About this file

This is a Subcontractor's Statement of Satisfaction form used by Hillsborough County, Florida in connection with the Lenwood Lane/1st Avenue NW/4th Avenue SE Culvert Replacements project. The form serves as an attestation that subcontractors have received full payment for work completed during a specific Application for Payment period submitted by the general contractor. The statement must be notarized and attached to each Application for Payment beginning with the second submission. It applies to all subcontractors whose work appeared on the prior Application for Payment for which the general contractor has received payment. The form requires completion of project information, including the Project Number, Project Name, General Contractor identification, Application for Payment Number, and the work period covered.

The document is a standardized compliance tool designed to ensure transparency in payment distribution throughout the project delivery process. Subcontractors must swear under oath that all monies owed to them by the general contractor from the specified Application for Payment have been paid in full. The statement requires notarization before a Florida notary public and must include the notary's commission information and identification method used to verify the subcontractor's identity. This form is integral to the payment certification process for the culvert replacement project, estimated at $1,958,866.12, with a 6% Small Business Enterprise (SBE) subcontractor participation goal.

View the file

Other files

File Type Posted
17-Payment Bond.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
38-Attachment D - Permits - Exempt - 46142473 1stAveNW SWFWMD ERP 849770.pdf PDF
41-Attachment F - Drain Report B. CIP 46142490 303 4th Ave SE.pdf PDF
44-Attachment G - SUE - C. CIP 46142490 303 4th Ave SE SUE.pdf PDF
45-IFB-26-00085 Insurance Requirements.pdf PDF
34-Attachment D - Permit - 46142473 1stAveNW USACOE NWP7 SAJ-2022-02318 Exp 03.14.2026.pdf PDF
12-Subcontractor Letter of Intent.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
30-Attachment C - Summary of Utility Notifications.pdf PDF
16-Performance Bond.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
31-Attachment D - Permit - 46142452 Lenwood Ln FDEP 0426730-001-SFG Exp 12.22.2025.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
9-Insurance Certificate.doc.doc DOC document
18-26-00085 Plans - 46142452 12026 LenwoodLn SS Structural Plans.pdf PDF
43-Attachment G - SUE - B. CIP 46142473 111 1st Ave NW SUE.pdf PDF
27-Attachment C - 46142473 1stAveNW Frontier URS 1day 040725 Signed.pdf PDF
39-Attachment E - Traffic Control Officer.pdf PDF
8-Change Order Form.pdf.pdf PDF
14-Affidavit of Compliance - Denying Doing Business with a Foreign Country of Concern.docx DOCX document
15-Bid Bond.doc DOC document
24-Attachment A - Construction Sign Specs YR2021.pdf PDF
21-26-00085 Plans - 46142490 303 4th Ave SS DrainPlan 2025-07-07.pdf PDF
46-26-00085 Contract Terms and Conditions.pdf PDF
42-Attachment G - SUE - A. CIP 46142452 12026 Lenwood Ln SUE.pdf PDF
19-26-00085 Plans - 46142452 LenwoodLn SS DrainPlan 2025-07-07.pdf PDF
5-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
20-26-00085 Plans - 46142473 1st Ave NW SS Drainplan 2025-07-11.pdf PDF
23-26-00085 Supplemental Specifications.pdf PDF
35-Attachment D - Permit - 46142490 4thAveSE SWFWMD ERP GP Exp 07.31.2028.pdf PDF
29-Attachment C - 46142490 4thAveSE Frontier URS 7Days 1Day 021125 Signed.pdf PDF
40-Attachment F - Drain Report A. CIP 46142452 Lenwood Ln.pdf PDF
26-Attachment C - 46142452 LenwoodLn Frontier URS 2days 021025 Signed.pdf PDF
25-Attachment B - Geotech Report.pdf PDF
28-Attachment C - 46142473 1stAveNW Spectrum URS 15Days 011725 Signed.pdf PDF
33-Attachment D - Permit - 46142473 1stAveNW NPDES FLR10WW35-001 Exp 06.07.2029.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
36-Attachment D - Permits - Exempt - 46142452 Lenwood Ln EPC 77658.pdf PDF
47-Agreement - Construction - Stand Alone.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
22-26-00085 Project Map.pdf PDF
32-Attachment D - Permit - 46142473 1stAveNW EPC MWP 74942 Exp 01.31.2026.pdf PDF
37-Attachment D - Permits - Exempt - 46142452 Lenwood Ln SWFWMD ERP 856673.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractors Statement of Satisfaction updated 4.9.2020

SUBCONTRACTOR'S STATEMENT OF SATISFACTION

(Attachment to General Contractor's Application for Payment No. )

Note: The General Contractor shall attach this statement to each Application for Payment beginning with the second Application for Payment. This statement is applicable to each subcontractor whose work appeared on the prior Application for Payment for which the General Contractor has been paid.

KNOW ALL MEN BY THESE PRESENTS, That, (Name) representing whose address is with the title of , who after being first duly sworn, upon oath, deposes and says that pursuant to the provisions of the contract for:

Project No.

Project Name:

General Contractor:

that all monies due him/her from the General Contractor's Application for Payment No.

(Period of work: to ) have been paid to him/her.

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

Sworn to (or affirmed) and subscribed before me by means of physical presence or online notarization, this ____ day of ___________, 20___, by____________________________, (Name of person making statement)

(Signature of Notary Public - State of Florida)

(Print, Type, or Stamp Commissioned Name of Notary Public)

Personally Known or Produced Identification

Type of Identification Produced ______________________

File details come from the government source that posted it. Updated .