Attachment J.11 Excavation and Handling of Contaminated Material.pdf

PDF 51 KB Posted

Attached to
Direct Current Back-Up System (DC BUS) Power Supply
Solicitation number
693KA8-20-R-00008
Issued by

About this file

This attachment provides guidance on excavating and handling contaminated materials as part of a federal contract for direct current backup power supply systems. The contractor must develop and submit a sampling plan prior to starting work that assesses monitoring needs, identifies clearance requirements, determines appropriate sampling methodologies, and specifies credentialed personnel. When excavating areas of potential contamination, the contractor must limit spills and prevent contaminated and uncontaminated materials from mixing. Confirmation sampling is required after suspected contaminated materials have been removed. Liquid collected from excavations and stockpiles must be temporarily stored and sampled according to regulatory requirements. Contaminated materials exceeding action levels must be treated or disposed of offsite at an approved facility meeting specified standards. Backfilling may proceed once confirmation test results are approved. The contractor must submit a closure report within 30 days of completing site work documenting excavation and sampling details, waste disposal, and drawing maps of excavation and sampling locations.

This federal contract opportunity is for life cycle support of direct current backup power supply systems for the Federal Aviation Administration. The solicitation specifies a single award indefinite delivery/indefinite quantity contract with a potential 10-year period of performance. Offerors must comply with instructions in Section L and submit proposals by the specified due date. The FAA will respond to any questions and requests for clarification by another specified date.

View the file

Other files

File Type Posted
SF 30 _ Amend 00004.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00004.pdf PDF
Section M _Eval Factors For Award_Amend 00004.pdf PDF
SF 33_ Amend 00003.pdf PDF
Section L _Instructions Conditions and Notices to Offerors_AMEND 00003.pdf PDF
FAA Response to Questions Requests for Clarifications_Amend 00003.pdf PDF
Section L_Instructions Conditions and Notices to Offerors_Amend 00002.pdf PDF
FAA Responses to Questions Requests for Clarifications_ Amend 00002.pdf PDF
SF 33_Amend 00001 and 00002.pdf PDF
Section F_Deliveries or Performances_Amend 00002.pdf PDF
Section C_Statement of Work_Amend 00002.pdf PDF
Attach J.25 DC BUS Equipment Characteristics _Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.pdf PDF
Section B.4_Price Schedule_Amend 00002.xlsx XLSX spreadsheet
Attach J.01 DC BUS Specification_Amend 00002.pdf PDF
Attach J.24 DC BUS Module Performance_Amend 00002.pdf PDF
Section G_Contract Admin Data_Amend 00002.pdf PDF
Attach J.02 CDRLs and DIDs _Amend 00002.pdf PDF
Section M_Evaluation Factors For Award_Amend 00002.pdf PDF
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission_AMENDMENT 00001.pdf PDF
Section E _ Inspection Acceptance.pdf PDF
Attachment J.21 Project Schedule Example Waco TX.pdf PDF
Attachment J.28 FAA Order 4600.27C.pdf PDF
Attachment J.23 Module Performance - L.1.doc DOC document
DC BUS Section L _ Information for ConsiderationAffecting Offeror Proposal Submission.pdf PDF
Section J _ List of Attachments .pdf PDF
Attachment J.07 FAA Form 3900-20_Pre-Construction and Maintenance Checklist.pdf PDF
Attachment J.13 FAA-G-2100H.pdf PDF
Attachment J.18 DC BUS CDLS Cumulative Warrantied Orders.xlsx XLSX spreadsheet
Section C _ Statement of Work.pdf PDF
Section I _ Contract Clauses.pdf PDF
Attachment J.16 DC BUS CDLS Quarterly Tracking Trending and Cost.xlsx XLSX spreadsheet
Attachment J.29 FAA Form 3900-17.pdf PDF
Attachment J.04 SOP FAA Field Site Requests.pdf PDF
Attachment J.15 Excerpt from JO 6980.31A.pdf PDF
Section H _ Special Contract Requirements.pdf PDF
Attachment J.22 DC BUS Past Performance Questionnaire.doc DOC document
Section K _ Rep Cert Other Statements Offerors.pdf PDF
Attachment J.08 DC BUS CAI and StartUp Chceklist.pdf PDF
Attachment J.26 Previous Contracts Lists.pdf PDF
Attachment J.09 DC BUS UXTM CAI Checklist.pdf PDF
Attachment J.30 FAA Order 6950.27A.pdf PDF
Attachment J.06 DC BUS Battery Test and Appendix.pdf PDF
Attachment J.24 DC BUS Module Performance - L.2.xls XLS spreadsheet
Attachment J.19 DC BUS CDLS Cumulative Spare Orders Depot Receipts.xlsx XLSX spreadsheet
Section B _ Supplies.Services.Price.pdf PDF
Attachment J.10 DC BUS Grounding Requirements.pdf PDF
Section B.4_Price Schedule.xlsx XLSX spreadsheet
Attachment J.03 DC BUS Frequently Used Acronyms.pdf PDF
Section D _ Packaging Marking.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIR 693KA8-20-R-00008

ATTACHMENT J.11

EXCAVATION AND HANDLING OF CONTAMINATED MATERIALS

3.0 EXECUTION

3.1 SAMPLING PLAN

Prior to start of work, the Contractor must develop, and submit to the RE for review and approval, a sampling plan. The sampling plan must:

a. assess the need for personal and/or area monitoring;

b. identify Federal, state, and local requirements for clearance;

c. determine the appropriate sampling methodologies;

d. address the credentials of the personnel performing the monitoring; and

e. clarify the credentials of the testing firm(s).

3.2 EXISTING STRUCTURES AND UTILITIES

No excavation must be performed until site utilities have been field located by a third party commercial utility locator. Contracting Officer’s Representative (COR)/Resident Engineer (RE) will coordinate the marking of all utilities in excavation area. The Contractor must take the necessary precautions to ensure no damage occurs to existing structures and utilities. Utilities encountered that were not previously shown or otherwise located must not be disturbed without approval from the RE.

3.3 CLEARING

Clearing must be performed to the limits shown on the drawings or as directed by the RE.

3.4 CONTAMINATED MATERIAL REMOVAL

3.4.1 EXCAVATION

Areas of potential contamination must be excavated to the depth and extent shown on the drawings or as directed by the RE. Excavation must be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered must be maintained for each area of excavation.

3.4.2 SHORING

If workers must enter the excavation, it must be evaluated, shored, sloped or braced as required by 29 CFR Part 1926, Subpart P, Excavations. The shoring must be approved by a Registered Engineer in accordance with 29 CFR 1926.651.

3.4.3 DEWATERING

Surface water must be diverted to prevent entry into the excavation. Dewatering must be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. In the event that the run on waters or in-situ waters may be contaminated these waters shall be containerized and sampled for determination, by the RE, of method of release.

3.5 CONFIRMATION SAMPLING AND ANALYSIS

The RE must be present to inspect the removal of contaminated material from each site. After all material suspected of being contaminated has been removed, the excavation must be examined for evidence of contamination. Field analysis must be used to determine the presence of contamination. As directed by the RE, the Contractor must excavate additional material. After all suspected contaminated material is removed, confirmation samples must be collected and analyzed in accordance with regulatory and permit requirements. The Contract must ensure appropriate Personal Protective Equipment (PPE) is used in the sampling and handling of contaminated materials or where there is the potential for the material to be contaminated. A minimum of one sample must be collected from the bottom of the excavation by an experienced sampling technician and analyzed for contaminants of concern. Based on test results, the Contractor must propose any additional excavation that may be required to remove material which is contaminated above action levels. Additional excavation must be subject to approval by the RE. Locations of samples must be marked in the field and documented on the as-built drawings or provided in a separate report.

3.6 CONTAMINATED MATERIAL STORAGE

Material must be placed in temporary storage immediately after excavation. The following paragraphs describe acceptable methods of material storage. Storage units must be in good condition and constructed of materials that are compatible with the material or liquid to be stored.

If multiple storage units are required, each unit must be clearly labeled with an identification number and a written log must be kept to track the source of contaminated material in each temporary storage unit.

3.6.1 STOCKPILES

Stockpiles must be constructed to isolate stored contaminated material from the environment. The maximum stockpile size must be 200 cubic yards. Stockpiles must be constructed to include:

a. A chemically resistant liner free of holes and other damage. The ground surface on which the liner is to be placed must be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.

b. Cover free of holes or other damage to prevent precipitation from entering the stockpile. The cover material must be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.

c. Berms surrounding the stockpile, a minimum of 8 inches in height. Vehicle access points must also be bermed.

d. The liner system must be sloped to allow collection of leachate. Storage and removal of liquid that collects in the stockpile, must be in accordance with paragraph Liquid Storage.

3.6.2 ROLL-OFF UNITS

Roll-off units used to temporarily store contaminated material must be water tight. A cover must be placed over the units to prevent precipitation from contacting the stored material. Liquid that collects inside the units must be removed and stored in accordance with paragraph Liquid Storage.

3.6.3 LIQUID STORAGE

Liquid collected from excavations and stockpiles must be temporarily stored in polyethylene drums or tanks, as appropriate and provided by the contractor. Liquid storage containers must be water-tight and must be located near the stockpile areas.

3.7 SAMPLING

3.7.1 SAMPLING OF SOLID MATERIAL

Samples of stored material must be collected at a frequency sufficient to meet the requirements of approved disposal facilities. Samples must be tested in accordance with regulatory and disposal facility permit requirements. Site specific requirements must meet 40 CFR Parts 264/265, Subpart A-E as stipulated within contractor documentation and must be reviewed and approved by the FAA RE and SECM prior to sampling.

Stored material with contaminant levels that exceed action levels must be treated or disposed offsite. Analyses for contaminated material to be taken to an offsite treatment facility must conform to local, state, and federal criteria as well as to the requirements of the treatment facility.

Documentation of all analyses performed must be furnished to the RE. Additional sampling and analyses to the extent required by the approved offsite treatment, storage, or disposal (TSD) facility must be approved by the RE.

3.7.2 SAMPLING LIQUID

Liquid collected from excavations and stockpile leachates must be sampled and tested in accordance with regulatory and permit requirements.

Liquid with contaminant levels that exceed action levels must be treated or disposed offsite.

Analyses for contaminated liquid must be taken to an offsite treatment facility and must conform to local, state, and federal criteria as well as to the requirements of the treatment facility.

Documentation of all analyses performed must be furnished to the RE. Additional sampling and analysis, to the extent required by the approved offsite TSD facility receiving the material, must be the responsibility of the Contractor and is subject to approval by the RE.

3.8 SPILLS

In the event of a spill or release of a hazardous substance (as designated in 40 CFR Part 302), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), the Contractor must notify the RE immediately. If the spill exceeds the reporting threshold set by the State and/or EPA, the Contractor must follow the pre-established procedures as described in the Facility Contingency Plan for immediate reporting and containment. Immediate containment actions must be taken to minimize the effect of any spill or leak. Cleanup must be in accordance with applicable federal, state, and local regulations. As directed by the RE, additional sampling and testing must be performed to verify spills have been cleaned up

3.9 BACKFILLING

3.9.1 CONFIRMATION TEST RESULTS

Excavations must be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill must be placed and compacted to the lines and grades shown on the drawings.

3.9.2 COMPACTION

Approved backfill must be placed in lifts with a maximum loose thickness of 12 inches. Soil must be compacted to 90 percent of maximum dry density.

3.10 CLOSURE REPORT

Three copies of a Closure Report must be prepared and submitted within 30 calendar days of completing work at the site. The report must be labeled with the contract number, project name, location, date, and the name of general contractor. The Closure Report must include the following information as a minimum:

a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.

b. A narrative report including, but not limited to, the following:

1. site conditions;

2. excavation logs;

3. field screening readings;

4. quantity of materials removed from each area of contamination;

5. quantity of water/product removed during dewatering;

6. waste disposal manifests

7. sampling locations and sampling methods;

8. sample collection data such as time of collection and method of preservation;

9. sample chain-of-custody forms; and

10. source of backfill.

c. Include the following:

1. Copies of all chemical and physical test results.

2. Copies of all manifests and land disposal restriction notifications, if applicable.

3. Copies of all certifications of final disposal signed by the responsible disposal facility official.

4. Field drawings showing limits of each excavation, limits of contamination, known underground utilities within 20 feet of excavation, sample locations, and sample identification numbers. On-site stockpile, storage, treatment, loading, and disposal areas must also be shown on the drawings.

File details come from the government source that posted it. Updated .