Section E _ Inspection Acceptance.pdf

PDF 20 KB Posted

Attached to
Direct Current Back-Up System (DC BUS) Power Supply Federal contract opportunity
Solicitation number
693KA8-20-R-00008
Issued by
Department of Transportation Federal Aviation Administration Headquarters

About this file

This document outlines requirements for a federal contract solicitation seeking life cycle in-service support of Direct Current Back-Up System (DC BUS) uninterruptible power supplies. The solicitation is issued by the Federal Aviation Administration for a potential 10-year indefinite delivery indefinite quantity contract with a single award. Offerors must submit proposals by March 27, 2020 responding to requirements in Section C and following instructions in Section L. The FAA will evaluate questions submitted by March 10, 2020 and provide responses by March 18, 2020. The contract will require the awardee to provide a Quality Assurance Plan and conduct quality assurance in accordance with FAA standards to ensure all contract requirements are met.

View the file

Other files for this federal contract opportunity

Other files attached to Direct Current Back-Up System (DC BUS) Power Supply, newest first.
File Type Posted
Section L _Instructions Conditions and Notices to Offerors_AMEND 00004.pdf PDF
SF 30 _ Amend 00004.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00003.pdf PDF
FAA Response to Questions Requests for Clarifications_Amend 00003.pdf PDF
SF 33_ Amend 00003.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Amend 00002.pdf PDF
Attach J.02 CDRLs and DIDs _Amend 00002.pdf PDF
FAA Responses to Questions Requests for Clarifications_ Amend 00002.pdf PDF
Section M_Evaluation Factors For Award_Amend 00002.pdf PDF
Section C_Statement of Work_Amend 00002.pdf PDF
Attach J.25 DC BUS Equipment Characteristics _Amend 00002.pdf PDF
Section G_Contract Admin Data_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.pdf PDF
Attach J.24 DC BUS Module Performance_Amend 00002.pdf PDF
SF 33_Amend 00001 and 00002.pdf PDF
Attach J.01 DC BUS Specification_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.xlsx XLSX spreadsheet
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission_AMENDMENT 00001.pdf PDF
Section D _ Packaging Marking.pdf PDF
Section I _ Contract Clauses.pdf PDF
Section C _ Statement of Work.pdf PDF
Attachment J.11 Excavation and Handling of Contaminated Material.pdf PDF
Attachment J.30 FAA Order 6950.27A.pdf PDF
Attachment J.23 Module Performance - L.1.doc DOC document
Attachment J.21 Project Schedule Example Waco TX.pdf PDF
Attachment J.19 DC BUS CDLS Cumulative Spare Orders Depot Receipts.xlsx XLSX spreadsheet
Section H _ Special Contract Requirements.pdf PDF
Attachment J.07 FAA Form 3900-20_Pre-Construction and Maintenance Checklist.pdf PDF
Attachment J.24 DC BUS Module Performance - L.2.xls XLS spreadsheet
Attachment J.22 DC BUS Past Performance Questionnaire.doc DOC document
Section B _ Supplies.Services.Price.pdf PDF
Attachment J.26 Previous Contracts Lists.pdf PDF
Attachment J.13 FAA-G-2100H.pdf PDF
Attachment J.08 DC BUS CAI and StartUp Chceklist.pdf PDF
Attachment J.15 Excerpt from JO 6980.31A.pdf PDF
Section K _ Rep Cert Other Statements Offerors.pdf PDF
Attachment J.06 DC BUS Battery Test and Appendix.pdf PDF
Attachment J.04 SOP FAA Field Site Requests.pdf PDF
Attachment J.09 DC BUS UXTM CAI Checklist.pdf PDF
Attachment J.03 DC BUS Frequently Used Acronyms.pdf PDF
Section B.4_Price Schedule.xlsx XLSX spreadsheet
Attachment J.10 DC BUS Grounding Requirements.pdf PDF
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission.pdf PDF
Attachment J.18 DC BUS CDLS Cumulative Warrantied Orders.xlsx XLSX spreadsheet
Attachment J.16 DC BUS CDLS Quarterly Tracking Trending and Cost.xlsx XLSX spreadsheet
Attachment J.29 FAA Form 3900-17.pdf PDF
Section J _ List of Attachments .pdf PDF
Attachment J.14 CDLS User Guide.pdf PDF
Attachment J.27 Business Declaration.docx DOCX document
Attachment J.20 DC BUS CDLS Depot Inventory.xlsx XLSX spreadsheet
Show all 50

Direct Current Back-Up System (DC BUS) Power Supply has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIR 693KA8-20-R-00008

PART I – SECTION E

INSPECTION AND ACCEPTANCE

E.1.0 AMS CLAUSE 3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY

REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make the full text available, or offeror and contractors may obtain the full text via Internet at: https://fast.faa.gov/contractclauses.cfm.

3.10.4-2 Inspection of Supplies – Fixed Price (Nov 1997) 3.10.4-3 Inspection of Supplies – Cost Reimbursement (Apr 1996) 3.10.4-4 Inspection of Services – Both Fixed-Price & Cost Reimbursement (Apr 1996) 3.10.4-5 Inspection – Time-and-Material and Labor-Hour (Apr 1996) 3.10.4-14 Assignment of a Quality Reliability Officer (QRO) (Oct 2015) 3.10.4-16 Responsibility for Supplies (Apr 1996)

E.2.0 POINTS OF INSPECTION AND ACCEPTANCE

E.2.1 Supplies and/or services will be inspected and accepted as specified in the delivery/task order. Acceptance will be made by the CO, COR, or designated FAA representative.

The system has been accepted when the Contractor demonstrates to the FAA that the system meets all requirements described in Section C. The FAA must be contacted forty-five (45) working days prior to when inspections are needed.

E.2.2 The FAA will provide a written notification of acceptance or rejection within thirty

(30) calendar days of receipt of the final product. Specific justification or substantiation of the reason(s) for rejection will also accompany the notice. If the FAA determines that there are omissions, errors, or deficiencies in the contractor’s equipment, the Contractor must make the necessary correction that will allow the FAA to accept the final product. The Contractor must correct the report or deliverable within seven (7) working days unless otherwise specified.

E.3.0 INSPECTION FOR QUALITY ASSURANCE PROGRAM

Quality Assurance is applicable to all phases of the DC BUS requirement. The Contractor must provide a Quality Assurance Plan (QAP), as detailed in Section C.3.1.8.1 of the SOW, for the design, development, evaluation, and furnishing of hardware, software, firmware supplies, services, and associated documentation (including any modification to existing hardware and software). The plan must integrate the FAA’s quality control needs into existing practices without developing a new quality assurance program. The Contractor must conduct its quality assurance program in accordance with the approved QAP.

The inspection requirements specifically set forth in this Contract must become a part of the Contractor's overall Quality Assurance Program. The absence of FAA inspection does not relieve the Contractor of the responsibility of ensuring that all services, products, or supplies submitted to the FAA for acceptance comply with all requirements of the contract. The Contractor must establish and maintain a Quality Assurance Program and provide the procedures and controls to ensure that all requirements of the contract are met.

https://fast.faa.gov/contractclauses.cfm

E.1.0 AMS CLAUSE 3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
E.2.0 POINTS OF INSPECTION AND ACCEPTANCE
E.3.0 INSPECTION FOR QUALITY ASSURANCE PROGRAM

File details come from the government source that posted it. Updated .