23-334100 Storm Sewer Pipe.pdf
PDF 118 KB Posted
- Attached to
- 2025 Stormwater Projects at Various Locations
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Northern Cambria Borough, Pennsylvania
About this file
This document is a technical specification section for Storm Sewer Pipe installation, likely for a municipal or transportation infrastructure project. The specification details the requirements for furnishing and installing High-Density Polyethylene (HDPE) storm sewer pipes, including comprehensive guidelines for excavation, pipe handling, bedding, jointing, and testing. The work encompasses installing storm sewer piping at specified depths, including all necessary excavation, removal of excess materials, connecting to existing structures, backfilling, compaction, restoration, and testing. The specification mandates that all HDPE pipe shall be manufactured according to ASTM F2648 standards, with smooth interior and annular exterior corrugations, and shall include storm sewer piping, manholes, inlets, endwalls, and associated structures.
The technical specification provides detailed requirements for pipe materials, including specific standards from ASTM, PennDOT, and other engineering organizations. The contractor is required to submit comprehensive product data, shop drawings, and guarantee certificates from the pipe manufacturer. Testing procedures include a Mirror Test to check alignment and potential television inspection of installed lines by the owner. The specification emphasizes strict quality control, with all defects to be repaired or replaced at the contractor's expense and to the full satisfaction of the owner. Pipe installation must follow precise guidelines for excavation, bedding, alignment, and jointing, with careful attention to preventing water infiltration and maintaining proper grade and positioning.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
334100-1
SECTION 334100
STORM SEWER PIPE
PART 1 GENERAL
2.1 DESCRIPTION
A. This work shall consist of furnishing and installing HDPE storm sewer at the depth indicated and on the bedding condition specified. This work includes but is not limited to: furnishing and placing the HDPE pipe; excavation; removal and disposal of excess material; the removal and disposal of abandoned pipes and structures, temporarily supporting underground structures; making connections at structures; bedding, select aggregate backfill and compaction; restoration; testing;
and all appurtenant equipment, labor, materials, equipment and supervision necessary to install the pipe as specified.
B. The extent of the storm sewer system work is as indicated on drawings and schedules, and by requirements of this Section.
C. Storm sewer main shall be constructed of the materials indicated on the drawings.
HDPE pipe shall be soil tight and shall have smooth interior and annular exterior corrugations.
D. Storm sewer system shall include but not be limited to:
1. Storm sewer piping.
2. Storm manholes, inlets, endwalls and other structures.
3. All excavating and backfill required for the storm sewer system.
4. Stakeout by Contractor from existing control points in field.
3.2 RELATED WORK SPECIFIED ELSEWHERE
E. Storm Sewer Structures - Section 333913
STORM SEWER PIPE 02723-2
4.3 REFERENCE STANDARDS
F. Pennsylvania Department of Transportation (PennDOT) Publication No. 408, latest edition.
G. American Society for Testing of Materials (ASTM)
C 32 Sewer and Manhole Brick (Made from Clay or Shale).
C 478 Precast Reinforced Concrete Manhole Sections.
C 923 Resilient Connectors Between Reinforced Concrete Manhole
Structures and Pipes.
D 3212 Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seal.
F 477 Elastomeric Seals (Gaskets) for Joining Plastic Pipe.
F 2648 Profile wall, interior liner, pipe, fittings, PE, subdrainage, land drainage, polyethylene33
H. American Water Works Association (AWWA)
D. American Concrete Institute 229 Controlled Low Strength Material
5.4 SUBMITTALS
I. Product Data: Submit manufacturer's technical product data and installation instructions for storm system materials and products. Certificates of conformance for all materials shall be submitted in accordance with Division 1, assuring conformance with these specifications. All pipe and appurtenances specified herein shall be covered by a guarantee certificate furnished by the Contractor and signed by an officer of the pipe manufacturer.
J. Shop Drawings: Submit shop drawings showing piping materials. Include details of underground structures, connections, manholes, covers, castings, fittings and pipe.
334100-3
K. Record Drawings: At project closeout, submit record drawings of installed storm sewer piping and products, in accordance with specifications.
6.5 QUALITY ASSURANCE
L. Manufacturer's Qualifications: Obtain materials from firms regularly engaged in manufacture of products of the types, materials, and sizes required, whose products have been in satisfactory use in similar service for not less than 5 years.
PART 7 PRODUCTS
8.6 PIPES AND PIPE FITTINGS
M. General: Provide pipes of the following materials as indicated on the drawings and specified herein. Provide pipe fittings and accessories of same material and weight/class as pipes, with joining method as indicated.
N. HDPE Pipe:
5. All HDPE pipe shall be manufactured in accordance with current ASTM
F2648. All pipe shall have smooth interior and annular exterior corrugations.
2. Joints shall be soil tight and gaskets when applicable, shall meet the requirements of ASTM477.
3. Gaskets shall be installed by the pipe manufacturer and covered with a removable, protective wrap to ensure the gasket is free from debris.
4. A joint lubricant as approved by the pipe manufacturer shall be used on the gasket and bell during assembly.
5. Pipe shall have a reinforced bell with a polymer composite band. The bell tolerance device shall be installed by the manufacturer.
6. Fittings shall conform to ASTM F 2306. Bell and spigot connections shall utilize a spun-on or welded bell and valley or saddle gasket meeting the soil tight joint performance requirements of ASTM F 2306.
7. Material for pipe production shall be engineered compound of virgin and recycled high-density polyethlylene conforming with the minimum
STORM SEWER PIPE 02723-4
requirements of cell classification 435420C (ESCR Test Condition B) as defined in ASTM D3350, except the carbon black content should not exceed 4%.
C. Flowable Concrete Fill:
1. Compressive Strength: - 300 psi.
2. Materials:
a. Cementitious Materials – 200 pounds.
b. Sand – 2,000 – 3,000 pounds.
c. Water – water to cementitious ratio = 1 to 1.5.
d. Air Entrainment – 10-15%.
e. Unit Weight – 118 pounds/cubic foot.
PART 9 EXECUTION
10.7 EXCAVATION AND BACKFILL
O. Excavation shall include the removal of material of whatever nature encountered within the limits of excavation, from the top of existing grade, or from the pavement subgrade line when existing paving is to be removed, to the pipe subgrade.
P. All slides, cave-ins, or unauthorized excess excavation shall be at the cost of the
Contractor and he shall backfill, without compensation, any cavities so caused with suitable satisfactory material including concrete or masonry if the Engineer determines such material necessary.
Q. Pipe failure may result if the design trench width is exceeded. If the trench width exceeds the width used for design, a better class of bedding or stronger pipe, or both must be provided, if directed by the Engineer.
R. Open no more trench in advance of pipe laying than is necessary to expedite the work.
334100-5
S. Excavate trenches to a width that will provide adequate working space, but not more than the maximum design width. Do not undercut trench walls.
T. Excavate trenches below the pipe invert a sufficient distance to provide space for the pipe bedding. Carry trenches in ledge rock, compact rocky or gravelly soil, or other unyielding materials below the bottom of the pipe at least one fourth of the outside diameter of the pipe, or in 4 in., whichever is greater. Refill the space beneath the pipe with specified pipe bedding material.
U. Excavate holes at each bell to provide full-length barrel support of the pipe and to prevent point loading at the bells or couplings.
V. Sheathing and shoring shall be used along the trenches, and shall be placed as required and necessary. It shall be left in place and shall be of sufficient strength to withstand all external pressures.
W. Additional requirements for pipe trench excavation, backfill and compaction shall be as specified herein for the appropriate conditions.
11.8 PIPE HANDLING
X. Protect pipe during handling against impact shocks and free fall.
Y. After delivery alongside the trench, the inspector will carefully examine each section of pipe for soundness and specification compliance. Unacceptable pipe will be marked with paint or other permanent marking material so that the marks would be plainly visible if the pipe was placed in the trench. The inspectors presence or lack thereof, does not relieve the contractor of any responsibility. No defective pipe is to be installed.
12.9 CLOSING ABANDONED UTILITIES
A. Close open ends of abandoned underground utilities which are indicated to remain in place. Provide sufficiently strong closures to withstand hydrostatic or earth pressure which may result after ends of abandoned utilities have been closed.
B. Close open ends of concrete or masonry pipe with not less than three (3) feet of flowable concrete fill and 8" thick brick masonry bulkheads.
STORM SEWER PIPE 02723-6
C. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Wood plugs are not acceptable.
D. Close manhole openings with not less than twelve (12) inches of brick masonry and parging.
3.4 PIPE BEDDING AND SUBGRADE PREPARATION
Z. Surface grade fill material or trench subgrade beneath the pipe to provide a uniform, firm and continuous support beneath the pipe at all points between bell holes or pipe joints. Densify fill material beneath the pipe.
AA. Carefully prepare bedding so that the pipe after installation will be true to line and grade.
BB. After each pipe has been brought to grade, aligned, and placed in final position, deposit and densify sufficient bedding material under the pipe haunches and on each side of the pipe to hold the pipe in proper position during subsequent pipe jointing, bedding, and backfilling operations. Deposit bedding material uniformly and simultaneously on each side of the pipe to prevent lateral displacement.
CC. The excavation into which the pipe is being laid shall be kept free from water and no joints shall be made underwater. Water shall not be allowed to rise in excavation until joint is complete. Care shall be used to secure watertightness and to prevent damage to joints during backfilling. All pipe joints shall be watertight within allowances established by these specifications.
13.5 PIPE LAYING
DD. Pipe laying shall be in accordance with ASTM D 2321 and per the manufacturer’s recommendations.
B. Pipe laying shall be accomplished only in the presence of the Engineer, or an authorized representative. Adequate and suitable equipment and appliances for safe and convenient handling and laying of pipes shall be used.
C. No pipe shall be placed upon a foundation into which frost has penetrated, nor at any time when the Engineer shall deem that there is a danger of formation of ice or penetration of frost at the bottom of excavation. Where the foundation is
334100-7 unsuitable, as determined by the Engineer, a stone or gravel foundation shall be placed and tamped to form an acceptable bed for the pipe.
D. Pipe shall be laid so that when completed, the interior bore will conform accurately to grades and alignment indicated by the contract documents or directed by the Engineer.
E. Pipes shall be thoroughly cleaned before they are laid and shall be kept clean until acceptance of completed work. Open ends shall be provided with a stopper carefully fitted so as to keep dirt and other substances from entering the pipe.
Unless approved otherwise by the Engineer, a stopper shall be kept in the end of the line when work is not in progress.
F. Whenever practicable, start pipe laying at the lowest point and install the pipe so that the spigot ends point in the direction of flow.
G. Unless otherwise required, lay all pipe straight between changes in alignment and at uniform grade between changes in grade.
H. Before joints are made, each pipe shall be well bedded and no pipe shall be brought into position until the preceding length has been thoroughly secured in place.
I. Clean joint contact surfaces immediately prior to jointing. Use lubricants, primers, or adhesives as recommended by the pipe or joint manufacturer.
14.6 TESTING AND ACCEPTANCE
EE. The Contractor shall cooperate and furnish all equipment, labor, and assistance necessary to perform testing required by the Engineer unless otherwise specified.
B. Upon completion and after backfill, the Engineer shall conduct a Mirror Test. The test will be accomplished by flashing a light from one end upon a mirror on the other end to check for poor alignment, misplaced pipe or other defects.
C. The Owner reserves the right to perform an internal television inspection of the lines installed under this contract. Television inspection equipment will be supplied by the Owner.
STORM SEWER PIPE 02723-8
D. All defects found shall be repaired or replaced by the contractor, at his expense, to the full satisfaction of the owner prior to acceptance.