This is a drainage report prepared by a professional engineer for Hillsborough County Public Works regarding the culvert replacement project at 303 4th Avenue SE (CIP Project No. 46142.490) in the Ruskin area. The report evaluates the replacement of an existing 43"x68" corrugated metal pipe (CMP) culvert with a 43"x68" elliptical reinforced concrete pipe (ERCP) culvert and associated headwalls. The project is located in the Little Manatee Watershed and is part of Hillsborough County's broader culvert replacement initiative, which includes two additional culvert sites at Lenwood Lane and 1st Avenue NW, with a combined project estimate of $1,958,866.12. The existing culvert is in poor condition with collapsing endwalls causing erosion of adjacent roadway pavement. The proposed improvements include extending the culvert to meet minimum clear zone requirements for improved public safety and upgrading a nearby 12" RCP driveway culvert to 14"x23" ERCP.

The drainage analysis demonstrates that the proposed culvert replacement will not cause significant adverse impacts to upstream and downstream nodes, with the modeling results showing minor improvements at the upstream section. Peak stage elevation data across multiple storm frequencies (2.33-year through 100-year, 24-hour events) indicates negligible differences between pre- and post-improvement conditions at critical nodes. The Hillsborough County Engineering and Operations Department is seeking competitive sealed bids from qualified contractors, with a 6% Small Business Enterprise (SBE) subcontractor participation goal established. Questions and requests for interpretation must be submitted no later than 14 calendar days after solicitation issuance, site visit, or pre-bid conference, whichever occurs later. The project requires implementation of routine maintenance protocols including periodic ditch and swale mowing, monthly inlet grate inspections, and yearly pipe and inlet inspections to maintain the gravity drainage system.

View the file

Other files

File Type Posted
17-Payment Bond.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
38-Attachment D - Permits - Exempt - 46142473 1stAveNW SWFWMD ERP 849770.pdf PDF
44-Attachment G - SUE - C. CIP 46142490 303 4th Ave SE SUE.pdf PDF
45-IFB-26-00085 Insurance Requirements.pdf PDF
34-Attachment D - Permit - 46142473 1stAveNW USACOE NWP7 SAJ-2022-02318 Exp 03.14.2026.pdf PDF
12-Subcontractor Letter of Intent.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
30-Attachment C - Summary of Utility Notifications.pdf PDF
16-Performance Bond.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
31-Attachment D - Permit - 46142452 Lenwood Ln FDEP 0426730-001-SFG Exp 12.22.2025.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
9-Insurance Certificate.doc.doc DOC document
18-26-00085 Plans - 46142452 12026 LenwoodLn SS Structural Plans.pdf PDF
43-Attachment G - SUE - B. CIP 46142473 111 1st Ave NW SUE.pdf PDF
27-Attachment C - 46142473 1stAveNW Frontier URS 1day 040725 Signed.pdf PDF
39-Attachment E - Traffic Control Officer.pdf PDF
8-Change Order Form.pdf.pdf PDF
14-Affidavit of Compliance - Denying Doing Business with a Foreign Country of Concern.docx DOCX document
15-Bid Bond.doc DOC document
24-Attachment A - Construction Sign Specs YR2021.pdf PDF
21-26-00085 Plans - 46142490 303 4th Ave SS DrainPlan 2025-07-07.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
46-26-00085 Contract Terms and Conditions.pdf PDF
42-Attachment G - SUE - A. CIP 46142452 12026 Lenwood Ln SUE.pdf PDF
19-26-00085 Plans - 46142452 LenwoodLn SS DrainPlan 2025-07-07.pdf PDF
5-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
20-26-00085 Plans - 46142473 1st Ave NW SS Drainplan 2025-07-11.pdf PDF
23-26-00085 Supplemental Specifications.pdf PDF
35-Attachment D - Permit - 46142490 4thAveSE SWFWMD ERP GP Exp 07.31.2028.pdf PDF
29-Attachment C - 46142490 4thAveSE Frontier URS 7Days 1Day 021125 Signed.pdf PDF
40-Attachment F - Drain Report A. CIP 46142452 Lenwood Ln.pdf PDF
26-Attachment C - 46142452 LenwoodLn Frontier URS 2days 021025 Signed.pdf PDF
25-Attachment B - Geotech Report.pdf PDF
28-Attachment C - 46142473 1stAveNW Spectrum URS 15Days 011725 Signed.pdf PDF
33-Attachment D - Permit - 46142473 1stAveNW NPDES FLR10WW35-001 Exp 06.07.2029.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
36-Attachment D - Permits - Exempt - 46142452 Lenwood Ln EPC 77658.pdf PDF
47-Agreement - Construction - Stand Alone.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
22-26-00085 Project Map.pdf PDF
32-Attachment D - Permit - 46142473 1stAveNW EPC MWP 74942 Exp 01.31.2026.pdf PDF
37-Attachment D - Permits - Exempt - 46142452 Lenwood Ln SWFWMD ERP 856673.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

303 4th AVE SE

CULVERT REPLACEMENT

Hillsborough County Public Works County Center, 22nd Floor

601 E. Kennedy Blvd.

Tampa, FL 33602

C.I.P. Project No. 46142.490

Submitted by:

2 Urban Center

4890 W. Kennedy Blvd . Su i te 985 Tampa, FL 33609

Phone: 813.641.1200 Fax: 813.633.2110

CA# 25990

November 7, 2023

Haylee LaTorre, State of Florida, Professional Engineer, License No. 61732.

This item has been digitally signed and sealed by Haylee LaTorre, P.E. on 11/7/2023.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Haylee LaTorre, P.E.

#61732

I. PURPOSE

The intent of this drainage report is to evaluate the culvert replacement design for the

303 4th Ave SE culvert replacement project (Hillsborough County CIP No. 46142.490).

The purpose of this project is to replace the existing 43”x68” CMP and headwalls with

43”x68” ERCP and headwalls. The proposed culvert will be extended to meet minimum clear zone requirements and improve public safety. The proposed improvements are scheduled to be constructed under Hillsborough County’s WORCs contract.

This drainage report provides an assessment of the proposed culvert replacement that satisfies the requirements established by the Southwest Florida Water Management

District (SWFWMD) Statewide ERP and Hillsborough County.

II. DESCRIPTION

This project is located west of 303 4th Ave SE in the Ruskin area, within Section 08, Township 32S, and Range 19E.

This project lies within the Little Manatee Watershed of Hillsborough County. The Little

Manatee Watershed covers approximately 228.35 square miles.

LITTLE MANATEE

WATERSHED

Figure 1. Watershed Location

The location of the 303 4th Ave SE Culvert Replacement Project is illustrated in Figure 2 below.

Figure 2. General Vicinity Map

III. EXISTING CONDITIONS

4th Ave SE is a local roadway that serves single family residential homes. This area is fully developed and is comprised mainly of single-family residential properties.

The existing neighborhood’s drainage discharges northward via ditch which oufalls to

Little Manatee River. The existing 43”x68” CMP is currently in poor condition. The endwalls and pipe ends are collapsing which also causes the

4th Ave edge of pavement asphalt to erode.

This project lies within the Little Manatee watershed SWMM Subbasins SUB922102 and

SUB922104. This subbasins encompases 1.54 acres and 5.61 acres, respectively.

PROJECT

LOCATION

Photo 3.1. Eroding Endwall and Culvert

(South Side)

The Little Manatee SWMM’s existing conditions model (ECM) data was utilized for

RECM model and the project’s existing culvert (Pipe Link P922104a) was modified to reflect the surveyed conditions. Subbasin SUB922104 was further subdivided to model the driveway culvert directly east of the project. The following was included in the

RECM:

• SUB92210401 (0.48 acres) was subvided from SUB2210401. This subbasin represent the drainage area upstream of the driveway culvert.

• P9221041 (12” RCP) represents the driveway culvert

• W9221041 represents the driveway overtopping flow

All other nodes and links adjacent to the project’s boundary remain unchanged. Table

A below illustrates the peak stage comparison result between the Little Manatee River

Water ECM and RECM.

ECM Peak

Stage (ft)

RECM Peak

Stage (ft)

ECM Peak

Stage (ft)

RECM Peak

Stage (ft)

2.33 3.18 3.18 0.00 2.33 3.54 3.73 0.19

5 3.82 3.80 -0.02 5 4.59 4.91 0.32

10 4.46 4.46 0.00 10 5.16 5.08 -0.08

25 4.75 4.74 -0.01 25 5.23 5.12 -0.11

50 5.20 5.19 -0.01 50 5.37 5.26 -0.11

100 5.40 5.38 -0.02 100 5.48 5.40 -0.08

24-hr

Design

Storm

Frequency

(Year)

TABLE A: ECM vs RECM PEAK STAGES

Node 922104

S Side of 4TH AVE SE

(Upstream)

Node 922102

N Side of 4TH AVE SE

(Downstream)

Difference in Peak

Elevation

(ft)

24-hr

Design

Storm

Frequency

(Year)

Difference in Peak

Elevation

(ft)

Photo 3.2. Broken driveway retaining wall at D/S culvert

Photo 3.3. Eroding Endwall and Asphalt

Pavement (North Side)

The results indicate that there are no significant changes between the ECM and the

RECM. The The peak stage difference in the mean year and 5 year storm 24 hr storm events at the upstream section of the culvert is due to the smaller cross section area of the culvert as reported in the survey (48”x68” CMP) and the size used in SWMM (4’x6’

CMP).

The See Figure 3.1 for the SWMM5 Little Manatee Watershed Connectivity (ECM)

Nodal Connectivity Map

IV. PROPOSED CONDITIONS

The 4th Ave SE culvert replacement project proposes to replace the existing 43”x68”

CMP with 43”x68” ERCP. The proposed culvert will also be lengthened to meet minimum clear zone requirements. The existing ditch will be regarded to accommodate the new headwall placements.

The project’s link, proposed culvert P922104a, was modified to represent the proposed

43”x 68” ERCP. See Figure 3.2 for SWMM5 Proposed Conditions Model (PCM) nodal connectivity.

The existing 12” RCP driveway culvert P9221041 is also proposed to be upgraded to

14”x23” ERCP.

The tables below illustrate the peak stage elevation differences between the existing and post improvement conditions in the 2.33-year, 5-year, 10-year, 25-year, and 100-year and 24 hours storm events.

RECM PCM RECM PCM

2.33 3.18 3.18 0.00 2.33 3.73 3.67 -0.06

5 3.80 3.81 0.01 5 4.91 4.83 -0.08

10 4.46 4.46 0.00 10 5.08 5.08 0.00

25 4.74 4.74 0.00 25 5.12 5.11 -0.01

50 5.19 5.19 0.00 50 5.26 5.26 0.00

100 5.38 5.38 0.00 100 5.40 5.40 0.00

RECM PCM RECM PCM

2.33 3.08 3.08 0.00 2.33 4.01 3.98 -0.03

5 3.65 3.66 0.01 5 5.06 4.99 -0.07

10 4.29 4.29 0.00 10 5.30 5.30 0.00

25 4.57 4.57 0.00 25 5.36 5.36 0.00

50 5.02 5.02 0.00 50 5.45 5.45 0.00

100 5.21 5.21 0.00 100 5.58 5.58 0.00

24-hr

Design

Storm

Frequency

(Year)

Difference in Peak

Elevation

(ft)

24-hr

Design

Storm

Frequency

(Year)

Node 922100

Downstorm of Little

Manatee River

TABLE B: PRE/POST-CONDITION

PEAK STAGE COMPARISON

24-hr

Design

Storm

Frequency

(Year)

Difference in Peak

Elevation

(ft)

24-hr

Design

Storm

Frequency

(Year)

Difference in Peak

Elevation

(ft)

Node 922102

N Side of 4TH AVE SE

(Downstream)

Node 922104

S Side of 4TH AVE SE

(Upstream)

Difference in Peak

Elevation

(ft)

Node 922110 South of

4TH Ave SE

(Upstream)

Based on the results, the proposed improvements will not cause any significant adverse impact tot the upstream and downstream nodes. The results show some minor improvements at the upstream section of the culvert.

RECM PCM

2.33 3.73 3.67 -0.06

5 4.91 4.83 -0.08

10 5.08 5.08 0.00

25 5.12 5.11 -0.01

50 5.26 5.26 0.00

100 5.40 5.40 0.00

TABLE B: PRE/POST-CONDITION

PEAK STAGE COMPARISON

Difference in Peak

Elevation

(ft) Peak Stage (ft)

Node 9221041

4th Ave Driveway

24-hr

Design

Storm

Frequency

(Year)

OPERATION AND MAINTENANCE INSTRUCTION

A. OPERATION

The project’s drainage system is a gravity system and requires no operational protocols.

B. MAINTENANCE

i. Ditches and Swales: All ditches and swales shall be periodically mowed and cleaned. During the mowing operation, ditches and swales shall be inspected for bare spots, damage, and erosion. Any bare spots greater than one square foot in area shall be seeded or sodded to replace grass cover. In cases of erosion or damage where underlying soil is missing, the missing soil shall be replaced, and area brought back to grade then seeded or sodded as required.

ii. Inlet Grates: Inlet grates will be checked monthly for damage or blockage.

Any damage grates will be replaced or repaired. Any debris blocking full flow through the gate will removed.

iii. Pipes and Inlets: Pipes and inlets will be inspected yearly for damage or blockage. Any damage pipes or inlets will be repaired or replaced. Any damaged pipes or inlets will be repaired or replaced. Any trash debris will be removed.

SWMM5 MODEL