BID ITEMS & DEDUCT ALTS:

REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS

A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT

RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN

THE DRAWINGS AND SPECIFICATIONS.

1. RME STORAGE ROOMS: WORK INCLUDES:

A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET

TEMPERATURE AND HUMIDITY CONTROL

REQUIREMENTS FOR RME STORAGE ROOMS.

INCLUDING INSTALLATION OF REPLACEMENT

AND/OR NEW STEAM GENERATORS AND

HUMIDIFICATION GRIDS.

B. REPLACEMENT OF NON-COMPLIANT SUSPENDED

ACOUSTICAL CEILING PANELS IN DESIGNATED RME

STORAGE ROOMS.

2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES

RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:

A. REPLACEMENT OF AHUs 1,2,3 AND 4.

B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE

AIR VOLUME (VAV) BOXES, REHEAT COILS AND

OTHER RELATED ITEMS.

C. REPLACEMENT OF HEATING WATER SYSTEM

INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION

TANK AND AIR SEPARATOR.

B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED

BELOW:

1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-

AHU-4 AND ASSOCIATED UTILITIES.

C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED

BELOW:

1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-

AHU-3 AND ASSOCIATED UTILITIES.

BID ITEMS & DEDUCT:

DOCUMENT SIGNATURE BLOCK

DIRECTOR DATE

CHIEF OF STAFF DATE

ASSOCIATE DIRECTOR DATE

ASSISTANT DIRECTOR DATE

ASSOCIATE DIRECTOR OF PATIENT SERVICES DATE

EXECUTIVE OF HIGH RELIABILITY DATE

CHIEF OF LOGISTICS DATE

INFECTION CONTROL DATE

SAFETY OFFICER DATE

CHIEF FACILITIES MANAGEMENT DATE

CHIEF OF STERILE PROCESSING SERVICES DATE

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:0

P

M

GI005

COVER SHEET - VOLUME II

AHT SW

HARRY S. TRUMAN MEMORIAL

VETERANS' HOSPITAL

C or re ct

R eu sa bl e M ed ic al E qu ip m en t S to ra ge

U

.S . D ep ar tm en t o f V et er an s

A ffa irs

Correct Reusable Medical Equipment Storage 800 Hospital Dr, Columbia, MO 65201

BLDG. 14 -

WAREHOUSE

BLDG. 1 -

HOSPITAL

PARKING

GARAGE 'A'

OR - SPS ADDITION

BLDG. 23 -

CHILLER

PLANT

STAFF/

CONTR

ENTRANCE

HOSPITAL

EAST

ENTRANCE

SOUTH STAFF PARKING

LOT 'D'

ACCESSIBLE PARKING

LOT 'B'

NORTH WEST PARKING

LOT 'C'

ACA BUILDING

ACA BLDG

PORTE

COCHERE

ORIGINAL

HOSPITAL

BLDG. 22 -

FACILITIES

MANAGEMENT

PARKING GARAGE ADD'N

NORTH EMERGENCY

ROOM ENTRANCE

EMERGENCY

ROOM

PATIENT

EDUCATION

CENTER

HOSPITAL

NORTH

ENTRANCE

BLDG. 16 -

GENERAL

STORAGE

HOSPITAL

MAIN

ENTRACE

WEST

EMERGENCY

ROOM

ENTRANCE

BLDG. 24 -

UPS

WAREHOUSE

BLDG. 14 -

WAREHOUSE

LOADING

DOCK

UNIV OF MISSOURI MEDICAL CENTER CAMPUS

UNIV OF MISSOURI

CAMPUS

E. STADIUM DRIVE

HOSPITAL DRIVE

M O

N K

D R

IV

E

T

IG

E R

A V

E N

U E

D E

A N

S ' D

R

IV

E

LOCATION MAP / PHOTO

NOT TO SCALE

VOLUME II

Mark Revisions: Date:

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:0

P

M

GI006

INDEX OF DRAWINGS

AHT SW

INDEX OF DRAWINGS

GENERAL INFORMATION - VOLUME I

GI001 COVER SHEET - VOLUME I

GI002 INDEX OF DRAWINGS

GI003 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

GI004 SITE PLAN

INFECTION CONTROL - PHASING

GI100 BASEMENT FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI101 FIRST FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI102 SECOND FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI103 THIRD FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI104 FOURTH, FIFTH, SIXTH, MACH LVL & PH FLOOR PLANS - INFECTION CONTROL -

PHASING

GI601 NOTES AND DETAILS - INFECTION CONTROL

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SS100 BASEMENT FLOOR PLAN - OVERALL

SS101 FIRST FLOOR PLAN - OVERALL

SS102 SECOND FLOOR PLAN - OVERALL

SS103 THIRD FLOOR PLAN - OVERALL

SS104 BASEMENT FLOOR FRAMING PLAN, AREA E & F

SS105 FIRST FLOOR, ENLARGED PLANS

SS106 FIRST FLOOR FRAMING PLAN, AREAS E & F

SS107 ENLARGED FLOOR PLANS

SS108 SECOND FLOOR FRAMING PLAN, AREAS E & F

SS109 ELEVATOR MACHINE ROOM PLAN - LOWER LEVEL

SS601 DETAILS

ARCHITECTURAL

AE100 BASEMENT FLOOR - FLOOR PLAN - OVERALL

AE101 BASEMENT FLOOR PLAN - ACA BUILDING- AREAS E & F

AE102 FIRST FLOOR - FLOOR PLAN - OVERALL

AE103 SECOND FLOOR - FLOOR PLAN - OVERALL

AE104 THIRD FLOOR - FLOOR PLAN - OVERALL

AE105 FOURTH, FIFTH, SIXTH, MACH. LVL. & P.H. FLOOR PLANS-OVERALL

AC100 BASEMENT FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC101 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A

AC102 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC103 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C

AC104 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D

AC105 FIRST FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC106 FIRST FLOOR REFLECTED CEILING PLAN, BUILDING 1 - AREA G

AC107 SECOND FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC108 SECOND FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC109 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A

AC110 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC111 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C

AC112 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D

AC113 THIRD FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC114 THIRD FLOOR - REFLECTED CEILING PLAN - AREA G

AC115 FOURTH AND SIXTH FLOOR - REFLECTED CEILING PLAN

AE301 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS A,B,C

AE302 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA D

AE303 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS E,F,G

AE304 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA G

AE305 SECOND FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS B,D,E,F

AE306 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREAS A,B,C,D,E,F

AE307 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREA G

AE601 ROOM FINISH SCHEDULE

GENERAL INFORMATION - VOLUME II

GI005 COVER SHEET - VOLUME II

GI006 INDEX OF DRAWINGS

GI007 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

FIRE ALARM

FA001 FIRE ALARM COVER SHEET

FA100 FIRE ALARM - BASEMENT FLOOR PLAN

FA101 FIRE ALARM - FIRST FLOOR PLAN

FA102 FIRE ALARM - SIXTH FLOOR PLAN

FAD201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

FAD202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION

FA201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

FA202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

FA203 FIRE ALARM - PENTHOUSE FLOOR PLAN

FA301 FIRE ALARM DETAILS

PLUMBING

P001 PLUMBING COVER SHEET

P100 PLUMBING - BASEMENT FLOOR PLAN

P101 PLUMBING - FIRST FLOOR PLAN

P102 PLUMBING - THIRD FLOOR PLAN

P103 PLUMBING - SIXTH FLOOR PLAN

PD201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

PD202 PLUMBING - ENALARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

PD203 PLUMBING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

P201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

P202 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

P203 PLUMBING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

P204 PLUMBING - PENTHOUSE FLOOR PLAN

P401 PLUMBING - DETAILS

VENTILATION

MH001 VENTILATION COVER SHEET

MH100 VENTILATION - BASEMENT FLOOR PLAN

MH101 VENTILATION - FIRST FLOOR PLAN

MH102 VENTILATION - SECOND FLOOR PLAN

MH103 VENTILATION - THIRD FLOOR PLAN

MH104 VENTILATION - FOURTH FLOOR PLAN

MHD201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

MHD202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION

MHD203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - DEMOLITION

MHD204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

MH201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

MH202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

MH203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

MH204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL

MH205 VENTILATION - ENLARGED BASEMENT FLOOR PLAN ROOMS

MH206 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH207 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH208 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH209 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH210 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH211 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH212 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS

MH213 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS

MH214 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS

MH215 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS

MH216 VENTILATION - ENLARGED FOURTH FLOOR PLAN ROOMS

MH301 VENTILATION SECTION VIEWS

MH401 VENTILATION DETAILS

MH402 VENTILATION DETAILS

MH501 VENTILATION SCHEDULES

MH502 VENTILATION SCHEDULES

MH701 VENTILATION CONTROLS

MH702 VENTILATION CONTROLS

MH703 VENTILATION CONTROLS

MH704 VENTILATION CONTROLS

MH705 VENTILATION CONTROLS

MH706 VENTILATION CONTROLS

MH707 VENTILATION CONTROLS

MH708 VENTILATION CONTROLS

PIPING

MP001 PIPING COVER SHEET

MP100 PIPING - BASEMENT FLOOR PLAN

MP101 PIPING - FIRST FLOOR PLAN

MP102 PIPING - SECOND FLOOR PLAN

MP103 PIPING - THIRD FLOOR PLAN

MP104 PIPING - SIXTH FLOOR PLAN

MPD201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

MPD202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION

MPD203 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

MPD204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #1

MPD205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #2

MPD206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

MPD207 PIPING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

MPD208 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION

MPD209 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - DEMOLITION

MP201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

MP202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

MP203 PIPING - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

MP204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #1

MP206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #2

MP207 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP208 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP209 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

MP210 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

MP211 PIPING - PENTHOUSE FLOOR PLAN - REMODEL

MP301 PIPING - SECTION VIEWS

MP401 PIPING DETAILS

MP402 PIPING DETAILS

MP403 PIPING DETAILS

MP501 PIPING SCHEDULES

MP601 PIPING FLOW DIAGRAMS - HYDRONIC

MP602 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #1

MP603 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #2

MP604 PIPING FLOW DIAGRAMS - STEAM

MP605 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #1

MP606 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #2

ELECTRICAL

E001 ELECTRICAL COVER SHEET

E100 ELECTRICAL - BASEMENT FLOOR PLAN

E101 ELECTRICAL - FIRST FLOOR PLAN

E102 ELECTRICAL - SECOND FLOOR PLAN

E103 ELECTRICAL - THIRD FLOOR PLAN

E104 ELECTRICAL - SIXTH FLOOR PLAN

ED201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

ED202 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

E201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

E202 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

E203 ELECTRICAL - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

E204 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL

E205 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

E206 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

E207 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

E208 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

E209 ELECTRICAL - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

E210 ELECTRICAL - PENTHOUSE FLOOR PLAN

E401 ELECTRICAL DETAILS

E501 ELECTRICAL SCHEDULES

E502 ELECTRICAL SCHEDULES

VOLUME I: VOLUME II:

ABBREVIATIONS

DET, DTL

DIAMETER

DIMENSION

DAMPER

DOWN

DISTRIBUTION PANEL

DOWNSPOUT, STORM DRAINAGE STRUCTURE

DOMESTIC WATER

DRAWING

EACH

EACH FACE, EXHAUST FAN

EXHAUST GRILLE

ELEVATION

ELECTRIC, ELECTRICAL CLOSET

EMER

EQ

EQUIP

EACH WAY

ELECTRIC WATER COOLER

EXH

EXIST

EXP

EXPANSION JOINT

EXPANSION JOINT

HEIGHT, HUMIDIFIER

HB

HANDICAPPED

HDW

HORIZ

HR

NA, N/A

NEC

NEUT

NIC

NOM

NTS

OA

OC

OD

OPNG

OPP

OH, OVHD

FRAME

FTG

T

T&B

TEL

TEMP

TERM

3/C

3/P

3 WAY

TO

TRANS

TS

TV

TW

TYP

WA

UH

V

VA

VAC

VCT

VENT

VERT

VEST

VS

VTR

VWC

W

W

W/

W/O

WC

WD

WP

WS

WT

WWF

SG

SAN

SCH

SD

SECT

SH

1 PH

SL

SP

SPDT

SPEC

SPST

SQ

SR

SS

ST

STA

STD

STL

SUP

SUSP

SV

SW

SWBD

SWGR

SIM

M

MAS

MATL

MAX

MECH

MET/MTL

MH

MIN

MISC

MM

MTD

MTG

MWP

MULL

KO

KVA

KW

L

LT

LAV

INT

INSUL

INV

JB

JC

JCT

JT

FXTR

GA

GALV

GFI, GFCI

GL

GWB

GYP

C

C

CAPACITY

CENTER TO CENTER

CEILING DIFFUSER

CEM

CAST IRON, COURTYARD INLET

CHILLER

CAST IRON PIPE

CIRCULATING

CONTROL JOINT

CIRCUIT

CENTERLINE

CEILING

CLEAR

CORRUGATED METAL PIPE

CORRUGATED METAL PIPE ARCH

CONCRETE MASONRY UNITS

CONDENSATE

CLEANOUT

COLUMN

COMMUNICATION

CONCRETE

CONDUCTOR

CONNECTION

CONSTRUCTION

CONTINUOUS

CONVERTER

NONREINFORCED CONCRETE PIPE

CONDUIT

CERAMIC TILE, CURRENT TRANSFORMER,

COOLING TOWER

CENTER, COOLING TOWER RETURN

COOLING TOWER SUPPLY

COLD WATER

CARPET

CONCRETE SEALER/SURFACE

BOARD

BUILDING

BLK

BEAM

BOTTOM

BEARING

BASEMENT

ACOUSTIC

ADJUSTABLE

ABOVE FINISHED FLOOR

ALTERNATE

AIR HANDLING UNIT

ANCHOR BOLT, AUGER BORING

AL

APPROXIMATE

ARCH

AUTOMATIC TRANSFER SWITCH

FA

FLOOR DRAIN, FIRE DAMPER

FOUNDATION

FEEDER

FIRE EXTINGUISHER

FINISHED FLOOR ELEVATION

FIG

FIN

FLOOR, FLASHING, FLOW LINE

FLUOR

P

PB

PIV

PL

PLYWD

PNL

PNT

CHAIR OR CRASH RAIL

CORNER GUARD

FIRE EXTINGUISHER CABINET

OF

WG

ALC

CUBICAL CURTAIN TRACK

CLEAN

ACOUSTIC TILE

L

EPDM ROOF MEMBRANE

HSKP

NEG

STRUC

R

RA

RAD

RB

RES

RECP

REINF

REG

REQD

REV

RF

RHC

RM

RPM

RWC

PRELIM

PRIM

PT

PTN

PVMT

PVC

PVC

AB

ACT

ACST

ADJ

AFF

AHU

ALT

ALUMINUM

ALCOVE

APPROX

ARCHITECTURAL

ATS

BD

BLDG

BLOCK

BM

BOT

BRG

BSMT

CELSIUS

CAP

CC

CD

CCT

CEMENT

CG

CH

CI

CIP

CIR

CJ

CKT

CLN

CLG

CLR

CMP

CMPA

CMU

CND,C

CNDS

CO

COL

COMM

CONC

COND

CONN

CONST

CONT

CONV

CP

CR

CS

CT

CT

CTR

CTS

CW

CPT

DETAIL

DIA

DIM

DMPR

DN

DP

DS

DW

DWG

EA

EF

EG

EJ

ELEV

ELEC

EMERGENCY

EPDM

EQUAL

EQUIPMENT

EW

EWC

EXHAUST

EXISTING

EXPANSION, EXPOSED

EXP JT

FIRE ALARM

FD

FDN

FDR

FE

FEC

FFE

FIGURE

FINISH

FL

FLUORESCENT

FRAME

FOOTING

FIXTURE

GAGE

GALVANIZED

GROUND FAULT INTERRUPT

GLASS

GYPSUM WALL BOARD

GYPSUM

HGT, H

HOSE BIBB

HC

HARDWARE

HORIZONTAL

HOUR, HAND RAIL

HOUSEKEEPING

INTERIOR

INSULATION, INSULATED

INVERT

JUNCTION BOX

JANITOR CLOSET

JUNCTION

JOINT

KNOCK OUT

KILOVOLT-AMPERE

KILOWATT

LOUVER, LENGTH, LENGTH OF CURVE

LIGHT

LAVATORY VERTICAL

METER, MEGA

MASONRY

MATERIAL

MAXIMUM

MECHANICAL

METAL

MANHOLE

MINIMUM, MINUTE

MISCELLANEOUS

MILLIMETER

MOUNTED

MOUNTING

MEMBRANE WATERPROOFING

MULLION

NOT APPLICABLE

NATIONAL ELECTRIC CODE

NEGATIVE

NEUTRAL

NOT IN CONTRACT

NOMINAL

NOT TO SCALE

OUTSIDE AIR

ON CENTER

OUTSIDE DIAMETER

OVERFLOW DRAIN

OPENING

OPPOSITE

PIPE, POLE

OVERHEAD

PULL BOX

POST INDICATOR VALVE

PLATE

PLYWOOD

PANEL

PAINT

PRELIMINARY

PRIMARY

POINT, POINT OF TANGENT

PARTITION

POINT OF VERTICAL CURVE

POLY VINYL CHLORIDE

PAVEMENT

RADIUS, RISER, RUBBER SHEATH

RETURN AIR

RADIUS

RESILIENT/RUBBER BASE

RCP

RECEPTACLE

REINFORCEMENT

REGULATOR, REGISTER

REQUIRED

REVISION

ROOF, RETURN FAN

REHEAT COIL

ROOM

REVOLUTIONS PER MINUTE

RESILIENT WALL COVERING

SANITARY SEWER

SCHEDULE

SPLITTER DAMPER, STORM DRAIN

SECTION

SUPPLY GRILLE

SHEET

SIMILAR

SINGLE PHASE

SLOPE

STATIC PRESSURE, SINGLE POLE

SINGLE POLE, DOUBLE THROW

SPECIFICATION

SINGLE POLE, SINGLE THROW

SQUARE

SUPPLY REGISTER

SANITARY SEWER

STEAM, SINGLE THROW, STREET, STAFF

STATION

STANDARD

STEEL

STRUCTURAL

SUPPORT

SUSPENDED

SHEET VINYL

SWITCH, SIDEWALK

SWITCHBOARD

SWITCHGEAR

TILE,TOP,TANGENT

TOP AND BOTTOM

TELEPHONE

TEMPERATURE, TEMPORARY

TERMINAL

THREE CONDUCTOR

THREE POLE

THREE WAY

TOP OF

TRANSITION

TOP OF STEEL, TOP OF STONE, TOP OF SLAB

TELEVISION

TOP OF WALL

TYPICAL

UNIT HEATER

VENT,VOLT,VALVE

VOLT AMPRE

VACUUM

VINYL COMPOSITION TILE

VENTILATING

VERTICAL

VESTIBULE

VENT STACK

VENT THRU ROOF

VINYL WALL COVERING

WIDTH,WASTE,WATER,WATT,WEST, WIRE,

WATER LINE STRUCTURE

WATT

WITH

WITHOUT

WATER CLOSET, WHEEL CHAIR

WIDTH, WINDOW DIMENSION

WALL GUARD

WATERPROOF, WEATHERPROOF

WASTE STACK, WATER SURFACE, WATERSTOP

WEIGHT

WELDED WIRE FABRIC

TA TOILET ACCESSORIES

WDW WINDOW

IR IMPACT RESISTANT, INFRARED

PEMB PRE-ENGINEERED METAL BUILDING

RESINOUS EPOXY SYSTEM

RIGID CONCRETE PIPE

IRWC IMPACT RESISTANT WALL COVERING

LVT LUXURY VINYL TILE

WRB WEATHER RESISTANT BARRIER

SC SEALED CONCRETE

UNO UNLESS NOTED OTHERWISE

BACKER ROD & SEALANTBR&S

RME REUSABLE MEDICAL EQUIPMENT

WAP WIRELESS (WIFI) ACCESS POINT

ARCHITECTURAL SYMBOLS

A101

DETAIL NUMBER

COLUMN NUMBER /

GRID LINE

SHEET NUMBER

ARCHITECTURAL

SECTION

WINDOW TYPE

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL

ELEVATION

X

X-XXX

DETAIL NUMBER

SHEET NUMBER

CENTER LINE

DIMENSION LINE

DOOR NUMBER

SYMBOL

x'- x"

EXISTING TO REMAIN

NEW CONSTRUCTION

EXISTING TO BE

REMOVED

EXISTING TO REMAIN

1i

KEYNOTE - RENOVATION

PLAN (U.N.O.)

WALL / PARTITION TYPE

KEYNOTE - DEMOLITION

PLAN

X

X

X

NOTE: NOT ALL SYMBOLS USED

ROOM NAME

W01

ROOM NAME

ROOM NUMBER

XX

X-XXX

SHEET DETAIL IS

DRAWN ON

DETAIL NUMBER

XX

X-XXX ARCHITECTURAL

ELEVATION - EXTERIOR

XX SP XX SP DESIGN SF

PROGRAM SF

ACT-X

X'-X" AFF

CEILING CODE

CEILING HEIGHT,

ABOVE FINISH FLOOR

X

NEW EXISTING

KEYNOTE - PHASING

PLAN

X

MATERIAL SYMBOLS

EARTH

CAST-IN-PLACE CONCRETE /

PRECAST CONCRETE

CONCRETE MASONRY

STEEL

CONTINUOUS WOOD

FRAMING

WOOD BLOCKING

FIBROUS INSULATION

GYPSUM BOARD

BRICK MASONRY

RIGID INSULATION

ROOF INSULATION

ALUMINUM

ARCHITECTURAL GENERAL NOTES:

1. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO CONSTRUCTION.

3. ALL EXISTING CONSTRUCTION, CABINETWORK, EQUIPMENT, ETC.

TO REMAIN IS INDICATED LIGHT OR HALF TONE.

4. ALL FURNITURE SHOWN HALF TONE WILL BE OWNER FURNISHED

AND OWNER INSTALLED.

5. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO

THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY

CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,

MATERIALS, OR ANY INVOLVED ACTIONS.

6. REFER TO AE100-SERIES BUILDING OVERALL FLOOR PLANS FOR

LOCATION OF EXISTING OR REQUIRED FIRE WALLS.

7. MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY AND

CONFIRM RATINGS WITH THE COR PRIOR TO BEGINNING OF

WORK.

8. VERIFY THAT EXISTING WALLS REQUIRING FIRE RATINGS ARE

MAINTAINED, REPAIRED AND EXTENDED TO STRUCTURE.

9. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT,

WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND

AT LEAST THE CORRIDOR SIDE OF NON-FIRE RATED CORRIDOR

WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE NOTED.

VERIFY AND CONFIRM RATINGS WITH THE COR PRIOR TO

BEGINNING OF WORK.

10. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATINGS

INTERSECT, THE HIGHEST-RATED PARTITION TAKES

PRECEDENT. MAINTAIN RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

11. PROVIDE FIRE RATED EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO AE100-SERIES OVERALL FLOOR PLAN SHEETS

FOR LOCATIONS OF FIRE RATED PARTITIONS.

12. A 1-HR FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL

OCCUPIED SPACE AND CONSTRUCTION AREAS. THIS

PROTECTION INCLUDES ANY EXISTING PENETRATIONS AND

OPENINGS.

13. REFER TO 'TEMPORARY CONSTRUCTION BARRIERS AND

ENCLOSURES' ON SHEET GI002 FOR INFORMATION RELATED TO

ENCLOSURE OF WORK AREAS AND PROTECTION OF EXISTING

AND NEW CONSTRUCTION.

14. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE

AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY

ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND

ON DIRECTION OF SUSPENDED ACOUSTICAL CEILING MAIN-TEES.

CONTRACTOR SHALL COORDINATE WORK AREA WITH MEP

DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS

RESPONSIBLE FOR WORK AS NECESSARY, FIELD VERIFY.

15. WORK AREAS SHOWN DO NOT DISTINGUISH BETWEEN PHASES

BUT ONLY SHOW AREAS TO BE REMOVED AND REINSTALLED.

CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING PHASING OF

WORK; SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN

MULTIPLE PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET

GI002.

16. ANY DISTURBED FINISHES MUST BE RESTORED TO MATCH

EXISTING FINISHES. COORDINATE WITH VA TO MATCH EXISTING

FINISHES.

17. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND CEILING-

MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO BE

CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK IN

ROOMS AND WORK AREA. CLEANING SHALL MEET THE

APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF WORK

BY THE VA.

ARCHITECTURAL GENERAL NOTES:

TEMP BARRIERS & ENCLOS

1. SEE SPECIFICATION SECTION 01 56 00 "TEMPORARY BARRIERS &

ENCLOSURES" FOR REQUIREMENTS RELATED TO ENCLOSURE OF

CONSTRUCTION IN PROGRESS.

2. SEE AE100-SERIES PLANS FOR NOTES AND INFORMATION

RELATED TO PHASING, TEMPORARY INTERIOR CONSTRUCTION

PARTITIONS AND OVERHEAD PROTECTION DURING

CONSTRUCTION.

3. ALL ENCLOSURES AND PENETRATIONS THROUGH EXISTING

STRUCTURE ARE TO BE MAINTAINED BY THE CONTRACTOR

DURING DEMOLITION AND NEW CONSTRUCTION TO PREVENT THE

INFILTRATION OF WATER INTO THE BUILDING DURING THE

COURSE OF THE PROJECT.

4. EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED

FROM DEMOLITION AND NEW CONSTRUCTION ACTIVITY.

PROTECTION METHODS SHALL BE APPROVED BY THE COR AT

LEAST ONE WEEK PRIOR TO INITIAL INSTALLATION.

5. ALL ENCLOSURES MUST BE INSPECTED AND APPROVED BY THE

COR BEFORE THE END OF EACH WORK DAY. UNSATISFACTORY

ENCLOSURE WORK SHALL BE CORRECTED BY THE CONTRACTOR

AND APPROVED BY THE COR BEFORE CESSATION OF THE DAY'S

WORK ACTIVITY.

TEMPORARY BARRIERS &

ENCLOSURES:

BID ITEMS & DEDUCT ALTS:

REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS

A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT

RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN

THE DRAWINGS AND SPECIFICATIONS.

1. RME STORAGE ROOMS: WORK INCLUDES:

A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET

TEMPERATURE AND HUMIDITY CONTROL

REQUIREMENTS FOR RME STORAGE ROOMS.

INCLUDING INSTALLATION OF REPLACEMENT

AND/OR NEW STEAM GENERATORS AND

HUMIDIFICATION GRIDS.

B. REPLACEMENT OF NON-COMPLIANT SUSPENDED

ACOUSTICAL CEILING PANELS IN DESIGNATED RME

STORAGE ROOMS.

2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES

RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:

A. REPLACEMENT OF AHUs 1,2,3 AND 4.

B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE

AIR VOLUME (VAV) BOXES, REHEAT COILS AND

OTHER RELATED ITEMS.

C. REPLACEMENT OF HEATING WATER SYSTEM

INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION

TANK AND AIR SEPARATOR.

B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED

BELOW:

1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-

AHU-4 AND ASSOCIATED UTILITIES.

C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED

BELOW:

1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-

AHU-3 AND ASSOCIATED UTILITIES.

BID ITEMS & DEDUCT:

1. SEE SHEET GI002 FOR ARCHITECTURAL GENERAL NOTES.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

EXTENTS OF CEILING REPLACEMENT PRIOR TO START OF

CONSTRUCTION. CONTRACTOR IS TO COORDINATE WITH ALL

TRADES IN ADJACENT SPACES TO ACCOMPLISH ABOVE-

CEILING ROUTING OF MECHANICAL AND ELECTRICAL ITEMS.

3. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO

THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY

CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,

MATERIALS, OR ANY INVOLVED ACTIONS.

4. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE

AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY

ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND

ON DIRECTION OF CEILING GRID MAIN-TEES. CONTRACTOR

SHALL COORDINATE WORK AREA WITH MEP DRAWINGS FOR

FULL SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR

WORK AS NECESSARY FOR A FINISHED AND COMPLETED

INSTALLATION.

5. WORK AREA SHOWN ON REFLECTED CEILING PLANS DOES NOT

DISTINGUISH BETWEEN PHASES BUT ONLY SHOWS AREAS TO

BE REMOVED AND REINSTALLED. CONTRACTOR IS

RESPONSIBLE FOR IDENTIFYING PHASING OF WORK IN

COORDINATION WITH MECHANICAL AND RELATED WORK;

SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN MULTIPLE

PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET GI002.

6. WHERE PORTIONS OF CEILINGS ARE SHOWN TO BE REMOVED

AND REINSTALLED, REMOVE AND REINSTALL ALL ITEMS

LOCATED IN CEILING, INCLUDING (BUT NOT LIMITED TO) LIGHTS,

DIFFUSERS, SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU,

ALARMS, ANTENNAS, OCCUPANCY SENSORS, SPEAKERS,

NURSE CALL, CODE LIGHTS, EMERGENCY SHOWER, CAMERA,

WIFI ACCESS POINT, CURTAIN TRACK, PATIENT LIFT OR

ACCESS HATCHES AS REQUIRED. ALL ITEMS MAY NOT BE

INDICATED ON DRAWINGS. FIELD VERIFY FOR FULL SCOPE OF

WORK.

7. REFER TO ROOM FINISH SCHEDULE FOR CEILING HEIGHTS /

MATERIAL AND LOCATIONS, UNLESS NOTED OR SHOWN

OTHERWISE. WHERE NOT SCHEDULED OR SHOWN, MATCH

EXISTING CEILING HEIGHTS AND MATERIALS.

8. REMOVE AND REPLACE CEILING SYSTEMS IN RME STORAGE

AND OTHER ROOMS WHERE DESIGNATED FOR MECHANICAL

WORK. REVIEW & COORDINATE EXISTING CONDITIONS W/ COR

FOR NEED TO REMOVE ALL OR PORTIONS OF EXISTING

CEILINGS AND MAINTAINING COMPLIANCE WITH VA OEHRM

REQ'TS. FOR PHYSICAL SECURITY.

9. IN RME STORAGE ROOMS, NOTIFY THE COR IF EXISTING WALL

CONSTRUCTION AND FINISHES DO NOT EXTEND TO

STRUCTURAL DECK ABOVE (APPLIES TO ALL SHEETS) UNLESS

NOTED OTHERWISE.

10. WHERE 1-HR-RATED CEILINGS ARE TO BE PROVIDED IN LIEU OF

EXTENDING WALLS TO STRUCTURE ABOVE FOR HORIZONTAL

ENCLOSURE OF ROOMS FOR SECURITY AND FIRE SEPARATION,

PROVIDE FIRE-RATED ASSEMBLIES OF GYPSUM WALLBOARD,

LIGHT-GAUGE METAL FRAMING AND CEILING SUSPENSION

SYSTEMS.

11. EXISTING CEILING TYPES, CEILING-MOUNTED FIXTURES AND

EQUIPMENT LOCATIONS OUTSIDE OF RME STORAGE ROOMS

OR OTHER ROOMS DESIGNATED FOR WORK SHOWN ON

ENLARGED REFLECTED CEILING PLANS ARE NOT FULLY

IDENTIFIED IN THE REFLECTED CEILING PLANS. FIELD VERIFY

EXISTING CEILING CONDITIONS IN CORRIDORS AND ROOMS

AFFECTED BY WORK PRIOR TO BIDDING AND BEFORE START

OF PROJECT WITH THE COR AND GENERAL CONTRACTOR.

12. FOR CEILINGS IN CORRIDORS AND ROOMS TO REMAIN

OCCUPIED AND FUNCTIONAL DURING NORMAL BUSINESS

HOURS, EXISTING SUSPENDED ACOUSTICAL CEILING TILES AND

GRID ARE TO BE REMOVED ONLY TO THE EXTENTS REQUIRED

TO PERMIT WORK DURING THE WORK SHIFT. REINSTALL GRID

AND CEILING TILES PRIOR TO THE END OF EVERY WORK SHIFT

UNLESS DIRECTED OTHERWISE BY THE COR.

13. MINIMIZE DISRUPTION TO ADJACENT SPACES. ACCESS ABOVE

CEILING SPACE AS NEEDED TO ACCOMPLISH SCOPE OF WORK.

REPLACE DAMAGED PADS AND SUSPENDED GRID MEMBERS

AS NEEED. RETURN ALL SYSTEMS TO PREVIOUS CONDITIONS.

14. REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY IN

INDIVIDUAL ROOMS UNLESS NOTED OTHERWISE. SEE

REFLECTED CEILING GENERAL NOTE ABOVE FOR CEILINGS IN

CORRDORS AND ROOMS TO REMAIN OCCUPIED AND

FUNCTIONAL DURING NORMAL BUISNESS HOURS.

15. COORDINATE SCHEDULING FOR REMOVAL AND

REINSTALLATION OF CEILINGS WITH THE COR.

16. CONTRACTOR IS TO REINSTALL ACOUSTICAL CEILING TILES

WHERE REMOVED IN ADJACENT ROOMS FOR PERFORMANCE

OF WORK AT THE END OF EVERY WORK SHIFT.

17. REMOVAL OF EXISTING CEILINGS AND TEMPORARY

MODIFICATION OF EXISTING SPRINKLER HEADS ARE TO BE

COORDINATED TO HAPPEN CONCURRENTLY.

18. ALTHOUGH NOT SPECIFICALLY SHOWN, THE ENTIRE PROJECT

HAS FIRE SPRINKLER HEADS IN CEILINGS. SCRIBE CEILING

MATERIALS CAREFULLY FOR A TIGHT FIT OF PENETRATIONS

THROUGH CEILING MATERIAL .

19. IN AREAS WHERE CONSTRUCTION WORK IS TO TAKE PLACE

OVER AN EXTENDED PERIOD OF TIME AND ACCESS TO WORK

AREA IS TO BE RESTRICTED TO THE CONTRACTOR AND

DESIGNATED PERSONNEL, A 1-HR FIRE-RATED SEPARATION IS

REQUIRED BETWEEN ALL OCCUPIED SPACE AND

CONSTRUCTION AREAS. THIS PROTECTION INCLUDES ANY

EXISTING PENETRATIONS AND OPENINGS. COORDINATE

PLACEMENT, SCHEDULING OF INSTALLATION AND REMOVAL

WITH THE COR. SEE 'TEMPORARY BARRIERS & ENCLOSURES'

ON SHEET GI002.

20. WHERE CEILINGS OF DIFFERENT HEIGHTS ABUT AND WHERE

EXISTING BULKHEADS ARE TO BE REMOVED FOR ACCESS TO

WORK, REPLACE WITH GYPSUM WALL BOARD AND METAL

STUD BULKHEADS TO MATCH EXISTING CONFIGURATIONS . DO

NOT BUILD BULKHEADS OF ACOUSTICAL CEILING MATERIALS

UNLESS SPECIFICALLY DETAILED.

21. EXISTING MECHANICAL CEILING COMPONENTS ARE TO BE

REUSED UNLESS NOTED OTHERWISE. REFER TO MECHANICAL

DRAWINGS FOR QUANTITY AND TYPE OF NEW / REPLACEMENT

DIFFUSERS, RETURN AIR GRILLES, AND EXHAUST GRILLES.

SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

22. FOR NEW MECHANICAL DIFFUSERS, GRILLES AND RELATED

CEILING-MOUNTED OR SUSPENDED ITEMS IN ROOMS TO BE

RENOVATED, SEE MECHANICAL DRAWINGS.

23. EXISTING ELECTRICAL DEVICES ARE TO BE REUSED UNLESS

OTHERWISE NOTED. REFER TO ELECTRICAL DRAWINGS FOR

QUANTITY AND TYPE OF NEW / REPLACEMENT LIGHTS,

SPEAKERS, DETECTORS, POWER OUTLETS, ETC. SCRIBE

CEILING MATERIALS CAREFULLY. WHERE NO DEVICES ARE

SHOWN ON PLANS, FIELD VERIFY LOCATION & QUANTITY OF

DEVICES IN EXISTING CEILING. THESE DEVICES WILL BE

RELOCATED TO THE NEW CEILING.

24. FOR NEW LIGHTING FIXTURE LAYOUTS IN ROOMS TO BE

RENOVATED, SEE ELECTRICAL DRAWINGS.

25. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND

CEILING-MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO

BE CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK

IN ROOMS AND WORK AREA. CLEANING SHALL MEET THE

APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF

WORK BY THE VA.

ARCHITECTURAL REFLECTED

CEILING PLAN NOTES:

1. CONTRACTOR SHALL COMPLY WITH THE MOST-CURRENT

VERSION OF OSHA'S PUBLICATION 3142-12R "LEAD IN

CONSTRUCTION" (29 CFR 1926.62) FOR CONSTRUCTION

ACTIVITIES THAT DISTURB LEAD-BASED PAINTED SURFACES,

PAINT CONTAINING DETECTABLE LEVELS OF LEAD OR OTHER

MATERIALS CONTAINING LEAD..

2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF

ASBESTOS AND LEAD BASED PAINT (LBP) REPORTS.

3. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP

REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH

MATERIALS IN THE AREA OF THE FACILITY IN QUESTION. REFER

TO THE VA'S ABATEMENT SPECIFICATIONS FOR HANDLING OF

MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT

SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.

4. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS

CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.

5. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE

HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND

NOTIFY THE GOVT. IMMEDIATELY FOR DIRECTION.

6. ALL CONTRACTORS' PERSONNEL IN AREAS NEAR DISTURBANCE

OR ABATEMENT OF HAZARDOUS MATERIALS MUST BE NOTIFIED

OF ACTIVITIES.

7. ASBESTOS AND LEAD-BASED PAINT ABATEMENT, IF REQUIRED,

SHALL BE CONDUCTED IN ACCORDANCE WITH VA

SPECIFICATIONS AND ALL APPLICABLE REGULATIONS.

8. ABATEMENT CONTRACTORS SHALL SCHEDULE WORK IN

GENERAL ACCORDANCE WITH THE PROJECT'S PHASING

STRATEGY.

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL

PENETRATIONS - CONSTRUCTION IS TO CONFORM TO

MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS /

PARTITIONS AND FLOORS. CONFORM WITH THE TESTED /

SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND

LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS

SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING

STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS

UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED

DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING

RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND

THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-

LABEL EXISTING WALL IF NECESSARY.

HAZARDOUS MATERIALS:

FIREPROOFING GENERAL NOTES:

PHASING GENERAL NOTES:

1. REFER TO SECTION 01 00 00 FOR PHASING REQUIREMENTS.

2. PHASES SHOWN IN THE PHASING DESCRIPTION ARE PART

OF THE SCOPE OF WORK CONTAINED IN THIS SET OF

CONTRACT DOCUMENT DRAWINGS.

3. A CONSTRUCTION PHASING PLAN SHALL BE PROVIDED BY

THE CONTRACTOR TO THE COR FOR REVIEW AND

APPROVAL PRIOR TO COMMENCEMENT OF THE WORK.

4. CONTRACTOR SHALL PROVIDE ALL SUBMITTALS AND

RECEIVE APPROVALS BEFORE CONSTRUCTION CAN START.

5. CONTRACTOR IS TO SUBMIT COORDINATION DRAWINGS

BEFORE CONSTRUCTION CAN START.

6. ALL WORK SHALL BE PERFORMED IN A MANNER TO ALLOW

FOR FULL OPERATION OF THE MEDICAL CENTER AT ALL

TIMES.

7. A SEVEN DAY NOTICE SHALL BE PROVIDED PRIOR TO ANY

INTERRUPTION OF UTILITY SERVICES.

8. TIMING OF WORK HOURS SHALL BE COORDINATED WITH

THE COR AT LEAST 7 DAYS PRIOR TO START OF WORK.

9. AT THE COMPLETION OF EACH WORK DAY, ALL AREAS

SHALL BE CLEANED OF CONSTRUCTION MATERIALS AND

EQUIPMENT TO ALLOW FOR CONTINUED OCCUPANCY OF

THE SPACE. THIS REQUIREMENT IS SPECIFIC TO CLINICAL

ROOMS DESIGNATED IN THE CONSTRUCTION PHASING

DESCRIPTION.

10. AT THE COMPLETION OF ALL PHASED WORK, TEMPORARY

INSTALLATIONS SHALL BE REMOVED BY THE CONTRACTOR

AND ANY REQUIRED REPAIRS SHALL BE PERFORMED. ANY

MATERIALS NOT SALVAGED BY THE OWNER SHALL BE

REMOVED BY THE CONTRACTOR.

11. OFF / WEEKEND HOURS WILL BE REQ'D IN SOME AREAS.

12. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED

IN ACTIVE PHASE DOES NOT ADVERSELY AFFECT NORMAL

OPERATIONS IN OTHER OCCUPIED SPACES.

13. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO

MAINTAIN SERVICE TO OCCUPIED SPACES.

14. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED

STEP TO ACHIEVE PHASED CONSTRUCTION. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO DEVELOP A

CONSTRUCTION PLAN TO INSTALL THE DESIGN WITHIN THE

PHASING CONSTRAINTS.

15. HVAC SYSTEMS (EXCEPT ACA-AHU-1,-2,-3,-4) IMPACTED BY

THE PROJECT SCOPE SHALL NOT BE OFFLINE FOR LONGER

THAN A 6-HOUR SPAN. PROVIDE TEMPORARY PORTABLE

HEATERS/COOLERS FOR SPACES IMPACTED BY HVAC

SYSTEM OUTAGES TO MAINTAIN ADEQUATE OCCUPIED

SPACE CONDITIONS DURING CONSTRUCTION.

PHASING GENERAL NOTES:

1. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE

PERFORMED DURING UNOCCUPIED HOURS (NIGHTS,

WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO

ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR

PATIENTS ARRIVE.

2. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT

HAVE ADVERSE EFFECTS (EXCESSIVE NOISE, EXCESSIVE

VIBRATION, ETC.) SHALL BE PERFORMED DURING

UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR

HOLIDAYS).

3. COORDINATE SCHEDULE WITH THE VA TO DETERMINE

EXACT ALLOWABLE TIMES OF CONSTRUCTION ACTIVITIES IN

EACH PROJECT AREA.

CONSTRUCTION ACTIVITIES:

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:0

P

M

GI007

ABBREVIATIONS, SYMBOLS AND GENERAL

NOTES

AHT SW

FIRE ALARM SHEET INDEX:

CONDUIT CONCEALED IN FINISHED AREAS -

EXPOSED IN UNFINISHED AREAS

LINETYPE/SYMBOL DESCRIPTION

CONDUIT STUB - TERMINATE WITH CAP

CONDUIT CONCEALED IN OR UNDER

FLOOR SLAB

CONDUIT TURNING UP

CONDUIT TURNING DOWN

FLEXIBLE CONNECTION TO EQUIPMENT

NUMBER OF WIRES

2D

V

S

P

EOL END OF THE LINE RESISTOR

2D

V

2V

S

P

D

WM

FIRE ALARM-WIRE SYMBOLS:

NOTES:

1. SEE SPECS AND CUTSHEET PACKAGE FOR ADDITIONAL WIRE INFORMATION.

2. ALL CONDUIT USED FOR FIRE ALARM WIRE SHALL BE MINIMUM OF 3/4".

SENSOR LOOP WIRING NUMBER ONE TWISTED PAIR PENN D990

SENSOR LOOP WIRING NUMBER TWO TWISTED PAIR WEST

PENN D99

UNDERGROUND SENSOR LOOP WIRING TWO PAIR-WEST PENN AQC225

NUMBER

NOTIFICATION LINE WIRING CIRCUIT 2 #12 WEST PENN 998

NOTIFICATION LINE WIRING CIRCUIT 4 #12 WEST PENN 998

UNDERGROUND NOTIFICATION LINE T4 #12 WEST PENN AQC227

WIRING CIRCUIT

NOTIFICATION SPEAKER - AUDIO 2 #18 WEST PENN D980

UNDERGROUND NOTIFICATION SPEAKER- 2 #16 WEST PENN AQC225

AUDIO

24V UN-INTERRUPTIBLE POWER 2 #14 WEST PENN 994

24V UN-INTERRUPTIBLE POWER 2 #14 WEST PENN AQC226

WIRE MOLD RACEWAY

1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES, STANDARDS, AND

MANUFACTURER'S INSTALLATION REQUIREMENTS.

2. REVIEW ALL PROJECT DOCUMENTS INCLUDING SPECS AND DRAWINGS PERTAINING TO ALL

DISCIPLINES PRIOR TO SUBMITTING A BID. SUBMIT PRE-BID REQUEST FOR INFORMATION FOR

ITEMS IN QUESTION AND/OR CONFLICTS FOUND.

3. DRAWINGS SHOW THE DESIGN INTENT DIAGRAMMATICALLY. THEY DO NOT SHOW THE EXACT

UTILITY ROUTING NOR EVERY ELBOW, OFFSET, ETC. WHERE REQUIRED, THE CONTRACTOR

SHALL MAKE ADJUSTMENTS TO THEIR SYSTEMS TO AVOID CONFLICT WITH THE STRUCTURE

AND OTHER DISCIPLINES. THE COST FOR SUCH ADJUSTMENTS SHALL BE INCLUDED IN THE BID.

4. OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR WORK PERFORMED.

5. OBTAIN UTILITY PURVEYOR REQUIREMENTS PRIOR TO PURCHASING EQUIPMENT OR

PERFORMING WORK.

6. THE G.C. OR C.M. TEAM SHALL LEAD THE SUBCONTRACTORS IN PROVIDING A COORDINATED

SET OF SHOP DRAWINGS. SEE GENERAL REQUIREMENTS SPEC FOR ADDITIONAL

INFORMATION.

7. PROVIDE FIRESTOPPING FOR ALL UTILITY PENETRATIONS THRU FIRE-RATED ASSEMBLIES.

8. COORDINATE FRAMING REQUIREMENTS FOR ACCESS PANELS AND EQUIPMENT/PANEL

SUPPORTS WITH G.C. OR C.M. PRIOR TO SUBMITTING BID.

9. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CORRECTION OF CONSTRUCTION

DEFICIENCIES LISTED ON THE JOB SITE OBSERVATION REPORT. RETURN THE JOB SITE

OBSERVATION REPORT TO A/E WITH DEFICIENCIES SIGNED OFF. PROVIDE PHOTOGRAPHIC

AND/OR VIDEO EVIDENCE OF CORRECTED DEFICIENCIES IF REQUESTED BY THE ENGINEER.

10. PROVIDE CLOSEOUT DOCUMENTATION UPON COMPLETION OF PROJECT. SEE GENERAL

REQUIREMENTS SPEC FOR ADDITIONAL INFORMATION.

GENERAL NOTES:

2021 INTERNATIONAL BUILDING CODE (IBC)

2024 NFPA 101 LIFE SAFETY CODE

2022 NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

2023 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70)

2021 INTERNATIONAL MECHANICAL CODE (IMC)

2021 INTERNATIONAL PLUMBING CODE (IPC)

2015 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,

COMMERCIAL AND MULTI-FAMILY HIGH-RISERESIDENTIAL BUILDINGS AND NEW LOW-RISE

RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2022.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2022.

UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN

THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)

CODES AND STANDARDS:

POINT OF CONNECTION OR DISCONNECTION

KEYNOTE SYMBOL#

DETAIL CALL-OUT SYMBOL

###-# EQUIPMENT TAG

GENERAL LEGEND:

SYMBOL DESCRIPTION

SECTION CUT CALL-OUT SYMBOL

ENLARGED PLAN CALL-OUT SYMBOL

EXISTING TO REMAIN

EXISTING TO BE REMOVED

NEW CONSTRUCTION

(E) EXISTING TO REMAIN

LINETYPE DESCRIPTION

(X) EXISTING TO BE REMOVED

1. FIRE ALARM WORK SHALL BE CONSTRUCTED IN A PROFESSIONAL MANNER. COMPONENTS

SHALL BE CLEANED PRIOR TO OWNER TURNOVER.

2. THE SCHEDULED EQUIPMENT SHALL BE USED AS THE BASIS OF DESIGN. MODEL NUMBERS

ARE PROVIDED FOR REFERENCE ONLY. EQUIPMENT SHALL MEET SPECIFIED PERFORMANCE.

THE CONTRACTOR SHALL IDENTIFY ALL SELECTED OPTIONS IN THE SUBMITTAL.

3. IF A CONTRACTOR PROVIDES EQUIPMENT OTHER THAN THE BASIS OF DESIGN, THAT

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED AS A RESULT. THAT

INCLUDES, BUT IS NOT LIMITED TO, STRUCTURAL MODIFICATIONS FOR INCREASED WEIGHT,

AND ELECTRICAL EQUIPMENT, WIRING, CONDUIT, AND BREAKER CHANGES FOR DIFFERENT

ELECTRICAL REQUIREMENTS.

4. COORDINATE POWER REQUIREMENTS WITH THE E.C. PRIOR TO PROVIDING SUBMITTALS TO

THE ENGINEER.

5. SEE SPEC SECTION 26 05 33 FOR CONDUIT/RACEWAY SYSTEM INSTALLATION, AND

CLEANING REQUIREMENTS.

6. PROVIDE CONDUIT OR RACEWAY EXPANSION JOINT THAT ACCOMMODATES THE BUILDING

MOVEMENT WHERE CONDUIT OR RACEWAY CROSSES BUILDING EXPANSION JOINT.

7. PAINT INTERIOR EXPOSED CONDUIT/RACEWAY, PULL BOXES, AND ASSOCIATED

HANGERS/SUPPORTS LOCATED IN OCCUPIED SPACES TO MATCH THE SURROUNDING

ARCHITECTURAL COLOR SCHEME. PAINT EXTERIOR CONDUIT, PULL BOXES AND ASSOCIATED

HANGERS/SUPPORTS ADJACENT TO EXTERIOR WALL TO MATCH WALL COLOR. FINAL

COLORS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. SEE SPEC SECTION 28 0500

FOR ADDITIONAL REQUIREMENTS.

8. PROVIDE IDENTIFICATION FOR CONDUIT, PULL BOXES, AND EQUIPMENT PER SPEC SECTION

26 0553.

9. CONDUIT/RACEWAY SHALL NOT PASS THRU NOR UNDER DATA ROOMS, ELEVATOR

MACHINE ROOMS, ELEVATOR HOISTWAYS, SKYLIGHTS, AND ROOF ACCESS HATCHES.

10. PULL BOXES SHALL BE ACCESSIBLE. PROVIDE KEYED ACCESS PANELS WHERE PULL BOXES

HAVE BEEN LOCATED IN CONCEALED AREAS. ACCESS PANEL SIZE SHALL BE LARGE ENOUGH

TO ACCESS EACH PULL BOX.

11. ALL FIRE ALARM LANDING ON PULL BOXES SHALL LAND IN TERMINAL BLOCKS. INSTALL

TERMINAL BLOCK ON THE INSIDE BACK PART OF BOX. LAND AND TERMINATE INCOMING

WIRES ON THE LEFT HAND SIDE. LAND AND TERMINATE OUTGOING WIRES ON THE RIGHT

HAND SIDE.

12. DEVICES SHALL NOT BE SET TO OUTPUT SIGNALS AT A MAXIMUM OF 110 dB. A VISUAL

DVICE SHALL BE INCLUDED FOR DEVICES WITH AMBIENT SOUND LEVELS ABOVE 105 dB.

13. WIRING SHALL BE TERMINATED ON EACH DEVICE AND AVOID LOOPING.

14. FIRE ALARM CONTRACTOR SHALL PASS TESTS REQUIRED BY LOCAL FIRE DEPARTMENTS.

CONTRACTOR IS RESPONSIBLE FOR ANY CORRECTIONS REQUIRED BY THE LOCAL FIRE

DEPARTMENT.

15. FIRE ALARM PANEL SHALL BE ACCESSIBLE TO FIRE DEPARTMENT PERSONNEL AND

AUTHORIZED MAINTENANCE DEPARTMENT.

16. ANNUNCIATION AT FIRE ALARM PANEL SHALL BE DIFFERENT BETWEEN A SUPERVISORY

SIGNAL & TROUBLE SIGNAL.

17. FIRE ALARM CONTROL PANEL SHALL SUPERVISE ANNUNCIATOR PANEL, FIRE ALARM

INITIATING DEVICES, AND NOTIFICATION DEVICES.

18. WIRING WITHIN EQUIPMENT AND TERMINAL CABINETS SHALL BE NUMBERED IN

SEQUENTIAL ORDER. THIS NUMBERING ORDER SHALL BE MAINTAINED ALL THE WAY TO

DEVICE FINAL CONNECTION.

19. ALL EXISTING FIRE ALARM DEVICES SHALL BE SALVAGED AND RETURNED BACK TO THE

OWNER.

20. DUCT TYPE SMOKE DETECTOR SHALL HAVE A MARKED LOCATION ON VISIBLE DUCTWORK

FOR ACCESS REQUIREMENTS.

21. INSTALL PANELS AT NO HIGHER THAN 6'-0" ABOVE FINISHED FLOOR.

FIRE ALARM NOTES:

LINETYPE/SYMBOL DESCRIPTION

NOTES:

1. NOT ALL SYMBOLS MAY APPLY.

2. SEE SPECS AND DRAWINGS FOR SPECIFIC COMPONENT REQUIREMENTS.

3. INITIATING/DETECTION DEVICE CIRCUITS SHALL BE WIRED WITH CLASS "B".

4. NOTIFICATION DEVICE CIRCUITS SHALL BE WIRED WITH CLASS "B".

FIRE ALARM-SYMBOLS:

FACP EXISTING FIRE ALARM CONTROL PANEL

DUCT SMOKE DETECTOR WITH TWO AUXILIARY CONTACTS -

MANUFACTURER TO BE COMPATIBLE WITH EXISTING SYSTEMD

SD

MR

MULTI - VOLTAGE CONTROL RELAY -

MANUFACTURER TO BE COMPATIBLE WITH EXISTING SYSTEM

INITIATING DEVICE DESCRIPTION:

FSD X = DATA CIRCUIT NUMBER

# = DEVICE NUMBER

X-#

NOTIFICATION DEVICE DESCRIPTION:

SS

XX CD

Y-#

A-#

#W

XX = CANDELA SIZE

Y = FACP/RPS # = CIRCUIT NUMBER

A = AMP. PANEL # = CIRCUIT NUMBER

# = WATTAGE SIZE

CONTRACTOR ABBREVIATIONS:

ABBREVIATION DESCRIPTION

C.M. CONSTRUCTION MANAGER

E.C. ELECTRICAL CONTRACTOR

F.A.C. FIRE ALARM CONTRACTOR

F.P.C. FIRE PROTECTION CONTRACTOR

G.C. GENERAL CONTRACTOR

M.C. MECHANICAL CONTRACTOR

P.C. PLUMBING CONTRACTOR

T.C. TECHNOLOGY CONTRACTOR

T.C.C. TEMPERATURE CONTROL CONTRACTOR

1. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID SUBMISSION TO VERIFY ALL FIELD

CONDITIONS INCLUDING BUT NOT LIMITED TO THE FOLLOWING:

A. LOCATIONS OF EXISTING FIRE ALARM SYSTEMS.

B. LOCATIONS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL,

PLUMBING, TECHNOLOGY, AND FIRE PROTECTION.

C. EXISTING SURFACES WHICH REQUIRE ALTERING.

D. EXISTING FIRE ALARM CONTROL PANEL CONDITIONS.

2. NOTIFY OWNER & LOCAL FIRE PROTECTION JURISDICTION OF REQUIRED SYSTEM

SHUTDOWNS AT LEAST TWO WEEKS PRIOR TO SHUTDOWN. EXACT SHUTDOWN TIME AND

PROCEDURE SHALL BE COORDINATED WITH OWNER & LOCAL FIRE PROTECTION

JURISDICTION AT LEAST 96 HOURS PRIOR TO SHUTDOWN.

3. WHEN FIRE ALARM CONDUIT/RACEWAY SYSTEMS OR EQUIPMENT ARE NOTATED TO BE

PERMANENTLY REMOVED THEIR ASSOCIATED COMPONENTS SHALL ALSO BE REMOVED

INCLUDING HANGERS, SUPPORTS, AND ACCESSORIES.

4. COORDINATE THE DISCONNECTION AND REMOVAL OF THE POWERED SYSTEMS WITH THE

E.C. WHEN REMOVING POWERED FIRE ALARM EQUIPMENT.

5. REPAIR EXISTING FLOORS, WALLS, AND CEILINGS IN ALTERED AREAS TO MATCH EXISTING.

SEE ARCHITECTURAL PLANS FOR FINISH DETAILS IN REMODEL AREAS.

6. F.A.C SHALL GUARANTEE AFFECTED (E) TECHNOLOGY DEVICES REMAIN OPERATIONAL WITH

ADEQUATE SIGNAL CONTINUITY.

RENOVATION NOTES:

AFG ABOVE FINISHED GRADE

CM COUNTER MOUNTED

FBO FURNISHED BY OTHERS

FF FINISHED FLOOR

IG ISOLATED GROUND

INV EMERGENCY INVERTER

PED PEDESTAL MOUNTED

UNO UNLESS OTHERWISE NOTED

FIRE ALARM ABBREVIATIONS:

ABBREVIATION DESCRIPTION

+XX DIMENSIONED HEIGHT ABOVE FINISHED FLOOR

-XX DIMENSIONED HEIGHT BELOW FINISHED FLOOR

1W ONE WIRE

2W TWO WIRE

3W THREE WIRE

A AMPERE

AFG ABOVE FINISH GRADE

AWG AMERICAN WIRE GAUGE

C.O. CONDUIT ONLY

D DEDICATED DEVICE ON INDIVIDUAL BRANCH CIRCUIT. CIRCUIT CAN

BE COMBINED WITH OTHER CIRCUITS FOR HOMERUNNING TO PANEL.

DN DOWN

DISC DISCONNECT

DN DOWN

DTR DOWN THRU ROOF

EM EQUIPMENT POWERED WITH EMERGENCY SOURCE INTERNAL OR

EXTERNAL.

FACP FIRE ALARM CONTROL PANEL

FD FIRE DAMPER

FL FULL LOAD AMPS

FSD FIRE SMOKE DAMPER

FT, ' FOOT OR FEET

GFCI GROUND FAULT CIRCUIT INTERRUPTER

IN., " INCH OR INCHES

J-BOX JUNCTION BOX

KVA KILOVOLT AMPERE

KW KILOWATT

MAX MAXIMUM

MIN MINIMUM

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NO., # NUMBER

NTS NOT TO SCALE

RPS REMOTE POWER SUPPLY

SPEC SPECIFICATION

SD SMOKE DETECTOR

TYP TYPICAL

U.C. UNDERGROUND CONDUIT

UNO UNLESS NOTED OTHERWISE

UTR UP THRU ROOF

W WIRES

WP WEATHERPROOF

NOTES:

1. NOT ALL ABBREVIATIONS MAY APPLY.

2. FIRE ALARM SCHEDULES CONTAIN EQUIPMENT TAG ABBREVIATIONS THAT ARE HEREBY

INCORPORATED INTO THE ABBREVIATION LIST.

3. SEE OTHER DISCIPLINE DRAWINGS WITHIN THE CONSTRUCTION DOCUMENTS FOR

ABBREVIATIONS NOT DEFINED ABOVE OR IN FIRE ALARM SCHEDULES.

1. THE PROJECT WILL BE CONSTRUCTED IN MULTIPLE PHASES. SEE ARCHITECTURAL &

PHASING DOCUMENTS FOR PHASING REQUIREMENTS.

2. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED IN ACTIVE PHASE DOES NOT

ADVERSELY AFFECT NORMAL OPERATIONS IN OTHER OCCUPIED SPACES.

3. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO MAINTAIN SERVICE TO OCCUPIED

SPACES.

4. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED STEP TO ACHIEVE PHASED

CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A CONSTRUCTION

PLAN TO INSTALL THE DESIGN WITHIN THE PHASING CONSTRAINTS.

5. HVAC SYSTEMS (EXCEPT ACA-AHU-1,-2,-3,-4) IMPACTED BY THE PROJECT SCOPE SHALL NOT

BE OFFLINE FOR LONGER THAN A 6-HOUR SPAN. PROVIDE TEMPORARY PORTABLE

HEATERS/COOLERS FOR SPACES IMPACTED BY HVAC SYSTEM OUTAGES TO MAINTAIN

ADEQUATE OCCUPIED SPACE CONDITIONS DURING CONSTRUCTION.

6. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE PERFORMED DURING

UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO

ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR PATIENTS ARRIVE.

7. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT HAVE ADVERSE EFFECTS

(EXCESSIVE NOISE, EXCESSIVE VIBRATION, ETC.) SHALL BE PERFORMED DURING

UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS).

8. COORDINATE SCHEDULE WITH THE VA TO DETERMINE EXACT ALLOWABLE TIMES OF

CONSTRUCTION ACTIVITIES IN EACH PROJECT AREA.

PHASING NOTES:

R EXISTING VOLTAGE RELAY

C EXISTING CONTROLS BOX

LINE TYPE /SYMBOL DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR SMOKE BARRIER

1-HOUR HAZARDOUS AREA FIRE BARRIER

FIRE-RATED ASSEMBLY LEGEND:

S S S S

HZ HZ HZ HZ

RE

G

IS

TE

RE

DPROFESSIONALENG

IN

EERER

IC

M.DeSPLINTER

S

TATE OF CALIFORNIA

Exp. 06-30-26

SIGNED: 06/23/25

F I R

E

ROT EC T

IO

N

P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

100% FINAL BID

DOCUMENTS

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t S to ra g e /2

M

E P

T

.0

C o lu m…