REPAIRS TO H/C RAMP CONV TO EIJO, NTP NTE $6,000$ 6,000.00GarrisonEMERGENCY9/11/142/19/15
20142014-6182BETWEEN OCCUPANCY QTRS AVAILABLE NEAR 17 OC 14$ 13,790.00AFH-GarrisonAFH9/16/141/26/15
20152014-6209REMOVE WOOD BLOCK AND CONCRETE 2" CAPPED FLOOR$ 30,968.00CustomerTARA9/16/142/5/15
20142014-6214MAKE FACILITY OPERATIONAL$ 108,932.00GarrisonASC9/17/141/13/15
20152014-6221CUT 2 NEW DOORS INTO WALLS/ONE INNER DOOR$ 11,394.00CustomerJMC9/17/1412/23/14
20152014-6280REPLACE FLOORING$ 92,855.00GarrisonPW-1329/19/146/18/15
20142014-6351REBUILD GAS METER NTP NTE $6,000$ - 0GarrisonEMERGENCY9/24/141/28/15
20142014-6354REPAIR A HOLE IN THE FEED WATER LINE SERVICING THE DA TANKS$ 5,295.45GarrisonEMERGENCY9/24/1410/14/14
20152014-6450INSTALL ADD'L OUTLETS AND LIGHTING F/3 FLAGS$ 2,999.00AFH-GarrisonAFH9/29/1410/5/15
20152014-6451REPLACE LIGHTING IN KITCHEN AND LAUNDRY RMS$ 2,580.00AFH-GarrisonAFH9/29/148/24/15
20152015-24REPLACE LIGHT FIXTURES$ 11,541.00CustomerJMTC10/1/146/16/15
20152015-45DEMOLISH KING FISHER PANEL$ 45,813.12GarrisonPW-13210/2/147/17/15
20162015-176CLEAN LEAD PAINT$ 83,434.00GarrisonPW-13210/9/144/22/16
20152015-188INSTALL LIGHTING F/RI AND MOLINE ENTRANCE SIGNS$ 10,079.00GarrisonPW-13210/10/146/18/15
20152015-275REPAIR/REPAINT/LABEL/LOCK WELL HEADS$ 9,176.00GarrisonPW-ENV10/16/145/26/15
20152015-391CARPET REPLACEMENT$ 65,000.00CustomerARDEC10/22/145/21/15
20152015-413DEWATER UNIT #9$ 16,629.00GarrisonPW-13110/23/143/2/16
20152015-512PACKAGE LEGACY JSIIDS EQUIP F/SHIPMENT$ 6,428.00GarrisonGARRISON10/29/148/26/15
20162015-643POUR SLAB AND MOVE GATE SHACK$ 24,483.00GarrisonGARRISON11/4/145/26/16
20152015-676REPAIR PVC ROOF DRAINS$ 18,578.00GarrisonPW-13211/5/144/15/15
20152015-701INSTALL 18" VALVE IN WATER PLANT$ 15,502.00GarrisonPW-13211/6/146/10/15
20152015-747REPLACE EXPANSION JOINTS (PIPE LEAKING) CONV FROM SO #747$ 25,854.43GarrisonPW-13211/12/143/23/15
20152015-759UPGRADE MENS RR$ 61,324.00CustomerASC11/12/148/4/15
20152015-760PAINT AND NEW FLOOR$ 34,721.00GarrisonPW-13211/12/1412/17/15
20162015-761PAINT 22 INTERIOR DOORS$ 11,009.00GarrisonPW-13211/12/141/27/16
20152015-764INSTALL COUNTER AND PAINT$ 16,525.97GarrisonNAF11/12/148/25/15
20152015-765MOVE SHADE STRUCTURE$ 5,283.00GarrisonPW-13211/12/143/18/16
20152015-782PAINT AND REPAIR WALLS, REPAIR CARPET TILES AND STEAM CLEAN CARPET$ 37,734.00CustomerASC11/13/143/12/15
20152015-825REMOVE A ROADWAY LIGHTING POLE; THE BASE PLATE WELDED JOINT HAS CORRODED AND POLE FAILURE IS IMMINENT$ 7,302.71GarrisonPW-13211/14/148/31/15
20152015-896SEAL COAT WITH EPOXY FLOOR COVERING$ 46,623.00GarrisonPW-13211/18/149/2/15
20152015-979MOVE TWO GENERATORS AND ENCLOSURES TO PW HARD LOT$ 7,220.00GarrisonPW-13111/20/144/1/15
20152015-1015COAL PILE AREA ANALYSIS/ASSESSMENT$ 14,958.00GarrisonPW-ENV11/24/147/10/15
20162015-1137INSTALL SIMPLEX CARD ACCESS AND ROLLING GATE$ 71,010.00CustomerTARA12/3/141/25/17
20152015-1140INSTALL RAILS ON MOLINE BRIDGE ENTRANCE RAMPS$ 146,732.00GarrisonPW-13212/3/147/14/15
20152015-1141MODIFY JERSEY BARRIERS ON STRUCT 48 AND RAMPS$ 13,804.00GarrisonPW-13212/3/149/24/15
20152015-1179INSTALL GATE SYSTEM$ 33,640.00GarrisonNAF12/4/146/16/15
20152015-1206HIGH TANK INSPECTION$ 24,525.00GarrisonPW-13112/8/147/14/15
20152015-1218POWER OUTAGE CONV F/SO #1218$ 19,712.88Garrison12/9/142/20/15
20152015-1230INSTALL PUSH BUTTONS AND NEW DOORS$ 67,082.00CustomerASC12/9/147/7/15
20152015-1247REPLACE MOTOR CONV FROM SO #374$ 7,601.22GarrisonPW-13212/10/142/17/15
20152015-1248LIGHTNING PROTECTION SYSTEM REPAIRS TO BLDGS 25 AND 280$ 108,185.00GarrisonPW-13212/10/1410/29/15
20152015-1318WATER MAIN BREAK CONV F/SO #1318$ 14,988.43Garrison12/16/145/6/15
20152015-1346JMC OFFICE SIGNS$ 6,461.00CustomerJMC12/17/146/5/15
20152015-1369UTILITIES DISCONNECT$ 13,895.00GarrisonPW-132 DEMO12/18/147/14/15
20152015-1384REPAIR SOUTH LOADING DOCK$ 5,798.08GarrisonEMERGENCY CLIN 024512/19/142/19/15
20152015-1498MAJOR WATER LEAK - HEAD IS BLOWING OFF SPRINKLER PIPE; COMING FROM CEILING // ADD: NEED ELECTRICIAN ASAP // ADD: VISUALS GOING OFF ON 4TH FLOOR$ 35,642.99GarrisonASC1/5/153/5/15
20152015-1502DEMO SECONDARY CONDUCTORS FROM TRANSFORMERS$ 7,438.00GarrisonPW-132 DEMO1/5/157/14/15
20152015-1503REPAIR ROOF LEAKS AND COVER WINDOWS$ 10,688.00GarrisonPW-1321/6/156/10/15
20152015-1591REPLACE CEILING INSULATION$ 128,998.00GarrisonPW-1321/7/155/27/15
20152015-1718REPLACE GAS METER$ 2,551.00AFH-GarrisonAFH1/14/158/11/15
20152015-1732RENOVATION OF VISITOR CONTROL CENTER$ 119,170.64GarrisonPW-1321/14/1510/14/15
20152015-1760INSTALL ARMY LOGO ON WATER TANK$ 47,394.00GarrisonPW-1321/15/156/10/15
20152015-1765DIGITIZE DPW VAULT FILES$ - 0GarrisonPW-ENV1/15/158/3/16
20152015-1857HANG NEW DRAPES AND ROOM DARKENING LINER (INCLUDES TOUCH-UP/PAINTING)$ 10,235.00CustomerJMC1/22/154/21/15
20152015-1862FURNISH AND INSTALL 2 EACH (NAMCO 780-80100) SWITCHES$ 7,675.00GarrisonPW-1321/22/153/18/15
20152015-1877CARPET REPLACEMENT, BREAKOUT PER FUNDING SOURCE$ 83,928.00CustomerARDEC1/23/156/16/15
20152015-1894UPDATE EXISTING ENTRANCE SIGNS ALONG RODMAN$ 14,447.00GarrisonPW-1321/26/159/9/15
20152015-1895INSTALL NEW WELCOME SIGN$ 31,747.00GarrisonPW-1321/26/1512/2/15
20152015-1896INSTALL PRIMARY AND SECONDARY BLDG SIGNS$ 33,936.00GarrisonPW-1321/26/153/7/16
20152015-1913CREATE A SUPPLY WINDOW IDENTICAL TO PHARMACY WINDOWS$ 4,646.00CustomerASC1/26/155/21/15
20152015-1946REMOVE OLD CARPET AND INSTALL NEW CARPET$ 8,999.00CustomerASC1/27/155/21/15
20152015-1994REPLACE OVERHEAD DOOR AND OPERATOR WITH NEW EQUIPMENT$ - 0GarrisonPW-1321/29/156/10/15
20152015-2008INSTALL POCKET DOOR$ 8,558.00GarrisonPW-1321/29/157/7/15
20152015-2013REPLACE DETERIORATED OVERHEAD DOOR$ 44,504.00GarrisonPW-1321/30/158/26/15
20162015-2029RENOVATE BREAK AREA$ 12,949.00CustomerTARA1/30/155/4/16
20152015-2069DISPOSE OF COPPER, NICKEL AND CHROME TANK$ 94,641.00GarrisonTARA2/3/157/1/15
20152015-2080REPAIR/REPLACE BROKEN MULTI DISPLAY PANEL$ 13,407.43GarrisonPW-1322/3/153/9/15
20152015-2105INSTALL SEAWALL AND SLUICE GATE$ 77,946.00GarrisonPW-1322/4/152/17/16
20152015-2107REPLACE "B" ROOF W/NEW EPDM ROOF$ 13,298.00GarrisonPW-1322/4/155/13/15
20152015-2116SECURE ALL WINDOWS IN WING$ - 0CustomerTARA2/4/1511/18/15
20152015-2118ADD FENCING TO SECURE WING$ 73,545.94CustomerTARA2/4/151/13/16
20152015-2120INSTALL SECURITY CAMERA$ 27,348.00CustomerTARA2/4/159/23/15
20152015-2121RELOCATE USACE-LRL OFFICE$ 18,219.00GarrisonPW-1322/4/156/16/15
20152015-2148DETERMINE STRUCTURAL INTEGRITY OF BLDG 65$ 17,558.00GarrisonPW-ENV2/5/157/7/15
20152015-2169ARMS VAULT ENHANCEMENT$ 30,684.65CustomerPW-1322/6/1512/17/15
20152015-2209MOVEMENT OF FURNITURE ON 26-27 FEBRUARY 2015$ 6,317.00GarrisonDES2/10/154/2/15
20152015-2210INSPECT BUILDING 340$ 8,289.00GarrisonPW-1312/10/157/1/15
20152015-2214REPAIR SIDEWALKS$ 30,000.00GarrisonPW-1322/10/151/13/16
20152015-2215REPLACE WEST H/C RAMP$ 138,266.00GarrisonPW-1322/10/151/6/16
20142015-2216INSTALL VENTING SYSTEM ON MAIN SEWER$ 102,571.00GarrisonPW-1322/10/158/18/15
20152015-2217REPLACE 2 SETS OF STEPS AND RAILING$ 38,537.00Garrison2/10/1511/2/15
20152015-2219REPAIR STEPS TO INCLUDE RAMP$ 95,237.00GarrisonPW-1322/10/159/22/15
20152015-2240PAINT MOTORCYCLE RANGE WITH COURSE MARKINGS$ 12,151.00GarrisonASC2/11/157/14/15
20152015-2325REPLACE SOUTH SIDE SIDEWALK$ 57,549.00GarrisonPW-1322/18/159/28/15
20152015-2349REPAIR STEPS, SOUTH SIDE, EAST DOOR$ 50,304.00GarrisonPW-1322/19/159/22/15
20152015-2367WASH WINDOWS WORK IS FOR FY15$ 2,752.00AFH-GarrisonAFH2/19/158/27/15
20162015-2369ABATE LEAD PAINT AND REPAINT SOUTH PORCH WORK IS FOR FY16$ 5,701.00AFH-GarrisonAFH2/19/156/14/16
20162015-2370ABATE LEAD PAINT & REPAINT NORTH PORCH WORK IS FOR FY16$ 15,825.00AFH-GarrisonAFH2/19/159/1/16
20172015-2371ABATE LEAD PAINT & REPAINT SW PORCH WORK IS FOR FY17$ 16,121.34AFH-GarrisonAFH2/19/1512/13/17
20182015-2372ABATE LEAD PAINT & REPAINT SE PORCH WORK IS FOR FY18$ 11,075.00AFH-GarrisonAFH2/19/1510/4/18
20172015-2376SCRAPE BSMT WALLS TO REMOVE LOOSE PAINT, APPLY ENCASING PRIMER WORK TO BE PERFORMED IN FY17$ 10,431.00AFH-GarrisonAFH2/19/1512/7/16
20172015-2377WASH WINDOWS WORK IS FOR FY17$ 2,957.00AFH-GarrisonAFH2/19/155/15/17
20152015-2492STORMWATER OUTFALL AND COMPLIANCE MAINTENANCE$ 18,687.00GarrisonPW-ENV2/25/1511/5/15
20152015-24952015 HARDENING OF EXTERIOR WINDOW$ 8,469.00GarrisonPW-1322/26/156/24/15
20152015-2552TREE REMOVAL$ 56,945.00GarrisonPW-1313/2/154/15/15
20152015-2553REPLACE THE LEADERSHIP PANEL AND ADD FRAMES AND TILES$ 4,166.00CustomerASC3/2/158/4/15
20152015-2586REPLACE SOUTH AND EAST DOORS$ 13,783.00Garrison3/4/158/26/15
20152015-2587INSTALL NEW 2 TON HOIST$ 30,371.00GarrisonPW-1323/4/159/24/15
20152015-2597REPLACE ALL ROOFING ON WEST SIDE$ 104,881.00GarrisonPW-1323/4/1510/21/15
20162015-2609REPLACE SEWER LINES IN MENS RR$ 21,292.00Garrison3/4/154/26/16
20152015-2611QUENCH TANK REPAIR, TANK #20 (RIA #33155)$ 43,968.00GarrisonTARA3/4/157/1/15
20152015-2672DEMO PARKING LOT$ 10,990.00GarrisonPW-1323/9/154/6/15
20152015-2692MOVE CAC OFFICE INTO THE NE CORNER OFFICE$ 16,314.39GarrisonPW-1323/10/157/1/15
20152015-2723REPAIR SANITARY SEWER MANHOLE G 3.5$ 5,704.00GarrisonPW-1323/12/157/14/15
20152015-2726ESTABLISH PROCESS CONTROL NTP NTE $8,000$ 30,721.42GarrisonEMERGENCY3/12/1510/10/17
20162015-2754REPLACE BASEMENT WINDOWS; NTE $17,500; FOR FY 16$ 10,857.00AFH-GarrisonAFH3/13/158/14/18
20152015-2775QA SMALL ARMS RECEIVING CRIB$ 16,689.00CustomerTARA3/16/158/5/15
20152015-2836NEW CARPET/PAINT/REMOVE WALLPAPER/WALL REPAIRS$ - 0CustomerASC3/19/1512/8/15
20152015-2838INSTALL 3 PANIC BUTTONS AND MOVE 1 EXISTING PANIC BUTTON$ 8,517.00CustomerASC3/19/1511/17/15
20152015-2980RENOVATE WOMEN'S RESTROOM$ 86,662.00CustomerCHRA3/26/1510/27/15
20152015-3014REMOVE VENTILATION DOOR & INSULATE ATTIC$ 13,677.00GarrisonPW-1323/30/159/8/15
20152015-3083DRIVEWAY TO BLDG 360$ 12,041.00GarrisonPW-1323/31/158/19/15
20152015-3087REPLACE 2 DOORS$ 15,864.00GarrisonPW-1324/1/1510/14/15
20152015-3092TROUBLESHOOT AND REPAIR THE UPS UNIT (APC SYMMETRA PX 300 KW); (LOG INDICATES FAILURE OF POWER MODULE ON 20 FEB 2015) NTP, NTE $10,770.60$ 10,770.12GarrisonEMERGENCY4/1/155/13/15
20152015-3104REPLACE FEEDER WIRE BETWEEN GENERATORS AND SWITCH ROOM$ 21,721.27GarrisonEMERGENCY CLIN 02454/1/154/22/15
20152015-3135CONSTRUCT CONCRETE PAD$ 16,633.00GarrisonPW-ENV4/2/159/16/15
20152015-3207RENOVATE MEN'S RESTROOM$ 85,768.00CustomerCHRA4/7/1510/27/15
20152015-3266TRI/TIER II/EPCRA PROGRAM REQUIREMENTS$ 6,697.00GarrisonPW-ENV4/9/151/22/16
20152015-3305CHANGE OF COMMAND F/COE (ON FRI 05 JUN 15)$ 5,658.00CustomerCOE4/13/156/8/15
20152015-3334CARPET ALL CURRENTLY TILED HALLWAYS, BLDG 104/1ST & 2ND FL$ 80,051.00CustomerCHRA4/14/151/7/16
20152015-3343JMC-NEC - SIPR CONNECTIONS$ 8,872.00CustomerJMC4/14/152/2/16
20152015-3355UPGRADE LAN CABLE IN BLDG 104 2ND FLOOR WEST WING$ 105,752.00CustomerCHRA4/15/152/10/16
20152015-3358REPAINT HALLWAYS IN BLDG 104 1ST & SMALL AREA 2ND & WALLS IN BLDG 103 1ST$ 19,927.00CustomerCHRA4/15/159/23/15
20152015-3368INSPECT/REPAIR/REPLACE CAPS ON MONITORING WELLS$ 25,021.00GarrisonPW-ENV4/15/1510/15/15
20152015-3369SURVEY OF ASH TREES ON ISLAND$ 18,185.00GarrisonPW-ENV4/15/159/30/15
20152015-3376REPLACE DETERIORATED EXT WINDOW TROUGHS (NTE $29,000)$ 6,778.00AFH-GarrisonAFH4/15/1510/7/15
20152015-3377CONDUCT REVISION TO NRHP NOMINATION$ 44,264.00GarrisonPW-ENV4/15/156/16/16
20152015-3424PROVIDE BICYCLE PARKING AT PERIMETER ACCESS POINTS OF JMTC$ 16,956.00CustomerTARA4/20/159/28/15
20152015-3426RIVERBANK FILTRATION COLLECTOR (DRILL RAINY WELL), PHASE 3$ 97,424.00GarrisonPW-ENV4/20/1512/3/15
20152015-3427REPAIR/REPLACE/INSTALL ACCESS PANELS FOR FIRE DAMPERS$ 19,633.72GarrisonPW-1324/20/159/23/15
20152015-3428REPLACE HOT WATER HEATER & THERMOSTATIC MIXING VALVE$ 46,546.00GarrisonPW-1324/20/158/26/15
20152015-3441SURVEY EXTERIOR CONDITION OF BLDGS 102-104$ 19,157.00GarrisonPW-ENV4/20/159/24/15
20152015-3442SURVEY EXTERIOR CONDITION OF BLDGS 60-62$ 19,157.00GarrisonPW-ENV4/20/159/24/15
20152015-3463PROVIDE PM TO HVAC UNITS$ 2,581.00AFH-GarrisonAFH4/21/157/29/15
20152015-3464CLEAN ROOFS, GUTTERS & DOWNSPOUTS$ 25,216.00AFH-GarrisonAFH4/21/155/25/16
20152015-3470RENOVATE MENS RESTROOM$ 78,286.00CustomerCHRA4/22/153/7/16
20152015-3471RENOVATE MENS RESTROOM$ 92,216.00CustomerCHRA4/22/1512/15/15
20152015-3472RENOVATE WOMENS RESTROOM$ 86,114.00CustomerCHRA4/22/153/7/16
20152015-3473RENOVATE WOMENS RESTROOM$ 86,503.00CustomerCHRA4/22/1512/15/15
20152015-3522CLEAN & APPLY WATER REPELLENT TO QUARTERS ONE$ 66,988.00GarrisonPW-ENV4/24/1510/20/15
20152015-3523CLEAN & APPLY WATER REPELLENT TO BLDG 225$ 46,699.00GarrisonPW-ENV4/24/1510/7/15
20152015-3525CONDUCT MIST-NET SURVEY$ 35,585.00GarrisonPW-ENV4/24/158/26/15
20152015-3538INSPECT HIGH MAST LIGHTS$ 6,231.00GarrisonPW-1314/27/158/26/15
20152015-3541BETWEEN OCCUPANCY MAINTENANCE$ 13,243.00AFH-GarrisonAFH4/28/157/14/15
20152015-3550EROSION CONTROL - OLD LOCK WALL$ 13,204.00GarrisonPW-ENV4/28/1512/2/15
20152015-3552EROSION CONTROL - DOWNSTREAM OF HYDRODAM$ 20,059.00GarrisonPW-ENV4/28/158/26/15
20152015-3571PAINT PAVEMENT MARKINGS - PARKING LOTS$ 61,699.00GarrisonPW-1324/28/156/6/16
20162015-3711BLDG 299 NORTH CROSSWALK/SIDEWALK$ 57,757.00CustomerTARA5/6/1511/16/16
20152015-3766REPLACE #2 AND 3 FEEDWATER PUMPS$ 13,497.02GarrisonEMERGENCY CLIN 02455/11/157/8/15
20152015-3827BUILD TWO NEW CHRA OFFICES$ 52,542.00CustomerCHRA5/14/1511/18/15
20152015-3839INVESTIGATE #3 RAW WATER PUMP NOT RUNNING$ 15,764.37GarrisonEMERGENCY CLIN 02455/14/159/24/15
20152015-3846DISPOSE OF HCL ACID AND POLYPROPYLENE TANKS$ 19,633.00GarrisonTARA5/15/159/9/15
20152015-3859REPLACE T8 TROFFERS W/ LED TROFFER$ 76,523.00GarrisonLEASE OF ASSET5/15/154/19/16
20152015-3930DISPOSE OF BLACK CHROME TANK #141$ 29,461.00GarrisonTARA5/20/157/14/15
20152015-3936SEAL ASPHALT DRIVEWAYS; FAMILY HOUSING QTRS 3 AND 6$ 18,484.00AFH-GarrisonAFH5/20/158/27/15
20152015-3939PROVIDE MULCH; VARIOUS QTRS$ 21,522.00AFH-GarrisonAFH5/20/158/4/15
20152015-3940REPLACE GAS METER; QTRS 2, 3112 TERRACE DRIVE$ 3,376.00AFH-GarrisonAFH5/20/1510/7/15
20152015-4020CLEAN, PREP AND PAINT CEILING$ 79,433.00CustomerTARA5/26/153/23/16
20152015-4031REPAIR WALK-IN FREEZER CONV FROM SO #4031 TO IJO #15-4031$ 6,909.00GarrisonPW-1325/26/1512/17/15
20152015-4085REPLACE T8 TROFFERS W/ LED TROFFERS (F/MID-AMERICAN REBATE)$ 144,270.00GarrisonLEASE OF ASSET5/28/154/19/16
20152015-4087REPLACE SHINGLED ROOF AND INSTALL GUTTER COVERS; BLDG 85$ 22,418.00GarrisonPW-1325/28/159/8/15
20152015-4124REPAIR BEARING IN #4 GENERATOR$ 15,907.00GarrisonPW-1326/1/153/2/16
20152015-4131INSTALL NEW PH METERS FOR FILTERS$ 51,018.00GarrisonPW-ENV6/1/1512/2/15
20152015-4139INSTALL NEW WATER SERVICES$ - 0GarrisonPW-1326/1/156/6/16
20162015-4149REPAIR BOAT DOCK; STR 327$ 21,683.00GarrisonPW-1326/2/156/21/16
20152015-4174PROVIDE NEW CONDENSER UNIT$ 2,739.38AFH-GarrisonAFH EMERGENCY 02476/3/156/8/15
20152015-4222CONVERT EXTERIOR EXIT DOORS TO EXIT ONLY$ 7,586.00CustomerPW-1326/5/155/6/16
20152015-4256REPLACE HOT WATER HEATER; BLDG 62$ 2,990.14GarrisonEMERGENCY CLIN 02456/8/156/24/15
20152015-4309PROVIDE MASS NOTIFICATION, BLDG 390 4TH FLOOR$ 45,007.00GarrisonPW-1326/10/152/18/16
20152015-4310JMC CHANGE OF COMMAND CEREMONY (9 JUL 15)$ 12,916.00CustomerJMC6/10/157/13/15
20152015-4313DEMO/REPLACE MOTOR ON DAMPER #4, BLDG 227$ - 0GarrisonEMERGENCY CLIN 02456/11/159/24/15
20152015-4322JMC-EMERGENCY OPERATIONS CENTER - IDS; BLDG 350 3RD-MIDDLE$ 29,499.00CustomerJMC6/11/151/12/16
20152015-4348SURVEY EXTERIOR CONDITION OF BLDGS 108, 109 & 110$ 19,157.00GarrisonPW-ENV6/12/1510/15/15
20152015-4349SURVEY EXTERIOR CONDITION OF BLDGS 66, 67 & 68$ 19,157.00GarrisonPW-ENV6/12/1510/27/15
20172015-4350CONDUCT DEER SURVEY$ 10,387.00GarrisonPW-ENV6/12/1511/30/17
20152015-4366REMOVE/PROVIDE NEW DUPLEX PUMP LIFT STATION CONV F/SO #4366$ 29,755.67GarrisonPW-1326/15/1512/16/15
20152015-4427MOVE FURNITURE & BOXES, STORE CURTAINS & BLINDS FOR HVAC REPLACEMENT$ - 0CustomerECBC6/17/156/8/16
20152015-4511SEALCOAT PARKING LOTS$ 60,405.00CustomerCOE6/22/157/6/16
20162015-4529REPAIR OR REPLACE THE ALLEN-BRADLEY PANELVIEW 550 UNIT FOR GENERATOR #6 AT THE HYDRO-ELECTRIC PLANT$ 9,225.75GarrisonPW-1326/22/153/2/16
20162015-4553INSTALL OVERHEAD RADIANT HEATERS$ 16,897.00GarrisonPW-1326/23/152/1/16
20152015-4618REPAIR/REPLACE DAMAGED CONCRETE ON EAST DOCKS$ - 0CustomerJMC6/25/153/15/16
20152015-4628SOUNDPROOF WALLS & REPLACE MAIN DOORS$ 18,345.00CustomerJMC6/26/1512/8/15
20152015-4629REPLACE DOORS$ 9,924.00CustomerJMC6/26/151/7/16
20162015-4635REPAIR LARGE ROOM & MOVE ASAP COUNSELOR$ 27,771.00GarrisonPW-1326/26/154/13/16
20162015-4674INSTALL LIGHTING; RV STORAGE LOTS$ 15,371.00GarrisonNAF6/29/154/4/16
20152015-4699REPAIR SINK HOLE$ 57,406.00GarrisonPW-1326/30/1511/18/15
20172015-4739WASH WINDOWS$ 2,636.00AFH-GarrisonAFH7/2/156/2/17
20162015-4740REPAIR SE PORCH$ 15,902.00AFH-GarrisonAFH7/2/156/20/16
20152015-4754RESTRIPE BRIDGE PER NEW REQUIREMENTS$ 12,327.44GarrisonPW-1327/2/159/24/15
20152015-4759INVESTIGATE AND REPAIR AS NEEDED; THERE IS A DRYING POOL OF WATER IN THE HALLWAY AND INSIDE RESTROOM, THERE IS A HEAVY MILDEW AND WET PLASTER S$ 13,455.22GarrisonEMERGENCY CLIN 01457/6/158/17/15
20152015-4777ASSIST WITH AND CLEAN UP WATER DAMAGE CONV F/SO #4777, NTP NTE $8,972.54$ - 0GarrisonPW-1317/7/158/31/15
20172015-4811INSTALL A 10' X 10' ROLL-UP DOOR$ 9,473.00CustomerJMT7/8/154/12/17
20152015-4822REINSTALL THE SLIPPED EXPANSION JOINT CONV F/SO #4822 TO EIJO #15-4822$ 8,544.14GarrisonEMERGENCY 02457/8/1511/2/15
20152015-4823REPAIR FOUNDATION CRACKS & WATERPROOF WALL; QTRS 7$ 12,403.00AFH-GarrisonAFH7/8/159/28/15
20152015-4941INSTALL 50FT OF V-GUTTER$ 6,302.00GarrisonPW-1327/14/1511/5/15
20152015-4964REPAIR PAVEMENT UNDER AND AROUND PATIO OVERHANG; BLDG 301$ 31,399.00GarrisonPW-1327/15/1511/18/15
20152015-4965REPAIR AND PAINT MACRO ARTIFACT - XM123; MEMORIAL FIELD$ 10,650.00GarrisonCMH (MUSEUM)7/15/1511/5/15
20152015-4966REPAIR AND PAINT MACRO ARTIFACT - XM124E2; MEMORIAL FIELD$ 8,218.00GarrisonCMH (MUSEUM)7/15/1511/5/15
20152015-4970SPANISH CANNON, CLEAN & PRESERVE BORE, FABRICATE & INSTALL SIGNAGE; NORTH AVENUE$ - 0GarrisonCMH (MUSEUM)7/15/1512/8/15
20152015-4984SAND & STAIN THE SOUTH PORCH$ 4,337.00AFH-GarrisonAFH7/16/156/23/16
20162015-4986REMOVE & REPLACE LIMESTONE STAIRS ON SOUTH PORCH$ 37,059.00AFH-GarrisonAFH7/16/1510/11/16
20152015-4994REPAIR OR REPLACE THE POWER MANAGER MODULE FOR THE BUILDING 68 EMERGENCY GENERATORS; THE UNIT HAS FAILED AND THE GENERATORS ARE OFF-LINE UNTIL$ 9,518.02GarrisonEMERGENCY CLIN 02457/16/159/23/15
20182015-5012REPLACE LIMESTONE STEPS AND CONCRETE PAD$ 32,744.00AFH-GarrisonAFH7/16/158/20/18
20162015-5015PROVIDE CARPET RUNNER ON THE STAIRS$ 5,236.00AFH-GarrisonAFH7/16/159/19/16
20162015-5119DISPOSE OF CADMIUM PLATING MATERIAL IN TANK #2 & CLEAN$ 22,402.00GarrisonTARA7/23/152/18/16
20162015-5125RETUBE SOUTH BOILER$ - 0GarrisonPW-1327/23/159/16/15
20152015-5218REPIPE TRAPS ABOVE CEILING CONV FROM SO #15-5218$ 4,762.81GarrisonPW-1327/28/1510/7/15
20162015-5225WINDOW CONVERSION FOR THE VISITOR CONTROL OFFICE; BLDG 299$ 4,088.00CustomerTARA7/28/152/17/16
20152015-5241REPAIR DAMAGE TO BRIDGE FROM AUTO ACCIDENT CONV F/SO #5241$ - 0GarrisonEMERGENCY CLIN 02457/30/152/18/16
20162015-5250RE-BUILD MAIN PORCH FASCIA & REPLACE SOFFIT$ 73,854.00GarrisonPW-1327/30/156/20/16
20152015-5257REPAIR CONCRETE$ 16,353.00CustomerPW-1327/31/154/26/16
20162015-5314IMPROVE LIGHTING IN BLDG 280$ 21,573.00CustomerDOL8/4/155/10/16
20152015-5317SINK HOLE BETWEEN UTILITY HOLES 251 AND 251A$ 13,835.00GarrisonPW-1328/5/1511/2/15
20152015-5331REMOVE PARTIAL WALL BETWEEN CAISSON ROOM AND KAVA CAFE; BLDG 60$ 21,385.00GarrisonPW-1328/5/151/13/16
20152015-5422REPAIR CHECK VALVE THAT FAILED CONV F/SO #5422 TO EIJO #15-5422$ 9,077.48GarrisonEMERGENCY 02458/10/1510/1/15
20152015-5430INSPECT, TEST, & REPAIR #2 HIGH SERVICE PUMP AS NEEDED; (PUMP CAVITATED OVER THE WEEKEND & OPERATORS EXPERIENCED MALFUNCTIONS)$ - 0GarrisonPW-1328/10/1511/17/15
20162015-5457REPLACE CARPET IN ROOMS 243; BLDG 350$ 12,521.00CustomerASC8/11/156/22/16
20152015-5504REPLACE WATER SERVICE VALVE (TAG #7); BLDG 210$ 4,208.00Garrison8/12/159/16/15
20162015-5528REPAIR ROOF AND BUILDING; BLDG 87$ 8,666.00GarrisonNAF8/13/156/7/16
20162015-5529INSTALL A/V EQUIPMENT; BLDG 60$ 32,789.00GarrisonNAF8/13/156/16/16
20152015-5530REPLACE ROOF AND VENT ATTIC; BLDG 183 CANNON FLATS$ - 0GarrisonPW-1328/13/1512/17/15
20162015-5531IMPROVE LIGHTING, PAINT AND NEW FLOORING; BLDG 60 LOCK & DAM LOUNGE$ 62,789.55GarrisonNAF8/13/158/18/16
20152015-5582INSTALL SMOKE DETECTORS; BLDG 150$ 33,747.00GarrisonPW-1328/18/154/19/16
20152015-5583REPLACE OVERHEAD DOOR$ 9,051.00CustomerPW-1328/18/151/4/16
20152015-5603TESTING UST(S) AND AST(S); RIA$ 11,726.00GarrisonPW-ENV8/18/1511/23/15
20162015-5640SOUNDPROOF NORTH WALL, ROOM 632; BLDG 350$ 11,075.00CustomerJMC8/19/151/20/16
20162015-5641UPDATE BUILDING 350 BUILDING DIRECTORIES; ALL FLOORS$ 18,928.00CustomerJMC8/19/153/8/17
20152015-5647PREP & PAINT MAIN HALLWAYS$ 6,709.00CustomerARDEC8/20/151/25/16
20162015-5650REPLACE ROLLED CARPET W/ CARPET TILES/ABATE ASBESTOS$ 6,230.00CustomerJMC8/20/151/20/16
20152015-5666PREPARE EXPLOSIVES SAFETY SUBMISSION FOR UXO SITE$ - 0GarrisonPW-1318/21/151/12/16
20152015-5719CARPET OFFICES$ 54,945.00CustomerCHRA8/25/151/12/16
20152015-5800REPLACE CARPET & FLOOR TILES$ 30,038.00GarrisonPW-1328/28/152/2/16
20162015-5958NEW STACK (PERFORMANCE) TEST FOR NG BOILER$ 9,725.00GarrisonPW-ENV9/8/151/22/16
20172015-6008DESIGN AND IMPLEMENT A ROOM UPS$ 73,212.00CustomerNET9/10/153/14/18
20152015-6167REPAIR WICKET GATE CONTROLLER ON UNIT #7 CONV F/SO #6167 TO EIJO$ 5,101.52GarrisonEMERGENCY 02459/21/153/24/16
20152015-6183INSTALL FIRE DAMPER IN SUPPLY DUCT BETWEEN MECHANICAL ROOM AND KITCHEN; BLDG 16$ - 0GarrisonPW-1329/21/1511/20/15
20162015-6309CONDUCT PRE-DEMO LEAD & ASBESTOS SAMPLING$ 9,183.00GarrisonPW-1319/29/1511/3/16
20162015-6312CONDUCT PRE-DEMO LEAD & ASBESTOS SAMPLING$ 24,145.00GarrisonPW-1319/29/1511/2/16
20162015-6314MODIFY MAIN ENTRANCE IAW ADA HANDICAP ACCESS STANDARDS$ 16,417.00GarrisonPW-1329/29/155/10/16
20162015-6320PROVIDE SINGLE BASIN SINK W/ POTABLE WATER FAUCET$ 8,700.00CustomerJMT9/29/151/26/16
20162016-42PREPARE FOR MILITARY PT$ 122,758.27GarrisonPW-13210/2/155/26/16
20162016-46REPLACE OBSOLETE VISUAL DISPLAY ON STANDBY GENERATOR CONV TO IJO #16-0046$ - 0GarrisonPW-13210/2/1512/16/15
20162016-85REPLACE POWER POLE AND REPAIR OH WIRES CONV F/SO #85 TO EIJO NTP NTE $10,000$ - 0GarrisonFY16 EMERGENCY10/6/1512/2/15
20162016-99POWER SHUTDOWN AND ELECTRICAL MAINTENANCE$ 10,544.00CustomerCOE10/6/153/7/16
20162016-113REPLACE EXTERIOR DOOR$ 4,326.00Customer10/7/155/18/16
20162016-123INSTALL LIGHTING AT SYLVAN DRIVE AND RODMAN AVENUE; LITEX$ 17,588.00GarrisonPW-13210/7/155/26/16
20162016-153REPLACE CARPET IN ROOMS 258, 259 & 259A; BLDG 350$ 13,475.00CustomerASC10/8/153/29/16
20162016-155REPAIR SINK HOLE; SYLVAN DRIVE NEAR RODMAN$ 42,859.00GarrisonPW-13210/8/155/26/16
20162016-162NEW CARPET/PAINTING/WALL REPAIRS (EXCLUDE ROOMS 102, 102A & 102B); BLDG 390 1ST FLOOR N$ 101,143.00CustomerASC10/8/1511/7/16
20182016-248UPDATE ROAD SIGNS AT ALL INSTALLATION GATES$ 68,793.00GarrisonPW-13210/15/1512/17/18
20162016-332INVESTIGATE REASON FOR PLUGGED DRAINS CONV TO EIJO$ 13,321.13GarrisonEMER CLIN 033610/21/1511/13/15
20162016-333INVESTIGATE MALFUNCTIONING VARIABLE FREQUENCY DRIVES (VFD);$ - 0GarrisonFY 16 EMERGENCY CLIN10/21/152/10/16
20162016-348REPLACE METAL HALIDE FIXTURES W/LED$ 26,722.00GarrisonPW-13210/21/152/9/16
20162016-386TRI/TIER II/EPCRA PROGRAM REQUIREMENTS$ 6,712.00GarrisonPW-ENV10/22/151/30/17
20162016-396INTRUSION DETECTION SYSTEM$ - 0CustomerJMC10/23/151/7/16
20162016-397INSTALL CHAIN LINK FENCE TO VISUALLY OBSCURE UTILITY DOOR$ 6,460.00CustomerJMC10/23/153/15/16
20162016-400NEW STACK (PERFORMANCE) TESTS FOR NG BOILERS$ 29,186.00GarrisonPW-EN10/23/154/1/16
20162016-412PAVE COURTYARD$ 91,171.00GarrisonEN10/23/157/7/16
20162016-418PROVIDE WIRELESS LIGHTING OFFICE CONTROLS W/ OCCUPANCY SENSORS & DIMMING$ 29,459.00GarrisonJMT10/23/154/19/16
20162016-459REPAIR WALK-IN COOLERS$ 21,302.00GarrisonPW-13210/27/153/18/16
20162016-465TRIM/REMOVE/PLANT SHRUBS & TREES$ 16,399.00CustomerASC10/27/154/14/16
20162016-477REPAIR AND PAINT DETERIORATING WALLS$ 8,537.00CustomerASC10/27/153/7/16
20162016-505POUR CONCRETE IN FRONT AND TO THE SIDE OF GRILL; BLDG 67$ 7,782.00GarrisonPW-13210/28/153/23/16
20162016-511BLDG 343 RR TIE AREA ANALYSIS/ASSESSMENT$ 10,077.00GarrisonEN10/28/153/30/16
20162016-548TREAT SELECTED ASH TREES FOR EMERALD ASH BORER; ARSENAL-WIDE$ 64,858.00GarrisonENC10/30/157/7/16
20172016-572IMPROVE DOCK AREA, BLDG 242$ 122,113.00GarrisonPW-13211/2/156/20/17
20172016-652REPAIR MISSING & LOOSE FORM PLUGS ON EXTERIOR FACES OF BLDG$ 93,971.00GarrisonPW-13211/5/1512/28/17
20162016-746CLEAN AHU-60-2-2$ - 0GarrisonPW-13211/10/151/4/16
20162016-756REPAIR POWER POLE, MOLINE GATE CONV TO IJO #16-756$ 12,306.87GarrisonPW-13211/12/154/12/16
20162016-809CONSTRUCT AN OFFICE$ 34,909.00CustomerASC11/16/158/24/16
20162016-810CONDUCT AN ARMS-LENGTH SURVEY$ 17,865.00Garrison11/16/153/30/16
20162016-829REPAIR SIDEWALKS, RIA-WIDE$ 35,000.00GarrisonPW-13211/17/156/14/18
20162016-851WATER LEAK AND REPAIR CONV F/SO #851$ 29,203.05GarrisonEMER CLIN 033611/18/155/6/16
20162016-911INSTALL SECURITY DOORS W/ CARD ACCESS$ 13,239.00Garrison11/19/158/9/16
20162016-936WATER LEAK AND CLEAN UP, STOOL OVERFLOWED CONV FROM SO #936$ 13,136.42GarrisonJMC11/23/151/19/16
20162016-980REMOVE AND REPLACE CARPET$ 9,618.00Garrison13211/24/153/7/16
20162016-1126INSTALL CHARGING STATION FOR ALTERNATIVE FUEL VEHICLE (AFV)$ 6,111.00CustomerPW-13212/3/154/1/16
20162016-1136CREATE A DISPLAY WALL FOR FORMER CSMS FOR ASC; BLDG 390, 1ST, S$ 3,867.00CustomerASC12/3/156/22/16
20162016-1137INSTALL HANDICAP OPENERS ON RESTROOM DOORS; BLDGS 60, 62 AND 102$ 56,415.00CustomerRIC12/3/1510/19/16
20172016-1174INSTALL NEW FIRE HYDRANT AND SERVICE VALVE; QUAD 1$ 14,496.00GarrisonPW-13212/7/1510/4/17
20162016-1210INSTALL 5 OVERHEAD DOORS$ 55,901.00CustomerJMT12/9/155/25/16
20162016-1262INSTALL 8 EMERGENCY/FIRE PHONES$ 10,462.00CustomerASC12/11/157/21/16
20162016-1285EXTEND WALLS ON TWO OFFICES & REPLACE CEILING TILES$ 11,611.00CustomerECB12/14/152/9/16
20162016-1291DRESS AND COAT BOTTOM OF THE HIGH MAST POLE$ 6,277.00GarrisonPW-13212/14/155/18/16
20162016-1297INSTALL HANDICAP POWERED DOORS; BLDG 211$ 7,586.00CustomerJMT-J900012/14/1510/13/16
20162016-1311REPAIR EXTERIOR LIGHTING FOR FLAGS AT FRONT PORCH; QTRS 4$ 2,964.00AFH-GarrisonAFH12/15/156/14/16
20162016-1326INSPECT/REPAIR ASH UNLOADING SYSTEM, BLDG 227$ - 0GarrisonEMERGENCY CLIN 033612/15/151/7/16
20162016-1375REPLACE GALVANIZED WATER LINE W/COPPER$ 12,406.00Garrison12/17/155/18/16
20162016-1446INSTALL LIGHTING FOR MOLINE ENTRANCE SIGN$ 30,084.00Garrison12/23/155/18/16
20162016-1496REPLACE SIDEWALK AND CONCRETE PAD AROUND FH 12 CONV FROM SO #1496 TO IJO #16-1496$ - 0Garrison12/29/155/18/16
20162016-1603CLEAN EXTERIOR STONE AND APPLY MODIFIED SILOXANE TREATMENT$ 135,719.00GarrisonENC1/6/169/28/16
20162016-1604CLEAN EXTERIOR STONE AND APPLY MODIFIED SILOXANE TREATMENT$ 75,859.00GarrisonENC1/6/167/28/16
20162016-1605CLEAN EXTERIOR STONE AND APPLY MODIFIED SILOXANE TREATMENT$ 73,102.00GarrisonENC1/6/169/28/16
20172016-1663INSTALL HARDWARE FOR ELECTRONIC ACCESS TO BLDG 60 COURTYARD$ 21,478.00GarrisonPW-1321/8/162/24/17
20162016-1679INSTALL CARD READER AND ELECTRONIC OPENER ON EXTERIOR DOOR; BLDG 102$ 14,983.00CustomerRIC1/8/167/7/16
20162016-1685CREATE NURSING MOTHER'S ROOM; BLDG. 390$ 66,317.00CustomerASC1/8/167/7/16
20162016-1699CANADA GOOSE MGMT$ 16,108.00GarrisonEN1/11/167/19/17
20162016-1718ADD SIMPLEX DOORS AND SOLID WOOD DOORS$ 65,669.00CustomerASC1/11/162/7/17

This is the start of the file's text. The full file is on GovTribe.