This is a Subsurface Utility Engineering (SUE) survey document and utility locating ticket prepared for Hillsborough County, Florida in support of a culvert replacement project at 12026 Lenwood Lane in Riverview. The document contains visible verification data sheets, cross-sectional utility mapping, and a Sunshine 811 utility locating ticket (No. 074204456) issued on March 15, 2022, with a work date of March 17, 2022. The survey was conducted by McKim & Creed on behalf of Northwest Surveying to identify and mark underground utilities prior to construction activities. The project scope involves the replacement of three existing 48-inch corrugated metal pipes (CMP) with 48-inch reinforced concrete pipes (RCP) and headwalls, with an estimated cost of $175,000 and a maximum crossing distance of 200 linear feet. The SUE crew (A.T., J.R., X.M.) completed the survey on March 24, 2022, identifying one test hole (VVH-1) at the storm drain culvert location on both sides of Lenwood Lane at the intersection with Dagwood Way and Entrance Way.

The survey identified a 6-inch steel water line (WL) utility owned by the City of Riverview at a depth of 0.80 feet below the surface, marked with a hub and lath in grass/dirt conditions. Utility notifications were sent to Frontier Communications, Hillsborough County Water Resource Services, and USIC Dispatch. The project is part of a larger competitive sealed bid solicitation for culvert replacements at three Hillsborough County locations (CIPs 46142452, 46142473, and 46142490) with a combined estimated project value of $1,958,866.12 and a 6% Small Business Enterprise (SBE) subcontractor participation goal. Questions and requests for interpretation must be submitted no later than 14 calendar days after solicitation issuance, site visit, or pre-bid conference, whichever is later.

View the file

Other files

File Type Posted
17-Payment Bond.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
38-Attachment D - Permits - Exempt - 46142473 1stAveNW SWFWMD ERP 849770.pdf PDF
41-Attachment F - Drain Report B. CIP 46142490 303 4th Ave SE.pdf PDF
44-Attachment G - SUE - C. CIP 46142490 303 4th Ave SE SUE.pdf PDF
45-IFB-26-00085 Insurance Requirements.pdf PDF
34-Attachment D - Permit - 46142473 1stAveNW USACOE NWP7 SAJ-2022-02318 Exp 03.14.2026.pdf PDF
12-Subcontractor Letter of Intent.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
30-Attachment C - Summary of Utility Notifications.pdf PDF
16-Performance Bond.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
31-Attachment D - Permit - 46142452 Lenwood Ln FDEP 0426730-001-SFG Exp 12.22.2025.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
9-Insurance Certificate.doc.doc DOC document
18-26-00085 Plans - 46142452 12026 LenwoodLn SS Structural Plans.pdf PDF
43-Attachment G - SUE - B. CIP 46142473 111 1st Ave NW SUE.pdf PDF
27-Attachment C - 46142473 1stAveNW Frontier URS 1day 040725 Signed.pdf PDF
39-Attachment E - Traffic Control Officer.pdf PDF
8-Change Order Form.pdf.pdf PDF
14-Affidavit of Compliance - Denying Doing Business with a Foreign Country of Concern.docx DOCX document
15-Bid Bond.doc DOC document
24-Attachment A - Construction Sign Specs YR2021.pdf PDF
21-26-00085 Plans - 46142490 303 4th Ave SS DrainPlan 2025-07-07.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
46-26-00085 Contract Terms and Conditions.pdf PDF
19-26-00085 Plans - 46142452 LenwoodLn SS DrainPlan 2025-07-07.pdf PDF
5-Contractors Affidavit for Payment of Debts and Claims.pdf.pdf PDF
20-26-00085 Plans - 46142473 1st Ave NW SS Drainplan 2025-07-11.pdf PDF
23-26-00085 Supplemental Specifications.pdf PDF
35-Attachment D - Permit - 46142490 4thAveSE SWFWMD ERP GP Exp 07.31.2028.pdf PDF
29-Attachment C - 46142490 4thAveSE Frontier URS 7Days 1Day 021125 Signed.pdf PDF
40-Attachment F - Drain Report A. CIP 46142452 Lenwood Ln.pdf PDF
26-Attachment C - 46142452 LenwoodLn Frontier URS 2days 021025 Signed.pdf PDF
25-Attachment B - Geotech Report.pdf PDF
28-Attachment C - 46142473 1stAveNW Spectrum URS 15Days 011725 Signed.pdf PDF
33-Attachment D - Permit - 46142473 1stAveNW NPDES FLR10WW35-001 Exp 06.07.2029.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
36-Attachment D - Permits - Exempt - 46142452 Lenwood Ln EPC 77658.pdf PDF
47-Agreement - Construction - Stand Alone.pdf PDF
4-Application for Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
22-26-00085 Project Map.pdf PDF
32-Attachment D - Permit - 46142473 1stAveNW EPC MWP 74942 Exp 01.31.2026.pdf PDF
37-Attachment D - Permits - Exempt - 46142452 Lenwood Ln SWFWMD ERP 856673.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21"x15"

CMP

35"x24"CMP

17"x13"

CMP

35"x24"CMP

21"x15"CMP

35" x24"

CMP

15" CMP

24" CMP

15" CMP

15"

CMP

15"

CMP

15" CMP

15"

CMP

15"CMP

30"

CMP

15"

CMP

15"

CMP

15"CMP

15"

CMP

48" CMP

15" HDPE

0 100 20050

Feet

WO# ST18937

CIP: 46142-452

Project Name: 12026 Lenwood Dr Scope of Work:

Replace Ex (3) 48" CMP W/ 48" RCP and HW's Note that crossing is at 12604 Lenwood Dr M/OL up to 200LF Cost Est $175,000 9/14/2020 Commish D: 4 Comm Area: Summerfield g Catch Basins

* Control Structures #* End Treatments !!2 Junctions

Features in Work Order County Storm Drains Sanitary Sewer

! ! Potable Water

Replace CMP's

Visible Verification Data Sheet

Project Address:

Contractor / M&C Project #:

WR # OR Phase:

SUE Crew Inits:

Date:

Surface Material:

Marked by Owner:

U ti li ty

T y p e

S iz e (I n ch es

M at er ia l

M ea su re

D o w n

(T en th s)

" FT

" FT

" FT

" FT

" FT

Notes:

Q u an ti ty

After

Depth

T es t H o le

I D

A p p ar en t

U ti li ty

O w n er

P h o to s

T y p e o f

T es t

H o le M ar k er S et

Before

Pipe Size

CROSS SECTIONAL VIEW

JWelker North Arrow

JWelker

CROSS VIEW UTILITY

Adjust Size and Color as necessary.

Scale as follows:

0-1": 100% Scale 1-2": 125% Scale 2-4": 150% Scale 4-12": 200% Scale 12"+: 400%

JWelker Rectangle

JWelker Text Box

VVH 1

JWelker

TEXT BLOCK

C-0.80' atraino Text Box 8" atraino atraino atraino atraino atraino Text Box

CULVERT

atraino

WATER

atraino Cabinet *adjust color for utility type* atraino Line atraino Line atraino TECO Test Hole atraino Rectangle atraino Text Box

VVH-1

atraino Text Box

LENWOOD LN

atraino atraino atraino atraino atraino Continuation Line atraino Continuation Line atraino Continuation Line atraino Continuation Line atraino atraino atraino Text Box

DAGWOOD WAY

atraino Arrow atraino Arrow atraino Text Box

ENTRANCE WAY

atraino Arrow atraino Arrow atraino Arrow atraino Arrow

3/15/22, 12:41 PM Ticket https://exactix.sunshine811.com/tickets/dashboard 1/2

Ticket : 074204456 Rev:000 Taken: 03/15/22 12:41ET

State: FL Cnty: HILLSBOROUGH GeoPlace: RIVERVIEW

CallerPlace: RIVERVIEW

Subdivision:

Address :

Street : LENWOOD LN

Cross 1 : DAGWOOD WAY

Within 1/4 mile: Y

Cross 2 : ENTRANCE WAY

Locat: PLEASE LOCATE APPROXIMATLEY 1/2 WAY ON LENWOOD LN AT THE STORM DRAIN

CULVERTS CROSSING UNDER THE ROAD, BOTH SIDE OF THE ROAD.

Remarks : *** LOOKUP BY BETWEEN ***

Grids : 2748B8217C 2748B8217D

Work date: 03/17/22 Time: 23:59ET Hrs notc: 059 Category: 3 Duration: 02 DAYS

Due Date : 03/17/22 Time: 23:59ET Exp Date : 04/14/22 Time: 23:59ET

Work type: EXCAVATING WATER MAIN Boring: N White-lined: N

Ug/Oh/Both: U Machinery: Y Depth: 6 FT Permits: N N/A

Done for : NORTHWEST SURVEYING

Company : MCKIM & CREED Type: OTHR

Co addr : 1365 HAMLET AVE

City : CLEARWATER State: FL Zip: 33756

Caller : WAYNE GUIDO Phone: 727-339-6504

Contact : WAYNE A GUIDO SR Phone: 727-777-8333

BestTime: 7:00 AM TO 5:00 PM

Mobile : 727-777-8333

Fax : 727-339-6504

Email : WGUIDO@MCKIMCREED.COM

Submitted: 03/15/22 12:41ET Oper: WAY Chan: WEB

Mbrs : GT1722 HCW906

Normal

3/15/22, 12:41 PM Ticket https://exactix.sunshine811.com/tickets/dashboard 2/2

* Responses are current as of 03/15/2022 12:41 PM

No FRONTIER

COMMUNICATIONS

GT1722

CATV,

COMMUNICATION

LINES

USIC DISPATCH

(800) 778-9140

AFTER HOURS

CRAIG ELLISON,

USIC.

(800) 575-5594

No HILLSBOROUGH

COUNTY WATER

RESOURCE

SERVICES

HCW906

WATER LISA JACKSON

(813) 335-9569

ERIC CHUMLEY

(813) 436-1009

LISA JACKSON

(813) 335-9569

Ex. Circum Service Area Utility Type(s) Contact Alternate Contact Emergency Contact Positive Response

Normal

Project Address#7#5: 074030008
Marked by Owner#7#5: M&C Locator
WR OR Phase#7#5: LENWOOD LN. RIVERVIEW,FL.
SUE Crew Inits#7#5: A.T., J.R., X.M.
Date#7#5: 3-24-2022
Notes#7#5:
Test Hole ID 1#7#5: VVH-1
Test Hole ID 2#7#5:
Test Hole ID 3#7#5:
Test Hole ID 4#7#5:
Test Hole ID 5#7#5:
Apparent Utility Owner1#7#5: [CITY 0F RIVERVIEW]
Apparent Utility Owner5#7#5: []
Apparent Utility Owner3#7#5: []
Apparent Utility Owner4#7#5: []
Apparent Utility Owner2#7#5: []
Type of Marker1#7#5: [HUB/LATH]
Type of Marker2#7#5: []
Type of Marker3#7#5: []
Type of Marker4#7#5: []
Type of Marker5#7#5: []
Utility Type1#7#5: [WL]
Utility Type2#7#5: []
Utility Type3#7#5: []
Utility Type4#7#5: []
Utility Type5#7#5: []
Surface Material#7#5: [GRASS/DIRT]
Quantity1#7#5: 1
Quantity2#7#5:
Quantity3#7#5:
Quantity4#7#5:
Quantity5#7#5:
Size1#7#5: 6
Size2#7#5:
Size3#7#5:
Size4#7#5:
Size5#7#5:
Material1#7#5: [STL]
Material2#7#5: []
Material3#7#5: []
Material4#7#5: []
Material5#7#5: []
Measure Down1#7#5: 0.80
Measure Down3#7#5:
Measure Down2#7#5:
Measure Down4#7#5:
Measure Down5#7#5:
Dropdown24#7#5: [11SUE1]
Check Box5: Yes
Check Box6: Yes
Check Box7: Yes
Check Box8: Yes

File details come from the government source that posted it. Updated .