1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Solicitation number
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Issued by
Salt Lake County, Utah

About this file

This Schedule of Values is a pricing document for the Salt Lake County Midvale Campus Renovation project (FAC133816-1), prepared during Stage 2 of the general contractor selection process. The document outlines the bidding structure for three pre-qualified contractors: Layton Construction (ICS), SIRQ Construction, and Willmeng Construction. Bidders are required to provide pricing for a base bid and three alternates: Alternate #1 (Pedestal Pavers), Alternate #2 (Secure Parking Heat), and Alternate #4 (unspecified scope to be defined by bidder). The pricing template includes line items for Payment and Performance Bond, Insurance (with Builder's Risk to be provided by Salt Lake County), Division 01-General Conditions, and additional work divisions. Bids were due November 19, 2026, and the project involves interior reconfiguration of the existing Midvale Campus building at 662 W Commerce Park Drive and construction of a 40-plus space parking structure. A mandatory site visit and questions submission through the Online Solicitation System are required. The contract term is 365 calendar days from Notice to Proceed, with liquidated damages of $1,000 per calendar day for schedule delays.

All pricing submissions must match the totals entered into the Online Solicitation System (OSS) for both the base bid and each alternate. Bidders must submit a completed Offer and Cover Summary and Schedule of Values with their initial bid, along with a 5% bid bond on AIA Form A310-2010. Performance and payment bonds at 100% of contract price are due within ten days of award. Minimum insurance requirements include $5 million general liability, $10 million commercial automobile liability, and $10 million environmental pollution liability specific to the Midvale Slag Superfund site remediation. All bidders must be registered Utah contractors holding a minimum B-100 license; all subcontractors must hold appropriate licenses. The project is subject to Salt Lake County Ordinance 3.26 apprenticeship requirements (10% apprentice labor hours per trade with $2-$10 per hour penalties for non-compliance) and Ordinance 3.27 construction procurement standards. Award will be made to the lowest responsive and responsible bidder whose bid falls within the construction budget, with the base bid and prioritized alternates evaluated as a combined total. Bids remain valid for 60 calendar days after opening. Funding is contingent on approval by the Mayor.

View the file

Other files

File Type Posted
-6- Construction General Conditions Version Draft New Campus V1.pdf PDF
9-12- APPENDIX B - Structural Calculations.pdf PDF
-1- Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
2--4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
11-10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
4--5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
6--8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
3--2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
-8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
12- APPENDIX B - Structural Calculations.pdf PDF
10--9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
8-11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
-9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
5--6- Construction General Conditions Version Draft New Campus V1.pdf PDF
12--1- UPDATED Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
7--7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
-7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2
Divisions of WorkBase BidAlternate#1:Pedestal PaversAlternate#2: Secure Parking HeatAlternate 4
(Specify entire work scope; examples are listed below)Total
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance (As currently outlined SLCO will provide Builder's Risk)$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________