29-Attachment C - 46142490 4thAveSE Frontier URS 7Days 1Day 021125 Signed.pdf

PDF 427 KB Posted

Attached to
Lenwood Lane/1st Avenue NW/4th Avenue SE Culvert Replacements
Solicitation number
IFB-26-00085
Issued by
Hillsborough County, Florida

About this file

This is a Utility Agency/Owner (UAO) Work Schedule Form submitted by Frontier Florida LLC to Hillsborough County for the culvert replacement project located at 303 4th Avenue SE (CIP Number 46142490). The document outlines the utility relocation, adjustment, installation, and protection of Frontier facilities required in connection with the county's roadway construction project. The estimated schedule allocates 30 calendar days for preliminary work prior to county project construction, 7 calendar days for material procurement during county project construction, and 1 calendar day for as-built information delivery following construction completion. The work schedule is based on plans dated August 19, 2024, and the UAO designated Paul Lineberry as the field representative (813-892-9692) and Randy James as the project representative to coordinate with Hillsborough County. The document was authorized by Randy James, Engineer, Public Works, on February 11, 2025, and received final approval from Hillsborough County Engineer of Record Haylee C. LaTorre on February 13, 2025, with project acceptance by County Project Manager Vanessa Hernandez on February 18, 2025.

The work schedule establishes binding timelines and procedures for Frontier Florida LLC's utility operations in connection with the broader culvert replacement project, which includes three locations estimated at $1,958,866.12 total project cost and carries a 6% Small Business Enterprise (SBE) participation goal for subcontractors. Frontier's obligations include obtaining a utility permit, complying with Hillsborough County Utility Agreement Management (UAM) requirements, locating facilities within 48 hours of notice, and providing written notification to the county prior to starting, stopping, resuming, or completing work. The UAO is not responsible for delays caused by events beyond its control that could not reasonably be anticipated or avoided through due diligence. Any deviations by Hillsborough County or its contractor from the plans dated August 19, 2024, may render this work schedule null and void and require additional assessment and negotiation of revised timelines.

View the file

Other files

File Type Posted
17-Payment Bond.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
38-Attachment D - Permits - Exempt - 46142473 1stAveNW SWFWMD ERP 849770.pdf PDF
41-Attachment F - Drain Report B. CIP 46142490 303 4th Ave SE.pdf PDF
44-Attachment G - SUE - C. CIP 46142490 303 4th Ave SE SUE.pdf PDF
45-IFB-26-00085 Insurance Requirements.pdf PDF
34-Attachment D - Permit - 46142473 1stAveNW USACOE NWP7 SAJ-2022-02318 Exp 03.14.2026.pdf PDF
12-Subcontractor Letter of Intent.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
30-Attachment C - Summary of Utility Notifications.pdf PDF
16-Performance Bond.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
31-Attachment D - Permit - 46142452 Lenwood Ln FDEP 0426730-001-SFG Exp 12.22.2025.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
9-Insurance Certificate.doc.doc DOC document
18-26-00085 Plans - 46142452 12026 LenwoodLn SS Structural Plans.pdf PDF
43-Attachment G - SUE - B. CIP 46142473 111 1st Ave NW SUE.pdf PDF
27-Attachment C - 46142473 1stAveNW Frontier URS 1day 040725 Signed.pdf PDF
39-Attachment E - Traffic Control Officer.pdf PDF
8-Change Order Form.pdf.pdf PDF
14-Affidavit of Compliance - Denying Doing Business with a Foreign Country of Concern.docx DOCX document
15-Bid Bond.doc DOC document
24-Attachment A - Construction Sign Specs YR2021.pdf PDF
21-26-00085 Plans - 46142490 303 4th Ave SS DrainPlan 2025-07-07.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
46-26-00085 Contract Terms and Conditions.pdf PDF
42-Attachment G - SUE - A. CIP 46142452 12026 Lenwood Ln SUE.pdf PDF
19-26-00085 Plans - 46142452 LenwoodLn SS DrainPlan 2025-07-07.pdf PDF
5-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
20-26-00085 Plans - 46142473 1st Ave NW SS Drainplan 2025-07-11.pdf PDF
23-26-00085 Supplemental Specifications.pdf PDF
35-Attachment D - Permit - 46142490 4thAveSE SWFWMD ERP GP Exp 07.31.2028.pdf PDF
40-Attachment F - Drain Report A. CIP 46142452 Lenwood Ln.pdf PDF
26-Attachment C - 46142452 LenwoodLn Frontier URS 2days 021025 Signed.pdf PDF
25-Attachment B - Geotech Report.pdf PDF
28-Attachment C - 46142473 1stAveNW Spectrum URS 15Days 011725 Signed.pdf PDF
33-Attachment D - Permit - 46142473 1stAveNW NPDES FLR10WW35-001 Exp 06.07.2029.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
36-Attachment D - Permits - Exempt - 46142452 Lenwood Ln EPC 77658.pdf PDF
47-Agreement - Construction - Stand Alone.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
22-26-00085 Project Map.pdf PDF
32-Attachment D - Permit - 46142473 1stAveNW EPC MWP 74942 Exp 01.31.2026.pdf PDF
37-Attachment D - Permits - Exempt - 46142452 Lenwood Ln SWFWMD ERP 856673.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hillsborough County County Road:

CIP Number: 46142490 Project Name: 303 4th Ave SE

Utility Agency/Owner (UAO): FRONTIER FLORIDA LLC

NON-CONSTRUCTION ITEMS ESTIMATED CONSTRUCTION ITEMS

*CALENDAR DAYS

Total Preliminary 30

Prior to County Project Construction

During County Project Construction

As-Built Information

I Plans Dated: 8/19/2024

ESTIMATED

*CALENDAR DAYS

1 Total Material Procurement

Total Right-of-Way Acquisition

Total Other * Calendar Days= UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part "C" of this Schedule

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.

Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.

Upon notification by, Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.

The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.

During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: _ Telephone Number: 813-838-8867

PAUL LINEBERRY

UAO Project Representative: RANDY JAMES Telephone Number:

U AO Field Representative: PAUL LINEBERRY Telephone Number:

813-892-9692 813-838-8867

This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled "Changes to Form Document" and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled "Changes to Form Document".

You MUST signify by selecting or checking which of the following applies:

[8J No changes to forms document.

D Appendix "Changes to Forms Document" is attached. _Number of Attachment Pages.

Authorized Utility Agent:

(Signature)

RANDY JAMES

(Printed Name)

ENGINEER PUBLIC WORKS

(Title)

February 11, 2025 (Date)

Final Approval by Hillsborough County:

**Engineer of Record (EOR):

Digitally signed by Haylee C LaTorre Date: 2025.02.13 10:33:30-05'00'

(Signature)

HAYLEE LATORRE

(Printed Name)

EOR

(Title)

2/13/2025 (Date)

(Signature)

Sandra Gonzalez, P.E.

(Printed Name)

Acceptance by Hillsborough County:

(Signature)

Vanessa Hernandez (Printed Name)

Project Manager (Title)

(Date)

(Date)

Section Manager (Title)

Vanessa Hernandez Typewritten Text 02/18/2025

2025-02-18T13:23:55-0500
Vanessa Hernandez
2025-02-28T16:33:32-0500
Sandra González