These are detailed engineering and civil site plan drawings for a NASA project at the Dryden Flight Research Center to repair flightline access roads and aircraft ramps. The project is divided into four phases: Phase 1 covers work at the Aircraft Ground Equipment (AGE) Yard at Building 4810, Phase 2 involves concrete aprons at Building 4801, Phase 3 includes taxiway and road work at Building 4840, and Phase 4 covers concrete aprons at Building 4826. The drawings provide comprehensive site plans, soil boring logs, civil site plans, striping plans, pavement joint plans, and detailed construction specifications for pavements, joints, and infrastructure improvements. The plans include precise grading, drainage, and construction details, with specific requirements for asphalt and concrete pavements, expansion and construction joints, and site-specific surveying and grounding elements.

View the file

Other files for this federal contract opportunity

Other files attached to Western Regional Multiple Award Construction Contracts (WRMACC), newest first.
File Type Posted
80AFRC25R0001_Amend 13.pdf PDF
80AFRC25R0001_Amend 12.pdf PDF
80AFRC25R0001_Amend 11.pdf PDF
80AFRC25R0001 Amend 10.pdf PDF
80AFRC25R0001 Amend 9.pdf PDF
80AFRC25R0001 Amend 8.pdf PDF
80AFRC25R0001 Rev3.pdf PDF
80AFRC25R0001 Rev2.pdf PDF
1 J.7 Pool 1 N254 Pictures.pdf PDF
1 J.8 ACM Survey (for A15).pdf PDF
2 Pool 2 So Cal Rev 2.pdf PDF
80AFRC25R0001 Amend 7.pdf PDF
80AFRC25R0001_Amend 6.pdf PDF
80AFRC25R0001_Amend 5.pdf PDF
80AFRC25R0001_Amend 3.pdf PDF
1 J.1a2-N254-Drawing-A254-1200-FP2.pdf PDF
1 J.1a3-N254-Drawing-A254-1200-FP3.pdf PDF
1 J.6a N254- Asbestos survey Report-Ext.pdf PDF
80AFRC25R001_Amend 2.pdf PDF
1 J.5a- N254 WD CA20250018_10JULY2025.pdf PDF
1 J.1a6-N254-Drawing-A254-1200-FP6.pdf PDF
1 J.6b N254-Roof Asbestos Survey.pdf PDF
2 Pool 2 So Cal Rev 1.pdf PDF
2 J02 Concept Design Rev1.pdf PDF
2 J-03 WD CA20250020_Mod 9.pdf PDF
WRMACC Amend 2 Q_A.pdf PDF
1 J.1a4-N254-Drawing-A254-1200-FP4.pdf PDF
1 J.1a5-N254-Drawing-A254-1200-FP5.pdf PDF
1 J.6c N254-Asbestos Survey Report Room 131.pdf PDF
2 J-02a As-builts 4802.pdf PDF
2 J-02b As-builts roads_ramps.pdf PDF
1 J.1a1-N254-Drawing-A254-1200-FP1.pdf PDF
80AFRC25R001_Amend 1.pdf PDF
WRMACC VIRTUAL PREPROPOSAL_PRE-BID CONFERENCE - Attendance report 7-09-25.pdf PDF
J-04 DRD 01 SHEMP.pdf PDF
1 J.3a-N254 Structural Calcs-UPS Anchorage.pdf PDF
2 Pool 2 So Cal.pdf PDF
2 J03 WD CA20250020_06JUN2025.pdf PDF
J-05 Performance Assessment Questionnaire.pdf PDF
1 N254 Pool 1 Nor Cal.pdf PDF
1 J.3b-N254 Structural Calcs-HVAC Anchorage.pdf PDF
2 J01 Specifications.pdf PDF
1 J.1a-N254 Drawings.pdf PDF
1 J.2a-N254 Permits.pdf PDF
1 J.2b-N254 Permit-Hold points.pdf PDF
1 J.4a-N254 Specifications.pdf PDF
1 J.5a- N254 WD CA20250018_06JUN2025.pdf PDF
J-01 WRMACC SOW.pdf PDF
80AFRC25R0001.pdf PDF
Solicitation Attachments 80AFRC25R0001.pdf PDF
Show all 50

Western Regional Multiple Award Construction Contracts (WRMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1: INCLUDES ALL WORK FOR AIRCRAFT GROUND EQUIPMENT (AGE) YARD AT BUILDING 4810

(SITE #1) SHOWN ON DRAWINGS C-1 AND C-5.

PHASE 2: INCLUDES ALL WORK FOR CONCRETE APRONS AT BUILDING 4801

(SITE #2) SHOWN ON DRAWINGS C-2, C-6, AND C-8.

PHASE 3: INCLUDES ALL WORK FOR TAXIWAY AND ROADS AT BUILDING 4840

(SITE #3) SHOWN ON DRAWINGS C-3 AND C-7.

PHASE 4: INCLUDES ALL WORK FOR CONCRETE APRONS AT BUILDING 4826

(SITE #4) SHOWN ON DRAWINGS C-4 AND C-9.

GENERAL NOTES FOR ALL PHASES:

A) ONE PHASE SHALL BE COMPLETELY FINISHED BEFORE CONSTRUCTION

CAN START ON ANOTHER PHASE.

B) COMPLETION OF A PHASE SHALL INCLUDE ALL WORK, INCLUDING DEMOLITION OF

EXISTING PAVEMENT AND CONSTRUCTION OF NEW PAVEMENT.

C) PHASING SHALL PROCEED IN SEQUENTIAL ORDER, UNLESS OTHERWISE DIRECTED

BY THE CONTRACTING OFFICER.

2.5

7.5

12.5

17.5

ND

ND

4.0

4.8

SM

3" Asphalt Paving - 3" Aggregate Base

SILTY SAND - fine to coarse, medium dense, moist, porous, light reddish brown

GRANITE - highly weathered, coarse grained, very dense, moist, light brown and light grey

NOTES: Groundwater not encountered. No caving. Boring backfilled with soil cuttings.

LOG OF BORING

DATE DRILLED: 12/16/09

EQUIPMENT USED: 8-Inch Diameter Hollow-stem-auger

BORING D13

PLATE A-1.13

2.5

7.5

12.5

17.5

ND

ND

8.0

8.7

SC

SP-SC

2-1/2" Asphalt Paving - 7" Aggregate Base

CLAYEY SAND - fine to medium, dense, moist, light brown

Medium to coarse

SAND, slightly Clayey - medium to coarse, dense, moist, light brown

NOTES: Groundwater not encountered. No caving. Boring backfilled with soil cuttings.

LOG OF BORING

DATE DRILLED: 12/16/09

EQUIPMENT USED: 8-Inch Diameter Hollow-stem-auger

BORING D14

PLATE A-1.14

2.5

7.5

12.5

17.5

ND

ND

3.9

19.6

SP

SM

2" Asphalt Paving - 6" Aggregate Base

SAND - fine to coarse, dense, moist, light yellowish brown

Some Clay

SILTY SAND - fine, medium dense, moist, some Clay, light brown

NOTES: Groundwater not encountered. No caving. Boring backfilled with soil cuttings.

LOG OF BORING

DATE DRILLED: 12/16/09

EQUIPMENT USED: 8-Inch Diameter Hollow-stem-auger

BORING D15

PLATE A-1.15

EDM-1710-Final-Drawings-T-1-T-2-T-1
EDM-1710-Final-Drawings-T-1-T-2-T-2
EDM-1710-Final-Drawings-T-3-T-3
EDM-1710-Final-Drawings-C-sheets-C-1
EDM-1710-Final-Drawings-C-sheets-C-2
EDM-1710-Final-Drawings-C-sheets-C-3
EDM-1710-Final-Drawings-C-sheets-C-4
EDM-1710-Final-Drawings-C-sheets-C-5
EDM-1710-Final-Drawings-C-sheets-C-6
EDM-1710-Final-Drawings-C-sheets-C-7
EDM-1710-Final-Drawings-C-sheets-C-8
EDM-1710-Final-Drawings-C-sheets-C-9
EDM-1710-Final-Drawings-C-sheets-C-10
EDM-1710-Final-Drawings-C-sheets-C-11