12- APPENDIX B - Structural Calculations.pdf

PDF 22 MB Posted

Attached to
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Solicitation number
SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (INVITATION ONLY)
Issued by
Salt Lake County, Utah

About this file

This document is a set of structural calculations for the Midvale Campus Renovation project in Salt Lake County, Utah, which is being executed as a two-stage construction procurement. The structural calculations appendix provides the technical engineering analysis and design specifications for the renovation work, which includes the reconfiguration of interior spaces within the existing Midvale Campus building and the construction of a 40+ space parking structure adjacent to the facility. These calculations serve as supporting technical documentation for the Stage 2 general contractor selection process, which is limited to three pre-qualified bidders approved during the Stage 1 RFP: Layton Construction (ICS), SIRQ Construction, and Willmeng Construction. The calculations establish the structural requirements and design parameters that contractors must adhere to in their bids and during construction execution.

The structural calculations document provides the engineering foundation necessary for contractors to accurately estimate costs, develop construction schedules, and plan their work methodologies for the renovation and parking structure components of the project. These technical specifications ensure that all qualified bidders are working from the same structural design standards and requirements, creating a level playing field for the competitive Stage 2 bidding process. As an appendix to the contract opportunity documents, these calculations represent a critical component of the project's bid package and will inform the final pricing and construction approach submitted by each of the three eligible contractors.

View the file

Other files

File Type Posted
-6- Construction General Conditions Version Draft New Campus V1.pdf PDF
9-12- APPENDIX B - Structural Calculations.pdf PDF
-1- Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
2--4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
11-10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx DOCX document
10- Plans- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
-3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx XLSX spreadsheet
4--5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
6--8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-5- 1.4 Section 3 Construction Agreement Version 31March2023.docx DOCX document
11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
3--2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
-8- 3.27 Const Procurement Min Standards Ordinance.pdf PDF
-2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx DOCX document
10--9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
8-11- APPENDIX A - GEOTECH REPORT- FAC133816-1.pdf PDF
-9- Project Manual- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2.pdf PDF
5--6- Construction General Conditions Version Draft New Campus V1.pdf PDF
12--1- UPDATED Instructions to Bidders- FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - Copy.pdf PDF
7--7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
-7- 3.26 Apprenticeship Utilzation Ordinance.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .