2 Pool 2 So Cal Rev 2.pdf

PDF 443 KB Posted

Attached to
Western Regional Multiple Award Construction Contracts (WRMACC) Federal contract opportunity
Solicitation number
80AFRC25R0001
Issued by
National Aeronautics and Space Administration Armstrong Flight Research Center

About this file

This is a Solicitation, Offer, and Award document for a construction project at NASA Armstrong Flight Research Center in Edwards, CA. The project involves repairing damaged apron and taxiway pavement and underground fire suppression systems. The solicitation includes three Contract Line Item Numbers (CLINs): Base Bid for fire suppression system and concrete ramp repair, Additive 1 for constructing a new tow way, and Additive 2 for repairing an existing taxiway. The estimated project price range is between $5,000,000 and $10,000,000, with a firm fixed price contract type.

Key contract details include a 10-calendar day start period after notice to proceed, with completion timeframes ranging from 150 to 270 calendar days depending on bid options. The total performance period shall not exceed 600 calendar days. Liquidated damages are set at $700 per calendar day of delay. The solicitation requires electronic submissions, and bidders must provide a bid guarantee of 20% of the bid price or $3M, whichever is less. Attachments include specifications, concept design, as-built drawings, wage determinations, and site-specific safety documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Western Regional Multiple Award Construction Contracts (WRMACC), newest first.
File Type Posted
80AFRC25R0001_Amend 13.pdf PDF
80AFRC25R0001_Amend 12.pdf PDF
80AFRC25R0001_Amend 11.pdf PDF
80AFRC25R0001 Amend 10.pdf PDF
80AFRC25R0001 Amend 9.pdf PDF
80AFRC25R0001 Amend 8.pdf PDF
80AFRC25R0001 Rev3.pdf PDF
80AFRC25R0001 Amend 7.pdf PDF
80AFRC25R0001 Rev2.pdf PDF
1 J.7 Pool 1 N254 Pictures.pdf PDF
1 J.8 ACM Survey (for A15).pdf PDF
80AFRC25R0001_Amend 6.pdf PDF
80AFRC25R0001_Amend 5.pdf PDF
80AFRC25R0001_Amend 3.pdf PDF
80AFRC25R001_Amend 2.pdf PDF
1 J.5a- N254 WD CA20250018_10JULY2025.pdf PDF
1 J.1a6-N254-Drawing-A254-1200-FP6.pdf PDF
1 J.6b N254-Roof Asbestos Survey.pdf PDF
2 Pool 2 So Cal Rev 1.pdf PDF
2 J02 Concept Design Rev1.pdf PDF
2 J-03 WD CA20250020_Mod 9.pdf PDF
1 J.1a2-N254-Drawing-A254-1200-FP2.pdf PDF
1 J.1a3-N254-Drawing-A254-1200-FP3.pdf PDF
1 J.6a N254- Asbestos survey Report-Ext.pdf PDF
2 J-02c Additional Drawings.pdf PDF
WRMACC Amend 2 Q_A.pdf PDF
1 J.1a4-N254-Drawing-A254-1200-FP4.pdf PDF
1 J.1a5-N254-Drawing-A254-1200-FP5.pdf PDF
1 J.6c N254-Asbestos Survey Report Room 131.pdf PDF
2 J-02a As-builts 4802.pdf PDF
2 J-02b As-builts roads_ramps.pdf PDF
1 J.1a1-N254-Drawing-A254-1200-FP1.pdf PDF
80AFRC25R001_Amend 1.pdf PDF
WRMACC VIRTUAL PREPROPOSAL_PRE-BID CONFERENCE - Attendance report 7-09-25.pdf PDF
J-05 Performance Assessment Questionnaire.pdf PDF
1 N254 Pool 1 Nor Cal.pdf PDF
J-04 DRD 01 SHEMP.pdf PDF
1 J.3a-N254 Structural Calcs-UPS Anchorage.pdf PDF
2 Pool 2 So Cal.pdf PDF
2 J03 WD CA20250020_06JUN2025.pdf PDF
1 J.3b-N254 Structural Calcs-HVAC Anchorage.pdf PDF
2 J01 Specifications.pdf PDF
1 J.1a-N254 Drawings.pdf PDF
1 J.2a-N254 Permits.pdf PDF
1 J.2b-N254 Permit-Hold points.pdf PDF
1 J.4a-N254 Specifications.pdf PDF
1 J.5a- N254 WD CA20250018_06JUN2025.pdf PDF
J-01 WRMACC SOW.pdf PDF
80AFRC25R0001.pdf PDF
Solicitation Attachments 80AFRC25R0001.pdf PDF
Show all 50

Western Regional Multiple Award Construction Contracts (WRMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

SUPPLIES AND/OR SERVICES TO BE PROVIDED

The Contractor shall provide all resources necessary to delivery and/or perform this task order for the Repair damaged apron and Taxiway pavement as well as underground fire suppression system at NASA Armstrong Research Center at Edwards, CA. Work shall be accomplished in accordance with the documents listed under “List of Attachments”.

All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the U.S. Government. Preservation, packaging and packing shall be in accordance with standard practices for commercial packaging.

Government personnel are not authorized to accept deliveries for the Contractor, nor are they responsible for off-loading shipments. A Contractor representative must be present to accept deliveries.

CLIN # Supplies/Services Quantity UNIT Unit Price

Extended Price

1 JOB *$TBP *$TBP

Firm Fixed Price (FFP) Repair of underground fire suppressions system and concrete ramp. The Contractor shall provide all resources necessary to complete the requirements identified in accordance with the documents listed under “List of Attachments”.

1 JOB *$TBP *$TBP

Firm Fixed Price (FFP) Additive 1: Constructing a new tow way: The Contractor shall provide all resources necessary to complete the requirements identified in accordance with the documents listed under “List of Attachments”.

1 JOB *$TBP *$TBP

Firm Fixed Price (FFP) Additive 2: Repair of existing taxiway: The Contractor shall provide all resources necessary to complete the requirements identified in accordance with the documents listed under “List of Attachments”.

1852.216-78 FIRM FIXED PRICE. (DEC 1988)

The total firm fixed price of this contract is *TBP.

1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS.

(OCT 1988)

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

Item Quality Assurance Function Location

1. In-process Inspections Project Site, AFRC

2. Final Inspections Project Site, AFRC

(End of Clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (See Schedule) after receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Base Bid: 150 Calendar Days Option bid 1: 180 Calendar Days Option bid 2: 270 Calendar Days

Total Period of Performance if Base Bid and all Bid Options are awarded shall not exceed 600 calendar days.

52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $700.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.228-1 BID GUARANTEE. (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.236-4 PHYSICAL DATA. (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.

(a)The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

(b) Weather conditions hazards may arise from weather conditions. Complete weather records and reports may be obtained from the National Weather Service.

The climate of the base is characterized by hot, dry summers, and cool, slightly moist winters.

Mean annual precipitation is less than 125mm. Most precipitation comes as light rainfall during the winter months. Light snowfalls of 50mm are not uncommon and heavy snow rarely occurs. Thunderstorms occasionally bring brief but heavy rains in late summer. Temperatures between 35 and 45 degrees C are common in summer. Winter temperatures may drop well below freezing. Both winter and summer are characterized by wide fluctuations between daytime and nighttime temperatures brought on by the generally low humidity of the desert.

Strong southwesterly winds are common particularly in spring and early summer. Moderate to strong easterly Santa Ana winds are common in the fall and winter. The frost-free season is quite variable, but on the average, it ranges from 200 to 250 days.

(c)Transportation facilities N/A

(d) The natural soils consist predominantly of older alluvial sediments deposited by river and stream action. About 300 mm of loose native fill covers the NASA/AFRC site, consisting of silty sand and sand, tan. Light brown to brown, slightly moist medium dense, medium grained, and containing some gravel and rootlets. The natural soils underlying the site consist of silty sands and sand to a depth of 2 meters. Decomposed granite and the top 300 mm of loose fill, all earth materials are dense and strong. Groundwater may be encountered near the Roger’s Dry Lakebed.

LIST OF ATTACHMENTS

The following documents, exhibits, and attachments are attached hereto and made a part of this requirement.

Attachment Title Date Pages 2 J-01 Specifications 06/18/2025 547 2 J-02 Concept Design Rev1 06/18/2025 1 2 J-02a As-builts 4802 06/24/2016 10 2 J-02b As-builts roads_ramps 07/20/2011 43 2 J-02c Additional drawings 07/29/2010 14 2 J-02d Detailing Sketches 08/19/2025 18 2 J-03 Wage Determination CA20250020_Mod 9 07/04/2025 27 2 J-04 Requirement/Site specific SHEMP TBD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

1852.236-74 MAGNITUDE OF REQURIEMENT (DEC 1988)

The Government estimated price range of this project is between $5,000,000.00 and $10,000,000.00.

(End of provision)

(END OF MODEL TASK ORDER)

File details come from the government source that posted it. Updated .