8-11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf
PDF 15 MB Posted
- Attached to
- SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
- Solicitation number
- SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
- Issued by
- Salt Lake County, Utah
About this file
Summary of Appendix A - Geotech Report
This is a geotechnical report supporting the Salt Lake County Midvale Campus Renovation project (FAC133816-1), a general contractor selection stage 2 solicitation administered by Salt Lake County, Utah. The project involves renovation of the existing Midvale Campus building located at 662 W Commerce Park Drive, Midvale, Utah, and construction of a 40-plus space parking structure adjacent to the building. The solicitation is limited to three pre-approved contractors from Stage 1: Layton Construction (ICS), SIRQ Construction, and Willmeng Construction. Bids were due November 19, 2026. The project scope includes reconfiguring interior spaces to accommodate relocation of County operations. Bidders were required to attend a mandatory site visit and submit all questions through the Online Solicitation System. Work must be completed within 365 calendar days of Notice to Proceed, with liquidated damages assessed at $1,000 per calendar day for schedule delays.
The geotechnical report serves as a critical reference document for bidders evaluating site conditions and subsurface characteristics that impact construction feasibility and cost estimates. The report informs bidders' understanding of soil composition, foundation requirements, and site-specific challenges related to the Midvale Slag Superfund site remediation, which requires bidders to carry environmental and pollution liability coverage of $10 million specific to this contaminated site. Award is based on the lowest responsive and responsible bid within the construction budget, with the base bid and prioritized alternates evaluated in combination. Funding is contingent on approval by the Mayor and funding level availability. Performance and payment bonds, each at 100% of contract price, are required within ten days of award. Minimum insurance requirements include $5 million general liability and $10 million commercial automobile liability. Bidders must hold a minimum B-100 Utah contractor license, and all subcontractors must hold appropriate trade licenses. Projects exceeding $3 million must comply with County apprenticeship and construction procurement standards.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .