Question
| Solicitation Reference |
| Question/Comment |
| FAA Response |
| 1 |
| General |
| Can the Government please indicate how they intend to award the 10 years of support under CLINs 0003, 0004, and 0005 (i.e., one year at a time or all 10 years at once upon IDIQ award)? |
| The ERSS Contract will have ten (10) 1-year contract periods. The period of performance will be awarded one year at a time. The base will be awarded with 9 option years. |
| 2 |
| General |
| Do all personnel accessing the site require an FAA badge? What is the process for site access for deliveries and short-term subcontractors (i.e., can they be escorted by the FAA and/or the Contractor)? |
| All personnel accessing the site require either FAA Badging or Visitor Badging with escort by persons with a FAA Badge. |
Deliveries and short-term subcontractor's must obtain Visitor Badging and Vehicle Pass from the Security Operations Center (SOC) and require escort by FAA Badged personnel at all times.
| 3 |
| SOW |
| Section 5.2 of C-001 states that the "The CQCC must be shown on the organization chart to report to a responsible company senior officer." Where should the organization chart be included in the proposal, if required, and what are the proposal submittal requirements for the organization chart (i.e., font, page size, page limitation, etc.)? |
| The organizational chart is not a proposal requirement. It is to be furnished at time of award. |
| 4 |
| Pricing Schedule |
| B-001 WJHTC Labor – Home office support labor categories will be needed on all Task Order proposals. Will the FAA consider adding the following Labor Categories to the labor table: Property Administrator, Project Controls/Estimator, Project Administrator, and Clerical? |
| Labor Categories for Property Administrator, Project Controls/Estimator, Project Administrator, and Clerical will not be added as separate categories to B-001 CLIN Structure Pricing Sheet. If applicable to your firm’s proposal, these additional labor categories should be included as ODCs with supporting documentation of labor hours and labor rates. |
| 5 |
| SIR |
| L.4.9 Annex #2 requires that NAICS 562910 be utilized by Prime contractors to determine small business eligibility for our potential sub-contractors. Given the wide array of subcontracting that may be required under the program, we recommend that a prime contractor determine business size status for sub-contractors based on the majority of the work the sub-contractor will perform on the program, consistent with standard Small Business Program reporting practices. |
For instance, potential subcontractors that provide services/products for implementation of the program would determine business size status based on the NAICS respective to the services/products they provide not the end utilization. This will ensure maximum SB utilization at all levels of the procurement under the program as well as consistent reporting practices.
SIR Section L.4.9 is updated to include the following: North American Industry Classification Standard (NAICS) code for this procurement is 562910 – Environmental Remediation Services. The Size Standard for this code is 750 employees. The NAICS code will be used to determine Small Business eligibility for prime contractors. Prime Contractors must use the NAICS code for the majority of the work the subcontractor is performing under the resultant contract for all potential sub-contractors.
| 6 |
| SOW |
| C-001 and associated appendices do not include any requirements for offsite laboratory vapor or soil sampling (I.e., Appendix B only includes the SAP for liquid but Appendix H provides pounds of contaminants removed from the Area D SVE system that are assumed to being calculated from laboratory analysis or PID readings). Are vapor and soil sampling required and by what methods and frequencies? |
| Requirements for laboratory analysis of all routine soil and/or vapor sampling will be included in the specifications as part of a specific CLIN I project. Costs for other special sampling events, not specifically referenced in another CLIN, will be incorporated under the SURGE CLIN. Methods and frequencies for vapor and soil sampling are determined on a project-by-project basis when required by FAA. |
Calculations of mass removal are based upon SVE System PID Readings and/or historic laboratory data, coupled with flow rates/volumes.
| 7 |
| Sample Task |
| Sample Task - Please confirm the distance of the proposed building relative to adjacent buildings or other permanent facilities. |
| Assume that no existing site buildings or other permanent facilities will be close enough to the proposed building location so as to impact the proposed work. |
| 8 |
| Sample Task |
| Sample Task - Specification 11371, Part 1.4 indicates that the GAC columns are to be “backwashable” and as part of the performance testing (Specification 11371, Part 3.6), a backwash cycle is to be conducted or simulated. However, the drawings do not show equipment, piping, or other necessary appurtenances (e.g., backwash pump, water supply line) for backwashing the media. Please confirm if a backwash system is to be included in the bid or will be provided by others |
| The backwash water shall be supplied by others. A temporary holding tank for backwash effluent water will also be supplied by others. These items are not part of the bid. The ERSS Contractor shall, however, ensure that the GAC units include the necessary fittings to allow connection for the backwashing cycle influent and effluent water. The ERSS Contractor shall supply labor to perform a simulated backwash event. |
| 9 |
| Sample Task |
| Sample Task - In addition to mercury and PFAS compounds, Specification 11371, Part 1.4.1 notes chlorinated VOCs are target constituents. However, the specific constituents and influent/effluent criteria is not specified. Are there performance criteria for VOCs? |
| There are no separate performance requirements for CVOCs. Due to the extremely low levels of CVOCs it can be assumed that GAC units meeting the performance requirements for PFAS and mercury will also meet the effluent limits for CVOCs. |
| 10 |
| Sample Task |
| Sample Task – Please confirm process piping will be installed within the treatment building to ASME B31.3 Process Piping and utility piping will be installed to ASME B31.9 Building Services Piping. |
| That is correct. |
| 11 |
| Sample Task |
| Sample Task – Please confirm that the recovery, injection, and monitoring wells will be outside and there are no structures, overhead or underground utilities, or other obstructions for drilling in or access to the work area. |
| All wells will be installed outside and with no access restrictions. Assume that there are no overhead or below grade encumbrances that will impact well drilling. |
| 12 |
| Sample Task |
| Sample Task - What is the Hazard Classification of the GAC Treatment Area? |
| The GAC treatment building and surrounding area are not classified as a Hazardous Area. |
| 13 |
| Sample Task |
| Sample Task - The contract requires four bollards but paving external to the building is not included in scope. Will bollards be installed by others? |
| Bollard costs shall be included in the bid proposal. |
| 14 |
| Sample Task |
| Sample Task - The pitless adapters, mechanical and electrical connections, submersible pumps, and instrumentation and controls for the new extraction wells are not included in the scope. Please confirm if these should be included or provided by others. |
| The pitless adapters, mechanical and electrical connections, submersible pumps, and instrumentation and controls for the new extraction wells will be supplied by others and are not part of the bid proposal. |
| 15 |
| SIR |
| The response to Question 33 in the Q&A states “Conformed_SIR_Amendment0004 Section L.4.6 is updated to omit reference to subcontractor commitment letters and transmittal letters. The prime contractor submittal (cover) letter must be included in Annex #1- Executive Summary.” However, SIR Section L.4.9, Annex #2 states “Offerors must submit a signed letter of agreement(s) or letters of intent with all proposed subcontractors binding the subcontractor for the performance of the specified proposed work under the Offeror’s proposal.” Please confirm requirement. |
Conformed SIR 692M15-19-R-00005_Amendment 0006 Section L.4.9, Annex #2 is updated to omit reference to a signed letter of agreement(s) or letters of intent for all subcontractors.