A_-_26-03-ITB_-_EXHIBIT_A_-_Electronic_Price_Sheet.xlsx
XLSX spreadsheet 66 KB Posted
- Attached to
- Police Department Tile Roof Replacement
- Solicitation number
- 26-03-ITB
- Issued by
- Indian River County, Florida
About this file
This is an Electronic Price Sheet for Solicitation #26-03-ITB, a Police Department Tile Roof Replacement project issued by the City of Sebastian, Florida. The project involves the removal and replacement of the clay barrel tile roof at the Sebastian Police Department located at 1201 Main Street, Sebastian, Florida 32958, with a new clay barrel tile roof system. The scope of work encompasses demolition of the existing clay tile roof covering across 11,150 square feet, inspection and repair of the plywood deck and fascia board, installation of peel and stick underlayment, installation of roof accessories including metal drip edge, eave closure, flashing, ridge and hip caps, and valley underlayment, removal and replacement of 30 feet of gutter and two downspouts, installation of new clay tile roof using adhesive foam, and flashing and waterproofing repairs at four identified Roof Top Units (RTUs). A bid alternate is included for installation of a second layer of peel and stick underlayment across the same 11,150 square foot area.
Contractors are required to submit unit costs and total costs for each pay item, with all pricing to include mobilization and demobilization, construction debris removal, site maintenance, dumpster rental, project management, operator costs, supervision, fuel, repairs, overhead and profit, insurance, lodging, meals, transportation, rentals, safety gear, telephone costs, cameras, GPS devices, and all miscellaneous expenses associated with the work. Quantities referenced in the bid sheet were derived from an Eagleview report number 67381534 and included in the bid package, with contractors required to field verify all quantities prior to submission. The Procurement Division is located at 1225 Main Street, Sebastian, Florida 32958, with contact available at 772-388-8231.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PD Roof Replacement
Bid Price Sheet
Solicitation # 26-03-ITB Solicitation Title: Police Department Tile Roof Replacement
Company Name
Proposer submits the following prices for the work described in this solicitation. Rates provided include all costs associated with the performance of the work, such as mobilization and demobilization, the operator, supervision, fuel, repairs, overhead and profits, insurance, lodging, meals, transportation, rentals, safety gear, telephone costs, cameras, GPS devices and all other materials, items and miscellaneous expenses associated with providing the requested services.
| ***Note: Quantities were taken from Eagleview report number 67381534, included in this bid package. Contractor to field verify quantities.*** | |||||
| General Building Storefront Renovation | |||||
| Pay Item No. | Repair Item | Unit | Quantity | Unit Cost | Total Cost |
| GC-1 | Mobilization/demobilization, construction debris removal & site maintenance, dumpster, project management | LS | 1 | $ - 0 | $ - 0 |
| GC-2 | Permit documents process & submittals | LS | 1 | $ - 0 | $ - 0 |
| General Building Storefront Renovation Subtotal | $ - 0 | ||||
| Site Work | |||||
| Pay Item No. | Repair Item | Unit | Quantity | Unit Cost | Total Cost |
| S-1 | Demo existing clay tile roof covering to clean and workable surface | SF | 11,150 | $ - 0 | $ - 0 |
| S-2 | Check plywood deck and repair damages. Include a price per plywood sheet to replace if found to be damaged. | EA | 1 | $ - 0 | $ - 0 |
| S-3 | Check fascia board and repair damages. Include a price per foot to replace fascia board if found to be damaged. | LF | 1 | $ - 0 | $ - 0 |
| S-4 | Installation of peel and stick underlayment. Quantity does not include underlayment side and end laps | SF | 11,150 | $ - 0 | $ - 0 |
| S-5 | Installation of accessories including metal drip edge, metal eave closure, flashing, ridge and hip caps, valley underlayment | LS | 1 | $ - 0 | $ - 0 |
| S-6 | Remove and replace 30-ft of gutter and (2) downspouts on the tile roof | LS | 1 | $ - 0 | $ - 0 |
| S-7 | Installation of new clay tile roof using adhesive foam | SF | 11,150 | $ - 0 | $ - 0 |
| S-8 | Flashing/waterproofing repairs at identified RTUs (4) | LS | 1 | $ - 0 | $ - 0 |
| Site Work Subtotal | $ - 0 | ||||
| Bid Alternate | |||||
| Pay Item No. | Repair Item | Unit | Quantity | Unit Cost | Total Cost |
| BA-1 | Installation of 2nd layer of peel and stick underlayment. Quantity does not include underlayment side and end laps | SF | 11,150 | $ - 0 | $ - 0 |
| Alternate Subtotal | $ - 0 |
Total Bid Price WITHOUT Alternate $ - 0
Total Bid Price WITHOUT Alternate $ - 0