Attachment J.07 FAA Form 3900-20_Pre-Construction and Maintenance Checklist.pdf

PDF 2 MB Posted

Attached to
Direct Current Back-Up System (DC BUS) Power Supply
Solicitation number
693KA8-20-R-00008
Issued by

About this file

This document is a pre-maintenance checklist for the Federal Aviation Administration. It outlines potential airborne contaminants from maintenance projects and ensures appropriate safety measures are addressed, such as availability of safety data sheets, notification of building occupants, adequate ventilation, and air monitoring if needed. Personnel must review and sign the checklist to document discussion of items and ensure issues are resolved before project commencement.

The related federal contract opportunity is a screening information request for life cycle support of direct current back-up power supply systems. The Federal Aviation Administration seeks to make one award for an indefinite delivery indefinite quantity contract with a ten-year period of performance. Questions regarding the request are due by March 10th and agency responses will be provided by March 18th. Proposals must be submitted by March 27th. The contract will support critical National Airspace communication and electronic equipment by providing conditioned, uninterruptible electrical power.

View the file

Other files

File Type Posted
SF 30 _ Amend 00004.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00004.pdf PDF
Section M _Eval Factors For Award_Amend 00004.pdf PDF
SF 33_ Amend 00003.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00003.pdf PDF
FAA Response to Questions Requests for Clarifications_Amend 00003.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Amend 00002.pdf PDF
FAA Responses to Questions Requests for Clarifications_ Amend 00002.pdf PDF
SF 33_Amend 00001 and 00002.pdf PDF
Section F_Deliveries or Performances_Amend 00002.pdf PDF
Section C_Statement of Work_Amend 00002.pdf PDF
Attach J.25 DC BUS Equipment Characteristics _Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.xlsx XLSX spreadsheet
Attach J.01 DC BUS Specification_Amend 00002.pdf PDF
Attach J.24 DC BUS Module Performance_Amend 00002.pdf PDF
Section G_Contract Admin Data_Amend 00002.pdf PDF
Attach J.02 CDRLs and DIDs _Amend 00002.pdf PDF
Section M_Evaluation Factors For Award_Amend 00002.pdf PDF
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission_AMENDMENT 00001.pdf PDF
Section E _ Inspection Acceptance.pdf PDF
Attachment J.21 Project Schedule Example Waco TX.pdf PDF
Attachment J.28 FAA Order 4600.27C.pdf PDF
Attachment J.23 Module Performance - L.1.doc DOC document
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission.pdf PDF
Section J _ List of Attachments .pdf PDF
Attachment J.13 FAA-G-2100H.pdf PDF
Attachment J.18 DC BUS CDLS Cumulative Warrantied Orders.xlsx XLSX spreadsheet
Section C _ Statement of Work.pdf PDF
Section I _ Contract Clauses.pdf PDF
Attachment J.16 DC BUS CDLS Quarterly Tracking Trending and Cost.xlsx XLSX spreadsheet
Attachment J.29 FAA Form 3900-17.pdf PDF
Attachment J.04 SOP FAA Field Site Requests.pdf PDF
Attachment J.15 Excerpt from JO 6980.31A.pdf PDF
Section H _ Special Contract Requirements.pdf PDF
Attachment J.22 DC BUS Past Performance Questionnaire.doc DOC document
Section K _ Rep Cert Other Statements Offerors.pdf PDF
Attachment J.11 Excavation and Handling of Contaminated Material.pdf PDF
Attachment J.08 DC BUS CAI and StartUp Chceklist.pdf PDF
Attachment J.26 Previous Contracts Lists.pdf PDF
Attachment J.09 DC BUS UXTM CAI Checklist.pdf PDF
Attachment J.30 FAA Order 6950.27A.pdf PDF
Attachment J.06 DC BUS Battery Test and Appendix.pdf PDF
Attachment J.24 DC BUS Module Performance - L.2.xls XLS spreadsheet
Attachment J.19 DC BUS CDLS Cumulative Spare Orders Depot Receipts.xlsx XLSX spreadsheet
Section B _ Supplies.Services.Price.pdf PDF
Attachment J.10 DC BUS Grounding Requirements.pdf PDF
Section B.4_Price Schedule.xlsx XLSX spreadsheet
Attachment J.03 DC BUS Frequently Used Acronyms.pdf PDF
Section D _ Packaging Marking.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Maintenance Environmental and Occupational Safety and Health Checklist

Section A. Purpose

This checklist is intended to be used to review maintenance projects prior to their commencement. The purpose of this checklist is to assess indoor air quality risks associated with planned maintenance activities. This checklist may not necessarily apply to all maintenance activities, but should be used to manage activities with the highest risk. The District Office Manager and/or their designee should rely on technical guidance provided by the Safety and Environmental Compliance Manager (SECM) to assess the risks associated with maintenance projects in their NAS facilities and based on their risk assessment, determine the need to apply the Pre- Maintenance Checklist.

This checklist relies on the training and professional judgment of the user. EOSH personnel, such as the SECM or designated EOSH professional should be consulted as needed for additional guidance and assistance. A facility point-of-contact (POC) with an understanding of facility procedures and equipment considerations should participate in site evaluation.

Section B. Maintenance Project Summary

The purpose of this section is to provide a brief description of the specific maintenance tasks and identify key personnel responsible for project completion. Fill in the requested site-specific information. Indicate if this work will occur in or adjacent to an occupied space.

FAA Form 3900-20 (03/15) Electronic Version (PDF) Pag

Project Name and Description:

Project Location: Facility:

Planned Start Date: Expected Completion Date:

Project/Design Representative Name: Phone:

EOSH Contact Name: Phone:

Facility Representative: Phone:

Section C. Potential Airborne Contaminants

Think about the project and its potential hazards. Consider sensitive NAS operations and all facility personnel that may be impacted by the projects. For each potential project hazard, indicate (with a checkmark) a potential for exposure/release/incident.

Potential Airborne Contaminant Project Hazards

Asbestos (e.g., tiles, insulation) A

O

U

C

O irborne dust (not lead or asbestos) Lead based paint

Wall coverings (paneling, wall paper) Paints/varnishes ther chemicals Combustion products (CO, hydrocarbons) se of sealants/caulks/glues/mastics Solvents

Molds/mildew/fungus Animal feces (rodents, birds) onstruction/demolition Grinding/sanding

Welding/cutting outdoors

Installation of carpet/vinyl flooring

New furniture/cubicles/cabinets

Cleaners/detergents

Pesticides

Roofing products

Welding/cutting indoors Other:

Other: ther: Other:

e 1 of 3

SIR 693KA8-20-R-00008

FAA Form 3900-20 (03/15) Electronic Version (PDF) Page 2 of 3

Section D. Site Ventilation

After reviewing the potential airborne contaminants in Section C, ensure that measures and controls to address applicable site airborne contaminants and ventilation issues are addressed. In your judgment, have appropriate measures been addressed to minimize the potential airborne contaminants? If yes, select the appropriate response below. If a potential airborne contaminant has been identified in Section C and no associated measures or controls are evident, then select “No” below. If a “No” is indicated use the closeout date box to indicate when appropriate measures or controls have been addressed.

Program Elements Yes/No/

N/A

* If No, Indicate Closeout Date

Notes

Chemical Substances (all projects)

1. Safety data sheet(s) (SDS) are available on-site for all substances.

2. SDS have been reviewed.

3. Substitute products have been evaluated.

4. Building occupants have been notified of potential odors/hazards.

5. Will odors have dissipated prior to shift change?

(a) If no was answered to the above question [5], has following shift been notified?

6. Substance is without strong odors/vapors that may migrate into or near occupied areas. If yes, skip to question 7.

(a) If no was answered to above question [6], can work be done when building is unoccupied? If yes, skip to question 7.

(a)(i) If no was answered to above question [(6)(a)], can area be pressurized? If yes, the section on supplemental ventilation must be completed.

(a)(ii) If no was answered to above question [(6)(a)(i)], is the existing air handling unit (AHU) adequate for ventilation as configured? If no, section on supplemental ventilation must be completed.

7. AHU intake vents have been sealed in accordance with appropriate procedures.

8. All other means by which vapors may enter the facility (e.g., open windows, window air conditioning (AC) units) have been eliminated.

For Indoor Projects (painting, remodeling)

9. Existing AHU is adequate for ventilation. If no, supplemental ventilation section must be completed.

10. Means of egress from occupied areas will remain clear and unaffected during the project.

Supplemental Ventilation

11. Existing AHU is adequate for ventilation needs associated with this project as configured. If yes, skip to question 18.

12. System can be reconfigured to meet ventilation requirements.

(a) If yes was answered to question 12, are personnel trained to reconfigure system available?

13. Does facility have adequate power supply and outlets for supplemental ventilation units?

14. Exhaust from units is prevented from being reintroduced to facility.

15. Is adequate return air available for ventilation units?

Program Elements Yes/No/

N/A

* If No, Indicate Closeout Date

Notes

Air Monitoring

16. The project may proceed without air monitoring.

(a) If no was answered to above question (16), has an air sampling plan been completed and air monitoring company been contracted?

17. Have arrangements been made for air monitoring in case of accidental substance release?

18. Has the Facility Asbestos Coordinator been notified as applicable?

Other

FAA Form 3900-20 (03/15) Electronic Version (PDF) Page 3 of 3

Section E. Review Information

The appropriate FAA EOSH professional and the Facility Manager, as applicable, will sign below to document discussion of the items on this form.

Reviewed By

EOSH Contact

Facility Manager

Facility POC

Other

Name Signature Date

Notes (e.g., provide further explanation of potential hazards, locations, etc. below and attach additional sheets if necessary)

Project Name and Description:
Project Location:
Facility:
Planned Start Date:
Expected Completion Date:
Facility Representative:
Notes Air Monitoring4:
Air Monitoring close out date:
Notes Air Monitoring:
Air Monitoring close out date2:
Notes Air Monitoring2:
Air Monitoring close out date3:
Notes Air Monitoring3:
Air Monitoring close out date4:
EOSH Contact Name Phone Number:
Facility Representative Phone Number:
Asbestos Check Box: Off
Installation or carpet/vinyl flooring check box: Off
New furniture/cubicles/cabinets check box: Off
Clearners/detergents check box: Off
Pesticides check box: Off
Roofing products check box: Off
Welding/cutting indoors check box: Off
Airborne dust (not lead or asbestos)Check Box: Off
Wall coverings (paneling, wall paper) check box: Off
Use of sealants/caulks/glues/mastics check box: Off
Other checmical check box: Off
Construction/demolition check box: Off
Welding/cutting outdoors check box: Off
Other airborne contaminants fill in blank box 4:
Lead based paint check box: Off
Paints/varnishes check box: Off
Solvents check box: Off
Combustion products (CO, hydrocarbons)check box: Off
Animal feces check box: Off
Grinding/sandings check box: Off
Molds/mildew/fungus: Off
Other airborne contaminantOther potential airborne contaminants: Off
1:
Safety data sheet(s) (SDS) are available on-site for all substances: [ ]
Safety data sheet(s) (SDS) are available on-site for all substances close out date:
Safety data sheet(s) (SDS) are available on-site for all substances notes:
2:
SDS have been reviewed: [ ]
SDS have been reviewed close out date:
SDS have been reviewed notes:
3:
Substitute products have been evaluated: [ ]
Substitute products have been evaluated close out date:
Substitute products have been evaluated notes:
Project/Design Representative Name:
Project/Design Representative Phone Number:
EOSH Contact Name:
Other Name:
Other Date:
4:
Building occupants have been notified of potential odors/hazards: [ ]
Building occupants have been notified of potential odors/hazards close out date:
Building occupants have been notified of potential odors/hazards notes:
5:
Will odors have dissipated prior to shift change?: [ ]
Will odors have dissipated prior to shift change? Notes:
Will odors have dissipated prior to shift change? Close out date:
5(a):
If no was answered to the above question [5], has following shift been notified?: [ ]
If no was answered to the above question [5], has following shift been notified? Close out date:
If no was answered to the above question [5], has following shift been notified? Notes:
6:
Substance is without strong odors/vapors that may migrate into or near occupied areas:
If yes, skip to question 7: [ ]
Close out date:
Notes:
6(a):
If no was answered to above question [6], can work be done when building is unoccupied? If yes, skip to question 7: [ ]
6(a)(i):
If no was answered to above question [(6)(a)], can area be pressurized? If yes, the section on supplemental ventilation must be completed: [ ]
6(a)(ii) If no was answered to above question [(6)(a)(i)], is the existing air handling unit (AHU) adequate for ventilation as configured? If no, section on supplemental ventilation must be completed: [ ]
7:
AHU intake vents have been sealed in accordance with appropriate procedures: []
Notes- 7:
Notes-6aii:
Notes-6ai:
Notes-6:
8:
All other means by which vapors may enter the facility (e:
g:
, open windows, window air conditioning (AC) units) have been eliminated: [ ]
9:
Existing AHU is adequate for ventilation:
If no, supplemental ventilation section must be completed: [ ]
Notes-8:
Notes-9:
10:
Means of egress from occupied areas will remain clear and unaffected during the project: [ ]
Notes-10:
Close out date 10:
11:
Existing AHU is adequate for ventilation needs associated with this project as configured:
If yes, skip to question 18: [ ]
Close out date 11:
Notes-11:
12:
System can be reconfigured to meet ventilation requirements: [ ]
Close out date 12:
Notes-12:
12(a):
If yes was answered to question 12, are personnel trained to reconfigure system available?: [ ]
Close out date 12a:
Notes-12a:
13:
Does facility have adequate power supply and outlets for supplemental ventilation units? If no, close out date: [ ]
14:
Exhaust from units is prevented from being reintroduced to facility: [ ]
Close out date 14:
Notes-14:
15:
Is adequate return air available for ventilation units?: [ ]
Is adequate return air available for ventilation units? If no, close out date:
Is adequate return air available for ventilation units? Notes:
Notes-13:
16:
The project may proceed without air monitoring: [ ]
16(a):
If no was answered to above question (16), has an air sampling plan been completed and air monitoring company been contracted?: [ ]
17:
Have arrangements been made for air monitoring in case of accidental substance release?: [ ]
18:
Has the Facility Asbestos Coordinator been notified as applicable?: [ ]
Close out date 7:
Close out date 6aii:
close out date 6ai:
Close out date 6a:
Close out date 8:
Close out date 9:
Close out date 13:
Other airborne contaminants fill in blank box 1:
Other airborne contaminant 1: Off
Other potential airborne contaminant project hazards box 2:
Other airborn contaminant project hazards check box 2: Off
Other airborn contaminant project hazards check box 3: Off
Other potential airborne contaminants fill in blank box 3:
Notes eg provide further explanation of potential hazards locations etc below and attach additional sheets if necessary:
Date of POC Signature:
Date of Facility Manager Signature:
Date of EOSH Contact Signature:
Response to other program element in row 22: Yes/No/N/A: [ ]
Response to other program element in row 21: Yes/No/N/A: [ ]
Response to other program element in row 20: Yes/No/N/A: [ ]
Response to other program element in row 19: Yes/No/N/A: [ ]
Fill in other program element if applicable in row 19:
Fill in other program element if applicable in row 20:
Fill in other program element if applicable in row 21:
Fill in other program element if applicable in row 22:
Name of EOSH Contact:
Name of Facility Manager:
Name of Facility POC:
Notes for other program element in row 20:
Notes for other program element in row 21:
Notes for other program element in row 22:
Notes for other program element in row 19:
Close out date for other program element in row 19:
Close out date for other program element in row 20:
Close out date for other program element in row 21:
Close out date for other program element in row 22:

File details come from the government source that posted it. Updated .