18. Schedule B Task Requirement, Revision 1 dated 3-23-23.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
General Construction Multiple Award IDIQ
Solicitation number
6973GH-23-R-00020
Issued by

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
Addendum 2 specifications.pdf PDF
Questions and Answers 16-37.pdf PDF
Attachment 25 AMP400 OC Construction contractors combined.pdf PDF
Questions and Answers 5 through 15.pdf PDF
Attachment 26 21-017375 Addendum 1.pdf PDF
List of Attendees for Site Visit.pdf PDF
Amendment 0003.pdf PDF
Attachment 24 EOSH documents.pdf PDF
Amendment 0002 with attachments.pdf PDF
Amendment 0001.pdf PDF
8. SOW Appendix A Submittal form.pdf PDF
3. Contractor's Release.pdf PDF
15. Division 27 Communications.pdf PDF
11. SOW Appendix D Installed Equipment Data sheet.pdf PDF
21. Client Auth. Letter.pdf PDF
18. Schedule B Task Requirement.pdf PDF
23. Past Performance Survey.doc DOC document
12. SOW Appendix E Construction waste management.pdf PDF
2. Chapter_33_Construction_Safety.pdf PDF
7. Specification Table of Contents 01.10.2023.pdf PDF
20. 21-017375 CAI B50 - Specifications for Bid.pdf PDF
16. Division 28 Electronic Safety and Security.pdf PDF
5. SF25A Payment Bond.pdf PDF
17. 21-017375 Task Requirement SOW.pdf PDF
19. 21-017375 CAI B50 - All Drawings for Bid.pdf PDF
1. Specification 01010, Statement of Work.pdf PDF
22.. Past Performance Information Form.doc DOC document
6. WD_2.10.23.pdf PDF
13. SOW Appendix F EXCAVATION PERMIT v1.pdf PDF
9. SOW Appendix B Substitution form.pdf PDF
4. SF25 Performance Bond.pdf PDF
14. Division 26 Elecrical Requirements.pdf PDF
6973GH-23-R-00020 3-1-23.pdf PDF
10. SOW Appendix C AMKFM-224001 Division 27 Revision 16.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Schedule B
Seed Project #2021-017375, CAI-013, Room B50
1.0 General Conditions $ ___________
2.0 Architectural Work $ ___________
(to include Concrete, framing, painting & Flooring, Fire Suppression)
3.0 Electrican Work $ ___________
4.0 Mechanical Work $____________
5.0 Demolition $____________
6.0 Crane Rental $____________
7.0 New Work
a. New Heat Pump $____________
b. Valves $____________
c. Piping $____________
d. Insulation $____________
e. Test and Balance Services $____________
f. HVAC Controls $____________
5.0 Bonding $____________
Subtotal $____________
3.0 Overhead Rate: ________ S___________
4.0 Profit Rate: ________ S___________

Total Proposed Price: $___________

File details come from the government source that posted it. Updated .