-3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Solicitation number
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Issued by
Salt Lake County, Utah

About this file

This Schedule of Values is a bidding document for the Midvale Campus Renovation General Contractor Selection Stage 2 project (FAC133816-1) issued by Salt Lake County, Utah. The project involves the renovation of the existing Midvale Campus building to relocate County operations, including construction of a 40+ space parking structure adjacent to the building and reconfiguration of interior spaces to meet County needs. This invitation-only second stage solicitation is limited to bidders approved during Stage 1: Layton Construction (ICS), SIRQ Construction, and Willmeng Construction. The Schedule of Values template requires bidders to provide pricing for the base bid and three alternates (Alternate #1: Pedestal Pavers, Alternate #2: Secure Parking Heat, and Alternate #4 for specified work scope). The document includes line items for Payment and Performance Bond, Insurance, Division 01-General Conditions, and other construction divisions, with all values to be entered as whole dollar amounts.

Bidders must ensure that the total for the base bid and each alternate submitted matches the corresponding totals entered into the Online Solicitation System (OSS). Salt Lake County notes that it will provide Builder's Risk insurance as currently outlined. The document includes a signature line for the name of the company bidding. No pricing information, set-asides, specific due dates, or contract term details are populated in this template document.

View the file

Other files

File Type Posted
-6- Construction General Conditions Version Draft New Campus V1.pdf PDF
9-12- APPENDIX B - Structural Calculations.pdf PDF
-1- Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
2--4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
11-10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
4--5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
6--8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
3--2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
-8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
12- APPENDIX B - Structural Calculations.pdf PDF
10--9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
8-11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
-9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
5--6- Construction General Conditions Version Draft New Campus V1.pdf PDF
12--1- UPDATED Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
7--7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
-7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2
Divisions of WorkBase BidAlternate#1:Pedestal PaversAlternate#2: Secure Parking HeatAlternate 4
(Specify entire work scope; examples are listed below)Total
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance (As currently outlined SLCO will provide Builder's Risk)$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________