About this file

This is a Project Manual for a Stage 2 General Contractor Selection process for the Midvale Campus Renovation project in Salt Lake County, Utah. The project involves the renovation of the existing Midvale Campus building to facilitate the relocation of County operations to the new campus. Work scope includes reconfiguration of interior spaces to meet County operational needs and the construction of a 40+ space parking structure adjacent to the existing building. This is an invitation-only bidding stage limited to contractors approved during Stage 1 of the RFP process: Layton Construction (ICS), SIRQ Construction, and Willmeng Construction. The project manual serves as the comprehensive bidding document containing specifications, drawings, and requirements for general contractor selection.

Specific pricing terms, contract value, payment schedules, and other financial details are not outlined in the available documentation summary. No set-asides are identified in the procurement. The project represents a capital improvement initiative for Salt Lake County's facilities consolidation efforts. Interested bidders must have been previously approved during Stage 1 to participate in the Stage 2 sealed bid or proposal submission process.

View the file

Other files

File Type Posted
-6- Construction General Conditions Version Draft New Campus V1.pdf PDF
9-12- APPENDIX B - Structural Calculations.pdf PDF
-1- Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
2--4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
11-10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
4--5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
6--8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
3--2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
-8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
12- APPENDIX B - Structural Calculations.pdf PDF
10--9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
8-11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
5--6- Construction General Conditions Version Draft New Campus V1.pdf PDF
12--1- UPDATED Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
7--7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
-7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .