Attachment J.09 DC BUS UXTM CAI Checklist.pdf

PDF 709 KB Posted

Attached to
Direct Current Back-Up System (DC BUS) Power Supply Federal contract opportunity
Solicitation number
693KA8-20-R-00008
Issued by
Department of Transportation Federal Aviation Administration Headquarters

About this file

This document is a Screening Information Request (SIR) issued by the Federal Aviation Administration for life cycle in-service support of Direct Current Back-Up System (DC BUS) uninterruptible power supplies. The FAA requires conditioned, uninterruptible electrical power to support critical National Air Space communication and electronic equipment. The anticipated contract type is an Indefinite Delivery Indefinite Quantity contract with a 10-year period of performance consisting of a two-year base period and four two-year option periods. Offerors must comply with instructions in Section L and submit any questions by March 10, 2020. The FAA will respond to questions by March 18, 2020 and proposals are due by March 27, 2020. The SIR provides relevant dates for the market survey, questions, responses, and proposals.

View the file

Other files for this federal contract opportunity

Other files attached to Direct Current Back-Up System (DC BUS) Power Supply, newest first.
File Type Posted
Section M _Eval Factors For Award_Amend 00004.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00004.pdf PDF
SF 30 _ Amend 00004.pdf PDF
SF 33_ Amend 00003.pdf PDF
Section C_Statement of Work_Amend 00002.pdf PDF
Attach J.25 DC BUS Equipment Characteristics _Amend 00002.pdf PDF
Section G_Contract Admin Data_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.pdf PDF
Attach J.24 DC BUS Module Performance_Amend 00002.pdf PDF
Section F_Deliveries or Performances_Amend 00002.pdf PDF
SF 33_Amend 00001 and 00002.pdf PDF
Attach J.01 DC BUS Specification_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.xlsx XLSX spreadsheet
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission_AMENDMENT 00001.pdf PDF
Attachment J.19 DC BUS CDLS Cumulative Spare Orders Depot Receipts.xlsx XLSX spreadsheet
Section H _ Special Contract Requirements.pdf PDF
Attachment J.07 FAA Form 3900-20_Pre-Construction and Maintenance Checklist.pdf PDF
Attachment J.24 DC BUS Module Performance - L.2.xls XLS spreadsheet
Attachment J.22 DC BUS Past Performance Questionnaire.doc DOC document
Section B _ Supplies.Services.Price.pdf PDF
Attachment J.26 Previous Contracts Lists.pdf PDF
Attachment J.13 FAA-G-2100H.pdf PDF
Attachment J.08 DC BUS CAI and StartUp Chceklist.pdf PDF
Attachment J.15 Excerpt from JO 6980.31A.pdf PDF
Section K _ Rep Cert Other Statements Offerors.pdf PDF
Attachment J.14 CDLS User Guide.pdf PDF
Attachment J.27 Business Declaration.docx DOCX document
Attachment J.20 DC BUS CDLS Depot Inventory.xlsx XLSX spreadsheet
Attachment J.25 DC BUS Equipment Characteristics - L.3.xls XLS spreadsheet
Attachment J.17 DC BUS CDLS Quarterly Depot Shipments.xlsx XLSX spreadsheet
Attachment J.05 FAA-STD-028C.pdf PDF
Section M _ Evaluation Factors for Award.pdf PDF
Section G _ Contract Admin Data.pdf PDF
Attachment J.02 CDRLs and DIDs.pdf PDF
Attachment J.28 FAA Order 4600.27C.pdf PDF
Attachment J.01 DC BUS Specification.pdf PDF
Attachment J.12 PreConstruction Conference Agenda and Checklist.pdf PDF
Section F _ Deliveries or Performances.pdf PDF
Attachment J.06 DC BUS Battery Test and Appendix.pdf PDF
Attachment J.04 SOP FAA Field Site Requests.pdf PDF
Attachment J.03 DC BUS Frequently Used Acronyms.pdf PDF
Section B.4_Price Schedule.xlsx XLSX spreadsheet
Attachment J.10 DC BUS Grounding Requirements.pdf PDF
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission.pdf PDF
Attachment J.18 DC BUS CDLS Cumulative Warrantied Orders.xlsx XLSX spreadsheet
Attachment J.16 DC BUS CDLS Quarterly Tracking Trending and Cost.xlsx XLSX spreadsheet
Attachment J.29 FAA Form 3900-17.pdf PDF
Section J _ List of Attachments .pdf PDF
Section D _ Packaging Marking.pdf PDF
Section I _ Contract Clauses.pdf PDF
Show all 50

Direct Current Back-Up System (DC BUS) Power Supply has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J.9

DC BUS System Installation Battery Monitoring System (UXTM)

Contractor Acceptance Inspection (CAI) Checklist

1. UXTM Battery Monitor, Harness, and Tab Washers

I. UXTM Equipment Installation

2. Laptop and Security Box

4. Facility Cleanup

II. UXTM Documentation and Familiarization

1. UXTM Startup Report

2. UXTM Product Description Guide (Alber)

3. UXTM Installation Guide (Alber)

4. UXTM Getting Started Guide (Alber)

5. DIM Getting Started Guide

6. UXTM Modbus Protocol Reference Guide (Alber)

8. UXTM Web Interface Guide (Alber)

9. UXTM Configurator Overview (Alber)

10. UXTM Wiring Schematic (Alber)

11. BXE System Installation Guide (Alber)

13. Battery Monitoring On Site Training

14. Site Drawings

12. Battery Xplorer Enterprise Quick Start Instructions (Alber)

3. Alarm cable to DCBUS LMS-1000 Binary Channel 8 / DCBUS Config.

Inspection Date: __________________ City:___________________

State:__________________

LOC

ID

FAC

Type

Equipment Type: DC BUS Verification Meets Requirements Does Not Meet

Requirements

SIR 693KA8-20-R-00008

Enable Latch Enable Latch No No Yes No No No Yes No No No Yes No No No Yes No No No Yes No No No Yes No No No Yes No No No Yes No No No Yes No

Enable Latch Enable Latch No No Yes No No No Yes No Yes No No No No No Yes No Yes Yes No No No No Yes No No No Yes No

Value N/A No No No No

No No No No

Major Minor

III. UXTM Set Up

A. Battery Configuration and Setup Information

1. Resistance Test Day Interval (90 Days)

2. Cell Temperature Enable (Yes)

Charger Cable / Intertier

1. Charger Cable Measurement

2. Intertier 1 -4 Not

Comments / Actions:

3. High Resistance (microhms) 150% of

4. Low Resistance (microhms) 0

5. High Cell Temperature (°C) 32.2

6. Low Cell Temperature (°C) 10

7. High Intercell Resistance (microhms) 150% of avg.

9. Cell to Ambient Delta (°C) 11

Cell Alarm Thresholds Value Major Minor

1. High Cell Voltage (V DC) 2.35

2. Low Cell Voltage (V DC) 2.18

4. Low Overall Voltage (V DC) 22.5

5. High Discharge Current (A DC) 201

6. High Ripple Current (A DC) 5

7. High Float Current (mA DC) 5000

8. Low Float Current (mA DC) 0

String Alarm Thresholds Value Major Minor

1. High Ambient Temperature (°C) 29

2. Low Ambient Temperature (°C) 18

3. High Overall Voltage (V DC) 28.5

3. Cell Temperature Scale (Celsius)

B. Thresholds

UXTM Data

Make: Model:

Serial #: kVA: kW:

Monitor Laptop Information

Make: Model:

Operating System (OS):

OS Version: Hard Drive Size:

RAM: Screen Size:

Processor:

SIGNATURES:

SSC Facility Representative Name and SSC (or Center):

Signature:

Phone Number:

Contractor Representative Name and Company:

Signature:

Phone Number:

Table 1

File details come from the government source that posted it. Updated .