This document is a technical specification section (Section 01340) detailing requirements for Shop Drawings, Product Data, and Samples submission for a construction project. The section provides comprehensive guidelines for contractors regarding the preparation, submission, and review of technical documentation related to project materials and work components. Key submission requirements include submitting four copies of Shop Drawings and Product Data, with detailed instructions on the information each submittal must contain, such as submission dates, project identifiers, contractor and manufacturer details, product specifications, applicable standards, and any deviations from contract documents.

The document outlines a structured process for document review and resubmission, requiring contractors to make corrections as specified by the Engineer and resubmit materials until approved. Each submittal must include a contractor's stamp certifying review, verification of products, field measurements, and coordination with contract requirements. The specification emphasizes the importance of timely submissions that do not cause delays in the work and provides a framework for systematic documentation and communication between the contractor and the project engineering team.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01340-1

SECTION 01340

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

PART 1 GENERAL

1.1 WORK INCLUDED

A. Submit Shop Drawings, Product Data, and Instruction Manuals required by Contract

Documents.

1.2 RELATED REQUIREMENTS

A. Definitions, and Additional Responsibilities of Parties: Conditions of the Contract.

1.3 SHOP DRAWINGS

A. Drawings shall be presented in a clear and thorough manner.

1. Details shall be identified by reference to sheet and detail, shown on

Contract Drawings.

1.4 PRODUCT DATA

A. Preparation

1. Clearly mark each copy to identify pertinent products or models.

2. Show performance characteristics and capacities.

3. Show dimensions and clearances required.

1.5 SUBMISSION REQUIREMENTS

A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor.

B. Number of Submittals Required:

1. Shop Drawings: Submit four (4) copies.

2. Product Data: Submit four (4) copies.

C. Submittals Shall Contain:

01340-2

1. The date of submission and the dates of any previous submissions.

2. The Project title and contract number.

3. The names of:

a. Contractor.

b. Supplier.

c. Manufacturer.

4. Identification of the product, with the specification section number.

5. Applicable standards, such as ASTM or Federal Specification numbers.

6. Identification of deviations from Contract Documents.

7. Identification of revisions on resubmittals.

8. An 8 in. x 3 in. blank space for Contractor and Engineer stamps.

9. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and of Contract Documents.

1.6 RESUBMISSION REQUIREMENTS

A. Make any corrections or changes in the submittals required by the Engineer and resubmit until approved.

B. Shop Drawings and Product Data:

1. Revise initial drawings or data, and resubmit as specified for the initial submittal.

2. Indicate any changes which have been made other than those previously noted by the Engineer.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION