Section_F_Deliveries_or_Performance_Rev_10.8.19.pdf
PDF 401 KB Posted
- Solicitation number
- 70Z02319RAVS03000
About this file
This solicitation requests proposals for an indefinite-delivery, indefinite-quantity contract to extend the service life of up to thirteen 270-foot Medium Endurance Cutters for the United States Coast Guard. The contractor will upgrade the electrical systems, including generator sets, switchboards, and other electrical components. Proposals are due by October 25th at 11:00 AM Eastern Time. The contract will have a 60-month base period and two 60-month option periods, for a total potential ordering period of 120 months. The solicitation incorporates terms from FAR 52.211-17, 52.242-17, and 52.247-34 by reference. The North American Industry Classification System code for this requirement is 336611.
Section F Deliveries or Performance Revised 8 Oct 2019
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
270 WMEC SLEP 70Z02319R239AVS03000
Part I - Schedule
Section F – Deliveries or Performance
Section F - Deliveries or Performance Page 1 of 6
TABLE OF CONTENTS
F.1. CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)
F.2. DEFINITIONS OF DAYS
F.3. ORDERING PERIOD
F.4. DELIVERY SCHEDULE
F.5. DELIVERY
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be access electronically at http://www.acquisition.gov/far.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
NUMBER TITLE DATE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEPT 1989)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
52.247-34 F.O.B. DESTINATION (NOV 1991)
F.2 DEFINITION OF DAYS
(a) Wherever used, “days” means calendar days, unless otherwise specified, and will include
Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day. When used, "working day" excludes weekends and U.S. Federal holidays.
F.3 ORDERING PERIOD
The total ordering period is 60 months or 120 months if all options are exercised.
F.4 DELIVERY SCHEDULE
The Government requires delivery to be made according to the following schedule. Specific delivery schedule will be identified in the individual delivery orders.
REQUIRED DELIVERY SCHEDULE
CLIN Description QTY Completion
0001 B-Class Ship Check
& Integrated System
Design http://www.acquisition.gov/far
270 WMEC SLEP 70Z02319R239AVS03000
Section F - Deliveries or Performance Page 2 of 6
0001AA B-Class Ship Check
& Report
1 Ea. Within 4 weeks after Delivery Order
0001AB B-Class Integrated
System Design
1 Ea. Within 5 months after Delivery Order
0002 B-Class Work
Package
1 Ea. Within 1 month after B-Class Integrated System
Design
0003 Planning Documents
0003AA Quality Assurance
Plan
1 Ea. 1 month prior to delivery of B-Class Integrated
System Design
0003AB Packing, Preservation and Marking Plan
1 Ea. Concurrent with delivery of B-Class Integrated
System Design
0004 B-Class Supply
0004AA, 1004AA,
2004AA, 3004AA,
4004AA, 5004AA,
6004AA, 7004AA,
8004AA, 9004AA
Ship Service
Generator Set &
Switchboard Package
1 Ea. Within 6 months after Delivery Order or sooner if mutually agreed upon
0004AB, 1004AB,
2004AB, 3004AB,
4004AB, 5004AB,
6004AB, 7004AB,
8004AB, 9004AB
Emergency Service
Generator Set &
Switchboard Package
1 Ea. Within 6 months after Delivery Order or sooner if mutually agreed upon
0004AC, 1004AC,
2004AC, 3004AC,
4004AC, 5004AC,
6004AC, 7004AC,
8004AC, 9004AC
On-Board Repair
Parts
1 Lot Within 4 months after Delivery Order or sooner if mutually agreed upon
0005 B-Class Preliminary
Provisioning
Technical Data
1 Ea. Within 2 months after delivery of B-Class Work
Package
0006 B-Class Shipboard
Integration Testing
Plan
1 Ea. Within 2 months after delivery of B-Class Work
Package
0007 A-Class Ship Check
0007AA, 1007AA, A-Class Ship Check
1 Ea. Within 4 weeks after Delivery Order
0007AB, 1007AB, A-Class Integrated
System Design
1 Ea. Within 14 weeks after Delivery Order
0008, 1008, A-Class Work
Package
1 Ea. Within 1 month after A-Class Integrated System
Design
0009 A-Class Supply
0009AA, 1009AA,
2009AA, 3009AA,
4009AA, 5009AA,
6009AA, 7009AA,
8009AA, 9009AA
Ship Service
Generator Set &
Switchboard Package
1 Ea. Within 6 months after Delivery Order or sooner if mutually agreed upon
270 WMEC SLEP 70Z02319R239AVS03000
Section F - Deliveries or Performance Page 3 of 6
0009AB, 1009AB,
2009AB, 3009AB,
4009AB, 5009AB,
6009AB, 7009AB,
8009AB, 9009AB
Emergency Service
Generator Set &
Switchboard Package
1 Ea. Within 6 months after Delivery Order or sooner if mutually agreed upon
0009AC, 1009AC,
2009AC, 3009AC,
4009AC, 5009AC,
6009AC, 7009AC,
8009AC, 9009AC
On-Board Repair
Parts
1 Lot Within 4 months after Delivery Order or sooner if mutually agreed upon
0010, 1010, A-Class Preliminary
Provisioning
Technical Data
1 Ea. Within 10 weeks after delivery of A-Class Work
Package
0011, 1011, 2011, 3011, 4011, 5011, 6011, 7011, 8011, System Stock Parts 1 Lot Within 4 months after Delivery Order or sooner if mutually agreed upon
0012, 1012, 2012, 3012, 4012, 5012, 6012, 7012, 8012, Onsite Technical
Representative
Support
Days Dates shall be listed on the Delivery Order
0013 Training
0013AA, 0013AA,
2013AA,
Training Plan and
Materials
1 Ea. Within 2 months after Delivery Order
0013AB, 1013AB,
2013AB, 3013AB,
4013AB, 5013AB,
6013AB, 7013AB,
8013AB, 9013AB
Onboard Training Days Dates shall be listed on the Delivery Order
0014, 1014, 2014, B-Class Final
Provisioning
Technical Data
1 Ea. Within 2 months after Delivery Order
0015, 1015, 2015, A-Class Final
Provisioning
Technical Data
1 Ea. Within 2 months after Delivery Order
0016, 1016, 2016, A & B Class
Shipboard Integration
Testing Plan
1 Ea. Within 1 month after A-Class Work Package
0017,1017, 2017, 3017, 4017, 5017, 6017, 7017, 8017, 9017, Travel Dollars Dates shall be listed on the Delivery Order
The Government will evaluate as an alternative, with regards to time of delivery, offers that propose delivery of each CLIN within the required delivery period. Offers that propose delivery that will not clearly fall within the required delivery specified above may be found unacceptable and may be rejected.
270 WMEC SLEP 70Z02319R239AVS03000
Section F - Deliveries or Performance Page 4 of 6
The Government reserves the right to award under the required delivery schedule of the proposed delivery schedule when an offeror provides an earlier delivery schedule than required above. If an offeror proposes no other delivery schedule, then the above schedule shall apply.
Offeror’s Proposed Delivery Schedule
CLIN Description QTY Completion
0001 B-Class Ship Check
0001AA B-Class Ship Check
1 Ea. Within ____ weeks after Delivery Order
0001AB B-Class Integrated
System Design
1 Ea. Within ____ months after Delivery Order
0002 B-Class Work
Package
1 Ea. Within __ month after B-Class Integrated System
Design
0003 Planning Documents
0003AA Quality Assurance
Plan
1 Ea. ___ month prior to delivery of B-Class
Integrated System Design
0003AB Packing, Preservation and Marking Plan
1 Ea. ______ with delivery of B-Class Integrated
System Design
0004 B-Class Supply
0004AA, 1004AA,
2004AA, 3004AA,
4004AA, 5004AA,
6004AA, 7004AA,
8004AA, 9004AA
Ship Service
Generator Set &
Switchboard Package
1 Ea. Within _____months after Delivery Order or sooner if mutually agreed upon
0004AB, 1004AB,
2004AB, 3004AB,
4004AB, 5004AB,
6004AB, 7004AB,
8004AB, 9004AB
Emergency Service
Generator Set &
Switchboard Package
1 Ea. Within ______ months after Delivery Order or sooner if mutually agreed upon
0004AC, 1004AC,
2004AC, 3004AC,
4004AC, 5004AC,
6004AC, 7004AC,
8004AC, 9004AC
On-Board Repair
Parts
1 Lot. Within ______ months after Delivery Order or sooner if mutually agreed upon
0005 B-Class Preliminary
Provisioning
Technical Data
1 Ea. Within _____ months after delivery of B-Class
Work Package
270 WMEC SLEP 70Z02319R239AVS03000
Section F - Deliveries or Performance Page 5 of 6
0006 B-Class Shipboard
Integration Testing
Plan
1 Ea. Within ____ months after delivery of B-Class
Work Package
0007 A-Class Ship Check
0007AA, 1007AA, A-Class Ship Check
1 Ea. Within ____ weeks after Delivery Order
0007AB, 1007AB, A-Class Integrated
System Design
1 Ea. Within ______ weeks after Delivery Order
0008, 1008, A-Class Work
Package
1 Ea. Within _______ month after A-Class Integrated
System Design
0009 A-Class Supply
0009AA, 1009AA,
2009AA, 3009AA,
4009AA, 5009AA,
6009AA, 7009AA,
8009AA, 9009AA
Ship Service
Generator Set &
Switchboard Package
1 Ea. Within ______ months after Delivery Order or sooner if mutually agreed upon
0009AB, 1009AB,
2009AB, 3009AB,
4009AB, 5009AB,
6009AB, 7009AB,
8009AB, 9009AB
Emergency Service
Generator Set &
Switchboard Package
1 Ea. Within _______ months after Delivery Order or sooner if mutually agreed upon
0009AC, 1009AC,
2009AC, 3009AC,
4009AC, 5009AC,
6009AC, 7009AC,
8009AC, 9009AC
On-Board Repair
Parts
1 Lot Within ______ months after Delivery Order or sooner if mutually agreed upon
0010, 1010, A-Class Preliminary
Provisioning
Technical Data
1 Ea. Within ______ weeks after delivery of A-Class
Work Package
0011, 1011, 2011, 3011, 4011, 5011, 6011, 7011, 8011, System Stock Parts 1 Lot Within _____months after Delivery Order or sooner if mutually agreed upon
0012, 1012, 2012, 3012, 4012, 5012, 6012, 7012, 8012, Onsite Technical
Representative
Support
Days Dates shall be listed on the Delivery Order.
0013 Training
0013AA, 0013AA,
2013AA,
Training Plan and
Materials
1 Ea. Within _____ months after Delivery Order
0013AB, 1013AB,
2013AB, 3013AB,
4013AB, 5013AB,
6013AB, 7013AB,
8013AB, 9013AB
Onboard Training Days Dates shall be listed on the Delivery Order
270 WMEC SLEP 70Z02319R239AVS03000
Section F - Deliveries or Performance Page 6 of 6
0014, 1014, 2014, B-Class Final
Provisioning
Technical Data
1 Ea. Within ______months after Delivery Order
0015, 1015, 2015, A-Class Final
Provisioning
Technical Data
1 Ea. Within _______ months after Delivery Order
0016, 1016, 2016, A & B Class
Shipboard Integration
Testing Plan
1 Ea. Within ______ month after A-Class Work
Package
0017,1017, 2017, 3017, 4017, 5017, 6017, 7017, 8017, 9017, Travel Dollars Dates shall be listed on the Delivery Order
F.5 DELIVERY
a) All data deliverables shall be delivered to the following address:
USCG Surface Forces Logistics Center
SFLC-CPD-C&P3-SSP-ISVS
Attn: Kelly Wyatt, Contracting Officer
707 E. Ordnance Road, Suite 410
Baltimore, MD 21226
M/F: Contract Number (to be provided upon contract award)
Delivery Order Number (to be provided with each individual delivery order)
b) Equipment shall be delivered to the following address:
USCG Surface Forces Logistics Center
Receiving, Bldg. #88
2401 Hawkins Point Road
Baltimore, MD 21226-5000
M/F: Contract Number (to be provided upon contract award)
Delivery Order Number (to be provided with each individual delivery order)
All packages shall be preserved, packaged, and marked in accordance with the contract and the approved
Preservation, Packaging, and Marking Plan.