Response_to_270_Site_visit_Questions_5_Nov_2019.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 70Z02319RAVS03000
About this file
This document contains questions and answers related to a solicitation for electrical power generation system upgrades on 270-foot Medium Endurance Cutters for the U.S. Coast Guard. The solicitation seeks an Indefinite-Delivery, Indefinite-Quantity contract to extend the service life of up to thirteen cutter hulls by replacing ship service and emergency diesel generator sets along with switchboard upgrades. Key details include specifications for new generator set dimensions, vibration limits, jackets, and paralleling capabilities to integrate with existing systems. The document clarifies responsibilities for drawings, calculations, and modifications between the contractor and Coast Guard. Offerors must submit pricing for initial equipment, onboard repair parts, system stock parts, technical support, and training. The closing date for proposals is October 25, 2019.
Response to 270' Site visit Questions 5 Nov 2019
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESD-RESPONSE<
| QUESTIONS / ANSWERS – 270' WMEC SLEP ELECTRICAL POWER GENERATION ON-SITE VISIT NORFORK, VA OCTOBER 17, 2019 | |||
| NO | QUESTIONS | ANSWERS | |
| 1 | Section_C-4_CDRL states that Provisioning Technical Data AClass (Preliminary), A-CLASS ELC-008; is due within 7 months after receipt of order for ACLASS ELC-003 [Integrated System Design: A Class (Preliminary)], which is significantly later than “Within 10 weeks after delivery of A-Class Work Package”. Which is the correct requirement? | The requirement for Preliminary Technical Data A CLASS ELC-008 is 7 months after receipt of order for Integrated System Design: A Class ELC-003. See revised section C-4, A-Class ELC-0008 | |
| 2 | SOW 4.12 invokes Section 508 of the Rehabilitation Act, which requires federal agencies to develop, procure, maintain and use information and communications technology (ICT) that is accessible to people with disabilities. This must be referring to physical access, such as people in wheel chairs, or people with hearing or vision impairments or those using any other kind of physical aids. It is not clear how that is applicable to a USCG cutter manned by crews without disabilities. Can the Government provide some clarity to how the Offeror will apply this requirement? | Section 508 compliance covers electronic deliverables such as reports and ensures that they are delivered in formats readable by technologies that aid those with disabilities. | |
| 3 | SOW Section 6.1.2 stipulates that drawings must be in AutoCAD format and produced to a commercial shipyard production level of detail. However, it does not state if drawings can be in commercial format or must be in USCG CAD drawing format and comply with all associated drawing USCG drawings standards. Please advise if commercial format is acceptable. | Yes, the commercial format is acceptable for the content of the drawings. | |
| 4 | SOW Section 6.2.5 requires a "Shipboard Mechanical Interface Drawing" to define "all mechanical connections ... which can be disconnected in the course of normal servicing of the generators sets. Permanent joints ... need not be depicted." Similarly, Section 6.2.6 narrowly addresses the requirement for a drawing defining how the generator set and exhaust silencer are to be mounted to their respective foundations. Other than the interface drawings, the scope does not identify any requirement for ripout and installation drawings that depict changes to the cutter's fuel, lube oil, and sea water cooling systems nor to the structure or deckplating in way of the foundations. Please confirm that the Government and not the Contractor is responsible for developing all the ripout and installation drawings for the Coast Guard Yard. | Yes, the Government is responsible for developing all the ripout and installation drawings for the Coast Guard Yard. | |
| 5 | Attachment C-1 Technical Specification: Ship Service & Emergency Diesel Generator Sets, section 1.1.3, identifies a maximum height dimension of 81 inches for the entire generator set including all accessories mounted on a common skid. Does this include the height of the flexible joint attached to the engine exhaust elbow? | Yes. | |
| 6 | The current configuration on the 270 WMEC EDG alternator is air cooling. The RFI indicated a requirement for an air cooled EDG winding as well, but the solicitation (paragraph 3.2 of Section C-1) indicates that all generator winds are required to be water cooled. Please confirm. Further, please confirm whether the EDG alternator windings are to be water cooled. If water cooled is required, will additional engineering and drawings be required or if the Contractor's role is limited to providing the calculations. | The Solicitation supersede the RFI. All windings shall be water cooled. Yes, the contractor role is limited to providing the calculations. | |
| 7 | Section 1.2.6 states "Generator set and/or alternator shall be resiliently mounted to the skid." Will USCG accept if the skid is resiliently mounted to the foundation instead? The NORTHLAND is set up this way. | Yes, see revised Section C-1, 1.2.6. | |
| 8 | Request the following attachments be provided as noted in Amdt #4 Section J List of Documents: a) J.17 USCG Specifications for 270 Foot B-Class Medium Endurance Cutter 1 September 1979; b) J.18 USCG Specification D-084-0481 Rev A - Equipment Unit Preservation, Packaging, and Marking; and c) J.19 USCG Specification D-086-0508, 2008 - Technical Documentation Specification Requirements and Standards | Yes. References attached; D-084-0481.PDF; D-086-0508.PDF; The 270 Ship Design Specs are too large to send and are located on the Network drive \\d05ms-bhawfp5\Communal3\ESD\ISVS\270 WMEC SLEP\6. References & Resources\Engineering References\270 Design Specification | |
| 9 | Reference SOW Section 6.2.5 regarding the piping system, does the USCG require associated calculations? If piping is removed, are ripout drawings required? Please describe the extent to which drawings and engineering for piping modifications must be provided. | See answer to question #4. | |
| 10 | Attachment C-1, 2.5.2 states that “seawater is currently provided by the ASW system at 145 gpm.” What is the contractor’s responsibility for piping calculations, system balancing, and adjustments or changes of head loss? | The contractor is not responsible for piping calculations, system balancing, and adjustments or changes of head loss. However, refer to the SOW, paragraph 6.2.5. | |
| 11 | Reference Attachment C-1, 2.5.8, will the Coast Guard accept an engine-attached Jacket Water Expansion Tank? | Yes | |
| 12 | Reference Attachment C-1, 2.10.5.5, will the Coast Guard accept a solution that replaces the expansion joints in the exhaust systems? | Yes | |
| 13 | Reference Attachment C-1, 2.10.5.6 and the EDG exhaust, does the USCG intend to replace the dry silencer, but retain the water trap silencer and underwater discharge piping? | Yes. | |
| 14 | Please clarify the following inconsistencies on the Pricing Sheet Attachment J-2: a. Pricing Worksheet instructions: Please clarify whether offerors are to fill in highlighted cells on the Total Price tab or only on the 6 tabs listed in the 2nd paragraph of the instructions | a. To clarify, the instructions are revised in Amendment 000007: Tabs (1-6) are now listed and identified with the instructions. | |
| b. Several highlight cells on the TOTAL Price worksheet contain formulas which apparently should not be filled in by offerors We recommend that a different highlight color be used to indicate cells for which values are calculated or imported from other tabs and should NOT be filled out by offerors. This applies to CLINs for On Board Repair Parts, System Stock Parts, Technical Support, and Onboard Training. Similarly, all cells in the Total Price column (column G) on the TOTAL PRICE worksheet contain formulas and do not appear intended for fill-in by offerors despite being highlighted. | b. The Offeror totals that populate over to the Total Price worksheet will be highlighted in Green. As identified by Amendment 000007 instructions, all other CLINS not identified, fill in the unit price on the total price tab. | ||
| c. The TOTAL PRICE worksheet formula for CLIN1013AB, cell G108, in Ordering Year 2 contains the product of two grayed-out cells for which there are no entries. We believe the proper entry for this cell should be ( =’Onboard Training’!E15 ) | c. The proper entry for cell for CLIN1013AB, cell G108, in Ordering Year 2 is corrected. | ||
| d. The TOTAL PRICE worksheet formula for CLIN5004AC, cell G245, in Ordering Year 6 does not apply the 2x QTY indicated for this item in cell E245 | d. The TOTAL PRICE worksheet formula for CLIN5004AC, cell G245, in Ordering Year 6 is corrected. | ||
| e. The TOTAL PRICE worksheet entry of $20,000 for Travel in Ordering Year 6 (CLIN5017, cell G265) does not appear to reflect the estimated quantity of two (2) complete shipsets of equipment and associated tech support shown in the “Table of Estimated Quantities”. We believe this value should be $40,000, as is provided in the subsequent years in which 2 shipsets are planned for each year. | e. The value of $40,000 is now listed in year 6, per Amendment 000007 | ||
| f. The TOTAL PRICE worksheet entry for CLIN7009AB, cell G331 appears to be incorrectly entered as zero. We believe this cell should contain the formula ( =E331*F331 ) | f. The TOTAL PRICE worksheet entry for CLIN7009AB, cell G331 is corrected. | ||
| g. Please clarify the significance of the INITIAL DELIVERY ORDER worksheet. This information does not appear to be pulled into the TOTAL PRICE worksheet. All of the pricing requested on this sheet is provided elsewhere in the J-2 workbook, but is not linked to this tab. Does the total evaluated price utilize the total year 1 value on the INITIAL DELIVERY ORDER tab, or the total for ORDERING YEAR 1 as calculated on the TOTAL PRICE tab? | g. The instructions in Amendment 000007 is revised. Tab (6) Initial Delivery Order does not calculate over. The Offeror shall complete this tab and as identified, this will be the pricing for the initial delivery order. | ||
| 15 | Request an extension of two weeks. This extension is needed due to delays in getting the drawings and delays in getting compliant vendor bids. Further, questions previously submitted have not yet been answered. | An extension of 1 week was provided per amendment 000006. | |
| 16 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.8.1 - Do new EDG batteries and EDG battery chargers need to be quoted as part of this proposal? | If the proposed system is not compatible with the existing batteries and battery chargers (i.e. voltage/amperage requirements) then a replacement system must be designed and included in the proposal. | |
| 17 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.10.5 – Since we continue to struggle with getting access to GFI can USCG provide cut sheets for currently installed SSDG and EDG silencers? | Yes. References attached. | |
| 18 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.11.1.1 – If control power is required to start the Ships Service Diesel Generators in addition to starting air, can the existing Machinery Control system UPS’s be used for the source of control power or do new dedicated UPS’s need to be provided? | No. If control is required to start the proposed Ships Service Diesel Generator sets then the design should include a dedicated source of control power and not reliant on any other shipboard systems. | |
| 19 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 4.2.1 - If HMI screen updates are required in CGMCS as a result of the SSDG and EDG replacements is the contractor responsible for the redesign and programming changes of the HMI screens or will NSWC handle both the screen design changes and software/programming changes? | No, NSWC will be responsible for the redesign of the CGMCS HMI screen redesign | |
| 20 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 1.1.3. – The dimensions provided in this paragraph do not appear to be able to fit in the place of the existing EDG in the steering flat. Based on measurements taken during ship check, the EDG skid mounted equipment will need to be 73” or less in height if the 8” resilient mounts are to be installed under the skid. Were these dimensions intended to indicate that 81” height limit was to include the height of the resilient mounts? | Yes. | |
| 21 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 1.1.3 – Is the 18” to 24” maintenance envelope requirement intended to include all directions? The existing SSDGs do not have an 18”-24” maintenance envelop on the forward end of the engines, and on the B-Class ship that was ship checked, the battery racks were in violation of this space requirement on the inboard side of the engines. Will the maintenance envelope requirement require the contractor to take this into consideration and redesign the relocation of equipment presently infringing on the maintenance windows of the existing engines? | See revised Section C-1 Technical Specification, 1.1.3 | |
| 22 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 1.1.5 – The reference MIL-STD-167-1A is not applicable to reciprocating equipment. Should a different reference be used for the vibration requirements of the engines? | MIL-STD-167-1A only applies to the rotating equipment; in this case it only applies to the generator rotor. | |
| 23 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.5.6 – The existing SSDGs use a JW cooler that is not mounted on the SSDG Skid. Can this arrangement be reused, or is it a requirement for the JW cooler to be part of the skid assembly? | Yes, separately mounted JW cooler is acceptable. | |
| 24 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.5.7 - The existing SSDGs use a JW heater that is not mounted on the SSDG Skid. Can this arrangement be reused, or is it a requirement for the JW heater to be part of the skid assembly? | Yes, separately mounted JW heater is acceptable. | |
| 25 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 2.6.5 – The existing EDG uses RACOR filters that are not mounted to the skid. Can this arrangement be reused, or is it a requirement that the fuel filters be mounted on the skid assembly? | Yes, separately mounted fuel filters are acceptable | |
| 26 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 3.2 – Can the Generator cooler use either salt water or fresh water in the cooler itself or will fresh water be required? | The generator cooler can use either salt water or fresh water. | |
| 27 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 3.7.1 – Is the existing set up capable of paralleling SSDGs with the EDG? If not is this due to interlocks or are the synchroscope selector switches not set up to select certain configurations? | Yes, EDG and SSDG can parallel together; just not all three generators at once | E |
| 28 | Section C-1 Technical Specifications - Ship Service & Emergency Diesel Generator Sets – Para 3.7.2 - Is the present electrical arrangement capable of paralleling all generators to shorepower including the EDG? If not is this due to interlocks or are the synchroscope selector switches not set up to select certain configurations? | Yes, all generators can be paralleled to shorepower. | |
| 29 | Section C-2 Technical Specifications - Switchboards – Para 2.9.1 – Does the existing lighting meet these requirements or is this intended to improve the existing lighting? | This is intended to improve current lighting. | |
| 30 | Section C-2 Technical Specifications - Switchboards – Para 2.11.1 – Are the 90% and 75% alarms presently available in the MPCMS Console or will these be added? | No the alarms are not currently in the MPCMS Console. The government will modify the MPCMS Console to accept the inputs specified in Section C-2: Paragraph 2.11.1. | |
| 31 | Section C-2 Technical Specifications - Switchboards – Para 2.12.1 – Are the low voltage alarms presently available in the MPCMS Console or will these be added? | Yes, they are currently available. | |
| 32 | Section C Statement of Work – 10.5.2 OBRP and 10.5.3 System Stock – The Contractor is required to provide initial sparing of OBRP for the ship to support the end items of one ships set of equipment for a period of 12 months, and to provide a list of system stock parts to support the end item for a period of 2 years. Due to presumable varying recommended quantities, how will the Contractor be evaluated equally against others for the price evaluation factor? | In evaluating offers, the Government will use Total Evaluated Price (TEP). | |
| 33 | Section L Instructions, Conditions, and Notices to Offerors – L.12(6) please clarify how “major provider” is defined so that we may decide if the past performance references and PPQs are required of our Subcontractor(s). | Major provided is defined as the "Prime" contractor. |