FAA Responses to Questions Requests for Clarifications_ Amend 00002.pdf

PDF 155 KB Posted

Attached to
Direct Current Back-Up System (DC BUS) Power Supply
Solicitation number
693KA8-20-R-00008
Issued by

About this file

This Screening Information Request outlines requirements for a Direct Current Back-Up System indefinite delivery indefinite quantity contract. The Federal Aviation Administration seeks a contractor to provide life cycle in-service support for DC BUS uninterruptible power supplies over a potential ten-year period. Services include installation, maintenance, logistics support, and training. The anticipated contract type is IDIQ with a two-year base period and four two-year options. Offerors must submit proposals by March 27, 2020 in accordance with instructions in Section L. The FAA will post responses to questions by March 18, 2020. The incumbent contractor is Oceus Networks Inc. under contract number DTFAWA-09-D-00013.

View the file

Other files

File Type Posted
SF 30 _ Amend 00004.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00004.pdf PDF
Section M _Eval Factors For Award_Amend 00004.pdf PDF
SF 33_ Amend 00003.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00003.pdf PDF
FAA Response to Questions Requests for Clarifications_Amend 00003.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Amend 00002.pdf PDF
SF 33_Amend 00001 and 00002.pdf PDF
Section F_Deliveries or Performances_Amend 00002.pdf PDF
Section C_Statement of Work_Amend 00002.pdf PDF
Attach J.25 DC BUS Equipment Characteristics _Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.xlsx XLSX spreadsheet
Attach J.01 DC BUS Specification_Amend 00002.pdf PDF
Attach J.24 DC BUS Module Performance_Amend 00002.pdf PDF
Section G_Contract Admin Data_Amend 00002.pdf PDF
Attach J.02 CDRLs and DIDs _Amend 00002.pdf PDF
Section M_Evaluation Factors For Award_Amend 00002.pdf PDF
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission_AMENDMENT 00001.pdf PDF
Section E _ Inspection Acceptance.pdf PDF
Attachment J.21 Project Schedule Example Waco TX.pdf PDF
Attachment J.28 FAA Order 4600.27C.pdf PDF
Attachment J.23 Module Performance - L.1.doc DOC document
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission.pdf PDF
Section J _ List of Attachments .pdf PDF
Attachment J.07 FAA Form 3900-20_Pre-Construction and Maintenance Checklist.pdf PDF
Attachment J.13 FAA-G-2100H.pdf PDF
Attachment J.18 DC BUS CDLS Cumulative Warrantied Orders.xlsx XLSX spreadsheet
Section C _ Statement of Work.pdf PDF
Section I _ Contract Clauses.pdf PDF
Attachment J.16 DC BUS CDLS Quarterly Tracking Trending and Cost.xlsx XLSX spreadsheet
Attachment J.29 FAA Form 3900-17.pdf PDF
Attachment J.04 SOP FAA Field Site Requests.pdf PDF
Attachment J.15 Excerpt from JO 6980.31A.pdf PDF
Section H _ Special Contract Requirements.pdf PDF
Attachment J.22 DC BUS Past Performance Questionnaire.doc DOC document
Section K _ Rep Cert Other Statements Offerors.pdf PDF
Attachment J.11 Excavation and Handling of Contaminated Material.pdf PDF
Attachment J.08 DC BUS CAI and StartUp Chceklist.pdf PDF
Attachment J.26 Previous Contracts Lists.pdf PDF
Attachment J.09 DC BUS UXTM CAI Checklist.pdf PDF
Attachment J.30 FAA Order 6950.27A.pdf PDF
Attachment J.06 DC BUS Battery Test and Appendix.pdf PDF
Attachment J.24 DC BUS Module Performance - L.2.xls XLS spreadsheet
Attachment J.19 DC BUS CDLS Cumulative Spare Orders Depot Receipts.xlsx XLSX spreadsheet
Section B _ Supplies.Services.Price.pdf PDF
Attachment J.10 DC BUS Grounding Requirements.pdf PDF
Section B.4_Price Schedule.xlsx XLSX spreadsheet
Attachment J.03 DC BUS Frequently Used Acronyms.pdf PDF
Section D _ Packaging Marking.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002

Section / Attachment: Page Other Identifier ERRORS, OMISSIONS FAA RESPONSE

General Question

Various SF 33, Cover Letter

Various provisions in the solicitation refer to a cover page/SF 33, including requirements that Offeror sign and return the SF 33 with its proposal and that the SF 33 be used to acknowledge amendments.

1. No cover letter/SF 33 was included in the original solicitation. Please provide.

2. No cover letter/SF 33 was included with Amendment 1. Please provide.

Provided as part of Amendment 2

C.3.4.1.1. 31 ILS PROGRAM PLANNING

Second sentence references the ISP (Integrated Support Plan) and Attachment J.3 (DID) DI-FAA ISP-L001. The (DID) DI-FAA ISP-L001 is located in Attachment J.02 Corrected to reference Attachment J.2.

C.3.4.3.9. 38

NEW TECHNOLOGY – COMMERCIAL &

TECHNICAL

Last sentence states "Training documentation requirements are addressed in paragraph 3.7.4.6". There does not appear to be a Section 3.7.4.6 of the SOW. Training documentation requirements are covered in Section C.3.6. Corrected to reference C.3.6.

C.3.5.12.1.

COMMERCIAL & TECHNICAL

DOCUMENTATION

Paragraph 3, first sentence, states "as detailed in Section C.3.3 – Commercial Technical Documentation of this SOW". Section C.3.3 covers DC Bus Installation. We believe the Commercial Technical Documentation of this SOW is covered in the section this statement is written in C.3.5.12.1 Corrected to reference C.3.2.1.4.

C.3.5.12.2 47 ??? This heading does not appear to have heading text.

Correct, there is not a heading. No change.

F.2.0 1 AUTHORIZED PERFORMANCE

Reference Authorized Performance. Last sentence mentions SOW Section C.3.6.7 CDLS Delivery Requirements / there does not appear to be a Section C.3.6.7 in the SOW. CDLS Delivery Requirements is covered in SOW Section C.3.5.7. Corrected to reference C.3.5.7.

F.5.0

3 DELIVERABLES/DELIVERY SCHEDULES

Reference DELIVERABLES/DELIVERY SCHEDULES. In the Deliverable Column, please see entry titled "Course Design Guide"; the Due Date column shows 21 working days after task order award. This contradicts SOW Section C.3.6.4.6 (item #2) which shows 45 working days after the award of task order. Base on the size and scope of this effort, we believe it is in the best interest of the FAA to require 45 working days.

Corrected Section F.5.0 to reference 45 working days.

F.5.0

3 DELIVERABLES/DELIVERY SCHEDULES

Reference DELIVERABLES/DELIVERY SCHEDULES. In the Deliverable Column, please see entry titled "Classroom Training Materials";

the Due Date column shows 21 working days after task order award. This contradicts SOW Section C.3.6.4.6 (item #3) which shows 75 working days after award of the task order. Base on the size and scope of this effort, we believe it is in the best interest of the FAA to require 75 working days.

Corrected Section F.5.0 to reference 75 working days.

G.13.0 6

FAA STUDENT ATTENDANCE OF

CONTRACTOR TRAINING

a.) references training for FAA personnel as described in SOW Section C.3.7 / there does not appear to be a Section C.3.7 in the SOW.

Training for FAA personnel is covered in SOW Section C.3.6. Corrected to reference C.3.6.

G.15.1 6 INVOICE SUBMISSION REQUIREMENTS

c.) references Each Invoice Summary must be submitted to the Government CO as identified in Section G.3 / Section G.3 covers Responsibility for Contract Administration. Please advise if a different Section was intended. Corrected to reference G.2.0.

J.2 5 CONTRACT DATA REQUIREMENTS LIST

Reference Data Item Number L001 Integrated Support Plan (ISP), block #5 states Sow Section 3.5.1.1 / Section C.3.4.1.1 covers the ISP (Integrated Support Plan). Corrected to reference C.3.4.1.1.

J.2

6 CONTRACT DATA REQUIREMENTS LIST

Reference Data Item Number L003 Contractor Depot Logistics Support (CDLS) Tracking, Trending, and Cost Reporting, block #5 states Sow Section C.3.6.3 / SOW Section C.3.6.3 deals with Training. Contractor Depot Logistics Support (CDLS) Tracking, Trending, and Cost Reporting can be found in SOW Section C.3.5.3 Corrected to reference C.3.5.3.

J.2 7 CONTRACT DATA REQUIREMENTS LIST

Reference Data Item Number L004 Support Equipment Candidate List (SECL), block #5 states Sow Section C.3.5.2.4 / There does not appear to be a Section C.3.5.2.4 in the SOW. Support Equipment Candidate List (SECL) is located in SOW Section C.3.4.2.4 Corrected to reference C.3.4.2.4.

J.2

7 CONTRACT DATA REQUIREMENTS LIST

Reference Data Item Number L004 Support Equipment Candidate List (SECL), block #16 first sentence states "The Contractor must submit the CDLS Tracking, Trending, and Cost Reporting report in accordance with the SOW. This statement appears to have been carried over from Data Item Number L003. This statement is not referencing the Support Equipment Candidate List (SECL) from Data Item Number L004

Corrected CDRL L004 to reflect Support Equipment Candidate List (SECL).

J.2 8 DATA ITEM DESCRIPTION

Data Item Description Integrated Support Plan (ISP), item #6 states Sow Section 3.5.1.1 / Section C.3.4.1.1 covers the ISP (Integrated Support Plan). Corrected to reference C.3.4.1.1.

J.2

11 DATA ITEM DESCRIPTION

Data Item Description CONTRACTOR DEPOT LOGISTICS SUPPORT (CDLS) TRACKING, TRENDING, AND COST REPORTING, item #6 states Sow Section C.3.6.3 / SOW Section C.3.6.3 deals with Training. Contractor Depot Logistics Support (CDLS) Tracking, Trending, and Cost Reporting can be found in SOW Section C.3.5.3 Corrected to reference C.3.5.3.

ERRORS, OMISSIONS

J.2 13 DATA ITEM DESCRIPTION

Data Item Description SUPPORT EQUIPMENT CANDIDATE LIST (SECL), item #6 states Sow Section 3.5.2.4 / There does not appear to be a Section C.3.5.2.4 in the SOW. Support Equipment Candidate List (SECL) is located in SOW Section C.3.4.2.4 Corrected to reference C.3.4.2.4.

L.8.1.1. 7 RELEVANT EXPERIENCE Second paragraph references Section C.3.7 Training. Training is Section C.3.6. Corrected to reference C.3.6.

L.8.1.1. 7 RELEVANT EXPERIENCE

Second paragraph references Section C.3.4 Installation. However, Section C.3.4 covers Logistics. Installation appears to Start at Section C.3.3 Corrected to reference C.3.3.

L.8.1.2. 7 PAST PERFORMANCE QUESTIONNAIRES References Attachment J.21, Past Performance Questionnaire. The Past Performance Questionnaire is Attachment J.22 Corrected to reference Attachment J.22.

L.8.2 8 EQUIPMENT PROPOSAL

b.) references Attachment J.24 in regards to DC-Bus Equipment Characteristics. Attachment J.24 is the DC-Bus Module Performance - L.2. The DC-Bus Equipment Characteristics Attachment is J.25 Corrected Attachment J references.

L.8.2.1 8 DC BUS MODULE PERFORMANCE

Second paragraph references the DC-Bus Module Performance and Attachments J.22 & J.23 / The DC-Bus Module Performance Attachments are J.23 and J.24 Corrected Attachment J references.

L.8.3

10 LOGISTICS PROPOSAL

Paragraph 1 states "The logistics proposal must be detailed to enable the FAA to make a thorough evaluation and to arrive at a sound determination as to whether the Offeror’s proposal meets the requirements of Section C.3.5 of the SOW. Section C.3.5 covers CDLS General. This statement should reference Section C.3.4 of the SOW. Corrected to reference C.3.4.

L.8.3 10 LOGISTICS PROPOSAL

Paragraph 2, sentence 2 references the Integrated Logistics System specified in Section C.3.5. / Section C.3.5 covers CDLS General.

The Integrated Logistics System is covered under Section 3.4. Corrected to reference C.3.4.

L.8.3.1 10 SOFTWARE

Paragraph 1, last 2 sentences refer to management of software changes and Section 3.3.1 of the SOW. Section 3.3.1 of the SOW covers Site Survey Tasks. We believe the management of software changes is in Section 3.1.8.2. of the SOW Corrected to reference C.3.2.1.

L.8.3.3 & J.02

10 INTEGRATED SUPPORT PLAN

First paragraph references ISP (Integrated Support Plan) requirements and Section C.3.5.1.1 of the SOW (twice). There does not appear to be a C.3.5.1.1 in the SOW. Section C.3.4.1.1 covers the ISP (Integrated Support Plan). This error occurs in Section J.02, page 5, Block No.5 as well. Corrections made to reference C.3.4.1.1.

L.8.3.3 11 INTEGRATED SUPPORT PLAN

a.) last sentence refers to time constraints in SOW Section 3.5.3.8. There does not appear to be a Section 3.5.3.8 in the SOW. We believe this should be Section 3.5.7 of the SOW Corrected to reference C.3.4.3.8.

L.8.3.3 11 INTEGRATED SUPPORT PLAN

b.) the last sentence refers to time constraints specified in Section C.3.6.7 of the SOW. There does not appear to be a Section C.3.6.7 in the SOW. We believe this should be Section 3.5.7 of the SOW Corrected to reference C.3.5.7.

L.8.4 11 TRAINING PROPOSAL Third paragraph mentions factory training facilities and instructors’ qualifications from Section C.3.7 of the SOW. There does not appear to be a Section C.3.7 in the SOW. The factory training facilities and instructors' qualifications are listed under Section C.3.6 Corrected to reference C.3.6.

M.5.1 6 Factor D – Training Proposal:

Factor D - Training Proposal: this paragraph references training requirements from Section 3.7 of the SOW. There does not appear to be a Section C.3.7 in the SOW. The training requirements are listed under Section C.3.6 Corrected to reference C.3.6.

Section / Attachment: Page Other Identifier QUESTIONS, REQUESTS for CLARIFICATIONS FAA RESPONSE

General Question Is this a new requirement or a follow-on to an existing contract. If an existing contract, may we have the contractor's name and conatract number.

This is a follow-on effort to contract DTFAWA-09-D-00013, awarded to Oceus Networks Inc.

General Question Various SF 33, Cover Letter

Various provisions in the solicitation refer to a cover page/SF 33, including requirements that Offeror sign and return the SF 33 with its proposal and that the SF 33 be used to acknowledge amendments.

1. No cover letter/SF 33 was included in the original solicitation. 2. No cover letter/SF 33 was included with Amendment 1. Provided as part of Amendment 2

B.4 / Pricing Tabs CLIN X001C Please advise if the FAA requires a 1KV Hard-Wired Inverter and a 1KV Inverter with Receptacle? Can the offeror provide a combined hardwire and receptacle inverter?

Yes, both inverters are required. No, they cannot be combined.

B.4 / Pricing Tabs CLIN X001D We believe CLIN X001D1 and X001D2 are redundant, as they both list 2KV Hard Wired. Did the FAA intend to list one of the sub-CLINs to read "1KV"? CLINs have been updated.

B.4 / Pricing Tabs X001D We believe CLIN X001D3 and X001D4 are redundant, as they both list 2KV Hard Wired. Did the FAA intend to list one of the sub-CLINs to read "1KV"? CLINs have been updated.

QUESTIONS, REQUESTS for CLARIFICATIONS

B.4 / Pricing Tabs

CLINs X002C - X002S

Please explain if the manufacturer's discount rate requested is to be based on a lump sum purchase of the estimated quantity listed in CLINs X002C - X002S or if the discount is intended to be applied to a single quantity and on an individual CLIN basis.

B.3.0 states, "The manufacturer’s discount rate, for CLINs X002C – X002S, must be completed as appropriate. If a manufacturer’s discount rate is not available, the response must be zero (0)."

It is not the intent of the FAA to dictate a discount not to dictate how any discount will be applied.

B.4 / Pricing Tabs

CLINs X002M &

X002N Regarding CLIN X002M (Modem, Multitech Corp) and CLIN X002N (Modem, Black Box Corp): per SOW Section C.3.3.4.1.1 we recognize Modems as GFE communications equipment. Request the FAA to remove both CLINs X002M and X002N from Section B.4

CLINs have been removed, modems provided as GFE.

C.3.1.6 / C.3.5.4 6 FAA Temporary Equipment Stockroom (E-

Stock)

The Contractor must furnish a storage warehouse … 200 square feet of secure warehouse space …" How is this space used and how is it different from the CDLS space defined in section 3.5.4. Please differentiate the differences between the E-Stock warehouse and the CDLS warehouse.

C.3.1.6 identifies the requirements for temporary storage of DC BUSs. C.3.5.4 identifies the requirements for CDLS. The FAA is not dictating how these requirements are met.

C.3.2.1.2/C3.2.1.3/C3.2.1.4/C.3 .5.12.1/C.3.6.3.2/G.10

10/11/47/5 0/4 Multiple

The paragraph requires that FAA "…must have full and complete data rights to all DC BUS system software, system firmware and all supporting documentation." The term "full and complete data rights" is not defined. Later in the provision, it states that "The FAA must have the right to reproduce, copy, alter, use and modify all data, documentation, software and firmware." The Government does not receive greater than standard commercial rights on commercial documentation, software, and firmware created at private expense. Would the FAA consider Removing this requirement?

No change, reference AMS Clause 3.5-13.

C.3.3 / C.3.3.3.1 / C.3.3.3.7 16 / 22 / 24 Direct Current Back-up System Installation/DC BUS Installation

Between these three sections the term Contractor is referring to different parties which causes confusion throughout this solicitation. No change.

C.3.3.2.2 19 Design Engineering Support

The Contractor must provide the necessary support … Electrical Engineer, Mechanical Engineer, CAD Operator/Designer, Clerical. For structural designs, a professional civil engineer would be required, would the Government allow charging professional civil engineer time against the mechanical engineer CLIN? Would the FAA consider Adding a CLIN for professional civil engineer or allow structural and mechanical Professional Engineers (PE) to use the mechanical engineer CLIN.

The FAA does not anticipate the need for either a civil or structural engineer in performance of this effort. If it becomes a need, it will be handled on a case by case basis. No change.

C.3.3.3 22

Reference SITE PREPARATION AND INSTALLATION TASK: last sentence states "The Contractor must submit the deliverables in the format identified in paragraph C.3.4.1 of this SOW". Section C.3.4.1 covers Integrated Logistics Support. We are not able to locate the format requirements for the deliverables (DC BUS Battery Test and CAI). Please identify the requested file format. Correct to reference C.3.3.1.

C.3.3.3.2.1 23 Field Engineer

"Completed military technical training and … or four (4) years …" This exceeds the normal industry standards for installation personnel with technical or advanced degrees. Personnel with advanced degrees will increase the cost of the installer workforce and may impact delivery schedules. Would the FAA consider removing item #3 from the field engineering requirements list? No, no change.

C.3.3.3.6 24 Responsibility for Revisions

The Contractor must , upon notification by the FAA, revise his/her schedules to address changes encountered during installation project coordination planning. We understand that this would take place and it is important that changes occur no more frequently than once per month. Would the FAA consider stipulating that the requests originate from the PMO and occur no more than once monthly?

Corrected to reference COR, no other changes made.

C.3.3.4 26

Reference Environmental Remote Monitoring System Installation: 5th paragraph states: "Note: Coordination and final integration of the DC BUS remote monitoring from the facility demarc to the Air Route Traffic Control Center (ARTCC) RMLS." This appears to be an incomplete statement.

Corrected to read, "Note: Coordination and final integration of the DC BUS remote monitoring from the facility demarc to the Air Route Traffic Control Center (ARTCC) RMLS, will be performed by FAA personnel."

C.3.3.4 / C.3.3.4.1.1 26

Environmental Remote Monitoring System (ERMS) Installation & The FAA

Will

Reference Environmental Remote Monitoring System Installation: 3rd paragraph, 3rd sentence states "Provide all necessary cables, modems" however, SOW Section C.3.3.4.1.1 covers what the FAA will do regarding Environmental Remote Monitoring System Installation and item #4 states "If there are any additional communications equipment that is required for communications (i.e., channel bankcards), they will be provided as GFE". Modems are classified as "communications equipment". Would the FAA consider removing the Contractor requirement to provide modems from SOW Section C.3.3.4 as they should be GFE. Corrected to state modems will be GFE.

C.3.3.4 27

Reference Environmental Remote Monitoring System Installation: 1st full paragraph on page 27 references "ERMS Panel P7B" twice.

It is our understanding that this is an older ERMS Panel Model, which has been replaced by ERMS Panel Model "V.4". This newer model is referenced in SOW Section C.3.3.4.1.2 / we are requesting the references to "ERMS Panel P7B" in SOW Section C.3.3.4 be corrected to read "ERMS Panel V.4".

Corrected to read "DC BUS ERMS V.4 Panel".

C.3.4.2.3 34 Reference Spare-Parts Peculiar, which is undefined in the document. Please define the FAA's meaning of "part-peculiar". Corrected to add definition.

C.3.4.3.5 37 Program Management Reports

The Contractor must submit the following Reports monthly or as designated by the CO or COR. … 4. Start Up Checklist, 5. Lifecycle Checklist and /or End of Life List. What is the content of these reports and in what format are these reports to be presented? Please clarify. Corrected to reference C.3.4.3.4.

C.3.5.7 42 CDLS Delivery Requirements "Name, Phone number, FAX number, and pager number must be provided as a point of contact." Can an SMS service be substituted for a pager number?" SMS is equivalent to pager services and can be substituted for a separate pager number. Corrected.

D.1.0 1 Packaging and Packing

Clause calls for preservation and packaging in accordance with "most economical rates and best commercial practices." Most economical rates is a standard that conflicts with best commercial practices. Does FAA mean most economical rates for best commercial practices? Would the FAA consider changing "most economical rates and best commercial practices" to "most economical rates for best commercial practices." No change.

G.15.1.f 6 INVOICE SUBMISSION REQUIREMENTS f.) mentions a Business Operations Portal as required by Section 6.1 of the FENS Functional and Technical Specification (Attachment J- 1). We were not able to identify these subjects in J.1 or other sections of the SIR.

Corrected to remove requirement from G.15.1.

G.15.2 7 INVOICE EXPIRATION

This Section discusses a Section B.3, Telecommunication Services and associated CLINs. We are unable to identify a Section B.3 / there is a paragraph B.3 in Section "B", but it does not discuss "Telecommunication Services". We believe this should be removed.

Corrected to remove reference from G.15.2.

H.3.8.2-17 Special Contract Requirements Alternate Program Manager states “Must be a full-time employee of the prime contractor". Will the government consider only requiring the Program Manager as an employee of the Prime Offeror, and require the offeror to explain lines of authority and contractual obligations? No change.

Section I, 3.2.2.7-1(b) 5 Qualification Requirement

Paragraph (b) states that one or more qualification requirements apply to the supplies or services covered by the contract. It states further that it must be demonstrated that qualifications are met before award of the contract and that the product, manufacturer or source must be qualified at time of award. Offerors are instructed to contact the agency activity to obtain all requirements that they or their products or services, or their subcontractors or their products or services must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification. 1. Please identify what supplies or services require pre-qualification.

2. Please identify what standards are prescribed for any such qualification.

3. Please identify the process for Offeror to demonstrate its ability to meet the standards specify for qualification.

4. When in the procurement schedule does FAA wish to schedule such demonstrations?

No change, see Attachment J.01 and Section L for the FAA's requirements.

J.01 4

EQUIPMENT CHARACTERISTICS AND

PERFORMANCE

Section 2.2 states "The vendor shall offer a DC BUS system capable of 24-volt DC 300 amp output minimum". The 300 amp rating contradicts Attachment J.01 sections 2.5.1.2 and 2.9.4, which both list a 200 amp rating. Corrected to read 200 amp.

J.01 10

EQUIPMENT CHARACTERISTICS AND

PERFORMANCE

Section 2.8.5 Controls: #2 Battery circuit breaker trip. This could be electrical, magnetic, mechanical. Please define what is meant by "battery circuit breaker trip", we recommend that the Government include this in the Alarm section.

Noted. “Battery circuit breaker trip” refers to a manual battery breaker that trips automatically at a current appropriate to protect the DCBUS/cables from excess battery current.

This breaker will be used as a manual control by site specialists to disconnect the battery from charge for testing. No change.

J.01 12

EQUIPMENT CHARACTERISTICS AND

PERFORMANCE Section 2.9.3.2. What is meant by “isolated ground return bus”? Is it meant to be isolated from chassis ground?

Corrected verbiage in Attachment J.01, Section 2.9.3.

J.01 17 Battery Testing

Section 3.2.3., item #7, first sentence states “Accomplish the Service Test or the Full Capacity Load Test”. Will the PMO determination of which test is to be performed (service or full capacity load) be provided with the task order for the associated Site Survey?

Yes, the intended test type will be proivded as part of the task order.

J.01 17 Battery Testing Section 3.2.3., item #7, second sentence states “Attachment J.15, Excerpt from JO 6980.31A paragraph 5-18”. Should this state “Attachment J.15, Excerpt from JO 6980.31A paragraph 5-19.

Corrected verbiage in Attachment J.01, Section 3.2.3.

J.01 17 Battery Testing Section 3.2.3., item #7, third sentence states “JO 6980.31 paragraph 5-54 shall be used for service test.” Please supply full copy of JO

6980.31 and confirm paragraph 5-54 covers all procedures required to perform the service test.

Corrected verbiage in Attachment J.01, Section 3.2.3.

J.2 5

Reference Data Item Number L001 Integrated Support Plan (ISP), block #16, item #1, second sentence states "The Contractor must provide the first submission of the ISP not later than 10 calendar days after award of the delivery order. This differs from SOW 3.4.1.1 by using the term "Delivery Order" vs. "Contract Award" and stating 10 days vs. 21 days. Base on the size and scope of this effort, we believe it is in the best interest of the FAA to require 21 days. Corrected to align with Section C.

J.2 7

Reference Data Item Number L004 Support Equipment Candidate List (SECL), block #16, item #1, second sentence states "The Contractor must submit the SECL not later than 10 calendar days after contract award. This differs from SOW 3.4.1.1 by stating 10 days vs. 21 days. Base on the size and scope of this effort, we believe it is in the best interest of the FAA to require 21 days. Corrected to align with Section C.

J.24 2

DC BUS MODULE PERFORMANCE

SPECIFICATION COMPLIANCE

Line #57 lists section 2.7.2.2 from Attachment J.01 / there does not appear to be a section 2.7.2.2 in attachment J.01. Was this meant to reference section 2.7.2.1 in Attachment J.01? If not please advise what was meant. Corrected to reference 2.7.2.1.

J.25 2 DC Bus Equipment Characteristics Sections 1.1a through 1.2d of Attachment J.01 are referenced but do not exist. In the J.01 attachment section 1.1, the requirements are listed numerically only. Please correct J.25 format to reference attachment J.01, section 1.1 Corrected.

J.25 2 DC Bus Equipment Characteristics In attachment J.25 there are only 13 entries for Attachment J.01, section 1.1 which lists 15 major component requirements. Please correct attachment J.25 format to match the 15 requirements in attachment J.01, section 1.1

Corrected Attachment J.25 to incorporate missing Attachment J.01, Section 1.1 references.

J.25 4 DC Bus Equipment Characteristics Sections 2.10.2a through 2.10.2c of Attachment J.01 are referenced but do not exist. In the J.01 attachment section 2.10.2, the requirements are listed numerically only. Please correct J.25 format to reference attachment J.01, section 2.10.2 Corrected.

J.25 4 DC Bus Equipment Characteristics In attachment J.25 there are only 9 entries for Attachment J.01, section 2.10.3 which lists 10 requirements. Please correct attachment J.25 format to match the 10 requirements in attachment J.01, section 2.10.3 Corrected.

K.3.6.4-18 10 Certification Regarding Steel and

Manufactured Products

This certification applies 49 USC Section 50101. This law applies to Airport Improvement Program funds and requires that only steel and manufactured goods produced in the US may be utilized in the project.

Offeror asks that FAA verify that this project will utilize Airport Improvement Program funds. If it will not, Offeror requests deletion of this certification.

No, no change.

K.3.6.4-18 10 Certification Regarding Steel and

Manufactured Products

This certification applies 49 USC Section 50101. Under this law, Offeror is required to certify that the only steel and manufactured goods used in the project are produced in the US. Waivers from the Secretary of the Department of Defense are available if steel and goods produced in the US are not produced in sufficient and reasonably available or are not of a satisfactory quality. Waiver is also available if the inclusion of only domestic material will increase the cost of the overall project by more than 25%. Would the FAA consider a waiver because of the use of domestic steel and domestic goods will increase overall project cost by greater than 25% and most likely are not available in sufficient quantities to meet Government requirements.

No, no change.

L.6 5 Time, Date, Place and Submission of

Proposals d.) states "Offerors must ensure submissions accommodate the FAA's size limit of 25MB per email."

If Offeror's proposal exceeds 25MB, is it permissible to submit the proposal via multiple emails, e.g., 1 volume per email? Yes.

L.8.1.2 7 PAST PERFORMANCE QUESTIONNAIRES

Second paragraph, last sentence, regarding Past Performance Questionnaire deadline: please confirm this date is equal to the Proposal Submission date. We reviewed attachment J.22 which does not list a date for submission.

Corrected to read, "…by the closing date of the SIR."

L.8.1.3. 7 KEY PERSONNEL

Paragraph 2 indicates a minimum of 5 years program management is required for the PM and 3 years for the APM, and then references Section C.3.1 of the SOW. However, Section C.3.1 of the SOW contradicts the program management experience required, listing 3 years program management is required for the PM and 1 year for the APM. Base on the size and scope of this effort, we believe it is in the best interest of the FAA to require at least 5 years experience for the PM and 3 years experience for the APM. Corrected C.3.1 to align with L.8.1.3.

L.8.3 10 Volume 2, Part C -Logistics Proposal … the Offeror's proposal meets the requirements of Section C.3.5 of the SOW. Should this be referencing C.3.4 of the SOW (Logistics)? Corrrected to reference C.3.4.

L.8.2 9 Volume 2, Part B - Equipment Proposal The Offeror must complete Attachments J.23, 24 and 25. Will the government accept the completed attachments as an Appendix to Volume 2 parts or submitted separately as an additional file? No.

L.8.2 9 Volume 2, Part B - Equipment Proposal Section L.8.2 a reference Attachments 22 and 23. From evaluating the attachments, will the government please confirm the attachments are referenced correctly, or should the reference cite Attachments 23 and 24?

Corrected to reference Attachments J.23 and J.24.

L.8.2 9 Volume 2, Part B - Equipment Proposal Section L.8.2 b reference Attachment 24. From evaluating the attachments, will the government please confirm the attachments are referenced correctly, or should the reference cite Attachments 25? Corrected to reference Attachcment J.25.

L.5 4 Proposal Presentation L.5.c references font size at 12 point Times New Roman. With the limited space allocated for the proposal sections, will the government please consider allowing Tables and Graphics to be 9 point Times New Roman or Arial Narrow? No.

L.4 4 Logistics Proposal The logistics proposal page count max is 45 pages. Due to the amount of information required to be addressed under the logistics proposal, will the government consider increasing the Logistics Proposal page count to 100 pages? No.

L.8.3.3 11 Integrated Support Plan The Offeror must provide a copy of their ISP. Will the government clarify is the Offeror's ISP counts towards page count or can be added as an Appendix to Volume 2, Part C?

Per L.4 and L.8.3, the ISP is part of the page count. No change.

L.8.3 10 Organizational Approach

Provide an organizational approach with clear lines of authority. Section C.3.1.1 states "Contractor must provide a program plan", will the government confirm the organizational approach and lines of authority is the only requirement required to be submitted in the proposal? If not, and a full program plan and program management section is required under the Logistics Proposal, will the government please designate a section for Program Management or increase the page count to allow for the explanation?

No change. Proposals should be submitted in accordance with L.8.3.

Section C.3.1.1 is referring to the scope of work/requirements/deliverables associated with the effort.

L.8.4 12 Training Proposal Second paragraph references Section 3.7. Will the government please confirm is SOW Section reference C.3.7 is correct, or is the reference meant to be C.3.6? Corrected to reference C.3.6.

L.8.4 12 Training Proposal Second paragraph references Section 3.7. Will the government allow for the copies of the commercial training materials be added as an appendix to Volume 2, Part D and not included in page count?

Corrected to reference C.3.6. No other changes.