This is a Scope of Work document outlining the installation and commissioning requirements for an air compressor system to be delivered to a County facility by August 17, 2026. The project encompasses the supply and installation of one compressor system unit, factory-authorized startup and commissioning services, operator and maintenance training, and warranty coverage. The vendor is responsible for furnishing all labor, tools, and materials necessary for mechanical assembly, component reconnection, connection to the existing compressed air distribution header, and condensate drain line connections. Installation must include verification that all safety devices, gauges, and controls are properly mounted and functional. The vendor shall provide on-site operator and maintenance training for a minimum of two hours duration at the time of startup and commissioning, with an operations and maintenance manual provided to the County. Documentation of all commissioning data must be submitted within five business days of completion.

The vendor is responsible for all costs associated with the system, installation, training, and warranty, with the total project cost to be included in a single line item. Warranty coverage includes 24 months for the compressor pump from acceptance and 12 months of parts and labor for the complete system. The County is responsible for electrical rough-in work, compressed air distribution piping beyond the system outlet connection point, and provision of a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. A critical requirement specifies that all components and sub-assemblies must be capable of passing through a 46-inch wide doorframe without structural modification to the building. The vendor must coordinate delivery access with the County not less than five business days in advance and shall be responsible for all required permits, licenses, and calibration certificates. An optional extended warranty coverage for years one through five is available at an additional cost to be specified by the vendor.

View the file

Other files

File Type Posted
B130D82C-B69F-E211-5C113B664A13BDA1.pdf PDF
4ADB9154-92D0-FA39-8C51818579A9E699.pdf PDF
E99102BF-B146-146D-35DFAF9763C1170B.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
1FF7D8D0-C608-E689-8D121B0F5CC22DA9.pdf PDF
9D5C4E27-A2A7-EBA2-2714B42F829186DC.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
B867E43E-FCA2-ABC6-686473D3D551080B.docx DOCX document
600B382B-92C2-EE01-36E3171A1CE23381.pdf PDF
4ADC6B3E-009D-638E-F9834A3736C61F00.xlsx XLSX spreadsheet
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
48C544C3-FCC4-F4ED-99FB5E91E5744B30.pdf PDF
44F2E64B-E391-5EAC-DD33927813E7BE98.xlsx XLSX spreadsheet
F388F0B8-095B-81FD-4AB0A90CB30AE31F.pdf PDF
98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx XLSX spreadsheet
260F9701-94BA-EFEA-FCAED968AC730EE0.docx DOCX document
ED338BF8-FCF8-7E6B-4327CDB3236D9A0A.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
47647B12-EF69-CBAE-3877E615229CE346.pdf PDF
44F2A935-093F-1234-3F0F06EFB73CE154.xlsx XLSX spreadsheet
45745F40-E0BA-1577-1AE1A9CC2179CA13.pdf PDF
455CC78D-B78A-EC66-F7D6D71B8AF36042.pdf PDF
47A09361-9A16-2F9F-03970F0DC73EAB8D.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
E9905CF7-C973-40FC-678D5FD85143E735.pdf PDF
477EEBB5-9B64-4073-39F4D92B43E61BB0.pdf PDF
47ADF7AD-983F-9719-2E5C720D20F03E5A.xlsx XLSX spreadsheet
BCDA75E7-EC2E-694E-CB30EC7B8D89F683.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
D19B3093-A699-8107-EE175100DAB2A969.pdf PDF
4ADC244E-B24C-BEC2-4654E43F7ACFB8A4.xlsx XLSX spreadsheet
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
A4692B9C-E659-F33F-532C87A025A11AC2.pdf PDF
9EDCD8B0-B36E-8610-B9A1060DE4F7BDD1.pdf PDF
E920A267-FB29-7597-A525F8234B855C09.pdf PDF
52DB9448-0DA4-58EC-7CC559390BFA917E.pdf PDF
451DAC14-D169-2A9F-1266443CD504A357.xlsx XLSX spreadsheet
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
3CA5BBE9-A618-9D6F-45A1FE1B6F58F0BF.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
8CFF3838-EA7E-33CD-42D86D9937F5AFDB.pdf PDF
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
8B0111A9-AB26-EF6C-1377B5BEC77C1480.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
Show 40 more

Latest 50 of 149 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $

13 1-5 Annual Rate Optional Extended Warranty Coverage $

Vendor Name

Completed By

Date

File details come from the government source that posted it. Updated .