About this file

This Data Item Description (DID) provides guidelines for a Production Surge Plan, which outlines a contractor's capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment without declaring war or mobilization. The document specifies detailed requirements for preparing the plan, including:

Key plan components include: 1) maximum sustainable production rate with a production building schedule, 2) two comprehensive lists of subcontracted and non-subcontracted items/components detailing nomenclature, part numbers, leadtime, and critical/pacing items, 3) a list of government contracts being performed at the contractor's facility, 4) impact analysis describing how surging this contract would affect other government contracts, 5) additional labor requirements needed to support maximum sustainable production rate, 6) strategic/critical materials list, and 7) production equipment details that could increase production rate or reduce leadtime by at least 10 percent. The document is identified with DID number DI-MGMT-80969 and supersedes DI-P-1634A, with distribution statement A allowing unlimited public release.

View the file

Other files

File Type Posted
PWS.pdf PDF
PERSONNEL_SKILL_REQUIREMENT_8153.pdf PDF
ITMDESC_8153.pdf PDF
CAVAFREPORTINGREQUIREMENTS.pdf PDF
CDRLS.pdf PDF
DI-MGMT-80503.pdf PDF
DI-MGMT-81838.pdf PDF
PKGRQMT_REPORT.pdf PDF
IUID_8154.pdf PDF
DI-PSSS-81995A.pdf PDF
FA811826R0018.pdf PDF
TRNSPDATA_REPORT.pdf PDF
PERSONNEL_SKILL_REQUIREMENT_8154.pdf PDF
IUID_8153.pdf PDF
JQRR_8154.pdf PDF
DI-MGMT-80441D.pdf PDF
GFP.pdf PDF
JQRR_8153.pdf PDF
ITMDESC_8154.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .