This document is a technical specification section (Section 01800) for Mobilization and Demobilization, detailing the contractor's responsibilities for preparing and concluding work at a project site. The section outlines the comprehensive requirements for transporting personnel, equipment, and supplies to and from the project location, establishing and dismantling temporary facilities, and managing all associated logistical activities. The specifications cover the full scope of mobilization, which includes transportation costs, setting up operational infrastructure, obtaining performance and payment bonds, and ensuring compliance with local, state, and federal transportation and safety regulations.

The specification does not include specific pricing or funding details, but establishes that any additional mobilization or demobilization activities resulting from contract changes will be compensated through corresponding price adjustments. The contractor is explicitly responsible for all transportation of equipment and materials, and must complete a thorough demobilization process that includes removing all trash, debris, equipment, parts, supplies, and temporary facilities assembled specifically for the contract. The document provides a standardized framework for managing the initial setup and final breakdown of a construction or project site, ensuring proper handling of resources and equipment throughout the project lifecycle.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01800-1

SECTION 01800

MOBILIZATION AND DEMOBILIZATION

PART 1 GENERAL

1.1 WORK INCLUDED

A. The work shall consist of the mobilization and demobilization of the Contractor’s forces and equipment necessary for performing the work required under the contract.

1.2 GENERAL REQUIREMENTS

A. Mobilization shall include all activities and associated costs for transportation of

Contractor’s personnel, equipment, and operating supplies to the site; establishment of all necessary general facilities for the Contractor’s operations at the site;

premiums paid for performance and payment bonds, including coinsurance and reinsurance agreements as applicable.

B. Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site;

including the disassembly, removal and site clean-up, of all temporary facilities assembled on the site specifically for this contract.

C. This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the Contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

1.3 SPECIAL REQUIREMENTS

A. The Contractor shall be responsible for the transportation of the Contractor’s equipment. All equipment and materials shall be mobilized and demobilized in accordance with all local, state and federal laws related to transportation and safety.

B. The demobilization shall include but not be limited to, removal and disposal of all trash, debris, Contractor’s equipment, parts, supplies, and all other such items.

END OF SECTION