ERSS Thumbdrive FAA SUPERFUND REPOSITORY File List.xlsx
XLSX spreadsheet 169 KB Posted
- Solicitation number
- 692M15-19-R-00005
About this file
This is a solicitation for environmental remediation support services at the William J. Hughes Technical Center located at Atlantic City International Airport in Pomona, New Jersey. The Federal Aviation Administration seeks to award an indefinite delivery/indefinite quantity hybrid fixed price and time and materials contract for a period of ten years. Work will involve operations and maintenance, remedial action construction, and Geographic Information Systems/Global Positioning System tasks in Areas of Concern undergoing active remediation at the Superfund National Priority List site. The NAICS code is 562910. The size standard is 750 employees. Interested parties should respond to Screening Information Request 692M15-19-R-00005 and accompanying attachments. Questions must be submitted in writing to the email addresses provided by the specified due dates. Proposal responses are also due on dates in the solicitation. The FAA will award one contract and amendments will be posted to SAM.gov.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AOC Drawings
| Area 20A (Salvage Yard) As-Builts | Interim Remedial Measure (IRM) | Area_20A_IRM_As_Builts.pdf | |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 As-Built Drawings | AREA-20A_01700-02_26_As-Built Record Drawings.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M10.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M11.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M12.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M13.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | T1.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | T2.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | A1 - Bldg & Foundation Details - Ext Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | A2 - Bldg & Foundation Details - Air Stripper Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | A3 - Bldg & Foundation Details - Inj Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C1 - Site Plan & Index.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C2 - Existing Conditions - Shallow Ext Area.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C3 - Existing Conditions - Intermediate Ext Area.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C4 - Existing Conditions - Injection Well Area.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C5 - Existing Conditions - Air Stripper.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C6 - Shallow Ext Well & Piping Layout.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C7 - Intermediate Ext Well & Piping Layout.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C8 - Injection Well Layout.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C9 - Air Stripper Layout.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C10 - Soil Erosion and Sedimentation Control.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C11 - Construction Details.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C12 - Process Piping - Shallow Ext Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C13 - Process Piping - Air Stripper Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C14 - Process Piping - Injection Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C15 - Process Piping - Manifolds & Details.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C16 - Piping Details.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C18 - Site Access Plan.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C19 - Proposed Monitoring Well Plan.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | C21 - Shallow Ext Area Bldg Layout.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E1 - Electrical Details.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E2 - Bldg Electrical Plan - Shallow Ext Area Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E3 - Bldg Electrical Plan - Air Stripper Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E4 - Bldg Electrical Plan - Inj Area Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E5 - Power Riser & Control Block Details - Shallow Ext Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E6 - Power Riser & Control Block Details - Air Stripper Bld.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E7 - Power Riser & Control Block Detials - Inj Control Bldg.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E8 - Electrical Schedules and Details.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | E9.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M1A.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M1B.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M2.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M3.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M5.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M6.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M7.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M8.pdf |
| Area 20A (Salvage Yard) As-Builts | Remedial Enhancements - Phase I | Phase 1 Plans | M9.pdf |
| Area 20A (Salvage Yard) As-Builts | Shallow Groundwater Extraction and Injection Systems | DACW61-95-B0020_Area_20A_E1_Shallow_wells_design_BW_opt.pdf | |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | M1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | M2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | T1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | T2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | AB-E1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | Area D Electrical Route.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | C1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E4_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E5_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E6_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E7_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E8_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | E9_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | Extraction_Well_Installation_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Extraction Well Control Modification | ExtractionWellControlModification_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | T2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | C1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | C2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | C3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | Free-Phase-PES_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | Free-Phase-PES_AB-SET.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | M1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | M2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Free Phase Petroleum Pumping System | T1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | T-1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | T2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | T-2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | A1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C4_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C5-AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C6-AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | C7_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | E1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | GW_Extract_Sys_Lats_n_Head_Piping.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | GW_Extract_Sys_Lats_n_Head_Piping_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | M1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Groundwater Extraction System Lateral and Header Piping | M2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | T1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | T2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | VES_Enhancements_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | VES_Enhancements_AB_Record.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C4_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C5_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C6_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | C7_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | E-1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | M1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | M2-AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | VES Enhancements | M3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Installation | Figure 3_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Installation | Figure 4_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Installation | Extraction_Well_Installation_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Installation | Figure 1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Installation | Figure 2_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Redevelopment | Well_Redevelopment_Figure_1_AB.pdf |
| Area D (Jet Fuel Farm) As-Builts | Area D - Remedial Enghancements Phase I - As-Builts | Well Redevelopment | Figure_1_AB.pdf |
| Area E (Building 11 Tank Excavation) As-Builts | Area E - Petroleum Impacted Soil Excavation As-Built Drawings.pdf | ||
| Area E (Building 11 Tank Excavation) As-Builts | Area E - Remedial Action Construction (Groundwater System) As-Built Drawings.pdf | ||
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C36 - Area 41 Pond Capping Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C37 - Area 41 Detention Basin Sections and Detail.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C38 - Area 41 Detention Basin Construction Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | Relocate Area B Injection Control Bldg and B-IW1(R).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | T1 - Title Sheet.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | T2 - Legends and Abbreviations.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C1 - Site Plan Existing Conditions.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C2 - Existing Conditions.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C3 - Area B Piping Plan Index.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C4 - Area B Piping Plan (Region A).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C5 - Area B Piping Plan (Region B).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C6 - Area B Piping Plan (Region C).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C7 - Area B Piping Plan (Region D).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C8 - Area B Piping Plan (Region E).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C9 - Area B Piping Plan (Region F).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C10 - Area B Piping Plan (Region G).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C11 - Area B Piping Plan (Region H).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C12 - Area B Piing Plan (Region I).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C13 - Area B Piping Plan (Region J).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C14 - Area B Piping Plan (Region K).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C15 - Area B Piping Plan (Region L).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C16 - Area B Piping Plan (Region M).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C17 - Area 41 Site Plan Existing Conditions.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C18 - Area 41 Activity Index.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C19 - Area 41 Soil Remediation Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C19A - Area 41 Contaminated Soil Stockpile Area.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C20 - Soil Remediation Notes.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C21 - Area 41 Piping Plan (Region A).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C22 - Area 41 Piping Plan (Region B).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C23 - Area 41 Piping Plan (Region C).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C24 - Area 41 Piping Plan (Region D).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C25 - Area 41 Piping Plan (Region E).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C26 - Area 41 Piping Plan (Region F).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C27 - Area 41 Piping Plan (Region G).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C28 - Area 41 Piping Plan (Region H).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C29 - Piping Plan (Hydraulic Profiles A & B).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C30 - Piping Plan (Hydraulic Profiles C through F).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C31 - Piping Plan (Hydraulic Profiles G and H).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C32 - Soil Erosion and Sediment Control Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C33 - Area 41 Temporary Storm Water Conveyance Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C34 - Water Course Crossing Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase I As-Builts | C35 - Soil Removal Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | S4 - Treatment Bldg Foundation Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | T1 - Title Sheet.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | T2 - Legends and Abbreviations.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | A1 - Treatment Bldg - East & West Elevations.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | A2 - Treatment Bldg - North & South Elevations.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | A3 - Treatment Bldg - Process Equipment Layout.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | A4 - Treatment Bldg - Building Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | A5 - Treatment Bldg - Architectural Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C1 - Site Plan and Index.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C2 - Area D Site Plan Existing Conditions.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C3 - Area D Layout Plan (South).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C4 - Area D Layout Plan (North).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C5 - Grading Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C6 - Utility Connections Existing Bldg (294).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C7 - Building 136 Demolition Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C8 - Soil Erosion and Sediment Control Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C9 - Site Access Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C10 - Site Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C11 - Subsurface Detention Structure Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | C12 - Catch Basin - Manhole - Culvert End Section Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E-1 - Electrical Symbol List-Notes Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E1 - Electrical Tie-in Site Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E2 - Building Site Utility at Area D.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E-2.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E3 - Electrical Site Utilities - Area B & 41 Control Bldgs.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E-4 - Power & Fire Riser Diagram - Treatment Bldgs.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E4.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E-5 - Power Riser Diagram - Areas B & 41.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E5.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E5-1.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E6 - Electrical Floor Plans - Treatment Building.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E7 - HVAC-Electrical Floor Plan - Area 41 Control Bldg.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E8 - HVAC-Electrical Floor Plan - Area B Control Bldg.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | E9 - Electrical Schedules and Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | HVAC-1 - Mechanical Symbols List and Notes.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | HVAC-2 - Mechanical Floor Plan - Treatment Bldg.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | HVAC-3 - Mechanical Flow Diagram and Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | HVAC-4 - Mechanical Sections and Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | HVAC-5 - Mechanical Schedules.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | M1 - Plumbing Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | RFI #16 - Utility Relocation - Water-Electrical-NaturalGas-Influent.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | S1 - Foundation Plan - Treatment Bldg.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | S2 - Foundation Joint Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIA As-Builts | S3 - Structural Loading Notes & Installation Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | S1 - Treatment Bldg Foundation Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | T1 - Title Sheet.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | T2 - Legends & Abbreviations.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | A1 - Treatment Bldg Process Equipment Layout.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C1 - Site Plan and Index.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C2 - Area D Layout Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C3 - Site Access Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C4 - Area B Sprinkler System Layout.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C5 - Demolition Plan Area D Building (294).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C6 - Renovation Plan Area D Building (294).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C7 - Proposed Location of B-EW4D.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | C8 - Monitoring Well and Construction Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E1 - Electrical Layout (Area B).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E2 - Electrical Layout (Area 41).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E3 - Electrical Floor Plans (Area B).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E5 - Electrical Floor Plans (Area D).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E6 - Distribution Diagrams (Area D).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E7 - Power Riser Diagram (Areas B & 41).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E8 - Control Block Diagram.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E9 - Electrical Details and Schedules.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E10 - Electrical Details (1 of 2).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E11 - Electrical Details (2 of 2).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E12 - Process Controls (P&ID).pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | E13 - Process Controls Communication.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M1 - Instrumentation Diagram.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M2 - Clarification Process & Instrumentation Diagram.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M3 - Post Clarification Process & Instrumentation Diagram.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M4 - Process and Instrumentation Diagram - Injection & Sprinkler.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M5 - Process Water Sludge & Backwash Piping Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M6 - Plant Air-Water Service-Chemical Feed Piping Plan.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M7 - Process Hydraulic Profile.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M8 - Pump-Equipment-Piping Schedules.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M9 - Tank and Mixer Schedules.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M10 - Equipment Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M11 - Extraction Well Mechanical Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M12 - Area B Control Bldg Process Piping.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M13 - Area 41 Control Bldg Process Piping.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M14 - Manifolds for Area B Control Bldgs.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M15 - Manifolds for Area 41 Control Bldgs.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M16 - Piping and Sprinkler System Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M17 - Tank Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M18 - Chemical Feed System Details.pdf | |
| Central Treatment Plant (CTP) As-Builts | CTP - Phase IIB As-Builts | M19 - Vapor-Liquid Separator Pit & VES Retrofit Details.pdf | |
| Recharge Bed As-Builts | Recharge Bed Final Layout.pdf | ||
| Recharge Bed As-Builts | Recharge Bed Bottom of Excavation.pdf | ||
| 247 | Documents |
Area 20A
| Area 20A Expanded Supplemental RI Report | Area 20A - Expanded Supplemental Remedial Investigation Report APPENDICES (09-12-2018).pdf |
| Area 20A Expanded Supplemental RI Report | Area 20A - Expanded Supplemental Remedial Investigation Report (09-12-2018).pdf |
| RECORD OF DECISION - AOC_20A.pdf | |
| Area 20A Draft GW Remedy Completion Strategy Plan 10-13-16.pdf | |
| Area 20A Final Engineering Report on Alternatives (EROA) (Nov 2016).pdf | |
| 5 | Documents |
Area 41
| RECORD OF DECISION - AOC_41.pdf | |
| 1 | Documents |
Area B
| RECORD OF DECISION - AOC_B.pdf | |
| Area B Groundwater Extraction and Monitoring Optimization Plan 01-21-16.pdf | |
| 2 | Documents |
Area D
| Area D Supplemental RI Report | Draft Final_Area_D_Supplemental_RI_Report_text_tables_figures.pdf |
| Area D Supplemental RI Report | Appendix A Complete.pdf |
| Area D Supplemental RI Report | Appendix B Complete.pdf |
| Area D Supplemental RI Report | Appendix_C-Lithologies.pdf |
| Area D Supplemental RI Report | Appendix_D_VES_data.pdf |
| Area D Supplemental RI Report | Appendix_E-Zebra_LIF_and_MIP_Report.pdf |
| Area D Supplemental RI Report | Appendix_F-Soil Boring Logs.pdf |
| RECORD OF DECISION - AOC_D.pdf | |
| 8 | Documents |
Area E
| Area E Supplemental Remedial Investigation Report (SRIR) Revised | Area E SRIR Appendix C.pdf |
| Area E Supplemental Remedial Investigation Report (SRIR) Revised | 2018-09-07 Area E Supplemental RI Report text tables figs.pdf |
| Area E Supplemental Remedial Investigation Report (SRIR) Revised | 2018-09-07 Area E Supplemental RI Report_TEXT ONLY.docx |
| RECORD OF DECISION - AOC_E.pdf | |
| DRAFT AREA E REMEDIAL ACTION REPORT 08-30-16.pdf | |
| 5 | Documents |
Monthly Operations Reports
| GWTS_MORs | 2004 | Area29 | April | Maintenance Tables | 05_04_Area29_PM_Schedule.PDF | |
| GWTS_MORs | 2004 | Area29 | April | Maintenance Tables | 04_04_Area29_PM_Report.PDF | |
| GWTS_MORs | 2004 | Area29 | April | Maintenance Tables | 04_04_Area29_SparePartsInv.PDF | |
| GWTS_MORs | 2004 | Area29 | April | Maintenance Tables | 04_04_Area29_UnschRepairs.PDF | |
| GWTS_MORs | 2004 | Area29 | April | Tables | Table-4 Area 29 Daily Activity Checklist April.xls | |
| GWTS_MORs | 2004 | Area29 | April | Tables | Table-1 29 daily well log April 04.xls | |
| GWTS_MORs | 2004 | Area29 | April | Tables | Table-2 Area 29 Daily Flows April 04.xls | |
| GWTS_MORs | 2004 | Area29 | April | Tables | Table-3 April 04 Weekly Chemical Consumption Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | April | Area 29 April 04 MOR.doc | ||
| GWTS_MORs | 2004 | Area29 | April | April 04 Area 29 Shakedown Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | April | April 2004 Weather.txt | ||
| GWTS_MORs | 2004 | Area29 | August | Maintenance Tables | Area29_UnschRepairs_0804.PDF | |
| GWTS_MORs | 2004 | Area29 | August | Maintenance Tables | Area29_PMReport_0804.PDF | |
| GWTS_MORs | 2004 | Area29 | August | Maintenance Tables | Area29_PMSched_0904_Pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | August | Maintenance Tables | Area29_PMSched_0904_Pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | August | Maintenance Tables | Area29_SparePartsInv_0804.PDF | |
| GWTS_MORs | 2004 | Area29 | August | Tables | Table-4 Area 29 Daily Activity Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | August | Tables | t1-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | August | Tables | Table 5-Air Emission Calculation to August 04.xls | |
| GWTS_MORs | 2004 | Area29 | August | Tables | Table-2 Area 29 Daily Flows August 04.xls | |
| GWTS_MORs | 2004 | Area29 | August | Tables | Table-3 August 04 Weekly Chemical Consumption Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | August | Area 29 Aug 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | August | ACYLCD082004.txt | ||
| GWTS_MORs | 2004 | Area29 | December | Maintenance Tables | Jan_2005_PM_Sched.PDF | |
| GWTS_MORs | 2004 | Area29 | December | Maintenance Tables | Dec_2004_PM_Report.PDF | |
| GWTS_MORs | 2004 | Area29 | December | Maintenance Tables | Dec_2004_SparePartsInv.PDF | |
| GWTS_MORs | 2004 | Area29 | December | Maintenance Tables | Dec_2004_UncshRepairs.PDF | |
| GWTS_MORs | 2004 | Area29 | December | Tables | Table-4 Area 29 Daily Activity Checklist December 04.xls | |
| GWTS_MORs | 2004 | Area29 | December | Tables | t1-Area-29-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | December | Tables | Table 5-Air Emission Calculation December 04.xls | |
| GWTS_MORs | 2004 | Area29 | December | Tables | Table-2 Area 29 Daily Flows December 04.xls | |
| GWTS_MORs | 2004 | Area29 | December | Tables | Table-3 Weekly Chemical Consumption Checklist December 04.xls | |
| GWTS_MORs | 2004 | Area29 | December | Area 29 Dec 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | December | ACYLCD122004.txt | ||
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02122004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02052004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02062004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02072004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02082004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02092004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02102004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Feb-04 | 02112004.PDF | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Mar_04_PM_Schedule_Pg2.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Feb_04_Maint_Report_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Jan_04_Maint_Report_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Jan_Feb_04_Spare_Parts_Inv.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Jan_Feb_04_Unsch_Repairs.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Jan-04_Maint_Report_Pg2.bmp | |
| GWTS_MORs | 2004 | Area29 | February | Jan_Feb_Maintenance_2004 | Mar_04_PM_Schedule_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | February | final-Feb 04Area 29 Shakedown Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | February | ACYLCD022004.txt | ||
| GWTS_MORs | 2004 | Area29 | February | Area 29 Daily Activity Checklist FEB2004.xls | ||
| GWTS_MORs | 2004 | Area29 | February | Feb 04 Weekly Chemical Consumption Checklist.xls | ||
| GWTS_MORs | 2004 | Area29 | February | Final-Area 29 Daily Flows Feb 04.xls | ||
| GWTS_MORs | 2004 | Area29 | February | final-Area 29 Feb 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01272004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01152004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01162004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01202004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01222004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01232004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01242004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01252004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan-04 | 01262004.PDF | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Mar_04_PM_Schedule_Pg2.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Feb_04_Maint_Report_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Jan_04_Maint_Report_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Jan_Feb_04_Spare_Parts_Inv.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Jan_Feb_04_Unsch_Repairs.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Jan-04_Maint_Report_Pg2.bmp | |
| GWTS_MORs | 2004 | Area29 | January | Jan_Feb_Maintenance_2004 | Mar_04_PM_Schedule_Pg1.bmp | |
| GWTS_MORs | 2004 | Area29 | January | final-Feb 04Area 29 Shakedown Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | January | ACYLCD022004.txt | ||
| GWTS_MORs | 2004 | Area29 | January | Area 29 Daily Activity Checklist FEB2004.xls | ||
| GWTS_MORs | 2004 | Area29 | January | Feb 04 Weekly Chemical Consumption Checklist.xls | ||
| GWTS_MORs | 2004 | Area29 | January | Final-Area 29 Daily Flows Feb 04.xls | ||
| GWTS_MORs | 2004 | Area29 | January | final-Area 29 Feb 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | July | Maintenance Tables | Area29_UnschRepairs0704.PDF | |
| GWTS_MORs | 2004 | Area29 | July | Maintenance Tables | Area29_PMReport0704.PDF | |
| GWTS_MORs | 2004 | Area29 | July | Maintenance Tables | Area29_PMSched0804.PDF | |
| GWTS_MORs | 2004 | Area29 | July | Maintenance Tables | Area29_SparePartsInv0704.PDF | |
| GWTS_MORs | 2004 | Area29 | July | Tables | Table-4 Area 29 Daily Activity Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | July | Tables | t1-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | July | Tables | Table-2 Area 29 Daily Flows July04.xls | |
| GWTS_MORs | 2004 | Area29 | July | Tables | Table-3 July 04 Weekly Chemical Consumption Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | July | July 04 Area 29 Shakedown-O&M Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | July | ACYLCD072004.txt | ||
| GWTS_MORs | 2004 | Area29 | July | Area 29 july 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | June | Maintenance Tables | Area29_UnschEvents0604.PDF | |
| GWTS_MORs | 2004 | Area29 | June | Maintenance Tables | Area29_PMReport0604.PDF | |
| GWTS_MORs | 2004 | Area29 | June | Maintenance Tables | Area29_PMSched0704.PDF | |
| GWTS_MORs | 2004 | Area29 | June | Maintenance Tables | Area29_SparePartsInv0604.PDF | |
| GWTS_MORs | 2004 | Area29 | June | Tables | Table-4 Area 29 Daily Activity Checklist June 04.xls | |
| GWTS_MORs | 2004 | Area29 | June | Tables | Table-1 29 daily well log June 04.xls | |
| GWTS_MORs | 2004 | Area29 | June | Tables | Table-2 Area 29 Daily Flows June 04.xls | |
| GWTS_MORs | 2004 | Area29 | June | Tables | Table-3 June 04 Weekly Chemical Consumption Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | June | June04 Area 29 Shakedown Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | June | ACYLCD062004.txt | ||
| GWTS_MORs | 2004 | Area29 | June | Area 29 june 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | March | Maintenance Tables | Area_29_Unscheduled_Repairs_0304.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Maintenance Tables | Area_29_0304_Spare_Parts_Inv..PDF | |
| GWTS_MORs | 2004 | Area29 | March | Maintenance Tables | Area_29_P_M_Report_0304_Pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Maintenance Tables | Area_29_P_M_Report_0304_Pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Maintenance Tables | Area_29_P_M_Sch_0404.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 04012004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03222004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03232004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03242004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03252004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03262004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03272004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03282004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03302004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Mar-04 | 03312004.PDF | |
| GWTS_MORs | 2004 | Area29 | March | Table-4 Area 29 Daily Activity Checklist March 2004.xls | ||
| GWTS_MORs | 2004 | Area29 | March | ACYLCD032004.txt | ||
| GWTS_MORs | 2004 | Area29 | March | Area 29 March 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | March | March 04 Area 29 Shakedown Daily Activities Summary(2).doc | ||
| GWTS_MORs | 2004 | Area29 | March | Table-1 area 29 daily well log march 04.xls | ||
| GWTS_MORs | 2004 | Area29 | March | Table-2 Area 29 Daily Flows March 04.xls | ||
| GWTS_MORs | 2004 | Area29 | March | Table-3 March 04 Weekly Chemical Consumption Checklist.xls | ||
| GWTS_MORs | 2004 | Area29 | May | Maintenance Tables | 0504_Area29_UnschRepairs.PDF | |
| GWTS_MORs | 2004 | Area29 | May | Maintenance Tables | 0504_Area29_PlannedMaint.PDF | |
| GWTS_MORs | 2004 | Area29 | May | Maintenance Tables | 0504_Area29_PM_Report.PDF | |
| GWTS_MORs | 2004 | Area29 | May | Maintenance Tables | 0504_Area29_SparePartsInv.PDF | |
| GWTS_MORs | 2004 | Area29 | May | Tables | Table-4 Area 29 Daily Activity Checklist May 04.xls | |
| GWTS_MORs | 2004 | Area29 | May | Tables | Table-1 29 daily well log May 04.xls | |
| GWTS_MORs | 2004 | Area29 | May | Tables | Table-2 Area 29 Daily Flows May 04.xls | |
| GWTS_MORs | 2004 | Area29 | May | Tables | Table-3 May 04 Weekly Chemical Consumption Checklist.xls | |
| GWTS_MORs | 2004 | Area29 | May | May 04 Area 29 Shakedown Daily Activities Summary.doc | ||
| GWTS_MORs | 2004 | Area29 | May | ACYLCD052004.txt | ||
| GWTS_MORs | 2004 | Area29 | May | Area 29 May 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | November | Maintenance Tables | Nov_2004_Unsch_Repairs.PDF | |
| GWTS_MORs | 2004 | Area29 | November | Maintenance Tables | Dec_2004_PMSched.PDF | |
| GWTS_MORs | 2004 | Area29 | November | Maintenance Tables | Nov_2004_PMReport.PDF | |
| GWTS_MORs | 2004 | Area29 | November | Maintenance Tables | Nov_2004_SparePartsInv.PDF | |
| GWTS_MORs | 2004 | Area29 | November | Tables | Table-4 Area 29 Daily Activity Checklist November 04.xls | |
| GWTS_MORs | 2004 | Area29 | November | Tables | t1-Area-29-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | November | Tables | Table 5-Air Emission Calculation November04.xls | |
| GWTS_MORs | 2004 | Area29 | November | Tables | Table-2 Area 29 Daily Flows November 04.xls | |
| GWTS_MORs | 2004 | Area29 | November | Tables | Table-3 Weekly Chemical Consumption Checklist November 04.xls | |
| GWTS_MORs | 2004 | Area29 | November | Area 29 Nov 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | November | ACYLCD112004.txt | ||
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_SparePartsInv_10_04.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_UncshRepairs_1004.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_PMReport_10_04_Pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_PMReport_10_04_Pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_PMSched_1104_Pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Maintenance Tables | Area29_PMSched_1104_Pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | October | Tables | Table-4 Area 29 Daily Activity Checklist October 04.xls | |
| GWTS_MORs | 2004 | Area29 | October | Tables | t1-Area-29-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | October | Tables | Table 5-Air Emission Calculation October 04.xls | |
| GWTS_MORs | 2004 | Area29 | October | Tables | Table-2 Area 29 Daily Flows October 04.xls | |
| GWTS_MORs | 2004 | Area29 | October | Tables | Table-3 Weekly Chemical Consumption Checklist October 04.xls | |
| GWTS_MORs | 2004 | Area29 | October | Area 29 Oct 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | October | ACYLCD102004.txt | ||
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_UnschRepairs_0904.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_PlannedPM_1004_pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_PlannedPM_1004_pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_PMReport_0904_pg1.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_PMReport_0904_pg2.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Maintenance Tables | Area29_SparePartsInv_0904.PDF | |
| GWTS_MORs | 2004 | Area29 | September | Tables | Table-4 Area 29 Daily Activity Checklist September 04.xls | |
| GWTS_MORs | 2004 | Area29 | September | Tables | t1-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | Area29 | September | Tables | Table 5-Air Emission Calculation September 04.xls | |
| GWTS_MORs | 2004 | Area29 | September | Tables | Table-2 Area 29 Daily Flows September 04.xls | |
| GWTS_MORs | 2004 | Area29 | September | Tables | Table-3 Weekly Chemical Consumption Checklist september 04.xls | |
| GWTS_MORs | 2004 | Area29 | September | Area 29 Sept 04 mor.doc | ||
| GWTS_MORs | 2004 | Area29 | September | ACYLCD092004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Maintenance Tables | June 2004 Unscheduled Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Maintenance Tables | July 2004 Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Maintenance Tables | June 2004 Due Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Maintenance Tables | June 2004 Spare Parts Inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | weeklys.June2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t2.aread.June2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t3-AreaDV-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t5-AreaD-VES Monthly Removal June 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Tables | t6-aread.June2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | LAKE HARVEY MEASUREMENTS for June 2004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | ACYLCD062004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | Iron and pH daily readings 0604.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 6-Jun | June 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Maintenance Tables | July unscheduled repairs.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Maintenance Tables | August 2004 Preventive Maintenance Schedule.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Maintenance Tables | July 2004 Due Events.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Maintenance Tables | July 2004 Spare parts inventory.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | weeklys July2004.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | AreaD-VES data-July04.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | Iron and pH daily readings 0704.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | LAKE HARVEY MEASUREMENTS for July 2004.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t1-AreaD-Free Product Disposal.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t2.aread.July2004.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t3-AreaD-GWTS Influent flow.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t4-AreaD-Caustic Usage.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t5-AreaD-VES Monthly Removal July 2004.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | Tables | t6-areaD-July2004.xls |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | July 2004 mor.doc | |
| GWTS_MORs | 2004 | CTP_Area20A | 7-Jul | 4-Jul | ACYLCD072004.txt | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Maintenance Tables | September 2004 Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Maintenance Tables | August 2004 Spare parts inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Maintenance Tables | August 2004 Unscheduled events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Maintenance Tables | August 2004DueCompleted Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | weeklys.Aug2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t2.aread.Aug2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t3-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t5-AreaD-VES Monthly Removal August 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | Tables | t6-aread.Aug2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | August 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 8-Aug | ACYLCD082004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Maintenance Tables | September Due Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Maintenance Tables | October Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Maintenance Tables | September 2004 Spare Pasrts Inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Maintenance Tables | September 2004 Unscheduled Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | weeklys.Sept2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t2.aread.Sept2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t3-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t5-AreaD-VES Monthly Removal September 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Tables | t6-aread.Sept2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | September 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | ACYLCD092004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | Iron and pH daily readings 0904.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 9-Sep | LAKE HARVEY MEASUREMENTS for September 2004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Maintenance Tables | October Due Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Maintenance Tables | November 2004 Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Maintenance Tables | October 2004 Spare Parts Inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Maintenance Tables | October 2004 unsceduled events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | weeklys.Oct2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t2.aread.Oct2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t3-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t5-AreaD-VES Monthly Removal October 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Tables | t6-aread.Oct2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | October 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | ACYLCD102004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | Iron and pH daily readings 1004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 10-Oct | LAKE HARVEY MEASUREMENTS for October 2004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Maintenance Reports | November 2004 unsceduled events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Maintenance Reports | December 2004 Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Maintenance Reports | November 2004 Completed Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Maintenance Reports | November 2004 Spare Parts Inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | weeklys.Nov2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t2.aread.Nov 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t3-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t5-AreaD-VES Monthly Removal November 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Tables | t6-aread.Nov2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | November 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | ACYLCD112004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | Iron and pH daily readings 1104.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 11-Nov | LAKE HARVEY MEASUREMENTS for November2004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Maintenance Reports | January 2005 Preventive Maintenance Schedule.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Maintenance Reports | December 2004 Completed Events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Maintenance Reports | December 2004 unsceduled events.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Maintenance Reports | December2004 Spare Parts Inventory.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | weeklys.Dec 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t1-AreaD-Free Product Disposal.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t2-AreaD-Dec 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t3-AreaD-GWTS Influent flow.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t4-AreaD-Caustic Usage.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t5-AreaD-VES Monthly Removal December 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Tables | t6-AreaD-Dec 2004.xls | |
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | LAKE HARVEY MEASUREMENTS for December 2004.xls | ||
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | ACYLCD122004.txt | ||
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | December 2004 mor.doc | ||
| GWTS_MORs | 2004 | CTP_Area20A | 12-Dec | Iron and pH daily readings 1204.xls | ||
| GWTS_MORs | 2005 | Area29 | April | Laboratory Analytical Results | Area 29 Lab Results 0405 pg12.PDF | |
| GWTS_MORs | 2005 | Area29 | April | Laboratory Analytical Results | Area 29 Lab Results 0405 pg1.PDF | |
| GWTS_MORs | 2005 | Area29 | April | Laboratory Analytical Results | Area 29 Lab Results 0405 pg2.PDF |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .