80AFRC25R0001 Amend 7.pdf
PDF 369 KB Posted
- Attached to
- Western Regional Multiple Award Construction Contracts (WRMACC) Federal contract opportunity
- Solicitation number
- 80AFRC25R0001
About this file
This document is an amendment to a NASA Western Regional Multiple Award Construction Contract (WRMACC) solicitation for two geographical pools (Northern California and Southern California) with multiple small business contract opportunities. NASA intends to award up to 30 small business contracts across two pools, with each pool containing construction projects at different NASA facilities. The solicitation covers both a base bid and optional additional work for each pool, including specific projects such as HVAC replacements, UPS system upgrades, exterior staircase installation, ramp and taxiway repairs, and fire suppression line repairs.
Key details include a 240-day price hold period, requirements for California contractor licensing, performance bonding capacity, and specific submission requirements across four proposal volumes. The projects are design-build in nature, with contractors responsible for design submissions at 35%, 65%, 100%, and final construction stages. The solicitation emphasizes site-specific requirements, including working around active NASA facilities, managing potential environmental contamination (including PFAS), maintaining aircraft operations during construction, and adhering to strict safety and operational protocols. Contractors must submit detailed past performance information, demonstrate technical capabilities, and provide pricing for base and optional work elements, with task orders potentially being set aside for specific small business categories.
View the file
Other files for this federal contract opportunity
Show all 50
Western Regional Multiple Award Construction Contracts (WRMACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Cacie Carrillo, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Provide responses to Request for Information (RFIs)/Questions
2. Incorporate resulting updates by issuing revised documents and attachments, as applicable.
NASA
Armstrong Flight Research Center P.O. Box 273, M/S 4811-140 Edwards, CA 93523-0273
Electronic Submissions Only See Section L of this Solicitation
N/A
80AFRC25R0001
08/19/2025
07/01/2025
1 19
12-Aug-25
For NASA use only For NASA use only
Should Volume I, Volume II, and Volume III be three separate computer files, combined within a single zip file? (Volume I looks like it'll be pretty short, but maybe different people will be reviewing the different volumes?)
Yes. 80AFRC25R0001 L.14 Electronic Submission of Proposals- Proposal Marking and Delivery Through NASA's EFSS Box (Nov 2021)
2 Do we submit two SF1442s, the one from Document 80AFRC25R0001 for the MACC, and the one from SF1442 N254 Pool 1 Nor Cal for the task order? If not, which one should we use?
Yes, both the WRMACC Standard Form 1442 (SF 1442) and Pool of Interest(s) SF 1442 must be signed. Offerors are reminded that the Pool of Interest task orders are not just model task orders but will result in actual awards. Therefore, all documents required for the award of a task order under one of the resulting WRMACC contracts need to be submitted.
80AFRC25R0001 L.12 1852.216-81 Proposal Page Limitations (Apr 2015)
80AFRC25R0001 L.12 1852.216-81 Proposal Page Limitations (Apr 2015)
1 N254 Pool 1 Nor Cal Rev 1 L.4 52.228-1 Bid Guarantee (Sep 1996) 2 Pool 2 So Cal Rev 1 L.4 52.228-1 Bid Guarantee (Sep 1996)
4 Do we submit any Section K representations and certifications with our bid if we have completed our annual sam.gov reps and certs and they are current? If so, where should they go?
Per Clause K.3, FAR 52.204-8(d), changes to the on-line annual representations and certifications are provided with the proposal. These exceptions shall be identified by the clause number, title, date. Solicitation updated to provide the location for the amended representation(s) and/or certification(s).
80AFRC25R0001 L.12 1852.216-81 Proposal Page Limitations (Apr 2015), Volume IV
L.12 1852.216-81 Proposal Page Limitations (Apr 2015) L.18 Volume III- Past Performance Information, Past Performance Evaluation Questionnaires
6 Can the 4-person limit be interpreted to allow for 4 representatives from the prime offeror and 4 from each subcontractor, or does the limit apply to the entire offeror team including subcontractors?.
No, the representatives per Offeror can not be interpreted as four (4) Prime representatives and four (4) representatives per Subcontractor. This limit is per the entire Offeror team including subcontractors.
80AFRC25R0001 L.9 1852.215-77 Preproposal/Pre-bid Conference (Apr 2015) Section (c)
7 Respectfully request minimum bid deadline extension of RFI Response Date + (2) weeks. The Government will consider this request upon receipt of all RFI/Questions. N/A N/A
8 Given the pandemic's effect on construction backlog, would projects completed in the last (6) years be allowed for submission in Volume 3 - Past Performance? No. 80AFRC25R0001
L.18 Volume III- Past Performance Information, Past Performance Evaluation Questionnaires
9 Will 3rd party / Facility O&M support be required by NASA for any scope of work? If so, please specify an allowance and hourly rates.
No, 3rd party/Facility O&M support will not be required as NASA has Facility O&M support contracts. N/A N/A
10 Regarding Volume I – Technical Acceptability General Building Contractor Licensing: Will a contractor license from another state be acceptable to meet this requirement? No. 80AFRC25R0001 L.16 Volume I- Technical Acceptability
Would be acceptable for us to submit proposals that include more than one architectural design firm.
We regularly collaborate with several design companies and would like to confirm whether providing multiple design companies within our submission is permissible
Yes. N/A N/A
Factor 1, page M2 states: “General Building Contractor Licenses: Contractor’s License Numbers will be verified with the California State License Board (CSLB) database to ensure they are current and in good standing. Lack of the meeting Class A or Class B license requirements will result in elimination from consideration for award. “ Can you please clarify if a California contractor’s license is required for this solicitation? Our understanding is that federal contractors are usually exempt from state licensing requirements when the work is done entirely on federal property under a federal contract. If a CA license is in fact needed, we would appreciate a 45-day extension on the bid submission deadline, so we have enough time to secure it.
Yes, a California contractor’s license is required. An extension will not be granted for this requirement. 80AFRC25R0001 L.16 Volume I- Technical Acceptability
Bid bond is required at time of submission. The offeror that is awarded the Model Task Order would be required to provide the Payment and Performance bond within ten (10) days of Task Order award.
80AFRC25R0001 L.12 1852.216-81 Proposal Page Limitations (Apr 2015)
See also comment to Question 3. 1 N254 Pool 1 Nor Cal Rev 1 L.4 52.228-1 Bid Guarantee (Sep 1996) 2 Pool 2 So Cal Rev 1 L.4 52.228-1 Bid Guarantee (Sep 1996)
I foresee on this project, at least the following trades: electrical, HVAC, BAS, structural, metal framing, roofing. Given that there will only be one bid walk scheduled for this project, I would want my major subcontractors to be able to field verify site conditions rather than bidding blind - especially for a project of this size, complexity, and importance to NASA
The representatives per Offeror have been remains to four (4). 80AFRC25R0001 L. 9 1852.215-77 Preproposal/Pre-bid Conference (Apr 2015) Section (c)
15 What is the dollar threshold which triggers mandatory MACC usage by NASA? Per NFS A-102.13(a) Construction: The WRMACC is to be utilized for construction projects over $1 million. NASA FAR Supplement Appendix A
Solicitation Number: 80AFRC25R0001 - WRMACC
NASA's ResponseQuestion or InputComment # ReferenceDocument Title
3 Are we correct that there is no bid bond for either the MACC itself or the task order, and that we just need to provide a surety letter?
Performance Bonding Capacity is required as part of the WRMACC Volume I submission. Additionally, a Standard Form 24 (SF 24) Bid Bond is required for the Pool of Interest model task order(s) proposed.
Document 80AFRC25R0001p. 53, the page limits section, seems to indicate that we should include copies of the Contractor Performance Assessment Questionnaires in Volume III. Do we include each CPAQ in the partially completed form in which we send it to our customer? Or do we ask them to copy us on the completed CPAQ when they submit it directly to you so that we can insert completed versions in our Volume III document?
Performance Assessment Questionnaires for Volume III should be completed utilizing Attachment J-05 Performance Assessment Questionnaire, See updated solicitation for further information.
5 80AFRC25R0001
13 It was mentioned in the pre-bid conference that payment and performance bonds are to be provided upon bid submission. Is that correct or did Ms. Carrillo mean to say "bid bonds"?
17 Is it possible to bid BOTH North and South Pool? Yes. If the Offeror is interested in both Pools, then the Offeror must submit a separate proposal for both Pool 1 and Pool 2 model task orders. N/A N/A
18 For off-ramp procedures, can you provide specifics around when a contractor would be deemed 'unresponsive'? See Clause H.6 of the solicitation. 80AFRC25R0001 H.6 On-Ramp and Off-Ramp
19 If an offeror's SAM profile has all updated Reps & Certs, do we still need to complete Section K? Yes, if the requirements are applicable. 80AFRC25R0001 L.19 Volume IV-Other
20 Is the use of multiple Architects allowed? Yes. N/A N/A
21 For a contractor submitting for both the North and South pool, is it recommended that both site visits be attended? Or will they be similar enough in nature that only attending one is necessary?
Site visits are recommended. Per the requirements of FAR 52.236-3, Site Investigation, offerors are responsible for satisfying themselves as to the conditions affecting the work. Contractors submitting proposals must ensure they meet the requirements of
FAR 52.236-3.
FAR | (Acquisition.GOV) L.6 52.236-27 Site Visit. (Construction), Section (a)
22 Can you provide this presentation to all bidders as an attachment for future reference. Yes. N/A N/A
You gave the example of having 3 required SDVOSB selected and the remaining 2 moving down for consideration as a small business. Will the requirements for the number of selected contractors each set-aside tier be made available, or is it not known at this time?
No. Selection will be determined after proposal evaluations. N/A Section M Step 5 Selection Decision for IDIQ Contracts
Yes. See updated solicitation. SF1442 See also comments to Questions 3 and 14. L.4 52.228-1 Bid Guarantee (Sep 1996)
SF1442
L.4 52.228-1 Bid Guarantee (Sep 1996)
26 What is the total number of awards for each pool and what is the number of each small business group (i.e. WOSB) being targeted for award?
The Government intends to award up to thirty (30) small business contracts as a result of this solicitation. . 80AFRC25R0001 Section M: Step 5 Selection Decision for
IDIQ Contracts
27 Please provide VETS requirement details/URL.
VETS-4212 requirement (if applicable): Many companies that have a contract or subcontract with the Federal Government are required to annually report their affirmative action efforts to employ protected veterans.
https://webapps.dol.gov/elaws/vets/4212/Intro.aspx
80AFRC25R0001 I.2: 52.222-37 Employment Reports on Veterans (Jun 2020)
28 Does the past performance requirement need to be similar to seed project, or similar to the overall MACC contract?
The past performance evaluation is an assessment of the Government’s confidence in the offeror’s ability to successfully perform the requirements of the solicitation. While relevance to the seed project may be considered, the evaluation is not limited solely to that scope, it encompasses the overall requirements of the MACC contract.
80AFRC25R0001 L.18 Volume III- Past Performance Information
29 The BOX link provided in the solicitation PDF does not appear to be a valid URL Due to these technical issues, all solicitation files have been uploaded to SAM.gov N/A N/A
(c) Document 80AFRC25R0001, p. 58, says, “All proposal Excel files shall be provided in their native format, i.e. xls. Files with signatures shall be in read-only format, using .pdf files. All other files may be submitted in their native format or converted to .pdf files. Zip disks are not permitted. All price breakdown information to aide in the price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft 365.” Are there any required Excel files to be submitted?
What price breakdown information, if any, is required?
All offerors responding to this solicitation shall price the pool of interest model task order, completing box 17 of the pool of interest SF1442, Supplies and/or Services to be provided CLIN table column "Extended Price".
1 N254 Pool 1 Nor Cal Rev 1 2 Pool 2 So Cal Rev 1
SF1442 Box 17 Supplies and/or Services "Extended Price"
(c) Document 80AFRC25R0001, p. 58, says, “All proposal Excel files shall be provided in their native format, i.e. xls. Files with signatures shall be in read-only format, using .pdf files. All other files may be submitted in their native format or converted to .pdf files. Zip disks are not permitted. All price breakdown information to aide in the price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft 365.”
Are there any required Excel files to be submitted? What price breakdown information, if any, is required?
Schedule of Values (SOV) nor Progress Schedule are not required at time of bid. After award, the winning contractor shall put the four items (punch-list items, site clean-up, demobilization, and final construction [as-built] drawings) on their SOV.
80AFRC25R0001
L.14.c. ELECTRONIC SUBMISSION OF PROPOSALS - The BOX link provided does not have an associated URL. It is not a valid link. Please provide the correct link so that we can perform a test submission prior to the bid.
https://nasagov.app.box.com/f/3ba2c908aa5f4923897f68b32e7077bf 80AFRC25R0001 L.14 Electronic Submission of Proposals- Proposal Marking and Delivery Through NASA's EFSS Box (Nov 2021)
Comment # Question or Input
25 For each Pool proposal submission (1&2), will a bid bond be required for each Pool? Currently the SF1442(s) do not state a bid guarantee is necessary (13b.)
1 N254 Pool 1 Nor Cal Rev 1
23 No. Foreign Nationals shall abide by the badging requirements of each center. Badging for AFRC is detailed in AFOP-1600.1-001 Visitor Control. 80AFRC25R0001 L.9 1852.215-77 Preproposal/Pre-bid
Conference
Document Title Reference
2 Pool 2 So Cal Rev 1
NASA's Response
Is the job walk restricted to U.S. citizens only?
33 Are we able to qualify for the pool for future task order solicitations if we only submit volumes 1 and 3, but not 2?
Offeror shall propose pricing for the construction project(s) in either one or both pools of interest. In Section M for Factor 2 Price, it states "Offerors that do not propose pricing in accordance with the solicitation guidance may be considered unacceptable and thus precluded from further evaluation and receiving an award." Offerors are not required to propose on both projects, only one to be considered for award. The total price for each Pool will be utilized for evaluation of the price factor for award of the IDIQ contracts for each pool.
80AFRC25R0001 L. 17 VOLUME II-PRICE
34 The BOX link provided does nnot have an associated URL. It is not a valid link. Please provide the correct link so that we can perform a test submission prior to the bid. See comment for question 32.
35 If we submit volumes 1 and 3, but not 2 can we be considered qualified for the pool for future task order solicitations? See comment for question 33.
RFP page L-10 at top.
a. In the naming conventions of the submissions suggests that submissions can be submitted by both primes and subs. Can you clarify how it will work if Subs are awardees? As a GC, will we only be able to reach out to Subs that have been awarded? Please clarify this.
This option is intended for subcontractors who prefer to not disclose their proprietary information like the subcontractor's cost breakdowns to the General Contractor. In such cases, the subcontractor may submit their part of the prime contractor's pricing proposal directly to the designated submission box for evaluation purposes. Award will be made only to the prime contractor.
80AFRC25R0001
Will specific task orders be directed to specific disadvantaged categories (like only 8a or only SB, for example)? Is there a target as to the percent of TOs that go to a specific category only? What percentage of TO’s will go to companies that are SB only?
Yes. Certain task orders may be set aside for specific disadvantaged categories, such as 8(a) or Small Business (SB). These determinations are made during the acquisition phase in alignment with the Agency’s small business goals and objectives.
38 See page L-8 of the SOW. At the top, section 3.c refers to A/E partnering agreement. Please confirm that the agreement will be put in Volume I, Factor 1. See updated solicitation. 80AFRC25R0001 L. 12 1852.215-81 PROPOSAL PAGE
LIMITATIONS (APR 2015)
This refers to the answered RFI # 11, where it states we can use multiple AE firms. In order to have multiple A/E options when the Task Orders come out, do we need to identify all potential AE firms we might partner with, include them in our MACC submission, and include partnering agreements for each of the potential AE firms in our submission?
No, you are not required to identify all potential A/E firms in your WRMACC submission. Any such information, will be provided at the task order level if and when it is required by the specific task order solicitation.
Given the fact that many of the TO’s in this MACC may be Design Build, none of the 3 volumes require much information from our A/E partner, other than the A/E partnering agreement we have with them. We will include, in the Vol III Past Perf, some projects that we worked with them on, but that seems to be the extent of any requirements for information from our AE firm in terms of licensing, design approach, etc. Can you confirm that my understanding here is correct?
Yes, it is the Contractor’s responsibility to engage licensed and qualified firms to perform any required design services. As such, the solicitation does not require extensive information from the A/E partner beyond the partnering agreement.
41 Can we use previously completed PPQ’s? No.
42 For the Past Performance requirement, can we use within the past 5 years in lieu of 3 years? No.
43 For the “licensing” requirement; please confirm this is only subject to the “California State License Board”? See comment for question 12.
I have a question regarding the solicitation mentioned above, and just wanted to confirm or not actually, when submitting a response to the solicitation, if we enter as a joint venture with another subcontractor or firm, do both firms or entities of the JV need to hold a current general building California license? Or can we submit with just one of the JV members holding a general builders CA license? Please confirm.
Under California Business and Professions Code § 7029.1, two or more separately licensed contractors may not jointly act as a contractor or be awarded a contract without first obtaining a joint venture license.
https://leginfo.legislature.ca.gov/
Comment # Question or Input NASA's Response Document Title Reference
Section L.16 Volume I – Technical Acceptability, item 2. General Bldg. Contractor Licensing Requirement states offerors are to provide their General Building Contractor’s License Numbers with California State License Board (CLSB). Accordingly, to the CLSB website the CSB processes the license applications in the order which they are received. As of 07/21/2025 the “date being working on” for the applications unit is 06/23/2025 (30-day waiting period). Due to the backlog of the thousands of documents being process by the CSLB, this delay for offerors to take the necessary steps to obtain/renew their license is unavoidable for the solicitation. In consideration of this backlog for the CSLB and the proposal response time for offerors to process their licensing required in Section L.16(2), will NASA be willing to allow offerors to provide their CSLB Application as evidence of the offeror’s good standing with the CSLB allowing to provide their license number prior to WRMACC award?
No. See comment for question 12.
On page 53 of the solicitation document 80AFRC25R0001+Rev1, under Volume I – Technical Acceptability, it states that a Performance Bonding Capacity is required. Then, under Volume II – Price/Other, it mentions that a bid bond is required. ➤ Could you please clarify the difference between these two requirements?
Under Volume I – Technical Acceptability, the requirement for Performance Bonding Capacity refers to the submission of a bonding capacity letter from a surety, in accordance with FAR 28.204, demonstrating the Offeror’s ability to obtain performance and payment bonds for future task orders.
Under Volume II – Price/Other, the requirement for a Bid Bond refers to the submission of a bid guarantee, in accordance with FAR 28.101, which must accompany all task order bids as specified in the solicitation. The bid bond assures that the bidder will execute the contract and provide the required performance and payment bonds if awarded.
2. In the document 1+N254+Pool+1+Nor+Cal+Rev+1, it states in red: "The amount of the bid guarantee shall be 20% of the bid price or $3M, whichever is less." ➤ Could you confirm whether the bid guarantee (bid bond) should be submitted under Volume I – Technical Acceptability or Volume II – Price/Other?
See comment for question 46.
On STEP 6: PROCESS IDIQ AWARDS on page M-7, it states, "Offerors can only receive one award."
Please clarify that this language does not mean if an Offeror submits proposals for both Pool 1 and Pool 2, they can only be awarded an IDIQ contract for a single pool. This does not appear to be the case, because Step 7 says "An offeror awarded one or both model task orders meet the guaranteed minimum amount of work."
We assume this means a single contractor can only receive one award per pool if they qualify under multiple set-asides, but request the language be clarified.
If an Offeror is selected for award in both Pool 1 and Pool 2, only one IDIQ contract will be issued. That single contract will authorize the Offeror to compete for future task orders in both pools for which they have been selected.
Please clarify the response to question #26. Does the government intend to award up to 30 total contracts or 30 per pool? If it is 30 total, is there a intended number of awards per pool? The Government intends to award up to thirty (30) small business contracts as a result of this solicitation. See comment for question 48.
50 L.14 (d) says "Offerors are encouraged to include all individual proposal files within a single .zip file."
L.15 states "Zip disks are not permitted." Please clarify what the government means by zip disk.
A Zip Disk is an obsolete type of physical computer disk for storing data, which will not be accepted. Whereas, a .zip file is a compressed digital file format which is acceptable.
The table under L.12(a) shows "SF1442 WR_MACC" is to be included in Volume II, and "WRMACC- SF1442 Amendment Acknowledged" is to be included in Volume IV. We assume this means the WRMACC SF1442 with Amendments Acknowledged should be included in both Volumes II and IV.
However, L.19 only lists Section K requirements to be included in Volume IV. Please clarify what is to be included in Volume IV.
See updated solicitation.
Section L-18 states "The Government requests that the Offeror transmit the Past Performance Evaluation Questionnaires (Attachment J-05) to references for any contracts that do not have a final CPARS rating. PPQs may be from either Government or non-Government sources."
Section M (p.M-4) states "In the event a CPARS record does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment J- 06, to the Program Manager, Contracting Officer Representative (COR), or Technical Point of Contact (TPOC), who is a Government employee and the Assessing Official." and also "If the past performance reference is for a commercial contract, not in support of a Government requirement, then the Assessing Official is not required to be a Government employee."
Please clarify which set of instructions takes precedent. The instructions in Section L could be interpreted as allowing PPQs to be sent to teaming partners for Government projects, or to government officials other than those listed in Section M.
A Teaming Arrangement is an arrangement between two or more companies, either as a partnership or joint venture, to perform on a specific contract. The team itself may be designated to act as the prime contractor; or one of the team members may be designated to act as the prime contractor, and the other member(s) designated to act as subcontractors (see FAR Subpart 9.6). When the characteristics of joint control are evident, then the teaming arrangement is a joint venture. When these characteristics are not present then the arrangement may more closely resemble that of a prime contractor/subcontractor. If there is no past performance information for the teaming arrangement such as a CPARS record, then the prime contractor and major subcontractors would each submit the Contractor Performance Assessment Questionnaire (CPAQ), Attachement J-05, separately for evaluation by the government.
The CPAQ would be sent to the official responsible for assessing performance for the contract who would then send the completed CPAQ to the government. For government contracts, that would normally be either the Program Manager, Contracting Officer Representative (COR), or Technical Point of Contact (TPOC). Percentage of work performed by each company in the teaming arranagement would also be considered in determining the relevancy of its portion of the evaluation.
The government did not specify on the SF30 form in Box E if the Contractor is required to sign and return the SF30 form with the proposal. We assume this means acknowledging amendments on the second page of the WRMACC SF1442 is sufficient.
The contractor is not required to sign and return the SF30 Form. However, contractors are expected to fill out Block 19 of the SF1442 to acknowledge amendments.
Within the evaluation factors, terms such as "relevant in size, complexity, and content" are used when referencing past performance projects. However, we find this unclear as the scope of the WRMACC IDIQ itself is broadly defined, referencing general categories in the Statement of Work (e.g., general construction, design/build, LEED, BIM, etc.).
Can the Government please provide more specific guidance or examples on what would be considered “relevant” in terms of size, complexity, and content for the purposes of past performance evaluation?
Relevant performance includes performance of similar or greater in size, content, and complexity of the effort described in the solicitation.
Projects selected for past performance information should be within the scope of the Statement of Work. See Section M, Evaluation Factors, Factor 3 Past Performance Evaluation. See also comment to question 83.
80AFRC25R0001 M.1. SOURCE SELECTION AND
EVALUATION FACTORS
The solicitation appears to request three past performance projects, but it is not clear if this is a minimum or a maximum.
Can the Government please confirm whether Offerors may submit more than three past performance projects, or if three is the maximum allowed?
Three past performance projects is the maximum allowed. Offerors may not submit more than three projects for evaluation. 80AFRC25R0001 L. 18 VOLUME III- PAST
PERFORMANCE INFORMATION
SF-1442 - Our understanding is that price will be provided in SF 1442 1+N254+Pool+1+Nor+Cal+Rev+1 (our selected pool). Also, the amendment acknowledgment already appears in Volume IV – Other, under “WRMACC – SF1442 Amendment Acknowledgment.” Given that, what exactly are we required to submit or complete on this form?
The WRMACC SF-1442 including the Amendment Acknowledgments is a separate required submission. The SF-1442 for Pool 1 Northern California and the SF-1442 for Pool 2 Southern California are both separate submissions from the WRMACC SF- 1442. For each pool of interest selected, offerors must provide the SF-1442 with the total firm-fixed price and a binding signature. The applicable bid bond requirements will be attached the selected pool SF-1442.
L.12 1852.215-81 PROPOSAL PAGE
LIMITATIONS (APR 2015)
57 J-02 - Are we to provide price under the SF 1442 form in 1+N254+Pool+1+Nor+Cal+Rev+1 (selected pool)? Are amendment acknowledgments required here as well? See comment for question 56.
58 Bid Bond: Please confirm that the bid guarantee must be 20% of the bid price or $3 million, whichever is less. See 52.228-1(c) within the model task order of interest.
59 J-02 Page 59 of 80AFRC25R0001+Rev1 references Attachment J-02 Pool 1 Northern California. Could you please advise where this attachment can be located?
Within the Contract Opportunity for 80AFRC25R0001 on SAM.gov, under "Attachements/Links"
60 Volume III - Past Performance: May we include additional documents such as organizational charts, a management plan, etc.?
Yes. Additional documents, such as organizational charts or a management plan, may be included if they help convey relevant past performance information. However, any such materials will count toward the applicable page limit.
61 Are CPARS excluded from the 15-page limit for this volume? Yes. CPARS must be submitted to the Government directly. See solicitation for instructions 80AFRC25R0001
Volume IV - Other: Since there is an order of selection, in which volume should we provide our SDVOSB certification? (Our firm, IPS, is a Service-Disabled Veteran-Owned Small Business. Will the certification document count toward the page limit for that volume?
Volume IV. There is no page limitation for Volume IV. 80AFRC25R0001 L. 12 1852.215-81 PROPOSAL PAGE
LIMITATIONS (APR 2015)
63 Does each volume require a cover letter, table of contents, and tabs? If so, will these count toward the page limit? Yes. See Section L.12 (c) of the Solicitation. 80AFRC25R0001 L. 12 1852.215-81 PROPOSAL PAGE
LIMITATIONS (APR 2015)
64 Solicitation: Please confirm that the Government only wants a single submission for Volume III – Past Performance Summary, even if we are pursuing BOTH Pools 1 and 2. Yes. Only a single submission for Volume III-Past Performance Summary is required.
65 Solicitation – Volume III – Performance Information: Since we are allowed to use ongoing projects, will the Government also accept interim CPARs? Yes if the interim CPARS are within the past three years .
66 Solicitation – Volume III – Performance Information: Will the Government accept previously completed PPQs? No.
67 Solicitation: The Box link for proposal submission on page L-9, is not an active link. Can the Government please provide an active link? See comment for question 32.
Please confirm that the only Section K requirements (if applicable) that need to be addressed in Volume IV – Other are:
K.3 – FAR 52.204-8 Annual Representation and Certification (MAY 2024). and K.4 – FAR 52.209-7 Information Regarding Responsibility Matters (OCT 2018)
The Contractor is responsible to review Section K in its entirety and determine which provisions are applicable and required for submission.
The contractor’s submission represents that the annual representations and certifications and other information on the SAM website (https://www.sam.gov) are current, accurate, and complete as of the date of submission. Any changes needed to update the information residing in SAM.gov are provided in Volume IV. Identify any changes by clause number, title, date.
80AFRC25R0001 Pool 1 Nor Cal Ames PTO 01, does NASA intend to select only one of the three options, or will you be considering each option as standalone and potentially exercising all, none, or any one or two of the three?
NASA intends to award the base requirement, along with any options that are determined to provide value to the Government and are within budget.
Will the MACC have task orders with certain set asides? Example: TO#3 comes out as a WOSB set aside and then TO#4 comes out Total small, and if the TO’s are set aside specific, can all MACC holders bid regardless of the set aside?
Yes, the WRMACC will have task orders with certain set asides. If a task order is set aside it will only be released to those who qualifiy for that small business category.
71 Will there be a requirement to bid all task orders that come out on the MACC? NASA encourages maximum participation.
What is the expected task order volume per year for the MACC, specifically pool 2.
Historically, under the NASA MACC, Pool 1 issued 30 task order awards and Pool 2 issued 50 task order awards, for a combined total of 80 task orders over a five-year period.
73 A recent contract is defined as "a contract/task order for work either completed or started within the past three years." (Section L-18) Is the requirement for completion within 3 years of the RFP issuance date, or 3 years of the proposal due date?
In accordance with FAR 15.305(a)(2)(ii), the solicitation defines what is considered “recent” performance. Section L-18 specifies that a recent contract is one either completed or started within the past three years. Unless otherwise stated in the solicitation, this three-year period is measured from the proposal due date, as past performance is evaluated based on the most current and relevant information available at the time of proposal submission.
In the interest of reducing the burden on Government staff and maximizing workload efficiencies, will the Government accept recently completed Past Performance Questionnaires (PPQ) that answer similar and/or the same past performance questions?
The Government will not accept PPQs submitted in response to another solicitation as fulfillment of this requirement.
Section L.12 allows 3 pages per CPARS report. Will the Government consider removing this page limitation to allow CPARS that are longer than three pages? See comment for question 61.
Section L.12.c lists A&E partnering agreements among the documents that are excluded from the page limitation. Are offerors required to name an AE design firm in their proposals?
Yes. If an A&E firm is included as part of your proposal for the model task orders, it must be identified in your submission.
In Section M, Factor 3, if a CPAQ is submitted for a project and the offeror does not receive the completed CPAQ directly from the client—because it is submitted directly to the government per the solicitation instructions—should the offeror include a copy of the partially completed CPAQ that was sent to the client?
No. If the CPAQ is submitted directly to the Government by the client in accordance with the solicitation instructions, the Offeror is not required to include a partially completed copy in their proposal.
In Section L.14.c., the current link to submit all proposal files to “NASA Western Regional Multiple Award Construction Contract BOX link” appears to not contain a hyperlink. Will the government please provide an active link for offerors to submit proposal files to?
See comment for question 32 for Box link.
Volume 1, item 2 General Building Contractor Licensing Requirement The state issues both a wall certificate and a pocket license. Of the 2 documents, the pocket license is the only document the contains an expiration date. Does NASA want a copy of the wall certificate, pocket license of both?
Provide a copy of the pocket license, as it contains the expiration date and confirms the license’s current validity. The wall certificate is not required.
Page L8, Provision L.12, Paragraph (c), states that title pages, table of contents, cover pages, and A&E partnering agreement, joint venture, teaming arrangements, and or mentor protege agreements, are excluded from the page counts specified in paragraph (a) of this provision. Paragraph (a) doesn’t provide the location within the proposal where these items are to be included. Are these items to be included after the title pages cover pages etc., or part of the Volumes I, II, or III ?
A&E partnering agreement, joint venture, teaming arrangements, and or mentor protege agreements are part of Volume IV. See updated solicitation. See also comment for question 63.
80AFRC25R0001 L. 12 1852.215-81 PROPOSAL PAGE
LIMITATIONS (APR 2015)
81 Are offerors required to acknowledge all amendments on the SF 1442 with corresponding SF 30’s for the main solicitation only or are we required to include them in both Pool 1 & 2 submissions as well?
All amendments must be acknowledged on the SF 1442 for the WRMACC. See comment for question 56.
The SF 1442 for both Pools require providing 240 days for government acceptance of the offeror’s proposal. CLIN 0001 for Pool 2 has a duration of 150 calendar days. It was stated at the job-walk presentation that any of the option bid items could be awarded within this 240-day window. Does this mean that an option item could be awarded even after Clin 0001 is complete since the duration is only 150 days?
No.
83 Vol. III, Past Performance – Please confirm that “relevant” contract magnitude is considered comparable to estimated model task order magnitude (i.e., $5-10M). Yes.
Vol. III, Past Performance – Please confirm that Offerors are to instruct customers completing PPQs to submit responses directly to the Government (i.e., NASA) and Offerors are not to include customer completed Past Performance Questionnaires as part of their response to Volume III – Past Performance.
Yes.
Vol. III, Past Performance – If Offerors are to instruct customers to submit PPQs to NASA, please clarify the 15-page limitation on Volume III. Are additional documents required under this volume from the Offeror?
No.
Vol. III, Past Performance – Given the recent turnover in federal employees, many Government employees with past project knowledge are no longer available and presiding points of contact do not have knowledge concerning past performance history. Given this challenge, will the Government consider submission of previously PPQs and/or CPARS in lieu of completing the Past Performance Evaluation Questionnaire (Attachment J-05)?
No. PPQs must be submitted directly to the Government. Previously completed or contractor-submitted PPQs will not be accepted.
87 Vol. III, Past Performance – Will Offerors with past performance history at NASA be more favorably rated?
Not necessarily. Past performance will be conducted in accordance with FAR requirements. Past performance at NASA facilities may be considered more relevant if similarities to work in the solicitation can be shown.
FAR | (Acquisition.GOV)
POOL 1
Responses
Pool 1- 1 Please provide a hazmat report for all scope areas. See attachments J.6a, J.6b and J.6c.
Pool 1- 2
Please provide clarification on the bidding schedule.
Spec 01 00 00, 1.4 SCOPE OF WORK lists the following:
1.4.a. Base Bid: HVAC Replacement.
1.4.b. OPTION 1: UPS Replacement.
1.4.a. OPTION 2: Staircase.
1.4.b. OPTION 3: UPS Cabinets Replacement.
Document "N254 Pool 1 Nor Cal.pdf" lists the following:
CLIN 0001: Install structural support members for UPS system and Battery cabinets. Remove and replace uninterruptible.
CLIN 0002: Install structural support members for UPS system and Battery cabinets. Remove and replace uninterruptible power supply (UPS) and batteries. Remove and reinstall existing battery cabinets CLIN 0003: Install exterior staircase.
CLIN 0004: Existing battery cabinets to be removed and replaced with new battery cabinets.
Please confirm that CLIN 0001 shall be the lump sum price to replace the HVAC system and CLIN 0002 shall be the lump sum price to replace the UPS system, reusing the (E) battery cabinets.
See paragraph 2 of this amendment which corrects the verbiage for CLIN 001, with the correct verbiage, it is confirmed, CLIN 0001 shall be the lump sum price to replace the HVAC system. CLIN 0002 is confirmed, CLIN 0002 shall be the lump sum price to replace the UPS system, reusing the (E) battery cabinets
Pool 1- 3
HVAC
Please confirm BAS integration of (N) HVAC system with (E) Siemens Apogee is included in this contract.
Confirmed, the contractor has to reconnect the new rooftop HVAC units into existing Siemens Apogee control system of N254.
Pool 1- 4 Fire Alarm Please identify (E) FACP manufacturer, model, and current maintenance contractor.
This information regarding the (E) FACP manufacturer, model, and current maintenance contractor, will be given to the awardee. It can also be verified during the site visit on July 24, 2025.
Pool 1- 5 Fire Alarm Please provide fire alarm as-built drawings of the (E) fire life safety system.
See paragraph 3, below, which adds fire protection drawings (J.1b – J.1g) to this solicitation.
Pool 1-6 Spec 05 1200 Structural Steel requests submittals of "AISC Quality Certification" (05 1200-6; SD-07 Certificates). Please confirm AISC Certified Building Fabricator & AISC Certified Erector will suffice.
Regarding the Structural Steel, the contractor is to comply with all contract drawings and specifications
Pool 1-7
On sheet S103 detail 1, the drilled pier foundation west the existing exterior doors is placed +/-36” from the existing wall. At the Pool 1 (Nor Cal) bid walk the drilled pier location was field verified to be +/- 2 ft in front of an existing transformer. The (e) transformer is not noted on the plans. In addition, the
(e) transformer is placed next to the switchgear box. The switchgear box by code requires a 3 ft clearance to allow access thus limits the option to temporary relocate the transformer during construction and the final location after the staircase is installed. Please advise how would the government like to proceed with the discrepancy for the (e) transformer and the drilled pier location for the staircase.
See Attachment
Pool 1-8
At the project Pool 1 (Nor Cal) site walk, an existing antenna was found outside N254, directly east of the exterior doors from corridor 124. It was field verified the antenna is in the same location of the new staircase landing noted on sheet S201, detail 1 between gridlines 5 & C of the drawings. In addition, the antenna is approximately 7-9 ft in height and the new staircase landing will be 6’-11” in height (noted on S201, detail 1). Please confirm the antenna will be relocated by the government prior to the staircase being constructed.
The Government will not relocate the antenna prior to the staircase being constructed.
Contractor is to demolish and dispose of the existing two satellite dishes and other loose metal frames/sheets on ground. See below Picture of Antenna (See Attachment)
Pool 1-9 For Pool 1 (Nor Cal), please confirm the approved disposal site for excess soils to be disposed.
Government (NASA) does not provide a pre-approved disposal site (landfills). It is contractor responsibility to provide to the government recommendations of disposal sites for approval.
Pool 1-10 For Pool 1 (Nor Cal), please confirm if N254 has roof warranty? If the existing roof is under warranty, please provide the contract information for the warranty holder and its roof installer.
NASA does not have any warranty for existing roof. However, as per contract, warranties are required for all new equipment and materials that will be installed for this project.
Pool 1-11 For Pool 1 (Nor Cal), please provide the approved controls manufacturer(s) for NASA-Ames Facilities Management Control System (FMCS) and N254’s HVAC system.
For the existing HVAC system, it is a Siemens system.
Pool 1-12 For Pool 1 (Nor Cal) site walk, the roof was inaccessible and unable to be field verified. Please provide photos of the existing roof area noted on sheet AD101 and it’s conditions of the existing HVAC system in the proposed area.
Photos are entitled, “Pool 1 N254 Attachment A-Photos”.
Pool 1-13 7. For Pool 1 (Nor Cal), the J.6a N254 Asbestos Survey Report, sampled on July 18, 2006, for Building 254 Roof states 2% Chrysotile was detected (see below) –
NASA does not have a map but, the below mastic sample was taken from upper roof.
Project worksite is on lower roof. (Attachment Picture)
Question or InputComment # NASA's Response
Pool 1-14 Please provide the map where the sample was taken to confirm if abatement will be required for the demolition of the roof noted on sheet AD101.
NASA does not have a map but, we do have a ACM Survey. See attachment B entitled, “Pool 1 N254 Attachment B-N254 ACM Survey July 24 2006 (for A15)”.
Pool 1-15 At the site visit, it appeared the ground mounted transformer next to the door where the new steel staircase is to be installed could possibly be in the way of the new column footing. If this becomes a factor, will this be treated as a changed condition?
No change order, see answer to question 8 above.
Pool 1-16
During the presentation at Ames Research Center and prior to walking the site, NASA personnel stated if funds become available, the seed project for Pool 1 could be awarded in January. The concern is, this would place the project in the rainy season. A comment was made that the Notice to Proceed could be pushed forward if needed. Please confirm the contractor could negotiate a delayed NTP to minimize the risk of rain on an open roof.
NASA is not opposed to conversations.
Pool 1-17 Since we were not allowed to inspect the rooftop at the Ames Research Center, please provide pictures of the existing equipment and related areas of work. See answer to question 13 above.
Pool 1-18 Building Occupancy: Can the Government confirm whether Building N254 is continuously occupied (24/7) and whether any building systems must always remain operational, including emergency backup systems such as generators?
N254 operations are 24/7 and whole building shutdown is not allowed. It is always occupied. Contractor is not allowed to tap the existing power supplies of N254 and must provide their own power supplies during construction.
Pool 1-19 Price Hold Period: Given the required 240-day price hold and the anticipated award date of late December 2025, will the Government allow price adjustments (e.g., for escalation) if award is delayed into 2026?
The Government would accept an Request for Equitable Adjustment for review and consideration.
Pool 1-20 System Connections to Roof: Please clarify what building systems or functions are supported by the existing roof and if any temporary protection or continuity of service will be required during replacement.
Contractor is to comply to all contract amendments, drawings and specifications.
Pool 1-21 Control Systems / Vendors / Manufacturers: For rooftop equipment (if any), are there required or preferred control system types, equipment manufacturers, or vendors? For the existing HVAC system, it is a Siemens system.
Pool 1-22 Roof Type & Warranty Requirements: Please confirm the desired roof system type, warranty duration, and whether there is a list of NASA-approved or preferred roofing contractors for this facility.
Government (NASA) does not provide pre-approved roofing companies. It is contractor responsibilities to through the submittal process to recommend to NASA roofing companies for approval.
Pool 1-23 Please provide the lay down area for the contractor For the lay down area, see bid drawing G001.
Pool 1-24 What manufacturer has the controls in the building? See answer to question 12 above.
Pool 1-25 What are the working hours for this project due to the building be occupied? Specification Section 1.3.3 Working Hours. Office areas are away from the work sites.
Pool 1-26 Does the contractor have to provide any dust protection for the server room. Yes, if works will create dust, all existing equipment must be protected.
Pool 1-27 During overhead work can the contractor block off the room they are working in For fire safety, it is not allowed to block any exit corridors. The contractor is to submit work plans for review and approval by NASA.
Pool 1-28 Please confirm that there is no work in the server room. As per Amendment 2, contractor is to provide temporary cooling units with its own power supplies.
Pool 1-29 Is the existing roof still under warranty. See answer to question 11 above.
Pool 1-30 Who was the original subcontractor that install the existing roofing…