ERSS Thumbdrive Appendices File List.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Amendment 0008- Environmental Remediation Support Services Federal contract opportunity
- Solicitation number
- 692M15-19-R-00005
About this file
This file contains appendices and supporting documentation for a federal solicitation seeking environmental remediation support services. The Federal Aviation Administration is soliciting proposals for operations and maintenance, remedial action construction, and GIS/GPS-related tasks at the William J. Hughes Technical Center Superfund site located at Atlantic City International Airport in Pomona, New Jersey. Offerors are directed to review the attached Screening Information Request, with any written questions to be submitted to the identified contracting officers by the stated deadlines. The statement of work appendices are too large to attach but will be provided to Phase II offerors. The FAA plans to award one hybrid fixed price and time and materials IDIQ contract for up to ten years of performance.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
| Appendix A - CERCLA Substantive Requirements | Appendix A_CERCLA Substantive Requirements Assessment Report (11-20-2013).pdf |
| 1 | Documents |
APPENDIX B
| Appendix B - Current Sampling and Analysis Plan (SAP) | Appendix B - ERSS Well Gauging Sheet Template.pdf |
| Appendix B - Current Sampling and Analysis Plan (SAP) | Appendix B - ERSS Master Sampling Plan CTP-B-D-E-20A-41.pdf |
| 2 | Documents |
APPENDIX C
| Appendix C - USEPA Five Year Review | Appendix_C_FAA Fifth Five Year Review (2019) EPA FINAL.pdf |
| 1 | Documents |
APPENDIX D
| AREA 20A | ||||
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C3 - Existing Conditions - Intermediate Ext Area.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C4 - Existing Conditions - Injection Well Area.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C5 - Existing Conditions - Air Stripper.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C6 - Shallow Ext Well & Piping Layout.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C7 - Intermediate Ext Well & Piping Layout.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C8 - Injection Well Layout.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C9 - Air Stripper Layout.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C10 - Soil Erosion and Sedimentation Control.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C11 - Construction Details.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C12 - Process Piping - Shallow Ext Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C13 - Process Piping - Air Stripper Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C14 - Process Piping - Injection Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C15 - Process Piping - Manifolds & Details.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C16 - Piping Details.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C18 - Site Access Plan.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C19 - Proposed Monitoring Well Plan.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C21 - Shallow Ext Area Bldg Layout.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E1 - Electrical Details.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E2 - Bldg Electrical Plan - Shallow Ext Area Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E3 - Bldg Electrical Plan - Air Stripper Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E4 - Bldg Electrical Plan - Inj Area Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E5 - Power Riser & Control Block Details - Shallow Ext Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E6 - Power Riser & Control Block Details - Air Stripper Bld.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E7 - Power Riser & Control Block Detials - Inj Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E8 - Electrical Schedules and Details.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | E9.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M1A.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M1B.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M2.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M3.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M5.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M6.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M7.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M8.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M9.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M10.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M11.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M12.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | M13.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | T1.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | T2.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | A1 - Bldg & Foundation Details - Ext Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | A2 - Bldg & Foundation Details - Air Stripper Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | A3 - Bldg & Foundation Details - Inj Control Bldg.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C1 - Site Plan & Index.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Individual Drawings | C2 - Existing Conditions - Shallow Ext Area.pdf | |
| AREA E | ||||
| Appendix D - Groundwater Remediation System Plans | Area E (Building 11 Tank Excavation) As-Builts | Area E - Remedial Action Construction (Groundwater System) As-Built Drawings.pdf | ||
| Appendix D - Groundwater Remediation System Plans | Area E (Building 11 Tank Excavation) As-Builts | Area E - Petroleum Impacted Soil Excavation As-Built Drawings.pdf | ||
| CENTRAL TREATMENT PLANT | ||||
| CTP - Phase I As-Builts | C27 - Area 41 Piping Plan (Region G).pdf | |||
| CTP - Phase I As-Builts | C28 - Area 41 Piping Plan (Region H).pdf | |||
| CTP - Phase I As-Builts | C29 - Piping Plan (Hydraulic Profiles A & B).pdf | |||
| CTP - Phase I As-Builts | C30 - Piping Plan (Hydraulic Profiles C through F).pdf | |||
| CTP - Phase I As-Builts | C31 - Piping Plan (Hydraulic Profiles G and H).pdf | |||
| CTP - Phase I As-Builts | C32 - Soil Erosion and Sediment Control Details.pdf | |||
| CTP - Phase I As-Builts | C33 - Area 41 Temporary Storm Water Conveyance Details.pdf | |||
| CTP - Phase I As-Builts | C34 - Water Course Crossing Details.pdf | |||
| CTP - Phase I As-Builts | C35 - Soil Removal Details.pdf | |||
| CTP - Phase I As-Builts | C36 - Area 41 Pond Capping Details.pdf | |||
| CTP - Phase I As-Builts | C37 - Area 41 Detention Basin Sections and Detail.pdf | |||
| CTP - Phase I As-Builts | C38 - Area 41 Detention Basin Construction Details.pdf | |||
| CTP - Phase I As-Builts | Relocate Area B Injection Control Bldg and B-IW1(R).pdf | |||
| CTP - Phase I As-Builts | T1 - Title Sheet.pdf | |||
| CTP - Phase I As-Builts | T2 - Legends and Abbreviations.pdf | |||
| CTP - Phase I As-Builts | C1 - Site Plan Existing Conditions.pdf | |||
| CTP - Phase I As-Builts | C2 - Existing Conditions.pdf | |||
| CTP - Phase I As-Builts | C3 - Area B Piping Plan Index.pdf | |||
| CTP - Phase I As-Builts | C4 - Area B Piping Plan (Region A).pdf | |||
| CTP - Phase I As-Builts | C5 - Area B Piping Plan (Region B).pdf | |||
| CTP - Phase I As-Builts | C6 - Area B Piping Plan (Region C).pdf | |||
| CTP - Phase I As-Builts | C7 - Area B Piping Plan (Region D).pdf | |||
| CTP - Phase I As-Builts | C8 - Area B Piping Plan (Region E).pdf | |||
| CTP - Phase I As-Builts | C9 - Area B Piping Plan (Region F).pdf | |||
| CTP - Phase I As-Builts | C10 - Area B Piping Plan (Region G).pdf | |||
| CTP - Phase I As-Builts | C11 - Area B Piping Plan (Region H).pdf | |||
| CTP - Phase I As-Builts | C12 - Area B Piing Plan (Region I).pdf | |||
| CTP - Phase I As-Builts | C13 - Area B Piping Plan (Region J).pdf | |||
| CTP - Phase I As-Builts | C14 - Area B Piping Plan (Region K).pdf | |||
| CTP - Phase I As-Builts | C15 - Area B Piping Plan (Region L).pdf | |||
| CTP - Phase I As-Builts | C16 - Area B Piping Plan (Region M).pdf | |||
| CTP - Phase I As-Builts | C17 - Area 41 Site Plan Existing Conditions.pdf | |||
| CTP - Phase I As-Builts | C18 - Area 41 Activity Index.pdf | |||
| CTP - Phase I As-Builts | C19 - Area 41 Soil Remediation Plan.pdf | |||
| CTP - Phase I As-Builts | C19A - Area 41 Contaminated Soil Stockpile Area.pdf | |||
| CTP - Phase I As-Builts | C20 - Soil Remediation Notes.pdf | |||
| CTP - Phase I As-Builts | C21 - Area 41 Piping Plan (Region A).pdf | |||
| CTP - Phase I As-Builts | C22 - Area 41 Piping Plan (Region B).pdf | |||
| CTP - Phase I As-Builts | C23 - Area 41 Piping Plan (Region C).pdf | |||
| CTP - Phase I As-Builts | C24 - Area 41 Piping Plan (Region D).pdf | |||
| CTP - Phase I As-Builts | C25 - Area 41 Piping Plan (Region E).pdf | |||
| CTP - Phase I As-Builts | C26 - Area 41 Piping Plan (Region F).pdf | |||
| CTP - Phase IIA As-Builts | HVAC-1 - Mechanical Symbols List and Notes.pdf | |||
| CTP - Phase IIA As-Builts | HVAC-2 - Mechanical Floor Plan - Treatment Bldg.pdf | |||
| CTP - Phase IIA As-Builts | HVAC-3 - Mechanical Flow Diagram and Details.pdf | |||
| CTP - Phase IIA As-Builts | HVAC-4 - Mechanical Sections and Details.pdf | |||
| CTP - Phase IIA As-Builts | HVAC-5 - Mechanical Schedules.pdf | |||
| CTP - Phase IIA As-Builts | M1 - Plumbing Details.pdf | |||
| CTP - Phase IIA As-Builts | RFI #16 - Utility Relocation - Water-Electrical-NaturalGas-Influent.pdf | |||
| CTP - Phase IIA As-Builts | S1 - Foundation Plan - Treatment Bldg.pdf | |||
| CTP - Phase IIA As-Builts | S2 - Foundation Joint Plan.pdf | |||
| CTP - Phase IIA As-Builts | S3 - Structural Loading Notes & Installation Details.pdf | |||
| CTP - Phase IIA As-Builts | S4 - Treatment Bldg Foundation Details.pdf | |||
| CTP - Phase IIA As-Builts | T1 - Title Sheet.pdf | |||
| CTP - Phase IIA As-Builts | T2 - Legends and Abbreviations.pdf | |||
| CTP - Phase IIA As-Builts | A1 - Treatment Bldg - East & West Elevations.pdf | |||
| CTP - Phase IIA As-Builts | A2 - Treatment Bldg - North & South Elevations.pdf | |||
| CTP - Phase IIA As-Builts | A3 - Treatment Bldg - Process Equipment Layout.pdf | |||
| CTP - Phase IIA As-Builts | A4 - Treatment Bldg - Building Details.pdf | |||
| CTP - Phase IIA As-Builts | A5 - Treatment Bldg - Architectural Details.pdf | |||
| CTP - Phase IIA As-Builts | C1 - Site Plan and Index.pdf | |||
| CTP - Phase IIA As-Builts | C2 - Area D Site Plan Existing Conditions.pdf | |||
| CTP - Phase IIA As-Builts | C3 - Area D Layout Plan (South).pdf | |||
| CTP - Phase IIA As-Builts | C4 - Area D Layout Plan (North).pdf | |||
| CTP - Phase IIA As-Builts | C5 - Grading Plan.pdf | |||
| CTP - Phase IIA As-Builts | C6 - Utility Connections Existing Bldg (294).pdf | |||
| CTP - Phase IIA As-Builts | C7 - Building 136 Demolition Plan.pdf | |||
| CTP - Phase IIA As-Builts | C8 - Soil Erosion and Sediment Control Details.pdf | |||
| CTP - Phase IIA As-Builts | C9 - Site Access Plan.pdf | |||
| CTP - Phase IIA As-Builts | C10 - Site Details.pdf | |||
| CTP - Phase IIA As-Builts | C11 - Subsurface Detention Structure Details.pdf | |||
| CTP - Phase IIA As-Builts | C12 - Catch Basin - Manhole - Culvert End Section Details.pdf | |||
| CTP - Phase IIA As-Builts | E-1 - Electrical Symbol List-Notes Details.pdf | |||
| CTP - Phase IIA As-Builts | E1 - Electrical Tie-in Site Plan.pdf | |||
| CTP - Phase IIA As-Builts | E2 - Building Site Utility at Area D.pdf | |||
| CTP - Phase IIA As-Builts | E-2.pdf | |||
| CTP - Phase IIA As-Builts | E3 - Electrical Site Utilities - Area B & 41 Control Bldgs.pdf | |||
| CTP - Phase IIA As-Builts | E-4 - Power & Fire Riser Diagram - Treatment Bldgs.pdf | |||
| CTP - Phase IIA As-Builts | E4.pdf | |||
| CTP - Phase IIA As-Builts | E-5 - Power Riser Diagram - Areas B & 41.pdf | |||
| CTP - Phase IIA As-Builts | E5.pdf | |||
| CTP - Phase IIA As-Builts | E5-1.pdf | |||
| CTP - Phase IIA As-Builts | E6 - Electrical Floor Plans - Treatment Building.pdf | |||
| CTP - Phase IIA As-Builts | E7 - HVAC-Electrical Floor Plan - Area 41 Control Bldg.pdf | |||
| CTP - Phase IIA As-Builts | E8 - HVAC-Electrical Floor Plan - Area B Control Bldg.pdf | |||
| CTP - Phase IIA As-Builts | E9 - Electrical Schedules and Details.pdf | |||
| CTP - Phase IIB As-Builts | M12 - Area B Control Bldg Process Piping.pdf | |||
| CTP - Phase IIB As-Builts | M13 - Area 41 Control Bldg Process Piping.pdf | |||
| CTP - Phase IIB As-Builts | M14 - Manifolds for Area B Control Bldgs.pdf | |||
| CTP - Phase IIB As-Builts | M15 - Manifolds for Area 41 Control Bldgs.pdf | |||
| CTP - Phase IIB As-Builts | M16 - Piping and Sprinkler System Details.pdf | |||
| CTP - Phase IIB As-Builts | M17 - Tank Details.pdf | |||
| CTP - Phase IIB As-Builts | M18 - Chemical Feed System Details.pdf | |||
| CTP - Phase IIB As-Builts | M19 - Vapor-Liquid Separator Pit & VES Retrofit Details.pdf | |||
| CTP - Phase IIB As-Builts | S1 - Treatment Bldg Foundation Plan.pdf | |||
| CTP - Phase IIB As-Builts | T1 - Title Sheet.pdf | |||
| CTP - Phase IIB As-Builts | T2 - Legends & Abbreviations.pdf | |||
| CTP - Phase IIB As-Builts | A1 - Treatment Bldg Process Equipment Layout.pdf | |||
| CTP - Phase IIB As-Builts | C1 - Site Plan and Index.pdf | |||
| CTP - Phase IIB As-Builts | C2 - Area D Layout Plan.pdf | |||
| CTP - Phase IIB As-Builts | C3 - Site Access Plan.pdf | |||
| CTP - Phase IIB As-Builts | C4 - Area B Sprinkler System Layout.pdf | |||
| CTP - Phase IIB As-Builts | C5 - Demolition Plan Area D Building (294).pdf | |||
| CTP - Phase IIB As-Builts | C6 - Renovation Plan Area D Building (294).pdf | |||
| CTP - Phase IIB As-Builts | C7 - Proposed Location of B-EW4D.pdf | |||
| CTP - Phase IIB As-Builts | C8 - Monitoring Well and Construction Details.pdf | |||
| CTP - Phase IIB As-Builts | E1 - Electrical Layout (Area B).pdf | |||
| CTP - Phase IIB As-Builts | E2 - Electrical Layout (Area 41).pdf | |||
| CTP - Phase IIB As-Builts | E3 - Electrical Floor Plans (Area B).pdf | |||
| CTP - Phase IIB As-Builts | E5 - Electrical Floor Plans (Area D).pdf | |||
| CTP - Phase IIB As-Builts | E6 - Distribution Diagrams (Area D).pdf | |||
| CTP - Phase IIB As-Builts | E7 - Power Riser Diagram (Areas B & 41).pdf | |||
| CTP - Phase IIB As-Builts | E8 - Control Block Diagram.pdf | |||
| CTP - Phase IIB As-Builts | E9 - Electrical Details and Schedules.pdf | |||
| CTP - Phase IIB As-Builts | E10 - Electrical Details (1 of 2).pdf | |||
| CTP - Phase IIB As-Builts | E11 - Electrical Details (2 of 2).pdf | |||
| CTP - Phase IIB As-Builts | E12 - Process Controls (P&ID).pdf | |||
| CTP - Phase IIB As-Builts | E13 - Process Controls Communication.pdf | |||
| CTP - Phase IIB As-Builts | M1 - Instrumentation Diagram.pdf | |||
| CTP - Phase IIB As-Builts | M2 - Clarification Process & Instrumentation Diagram.pdf | |||
| CTP - Phase IIB As-Builts | M3 - Post Clarification Process & Instrumentation Diagram.pdf | |||
| CTP - Phase IIB As-Builts | M4 - Process and Instrumentation Diagram - Injection & Sprinkler.pdf | |||
| CTP - Phase IIB As-Builts | M5 - Process Water Sludge & Backwash Piping Plan.pdf | |||
| CTP - Phase IIB As-Builts | M6 - Plant Air-Water Service-Chemical Feed Piping Plan.pdf | |||
| CTP - Phase IIB As-Builts | M7 - Process Hydraulic Profile.pdf | |||
| CTP - Phase IIB As-Builts | M8 - Pump-Equipment-Piping Schedules.pdf | |||
| CTP - Phase IIB As-Builts | M9 - Tank and Mixer Schedules.pdf | |||
| CTP - Phase IIB As-Builts | M10 - Equipment Details.pdf | |||
| CTP - Phase IIB As-Builts | M11 - Extraction Well Mechanical Details.pdf | |||
| RECHARGE BED | ||||
| Recharge Bed As-Builts | Recharge Bed Bottom of Excavation.pdf | |||
| Recharge Bed As-Builts | Recharge Bed Final Layout.pdf | |||
| AREA D | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_GES_PipingEnlargedLayout.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_GES_PipingLayout.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_LegendsAbbreviations.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_SitePlanExistingConditions.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_SoilErosionSedimentControl.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_TitleSheet.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_Legends_Abbreviations.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_Mechanical_ElectricalDetails.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_SitePlan_ExistingConditions.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_SitePlan_NewCompressedAirPipingLayout.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_SoilErosion_SedimentationControlDetails.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_TitleSheet.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_201205_WellheadDetails.pdf | ||||
| AreaD_FreePhasePetroleumExtractionSystem_AsBuilts_comp_201205.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_2012_05.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_2012_05_comp.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_B294B_ErectionFoundationDetail.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_B294B_ExistingExtractionWellRe.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_B294B_ExtractionWellModificati.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_B294B_PipingLayout.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_ConstructionDetails.pdf | ||||
| AreaD_GroundwaterExtractionSystemLateral_HeaderPiping_AsBuilts_201205_ElectricalLayout.pdf | ||||
| 202 | Documents |
APPENDIX E
| Appendix E - FAA GIS Program Geospatial and Environmental Data Standards | Appendix G_FAA Geographic Information System Program Geospatial and Environmental Data Standards.pdf |
| 1 | Documents |
APPENDIX F
| Appendix F - ERSS Preventative Maintenance Program | Appendix F_ERSS Preventative Maintenance Program.pdf |
| 1 | Documents |
APPENDIX G
| AREA 20A | |||
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 5-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 6-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 7-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 8-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 1-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 2-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 3-8.pdf.pdf | |
| Appendix G - Operation and Maintenance (O&M) Manuals | Area 20A - Operation and Maintenance Plan | Area 20A - Phase I Remedial Enhancements - O+M Manual - Vol 4-8.pdf.pdf | |
| CENTRAL TREATMENT PLANT | |||
| Appendix G - Operation and Maintenance (O&M) Manuals | CTP - Operation and Maintenance Plan | CTP - Operation and Maintenance Plan.pdf | |
| 9 | Documents |
APPENDIX H
| Appendix H - Monthly Operating Report (MOR) | Monthly Operating Report (August 2019).pdf |
| 1 | Documents |
APPENDIX I
| Appendix I - Quarterly Discharge Monitoring Report | FAA - Discharge Monitoring Report (Second Quarter 2019).pdf |
| 1 | Documents |
APPENDIX J
| Appendix J - Private Water Monitoring Report | Private Water Monitoring Report (Second Quarter 2019).pdf |
| 1 | Documents |
File details come from the government source that posted it. Updated .