Summary 692M15-19-R-00005 Pricing Schedule
| INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells |
| OFFEROR NAME: |
| CLIN | CLIN Type | Supplies/Services | SOW Reference | Quantity | Units | Total Cost |
| 0001 | FFP | Remedial Action Construction Task and System Enhancements | 2.1 | TBD | NTE | $53,728,824 |
| 0002 | T&M | Shakedown and Initial O&M Task | 2.2 | TBD | NTE | $659,644 |
| 0003 | FFP | Long Term O&M (B, D, E, 20A, & 41) | 2.3 | 1 | Lot | $360,000 |
| 0004 | FFP | GIS/GPS Support Task | 2.4 | 1 | Lot | $0 |
| 0005 | FFP | National Environmental Data Repository Management Support Task | 2.5 | 1 | Lot | $0 |
| 0006 | T&M | Long Term O&M SURGE | 2.6 | 1 | NTE | $2,000,000 |
| 0007 | NTE | Travel/Training | | 1 | NTE | $275,200 |
| | TOTAL CONTRACT CEILING | | | | $57,023,668 |
| NOTES for OFFERORS: |
| CLIN 0001 - To be negotiated at the task order level, resultant order type will be FIRM FIXED PRICE (FFP) with a total contract not to exceed value (as indicated). |
| CLIN 0002 - To be negotiated at the task order level, resultant order type will be TIME & MATERIALS (T&M) with a total contract not to exceed value (as indicated). |
| CLIN 0003 - FIRM FIXED PRICE task order. Contractor to input fully burdened labor rates into appropriate tab. |
| CLIN 0004 - FIRM FIXED PRICE task order. Contractor to input fully burdened labor rates into appropriate tab. |
| CLIN 0005 - FIRM FIXED PRICE task order. Contractor to input fully burdened labor rates into appropriate tab. |
| CLIN 0006 - To be negotiated at the task order level, resultant order type will be TIME & MATERIALS (T&M) with a total contract not to exceed value (as indicated). |
| CLIN 0007 - Travel and Training are on the contract will be billed at COST, and have a not to exceed value (as indicated), |
FAA WILLIAM J HUGHES TECHNICAL CENTER
ENVIRONMENTAL REMEDIATION SUPPORT SERVICES (ERSS) CONTRACT
PRICING SCHEDULE - SUMMARY
WJHTC Labor
| INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells |
| OFFEROR NAME: |
| Category | Year 1 Fully Burdened Rate | Year 2 Fully Burdened Rate | Year 3 Fully Burdened Rate | Year 4 Fully Burdened Rate | Year 5 Fully Burdened Rate | Year 6 Fully Burdened Rate | Year 7 Fully Burdened Rate | Year 8 Fully Burdened Rate | Year 9 Fully Burdened Rate | Year 10 Fully Burdened Rate |
| Project Manager/Principal* | | | | | | | | | | |
| Operations Manager* | | | | | | | | | | |
| Plant System Operator (#1) | | | | | | | | | | |
| Plant System Operator (#2) | | | | | | | | | | |
| Project Geologist/Hydrogeologist* | | | | | | | | | | |
| Site Health & Safety Officer* | | | | | | | | | | |
| Maintenance Supervisor | | | | | | | | | | |
| Maintenance Technician | | | | | | | | | | |
| Quality Control Supervisor (QCS) | | | | | | | | | | |
| Field Sampler/Technician | | | | | | | | | | |
| Environmental Technician | | | | | | | | | | |
| Geotechnical Engineer | | | | | | | | | | |
| Environmental Engineer | | | | | | | | | | |
| Geologist/Hydrogeologist | | | | | | | | | | |
| Chemical Quality Control Manager (CQCM) | | | | | | | | | | |
| Certified Industiral Hygienist (CIH) | | | | | | | | | | |
| GIS/GPS System Administrator* |
| GIS Specialist/Analyst (Mid-Level) |
| GIS Specialist/Analyst (Entry-Level) |
| GIS Specialist/Analyst Planner (Mid-Level) |
| GIS Specialist/Analyst Planner (Entry-Level) |
| National Environmental Data Repository Management (NEDRM) Administrator* |
| NEDRM GIS Specialist/Analyst |
| NOTE: "*" indicates Key Personnel |
FAA WILLIAM J HUGHES TECHNICAL CENTER
PRICING SCHEDULE
CLIN 0003
| INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells | |
| OFFEROR NAME: | 0 |
| YEAR 1 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 1 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 2 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 2 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 3 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 3 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 4 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 4 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 5 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 5 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 6 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 6 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 7 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 7 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 8 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 8 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 9 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 9 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 10 - CLIN III - OPERATIONS AND MAINTENANCE (O&M) | | | | | |
| SUBTASK | DESCRIPTION | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| 1 | System Operation - SOW Section 2.3.1 | | | | |
| Plant System Operator (#1) | Hours | 1,904 | | $0.00 |
| Plant System Operator (#2) | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 2 | System Management - SOW Section 2.3.1.3 | | | | |
| Project Manager/Principal* | Hours | 1,904 | | $0.00 |
| Operations Manager* | Hours | 1,904 | | $0.00 |
| Project Geologist/Hydrogeologist* | Hours | 1,904 | | $0.00 |
| Site Health and Safety Officer* | Hours | 1,904 | | $0.00 |
| Environmental Technician | Hours | 1,904 | | $0.00 |
| Chemical Quality Control Manager | Hours | 360 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| 3 | Reserved | | | | |
| 4 | Permits, Fees & Certifications - SOW Section 3 | | | | |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 5 | System Maintenance - SOW Section 2.3.1.6 | | | | |
| Maintenance Supervisor | Hours | 1,904 | | $0.00 |
| Maintenance Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| 6 | Maintenance Supplies, Spare Parts, and Consumables - SOW Section 2.3.1.6 | | | | |
| Other Direct Costs (FAA Provided Quantity and Cost) | NTE | 1 | $36,000.00 | $36,000.00 |
| 7A | Granular Activated Carbon Change Out (CTP) - SOW Section 2.3.1.5. | | | | |
| Carbon Change Out (20,000 pounds) | Each | 2 | | $0.00 |
| 8 | Reserved | | | | |
| 9A | Reserved | | | | |
| 10A | Sludge Disposal (CTP) - SOW Section 2.3.1.5. | | | | |
| Disposable Cubic Yard Box Purchase | Box | 18 | | $0.00 |
| Sludge Transportation and Disposal | Ton | 10 | | $0.00 |
| 11 | Discharge Monitoring and Reporting - SOW Section 2.3.1.4. | | | | |
| Quality Control Supervisor | Hours | 1,904 | | $0.00 |
| Field Sampler/Technician | Hours | 1,904 | | $0.00 |
| Other Direct Costs | NTE | 1 | | $0.00 |
| Subcontractors | NTE | 1 | | $0.00 |
| YEAR 10 TOTAL: | | | | | $36,000.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| CLIN III TOTAL (YEAR 1 - YEAR 10) | | | | | $360,000.00 |
FAA WILLIAM J HUGHES TECHNICAL CENTER
PRICING SCHEDULE - CLIN III - Operations and Maintenance
CLIN 0004
| INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells | |
| OFFEROR NAME: | 0 |
| YEAR 1 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 1 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 2 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 2 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 3 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 3 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 4 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 4 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 5 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 5 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 6 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 6 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 7 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 7 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 8 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 8 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 9 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 9 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| YEAR 10 - CLIN IV - GIS/GPS SUPPORT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| GIS/GPS System Administrator* | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Mid Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst (Entry Level) | On site | Hours | 1,904 | | $0.00 |
| GIS Specialist/Analyst Planner (Mid Level) | On site | Hours | 1,904 | $0.00 |
| GIS Specialist/Analyst Planner (Entry Level) | On site | Hours | 1,904 | $0.00 |
| YEAR 10 Total | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | |
| * - Indicates Key Personnel. | | | | |
| CLIN IV TOTAL (YEAR 1 - YEAR 10) | | | | $0.00 |
FAA WILLIAM J HUGHES TECHNICAL CENTER
PRICING SCHEDULE - CLIN IV - GIS/GPS Support
CLIN 0005
| INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells | |
| OFFEROR NAME: | 0 |
| YEAR 1 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 1 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 2 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 2 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 3 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 3 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 4 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 4 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 5 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 5 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 6 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 6 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 7 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 7 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 8 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 8 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 9 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 9 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| YEAR 10 - CLIN V - NATIONAL ENVIRONMENTAL DATA REPOSITORY MANAGEMENT | | | | | |
| DESCRIPTION | ONSITE/OFFSITE | UNITS | QUANTITY | BURDENED UNIT COST | TOTAL COST |
| National Environmental Data Repository Management (NEDRM) Administrator* | On site | Hours | 1,904 | | $0.00 |
| National Environmental Data Repository Management GIS Specialist/Analyst | On site | Hours | 1,904 | | $0.00 |
| YEAR 10 Total | | | | | $0.00 |
| Note: Backup documentation for lump sum items (labor, materials, and subcontractors) must be provided. | | | | | |
| * - Indicates Key Personnel. | | | | | |
| CLIN V TOTAL (YEAR 1 - YEAR 10) | | | | | $0.00 |