BID ITEMS & DEDUCT ALTS:
REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS
A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT
RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN
THE DRAWINGS AND SPECIFICATIONS.
1. RME STORAGE ROOMS: WORK INCLUDES:
A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET
TEMPERATURE AND HUMIDITY CONTROL
REQUIREMENTS FOR RME STORAGE ROOMS.
INCLUDING INSTALLATION OF REPLACEMENT
AND/OR NEW STEAM GENERATORS AND
HUMIDIFICATION GRIDS.
B. REPLACEMENT OF NON-COMPLIANT SUSPENDED
ACOUSTICAL CEILING PANELS IN DESIGNATED RME
STORAGE ROOMS.
2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES
RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:
A. REPLACEMENT OF AHUs 1,2,3 AND 4.
B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE
AIR VOLUME (VAV) BOXES, REHEAT COILS AND
OTHER RELATED ITEMS.
C. REPLACEMENT OF HEATING WATER SYSTEM
INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION
TANK AND AIR SEPARATOR.
B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED
IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED
BELOW:
1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-
AHU-4 AND ASSOCIATED UTILITIES.
C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED
IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED
BELOW:
1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-
AHU-3 AND ASSOCIATED UTILITIES.
BID ITEMS & DEDUCT:
DOCUMENT SIGNATURE BLOCK
DIRECTOR DATE
CHIEF OF STAFF DATE
ASSOCIATE DIRECTOR DATE
ASSISTANT DIRECTOR DATE
ASSOCIATE DIRECTOR OF PATIENT SERVICES DATE
EXECUTIVE OF HIGH RELIABILITY DATE
CHIEF OF LOGISTICS DATE
INFECTION CONTROL DATE
SAFETY OFFICER DATE
CHIEF FACILITIES MANAGEMENT DATE
CHIEF OF STERILE PROCESSING SERVICES DATE
RICHARD
JOSEPH
ONKEN
A-5125
A
R C H I T E
C
T
S T
A T
E
O F N E B
R A
S K
A
6/23/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
100% FINAL BID
DOCUMENTS
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
06/26/2025
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5
A
-2
-1
.A rc h
R
-C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t
S to ra g e
.r v t
/2
/2
:0
:0
P
M
GI005
COVER SHEET - VOLUME II
AHT SW
HARRY S. TRUMAN MEMORIAL
VETERANS' HOSPITAL
C or re ct
R eu sa bl e M ed ic al E qu ip m en t S to ra ge
U
.S . D ep ar tm en t o f V et er an s
A ffa irs
Correct Reusable Medical Equipment Storage 800 Hospital Dr, Columbia, MO 65201
BLDG. 14 -
WAREHOUSE
BLDG. 1 -
HOSPITAL
PARKING
GARAGE 'A'
OR - SPS ADDITION
BLDG. 23 -
CHILLER
PLANT
STAFF/
CONTR
ENTRANCE
HOSPITAL
EAST
ENTRANCE
SOUTH STAFF PARKING
LOT 'D'
ACCESSIBLE PARKING
LOT 'B'
NORTH WEST PARKING
LOT 'C'
ACA BUILDING
ACA BLDG
PORTE
COCHERE
ORIGINAL
HOSPITAL
BLDG. 22 -
FACILITIES
MANAGEMENT
PARKING GARAGE ADD'N
NORTH EMERGENCY
ROOM ENTRANCE
EMERGENCY
ROOM
PATIENT
EDUCATION
CENTER
HOSPITAL
NORTH
ENTRANCE
BLDG. 16 -
GENERAL
STORAGE
HOSPITAL
MAIN
ENTRACE
WEST
EMERGENCY
ROOM
ENTRANCE
BLDG. 24 -
UPS
WAREHOUSE
BLDG. 14 -
WAREHOUSE
LOADING
DOCK
UNIV OF MISSOURI MEDICAL CENTER CAMPUS
UNIV OF MISSOURI
CAMPUS
E. STADIUM DRIVE
HOSPITAL DRIVE
M O
N K
D R
IV
E
T
IG
E R
A V
E N
U E
D E
A N
S ' D
R
IV
E
LOCATION MAP / PHOTO
NOT TO SCALE
VOLUME II
Mark Revisions: Date:
RICHARD
JOSEPH
ONKEN
A-5125
A
R C H I T E
C
T
S T
A T
E
O F N E B
R A
S K
A
6/23/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
100% FINAL BID
DOCUMENTS
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
06/26/2025
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5
A
-2
-1
.A rc h
R
-C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t
S to ra g e
.r v t
/2
/2
:0
:0
P
M
GI006
INDEX OF DRAWINGS
AHT SW
INDEX OF DRAWINGS
GENERAL INFORMATION - VOLUME I
GI001 COVER SHEET - VOLUME I
GI002 INDEX OF DRAWINGS
GI003 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
GI004 SITE PLAN
INFECTION CONTROL - PHASING
GI100 BASEMENT FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING
GI101 FIRST FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING
GI102 SECOND FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING
GI103 THIRD FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING
GI104 FOURTH, FIFTH, SIXTH, MACH LVL & PH FLOOR PLANS - INFECTION CONTROL -
PHASING
GI601 NOTES AND DETAILS - INFECTION CONTROL
STRUCTURAL
SG001 STRUCTURAL GENERAL NOTES
SS100 BASEMENT FLOOR PLAN - OVERALL
SS101 FIRST FLOOR PLAN - OVERALL
SS102 SECOND FLOOR PLAN - OVERALL
SS103 THIRD FLOOR PLAN - OVERALL
SS104 BASEMENT FLOOR FRAMING PLAN, AREA E & F
SS105 FIRST FLOOR, ENLARGED PLANS
SS106 FIRST FLOOR FRAMING PLAN, AREAS E & F
SS107 ENLARGED FLOOR PLANS
SS108 SECOND FLOOR FRAMING PLAN, AREAS E & F
SS109 ELEVATOR MACHINE ROOM PLAN - LOWER LEVEL
SS601 DETAILS
ARCHITECTURAL
AE100 BASEMENT FLOOR - FLOOR PLAN - OVERALL
AE101 BASEMENT FLOOR PLAN - ACA BUILDING- AREAS E & F
AE102 FIRST FLOOR - FLOOR PLAN - OVERALL
AE103 SECOND FLOOR - FLOOR PLAN - OVERALL
AE104 THIRD FLOOR - FLOOR PLAN - OVERALL
AE105 FOURTH, FIFTH, SIXTH, MACH. LVL. & P.H. FLOOR PLANS-OVERALL
AC100 BASEMENT FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F
AC101 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A
AC102 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B
AC103 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C
AC104 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D
AC105 FIRST FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F
AC106 FIRST FLOOR REFLECTED CEILING PLAN, BUILDING 1 - AREA G
AC107 SECOND FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B
AC108 SECOND FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F
AC109 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A
AC110 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B
AC111 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C
AC112 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D
AC113 THIRD FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F
AC114 THIRD FLOOR - REFLECTED CEILING PLAN - AREA G
AC115 FOURTH AND SIXTH FLOOR - REFLECTED CEILING PLAN
AE301 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS A,B,C
AE302 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA D
AE303 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS E,F,G
AE304 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA G
AE305 SECOND FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS B,D,E,F
AE306 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREAS A,B,C,D,E,F
AE307 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREA G
AE601 ROOM FINISH SCHEDULE
GENERAL INFORMATION - VOLUME II
GI005 COVER SHEET - VOLUME II
GI006 INDEX OF DRAWINGS
GI007 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
FIRE ALARM
FA001 FIRE ALARM COVER SHEET
FA100 FIRE ALARM - BASEMENT FLOOR PLAN
FA101 FIRE ALARM - FIRST FLOOR PLAN
FA102 FIRE ALARM - SIXTH FLOOR PLAN
FAD201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION
FAD202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION
FA201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL
FA202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL
FA203 FIRE ALARM - PENTHOUSE FLOOR PLAN
FA301 FIRE ALARM DETAILS
PLUMBING
P001 PLUMBING COVER SHEET
P100 PLUMBING - BASEMENT FLOOR PLAN
P101 PLUMBING - FIRST FLOOR PLAN
P102 PLUMBING - THIRD FLOOR PLAN
P103 PLUMBING - SIXTH FLOOR PLAN
PD201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
PD202 PLUMBING - ENALARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
PD203 PLUMBING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION
P201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
P202 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
P203 PLUMBING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL
P204 PLUMBING - PENTHOUSE FLOOR PLAN
P401 PLUMBING - DETAILS
VENTILATION
MH001 VENTILATION COVER SHEET
MH100 VENTILATION - BASEMENT FLOOR PLAN
MH101 VENTILATION - FIRST FLOOR PLAN
MH102 VENTILATION - SECOND FLOOR PLAN
MH103 VENTILATION - THIRD FLOOR PLAN
MH104 VENTILATION - FOURTH FLOOR PLAN
MHD201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION
MHD202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION
MHD203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - DEMOLITION
MHD204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION
MH201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL
MH202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL
MH203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL
MH204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL
MH205 VENTILATION - ENLARGED BASEMENT FLOOR PLAN ROOMS
MH206 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH207 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH208 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH209 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH210 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH211 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS
MH212 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS
MH213 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS
MH214 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS
MH215 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS
MH216 VENTILATION - ENLARGED FOURTH FLOOR PLAN ROOMS
MH301 VENTILATION SECTION VIEWS
MH401 VENTILATION DETAILS
MH402 VENTILATION DETAILS
MH501 VENTILATION SCHEDULES
MH502 VENTILATION SCHEDULES
MH701 VENTILATION CONTROLS
MH702 VENTILATION CONTROLS
MH703 VENTILATION CONTROLS
MH704 VENTILATION CONTROLS
MH705 VENTILATION CONTROLS
MH706 VENTILATION CONTROLS
MH707 VENTILATION CONTROLS
MH708 VENTILATION CONTROLS
PIPING
MP001 PIPING COVER SHEET
MP100 PIPING - BASEMENT FLOOR PLAN
MP101 PIPING - FIRST FLOOR PLAN
MP102 PIPING - SECOND FLOOR PLAN
MP103 PIPING - THIRD FLOOR PLAN
MP104 PIPING - SIXTH FLOOR PLAN
MPD201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION
MPD202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION
MPD203 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
MPD204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #1
MPD205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #2
MPD206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
MPD207 PIPING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION
MPD208 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION
MPD209 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - DEMOLITION
MP201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL
MP202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL
MP203 PIPING - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL
MP204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
MP205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #1
MP206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #2
MP207 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
MP208 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
MP209 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL
MP210 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL
MP211 PIPING - PENTHOUSE FLOOR PLAN - REMODEL
MP301 PIPING - SECTION VIEWS
MP401 PIPING DETAILS
MP402 PIPING DETAILS
MP403 PIPING DETAILS
MP501 PIPING SCHEDULES
MP601 PIPING FLOW DIAGRAMS - HYDRONIC
MP602 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #1
MP603 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #2
MP604 PIPING FLOW DIAGRAMS - STEAM
MP605 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #1
MP606 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #2
ELECTRICAL
E001 ELECTRICAL COVER SHEET
E100 ELECTRICAL - BASEMENT FLOOR PLAN
E101 ELECTRICAL - FIRST FLOOR PLAN
E102 ELECTRICAL - SECOND FLOOR PLAN
E103 ELECTRICAL - THIRD FLOOR PLAN
E104 ELECTRICAL - SIXTH FLOOR PLAN
ED201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION
ED202 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
E201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL
E202 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL
E203 ELECTRICAL - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL
E204 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL
E205 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
E206 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
E207 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL
E208 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL
E209 ELECTRICAL - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL
E210 ELECTRICAL - PENTHOUSE FLOOR PLAN
E401 ELECTRICAL DETAILS
E501 ELECTRICAL SCHEDULES
E502 ELECTRICAL SCHEDULES
VOLUME I: VOLUME II:
ABBREVIATIONS
DET, DTL
DIAMETER
DIMENSION
DAMPER
DOWN
DISTRIBUTION PANEL
DOWNSPOUT, STORM DRAINAGE STRUCTURE
DOMESTIC WATER
DRAWING
EACH
EACH FACE, EXHAUST FAN
EXHAUST GRILLE
ELEVATION
ELECTRIC, ELECTRICAL CLOSET
EMER
EQ
EQUIP
EACH WAY
ELECTRIC WATER COOLER
EXH
EXIST
EXP
EXPANSION JOINT
EXPANSION JOINT
HEIGHT, HUMIDIFIER
HB
HANDICAPPED
HDW
HORIZ
HR
NA, N/A
NEC
NEUT
NIC
NOM
NTS
OA
OC
OD
OPNG
OPP
OH, OVHD
FRAME
FTG
T
T&B
TEL
TEMP
TERM
3/C
3/P
3 WAY
TO
TRANS
TS
TV
TW
TYP
WA
UH
V
VA
VAC
VCT
VENT
VERT
VEST
VS
VTR
VWC
W
W
W/
W/O
WC
WD
WP
WS
WT
WWF
SG
SAN
SCH
SD
SECT
SH
1 PH
SL
SP
SPDT
SPEC
SPST
SQ
SR
SS
ST
STA
STD
STL
SUP
SUSP
SV
SW
SWBD
SWGR
SIM
M
MAS
MATL
MAX
MECH
MET/MTL
MH
MIN
MISC
MM
MTD
MTG
MWP
MULL
KO
KVA
KW
L
LT
LAV
INT
INSUL
INV
JB
JC
JCT
JT
FXTR
GA
GALV
GFI, GFCI
GL
GWB
GYP
C
C
CAPACITY
CENTER TO CENTER
CEILING DIFFUSER
CEM
CAST IRON, COURTYARD INLET
CHILLER
CAST IRON PIPE
CIRCULATING
CONTROL JOINT
CIRCUIT
CENTERLINE
CEILING
CLEAR
CORRUGATED METAL PIPE
CORRUGATED METAL PIPE ARCH
CONCRETE MASONRY UNITS
CONDENSATE
CLEANOUT
COLUMN
COMMUNICATION
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
CONTINUOUS
CONVERTER
NONREINFORCED CONCRETE PIPE
CONDUIT
CERAMIC TILE, CURRENT TRANSFORMER,
COOLING TOWER
CENTER, COOLING TOWER RETURN
COOLING TOWER SUPPLY
COLD WATER
CARPET
CONCRETE SEALER/SURFACE
BOARD
BUILDING
BLK
BEAM
BOTTOM
BEARING
BASEMENT
ACOUSTIC
ADJUSTABLE
ABOVE FINISHED FLOOR
ALTERNATE
AIR HANDLING UNIT
ANCHOR BOLT, AUGER BORING
AL
APPROXIMATE
ARCH
AUTOMATIC TRANSFER SWITCH
FA
FLOOR DRAIN, FIRE DAMPER
FOUNDATION
FEEDER
FIRE EXTINGUISHER
FINISHED FLOOR ELEVATION
FIG
FIN
FLOOR, FLASHING, FLOW LINE
FLUOR
P
PB
PIV
PL
PLYWD
PNL
PNT
CHAIR OR CRASH RAIL
CORNER GUARD
FIRE EXTINGUISHER CABINET
OF
WG
ALC
CUBICAL CURTAIN TRACK
CLEAN
ACOUSTIC TILE
L
EPDM ROOF MEMBRANE
HSKP
NEG
STRUC
R
RA
RAD
RB
RES
RECP
REINF
REG
REQD
REV
RF
RHC
RM
RPM
RWC
PRELIM
PRIM
PT
PTN
PVMT
PVC
PVC
AB
ACT
ACST
ADJ
AFF
AHU
ALT
ALUMINUM
ALCOVE
APPROX
ARCHITECTURAL
ATS
BD
BLDG
BLOCK
BM
BOT
BRG
BSMT
CELSIUS
CAP
CC
CD
CCT
CEMENT
CG
CH
CI
CIP
CIR
CJ
CKT
CLN
CLG
CLR
CMP
CMPA
CMU
CND,C
CNDS
CO
COL
COMM
CONC
COND
CONN
CONST
CONT
CONV
CP
CR
CS
CT
CT
CTR
CTS
CW
CPT
DETAIL
DIA
DIM
DMPR
DN
DP
DS
DW
DWG
EA
EF
EG
EJ
ELEV
ELEC
EMERGENCY
EPDM
EQUAL
EQUIPMENT
EW
EWC
EXHAUST
EXISTING
EXPANSION, EXPOSED
EXP JT
FIRE ALARM
FD
FDN
FDR
FE
FEC
FFE
FIGURE
FINISH
FL
FLUORESCENT
FRAME
FOOTING
FIXTURE
GAGE
GALVANIZED
GROUND FAULT INTERRUPT
GLASS
GYPSUM WALL BOARD
GYPSUM
HGT, H
HOSE BIBB
HC
HARDWARE
HORIZONTAL
HOUR, HAND RAIL
HOUSEKEEPING
INTERIOR
INSULATION, INSULATED
INVERT
JUNCTION BOX
JANITOR CLOSET
JUNCTION
JOINT
KNOCK OUT
KILOVOLT-AMPERE
KILOWATT
LOUVER, LENGTH, LENGTH OF CURVE
LIGHT
LAVATORY VERTICAL
METER, MEGA
MASONRY
MATERIAL
MAXIMUM
MECHANICAL
METAL
MANHOLE
MINIMUM, MINUTE
MISCELLANEOUS
MILLIMETER
MOUNTED
MOUNTING
MEMBRANE WATERPROOFING
MULLION
NOT APPLICABLE
NATIONAL ELECTRIC CODE
NEGATIVE
NEUTRAL
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
OUTSIDE AIR
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPENING
OPPOSITE
PIPE, POLE
OVERHEAD
PULL BOX
POST INDICATOR VALVE
PLATE
PLYWOOD
PANEL
PAINT
PRELIMINARY
PRIMARY
POINT, POINT OF TANGENT
PARTITION
POINT OF VERTICAL CURVE
POLY VINYL CHLORIDE
PAVEMENT
RADIUS, RISER, RUBBER SHEATH
RETURN AIR
RADIUS
RESILIENT/RUBBER BASE
RCP
RECEPTACLE
REINFORCEMENT
REGULATOR, REGISTER
REQUIRED
REVISION
ROOF, RETURN FAN
REHEAT COIL
ROOM
REVOLUTIONS PER MINUTE
RESILIENT WALL COVERING
SANITARY SEWER
SCHEDULE
SPLITTER DAMPER, STORM DRAIN
SECTION
SUPPLY GRILLE
SHEET
SIMILAR
SINGLE PHASE
SLOPE
STATIC PRESSURE, SINGLE POLE
SINGLE POLE, DOUBLE THROW
SPECIFICATION
SINGLE POLE, SINGLE THROW
SQUARE
SUPPLY REGISTER
SANITARY SEWER
STEAM, SINGLE THROW, STREET, STAFF
STATION
STANDARD
STEEL
STRUCTURAL
SUPPORT
SUSPENDED
SHEET VINYL
SWITCH, SIDEWALK
SWITCHBOARD
SWITCHGEAR
TILE,TOP,TANGENT
TOP AND BOTTOM
TELEPHONE
TEMPERATURE, TEMPORARY
TERMINAL
THREE CONDUCTOR
THREE POLE
THREE WAY
TOP OF
TRANSITION
TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TELEVISION
TOP OF WALL
TYPICAL
UNIT HEATER
VENT,VOLT,VALVE
VOLT AMPRE
VACUUM
VINYL COMPOSITION TILE
VENTILATING
VERTICAL
VESTIBULE
VENT STACK
VENT THRU ROOF
VINYL WALL COVERING
WIDTH,WASTE,WATER,WATT,WEST, WIRE,
WATER LINE STRUCTURE
WATT
WITH
WITHOUT
WATER CLOSET, WHEEL CHAIR
WIDTH, WINDOW DIMENSION
WALL GUARD
WATERPROOF, WEATHERPROOF
WASTE STACK, WATER SURFACE, WATERSTOP
WEIGHT
WELDED WIRE FABRIC
TA TOILET ACCESSORIES
WDW WINDOW
IR IMPACT RESISTANT, INFRARED
PEMB PRE-ENGINEERED METAL BUILDING
RESINOUS EPOXY SYSTEM
RIGID CONCRETE PIPE
IRWC IMPACT RESISTANT WALL COVERING
LVT LUXURY VINYL TILE
WRB WEATHER RESISTANT BARRIER
SC SEALED CONCRETE
UNO UNLESS NOTED OTHERWISE
BACKER ROD & SEALANTBR&S
RME REUSABLE MEDICAL EQUIPMENT
WAP WIRELESS (WIFI) ACCESS POINT
ARCHITECTURAL SYMBOLS
A101
DETAIL NUMBER
COLUMN NUMBER /
GRID LINE
SHEET NUMBER
ARCHITECTURAL
SECTION
WINDOW TYPE
1 Ref
R e f
1 Ref
R e f
ARCHITECTURAL
ELEVATION
X
X-XXX
DETAIL NUMBER
SHEET NUMBER
CENTER LINE
DIMENSION LINE
DOOR NUMBER
SYMBOL
x'- x"
EXISTING TO REMAIN
NEW CONSTRUCTION
EXISTING TO BE
REMOVED
EXISTING TO REMAIN
1i
KEYNOTE - RENOVATION
PLAN (U.N.O.)
WALL / PARTITION TYPE
KEYNOTE - DEMOLITION
PLAN
X
X
X
NOTE: NOT ALL SYMBOLS USED
ROOM NAME
W01
ROOM NAME
ROOM NUMBER
XX
X-XXX
SHEET DETAIL IS
DRAWN ON
DETAIL NUMBER
XX
X-XXX ARCHITECTURAL
ELEVATION - EXTERIOR
XX SP XX SP DESIGN SF
PROGRAM SF
ACT-X
X'-X" AFF
CEILING CODE
CEILING HEIGHT,
ABOVE FINISH FLOOR
X
NEW EXISTING
KEYNOTE - PHASING
PLAN
X
MATERIAL SYMBOLS
EARTH
CAST-IN-PLACE CONCRETE /
PRECAST CONCRETE
CONCRETE MASONRY
STEEL
CONTINUOUS WOOD
FRAMING
WOOD BLOCKING
FIBROUS INSULATION
GYPSUM BOARD
BRICK MASONRY
RIGID INSULATION
ROOF INSULATION
ALUMINUM
ARCHITECTURAL GENERAL NOTES:
1. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO CONSTRUCTION.
3. ALL EXISTING CONSTRUCTION, CABINETWORK, EQUIPMENT, ETC.
TO REMAIN IS INDICATED LIGHT OR HALF TONE.
4. ALL FURNITURE SHOWN HALF TONE WILL BE OWNER FURNISHED
AND OWNER INSTALLED.
5. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO
THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY
CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,
MATERIALS, OR ANY INVOLVED ACTIONS.
6. REFER TO AE100-SERIES BUILDING OVERALL FLOOR PLANS FOR
LOCATION OF EXISTING OR REQUIRED FIRE WALLS.
7. MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY AND
CONFIRM RATINGS WITH THE COR PRIOR TO BEGINNING OF
WORK.
8. VERIFY THAT EXISTING WALLS REQUIRING FIRE RATINGS ARE
MAINTAINED, REPAIRED AND EXTENDED TO STRUCTURE.
9. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT,
WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND
AT LEAST THE CORRIDOR SIDE OF NON-FIRE RATED CORRIDOR
WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE NOTED.
VERIFY AND CONFIRM RATINGS WITH THE COR PRIOR TO
BEGINNING OF WORK.
10. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATINGS
INTERSECT, THE HIGHEST-RATED PARTITION TAKES
PRECEDENT. MAINTAIN RATING BEHIND FIRE EXTINGUISHER
CABINETS, ETC.
11. PROVIDE FIRE RATED EXPANSION JOINTS IN RATED FIRE RATED
WALLS; REFER TO AE100-SERIES OVERALL FLOOR PLAN SHEETS
FOR LOCATIONS OF FIRE RATED PARTITIONS.
12. A 1-HR FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL
OCCUPIED SPACE AND CONSTRUCTION AREAS. THIS
PROTECTION INCLUDES ANY EXISTING PENETRATIONS AND
OPENINGS.
13. REFER TO 'TEMPORARY CONSTRUCTION BARRIERS AND
ENCLOSURES' ON SHEET GI002 FOR INFORMATION RELATED TO
ENCLOSURE OF WORK AREAS AND PROTECTION OF EXISTING
AND NEW CONSTRUCTION.
14. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE
AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY
ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND
ON DIRECTION OF SUSPENDED ACOUSTICAL CEILING MAIN-TEES.
CONTRACTOR SHALL COORDINATE WORK AREA WITH MEP
DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS
RESPONSIBLE FOR WORK AS NECESSARY, FIELD VERIFY.
15. WORK AREAS SHOWN DO NOT DISTINGUISH BETWEEN PHASES
BUT ONLY SHOW AREAS TO BE REMOVED AND REINSTALLED.
CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING PHASING OF
WORK; SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN
MULTIPLE PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET
GI002.
16. ANY DISTURBED FINISHES MUST BE RESTORED TO MATCH
EXISTING FINISHES. COORDINATE WITH VA TO MATCH EXISTING
FINISHES.
17. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND CEILING-
MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO BE
CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK IN
ROOMS AND WORK AREA. CLEANING SHALL MEET THE
APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF WORK
BY THE VA.
ARCHITECTURAL GENERAL NOTES:
TEMP BARRIERS & ENCLOS
1. SEE SPECIFICATION SECTION 01 56 00 "TEMPORARY BARRIERS &
ENCLOSURES" FOR REQUIREMENTS RELATED TO ENCLOSURE OF
CONSTRUCTION IN PROGRESS.
2. SEE AE100-SERIES PLANS FOR NOTES AND INFORMATION
RELATED TO PHASING, TEMPORARY INTERIOR CONSTRUCTION
PARTITIONS AND OVERHEAD PROTECTION DURING
CONSTRUCTION.
3. ALL ENCLOSURES AND PENETRATIONS THROUGH EXISTING
STRUCTURE ARE TO BE MAINTAINED BY THE CONTRACTOR
DURING DEMOLITION AND NEW CONSTRUCTION TO PREVENT THE
INFILTRATION OF WATER INTO THE BUILDING DURING THE
COURSE OF THE PROJECT.
4. EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED
FROM DEMOLITION AND NEW CONSTRUCTION ACTIVITY.
PROTECTION METHODS SHALL BE APPROVED BY THE COR AT
LEAST ONE WEEK PRIOR TO INITIAL INSTALLATION.
5. ALL ENCLOSURES MUST BE INSPECTED AND APPROVED BY THE
COR BEFORE THE END OF EACH WORK DAY. UNSATISFACTORY
ENCLOSURE WORK SHALL BE CORRECTED BY THE CONTRACTOR
AND APPROVED BY THE COR BEFORE CESSATION OF THE DAY'S
WORK ACTIVITY.
TEMPORARY BARRIERS &
ENCLOSURES:
BID ITEMS & DEDUCT ALTS:
REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS
A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT
RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN
THE DRAWINGS AND SPECIFICATIONS.
1. RME STORAGE ROOMS: WORK INCLUDES:
A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET
TEMPERATURE AND HUMIDITY CONTROL
REQUIREMENTS FOR RME STORAGE ROOMS.
INCLUDING INSTALLATION OF REPLACEMENT
AND/OR NEW STEAM GENERATORS AND
HUMIDIFICATION GRIDS.
B. REPLACEMENT OF NON-COMPLIANT SUSPENDED
ACOUSTICAL CEILING PANELS IN DESIGNATED RME
STORAGE ROOMS.
2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES
RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:
A. REPLACEMENT OF AHUs 1,2,3 AND 4.
B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE
AIR VOLUME (VAV) BOXES, REHEAT COILS AND
OTHER RELATED ITEMS.
C. REPLACEMENT OF HEATING WATER SYSTEM
INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION
TANK AND AIR SEPARATOR.
B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED
IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED
BELOW:
1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-
AHU-4 AND ASSOCIATED UTILITIES.
C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED
IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED
BELOW:
1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-
AHU-3 AND ASSOCIATED UTILITIES.
BID ITEMS & DEDUCT:
1. SEE SHEET GI002 FOR ARCHITECTURAL GENERAL NOTES.
2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
EXTENTS OF CEILING REPLACEMENT PRIOR TO START OF
CONSTRUCTION. CONTRACTOR IS TO COORDINATE WITH ALL
TRADES IN ADJACENT SPACES TO ACCOMPLISH ABOVE-
CEILING ROUTING OF MECHANICAL AND ELECTRICAL ITEMS.
3. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO
THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY
CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,
MATERIALS, OR ANY INVOLVED ACTIONS.
4. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE
AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY
ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND
ON DIRECTION OF CEILING GRID MAIN-TEES. CONTRACTOR
SHALL COORDINATE WORK AREA WITH MEP DRAWINGS FOR
FULL SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR
WORK AS NECESSARY FOR A FINISHED AND COMPLETED
INSTALLATION.
5. WORK AREA SHOWN ON REFLECTED CEILING PLANS DOES NOT
DISTINGUISH BETWEEN PHASES BUT ONLY SHOWS AREAS TO
BE REMOVED AND REINSTALLED. CONTRACTOR IS
RESPONSIBLE FOR IDENTIFYING PHASING OF WORK IN
COORDINATION WITH MECHANICAL AND RELATED WORK;
SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN MULTIPLE
PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET GI002.
6. WHERE PORTIONS OF CEILINGS ARE SHOWN TO BE REMOVED
AND REINSTALLED, REMOVE AND REINSTALL ALL ITEMS
LOCATED IN CEILING, INCLUDING (BUT NOT LIMITED TO) LIGHTS,
DIFFUSERS, SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU,
ALARMS, ANTENNAS, OCCUPANCY SENSORS, SPEAKERS,
NURSE CALL, CODE LIGHTS, EMERGENCY SHOWER, CAMERA,
WIFI ACCESS POINT, CURTAIN TRACK, PATIENT LIFT OR
ACCESS HATCHES AS REQUIRED. ALL ITEMS MAY NOT BE
INDICATED ON DRAWINGS. FIELD VERIFY FOR FULL SCOPE OF
WORK.
7. REFER TO ROOM FINISH SCHEDULE FOR CEILING HEIGHTS /
MATERIAL AND LOCATIONS, UNLESS NOTED OR SHOWN
OTHERWISE. WHERE NOT SCHEDULED OR SHOWN, MATCH
EXISTING CEILING HEIGHTS AND MATERIALS.
8. REMOVE AND REPLACE CEILING SYSTEMS IN RME STORAGE
AND OTHER ROOMS WHERE DESIGNATED FOR MECHANICAL
WORK. REVIEW & COORDINATE EXISTING CONDITIONS W/ COR
FOR NEED TO REMOVE ALL OR PORTIONS OF EXISTING
CEILINGS AND MAINTAINING COMPLIANCE WITH VA OEHRM
REQ'TS. FOR PHYSICAL SECURITY.
9. IN RME STORAGE ROOMS, NOTIFY THE COR IF EXISTING WALL
CONSTRUCTION AND FINISHES DO NOT EXTEND TO
STRUCTURAL DECK ABOVE (APPLIES TO ALL SHEETS) UNLESS
NOTED OTHERWISE.
10. WHERE 1-HR-RATED CEILINGS ARE TO BE PROVIDED IN LIEU OF
EXTENDING WALLS TO STRUCTURE ABOVE FOR HORIZONTAL
ENCLOSURE OF ROOMS FOR SECURITY AND FIRE SEPARATION,
PROVIDE FIRE-RATED ASSEMBLIES OF GYPSUM WALLBOARD,
LIGHT-GAUGE METAL FRAMING AND CEILING SUSPENSION
SYSTEMS.
11. EXISTING CEILING TYPES, CEILING-MOUNTED FIXTURES AND
EQUIPMENT LOCATIONS OUTSIDE OF RME STORAGE ROOMS
OR OTHER ROOMS DESIGNATED FOR WORK SHOWN ON
ENLARGED REFLECTED CEILING PLANS ARE NOT FULLY
IDENTIFIED IN THE REFLECTED CEILING PLANS. FIELD VERIFY
EXISTING CEILING CONDITIONS IN CORRIDORS AND ROOMS
AFFECTED BY WORK PRIOR TO BIDDING AND BEFORE START
OF PROJECT WITH THE COR AND GENERAL CONTRACTOR.
12. FOR CEILINGS IN CORRIDORS AND ROOMS TO REMAIN
OCCUPIED AND FUNCTIONAL DURING NORMAL BUSINESS
HOURS, EXISTING SUSPENDED ACOUSTICAL CEILING TILES AND
GRID ARE TO BE REMOVED ONLY TO THE EXTENTS REQUIRED
TO PERMIT WORK DURING THE WORK SHIFT. REINSTALL GRID
AND CEILING TILES PRIOR TO THE END OF EVERY WORK SHIFT
UNLESS DIRECTED OTHERWISE BY THE COR.
13. MINIMIZE DISRUPTION TO ADJACENT SPACES. ACCESS ABOVE
CEILING SPACE AS NEEDED TO ACCOMPLISH SCOPE OF WORK.
REPLACE DAMAGED PADS AND SUSPENDED GRID MEMBERS
AS NEEED. RETURN ALL SYSTEMS TO PREVIOUS CONDITIONS.
14. REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY IN
INDIVIDUAL ROOMS UNLESS NOTED OTHERWISE. SEE
REFLECTED CEILING GENERAL NOTE ABOVE FOR CEILINGS IN
CORRDORS AND ROOMS TO REMAIN OCCUPIED AND
FUNCTIONAL DURING NORMAL BUISNESS HOURS.
15. COORDINATE SCHEDULING FOR REMOVAL AND
REINSTALLATION OF CEILINGS WITH THE COR.
16. CONTRACTOR IS TO REINSTALL ACOUSTICAL CEILING TILES
WHERE REMOVED IN ADJACENT ROOMS FOR PERFORMANCE
OF WORK AT THE END OF EVERY WORK SHIFT.
17. REMOVAL OF EXISTING CEILINGS AND TEMPORARY
MODIFICATION OF EXISTING SPRINKLER HEADS ARE TO BE
COORDINATED TO HAPPEN CONCURRENTLY.
18. ALTHOUGH NOT SPECIFICALLY SHOWN, THE ENTIRE PROJECT
HAS FIRE SPRINKLER HEADS IN CEILINGS. SCRIBE CEILING
MATERIALS CAREFULLY FOR A TIGHT FIT OF PENETRATIONS
THROUGH CEILING MATERIAL .
19. IN AREAS WHERE CONSTRUCTION WORK IS TO TAKE PLACE
OVER AN EXTENDED PERIOD OF TIME AND ACCESS TO WORK
AREA IS TO BE RESTRICTED TO THE CONTRACTOR AND
DESIGNATED PERSONNEL, A 1-HR FIRE-RATED SEPARATION IS
REQUIRED BETWEEN ALL OCCUPIED SPACE AND
CONSTRUCTION AREAS. THIS PROTECTION INCLUDES ANY
EXISTING PENETRATIONS AND OPENINGS. COORDINATE
PLACEMENT, SCHEDULING OF INSTALLATION AND REMOVAL
WITH THE COR. SEE 'TEMPORARY BARRIERS & ENCLOSURES'
ON SHEET GI002.
20. WHERE CEILINGS OF DIFFERENT HEIGHTS ABUT AND WHERE
EXISTING BULKHEADS ARE TO BE REMOVED FOR ACCESS TO
WORK, REPLACE WITH GYPSUM WALL BOARD AND METAL
STUD BULKHEADS TO MATCH EXISTING CONFIGURATIONS . DO
NOT BUILD BULKHEADS OF ACOUSTICAL CEILING MATERIALS
UNLESS SPECIFICALLY DETAILED.
21. EXISTING MECHANICAL CEILING COMPONENTS ARE TO BE
REUSED UNLESS NOTED OTHERWISE. REFER TO MECHANICAL
DRAWINGS FOR QUANTITY AND TYPE OF NEW / REPLACEMENT
DIFFUSERS, RETURN AIR GRILLES, AND EXHAUST GRILLES.
SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.
22. FOR NEW MECHANICAL DIFFUSERS, GRILLES AND RELATED
CEILING-MOUNTED OR SUSPENDED ITEMS IN ROOMS TO BE
RENOVATED, SEE MECHANICAL DRAWINGS.
23. EXISTING ELECTRICAL DEVICES ARE TO BE REUSED UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL DRAWINGS FOR
QUANTITY AND TYPE OF NEW / REPLACEMENT LIGHTS,
SPEAKERS, DETECTORS, POWER OUTLETS, ETC. SCRIBE
CEILING MATERIALS CAREFULLY. WHERE NO DEVICES ARE
SHOWN ON PLANS, FIELD VERIFY LOCATION & QUANTITY OF
DEVICES IN EXISTING CEILING. THESE DEVICES WILL BE
RELOCATED TO THE NEW CEILING.
24. FOR NEW LIGHTING FIXTURE LAYOUTS IN ROOMS TO BE
RENOVATED, SEE ELECTRICAL DRAWINGS.
25. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND
CEILING-MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO
BE CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK
IN ROOMS AND WORK AREA. CLEANING SHALL MEET THE
APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF
WORK BY THE VA.
ARCHITECTURAL REFLECTED
CEILING PLAN NOTES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST-CURRENT
VERSION OF OSHA'S PUBLICATION 3142-12R "LEAD IN
CONSTRUCTION" (29 CFR 1926.62) FOR CONSTRUCTION
ACTIVITIES THAT DISTURB LEAD-BASED PAINTED SURFACES,
PAINT CONTAINING DETECTABLE LEVELS OF LEAD OR OTHER
MATERIALS CONTAINING LEAD..
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF
ASBESTOS AND LEAD BASED PAINT (LBP) REPORTS.
3. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP
REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH
MATERIALS IN THE AREA OF THE FACILITY IN QUESTION. REFER
TO THE VA'S ABATEMENT SPECIFICATIONS FOR HANDLING OF
MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT
SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.
4. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS
CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.
5. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE
HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND
NOTIFY THE GOVT. IMMEDIATELY FOR DIRECTION.
6. ALL CONTRACTORS' PERSONNEL IN AREAS NEAR DISTURBANCE
OR ABATEMENT OF HAZARDOUS MATERIALS MUST BE NOTIFIED
OF ACTIVITIES.
7. ASBESTOS AND LEAD-BASED PAINT ABATEMENT, IF REQUIRED,
SHALL BE CONDUCTED IN ACCORDANCE WITH VA
SPECIFICATIONS AND ALL APPLICABLE REGULATIONS.
8. ABATEMENT CONTRACTORS SHALL SCHEDULE WORK IN
GENERAL ACCORDANCE WITH THE PROJECT'S PHASING
STRATEGY.
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL
PENETRATIONS - CONSTRUCTION IS TO CONFORM TO
MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS /
PARTITIONS AND FLOORS. CONFORM WITH THE TESTED /
SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND
LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS
SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING
STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS
UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED
DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING
RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND
THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-
LABEL EXISTING WALL IF NECESSARY.
HAZARDOUS MATERIALS:
FIREPROOFING GENERAL NOTES:
PHASING GENERAL NOTES:
1. REFER TO SECTION 01 00 00 FOR PHASING REQUIREMENTS.
2. PHASES SHOWN IN THE PHASING DESCRIPTION ARE PART
OF THE SCOPE OF WORK CONTAINED IN THIS SET OF
CONTRACT DOCUMENT DRAWINGS.
3. A CONSTRUCTION PHASING PLAN SHALL BE PROVIDED BY
THE CONTRACTOR TO THE COR FOR REVIEW AND
APPROVAL PRIOR TO COMMENCEMENT OF THE WORK.
4. CONTRACTOR SHALL PROVIDE ALL SUBMITTALS AND
RECEIVE APPROVALS BEFORE CONSTRUCTION CAN START.
5. CONTRACTOR IS TO SUBMIT COORDINATION DRAWINGS
BEFORE CONSTRUCTION CAN START.
6. ALL WORK SHALL BE PERFORMED IN A MANNER TO ALLOW
FOR FULL OPERATION OF THE MEDICAL CENTER AT ALL
TIMES.
7. A SEVEN DAY NOTICE SHALL BE PROVIDED PRIOR TO ANY
INTERRUPTION OF UTILITY SERVICES.
8. TIMING OF WORK HOURS SHALL BE COORDINATED WITH
THE COR AT LEAST 7 DAYS PRIOR TO START OF WORK.
9. AT THE COMPLETION OF EACH WORK DAY, ALL AREAS
SHALL BE CLEANED OF CONSTRUCTION MATERIALS AND
EQUIPMENT TO ALLOW FOR CONTINUED OCCUPANCY OF
THE SPACE. THIS REQUIREMENT IS SPECIFIC TO CLINICAL
ROOMS DESIGNATED IN THE CONSTRUCTION PHASING
DESCRIPTION.
10. AT THE COMPLETION OF ALL PHASED WORK, TEMPORARY
INSTALLATIONS SHALL BE REMOVED BY THE CONTRACTOR
AND ANY REQUIRED REPAIRS SHALL BE PERFORMED. ANY
MATERIALS NOT SALVAGED BY THE OWNER SHALL BE
REMOVED BY THE CONTRACTOR.
11. OFF / WEEKEND HOURS WILL BE REQ'D IN SOME AREAS.
12. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED
IN ACTIVE PHASE DOES NOT ADVERSELY AFFECT NORMAL
OPERATIONS IN OTHER OCCUPIED SPACES.
13. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO
MAINTAIN SERVICE TO OCCUPIED SPACES.
14. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED
STEP TO ACHIEVE PHASED CONSTRUCTION. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO DEVELOP A
CONSTRUCTION PLAN TO INSTALL THE DESIGN WITHIN THE
PHASING CONSTRAINTS.
15. HVAC SYSTEMS (EXCEPT ACA-AHU-1,-2,-3,-4) IMPACTED BY
THE PROJECT SCOPE SHALL NOT BE OFFLINE FOR LONGER
THAN A 6-HOUR SPAN. PROVIDE TEMPORARY PORTABLE
HEATERS/COOLERS FOR SPACES IMPACTED BY HVAC
SYSTEM OUTAGES TO MAINTAIN ADEQUATE OCCUPIED
SPACE CONDITIONS DURING CONSTRUCTION.
PHASING GENERAL NOTES:
1. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE
PERFORMED DURING UNOCCUPIED HOURS (NIGHTS,
WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO
ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR
PATIENTS ARRIVE.
2. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT
HAVE ADVERSE EFFECTS (EXCESSIVE NOISE, EXCESSIVE
VIBRATION, ETC.) SHALL BE PERFORMED DURING
UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR
HOLIDAYS).
3. COORDINATE SCHEDULE WITH THE VA TO DETERMINE
EXACT ALLOWABLE TIMES OF CONSTRUCTION ACTIVITIES IN
EACH PROJECT AREA.
CONSTRUCTION ACTIVITIES:
RICHARD
JOSEPH
ONKEN
A-5125
A
R C H I T E
C
T
S T
A T
E
O F N E B
R A
S K
A
6/23/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
100% FINAL BID
DOCUMENTS
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
06/26/2025
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5
A
-2
-1
.A rc h
R
-C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t
S to ra g e
.r v t
/2
/2
:0
:0
P
M
GI007
ABBREVIATIONS, SYMBOLS AND GENERAL
NOTES
AHT SW
FIRE ALARM SHEET INDEX:
CONDUIT CONCEALED IN FINISHED AREAS -
EXPOSED IN UNFINISHED AREAS
LINETYPE/SYMBOL DESCRIPTION
CONDUIT STUB - TERMINATE WITH CAP
CONDUIT CONCEALED IN OR UNDER
FLOOR SLAB
CONDUIT TURNING UP
CONDUIT TURNING DOWN
FLEXIBLE CONNECTION TO EQUIPMENT
NUMBER OF WIRES
2D
V
S
P
EOL END OF THE LINE RESISTOR
2D
V
2V
S
P
D
WM
FIRE ALARM-WIRE SYMBOLS:
NOTES:
1. SEE SPECS AND CUTSHEET PACKAGE FOR ADDITIONAL WIRE INFORMATION.
2. ALL CONDUIT USED FOR FIRE ALARM WIRE SHALL BE MINIMUM OF 3/4".
SENSOR LOOP WIRING NUMBER ONE TWISTED PAIR PENN D990
SENSOR LOOP WIRING NUMBER TWO TWISTED PAIR WEST
PENN D99
UNDERGROUND SENSOR LOOP WIRING TWO PAIR-WEST PENN AQC225
NUMBER
NOTIFICATION LINE WIRING CIRCUIT 2 #12 WEST PENN 998
NOTIFICATION LINE WIRING CIRCUIT 4 #12 WEST PENN 998
UNDERGROUND NOTIFICATION LINE T4 #12 WEST PENN AQC227
WIRING CIRCUIT
NOTIFICATION SPEAKER - AUDIO 2 #18 WEST PENN D980
UNDERGROUND NOTIFICATION SPEAKER- 2 #16 WEST PENN AQC225
AUDIO
24V UN-INTERRUPTIBLE POWER 2 #14 WEST PENN 994
24V UN-INTERRUPTIBLE POWER 2 #14 WEST PENN AQC226
WIRE MOLD RACEWAY
1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES, STANDARDS, AND
MANUFACTURER'S INSTALLATION REQUIREMENTS.
2. REVIEW ALL PROJECT DOCUMENTS INCLUDING SPECS AND DRAWINGS PERTAINING TO ALL
DISCIPLINES PRIOR TO SUBMITTING A BID. SUBMIT PRE-BID REQUEST FOR INFORMATION FOR
ITEMS IN QUESTION AND/OR CONFLICTS FOUND.
3. DRAWINGS SHOW THE DESIGN INTENT DIAGRAMMATICALLY. THEY DO NOT SHOW THE EXACT
UTILITY ROUTING NOR EVERY ELBOW, OFFSET, ETC. WHERE REQUIRED, THE CONTRACTOR
SHALL MAKE ADJUSTMENTS TO THEIR SYSTEMS TO AVOID CONFLICT WITH THE STRUCTURE
AND OTHER DISCIPLINES. THE COST FOR SUCH ADJUSTMENTS SHALL BE INCLUDED IN THE BID.
4. OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR WORK PERFORMED.
5. OBTAIN UTILITY PURVEYOR REQUIREMENTS PRIOR TO PURCHASING EQUIPMENT OR
PERFORMING WORK.
6. THE G.C. OR C.M. TEAM SHALL LEAD THE SUBCONTRACTORS IN PROVIDING A COORDINATED
SET OF SHOP DRAWINGS. SEE GENERAL REQUIREMENTS SPEC FOR ADDITIONAL
INFORMATION.
7. PROVIDE FIRESTOPPING FOR ALL UTILITY PENETRATIONS THRU FIRE-RATED ASSEMBLIES.
8. COORDINATE FRAMING REQUIREMENTS FOR ACCESS PANELS AND EQUIPMENT/PANEL
SUPPORTS WITH G.C. OR C.M. PRIOR TO SUBMITTING BID.
9. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CORRECTION OF CONSTRUCTION
DEFICIENCIES LISTED ON THE JOB SITE OBSERVATION REPORT. RETURN THE JOB SITE
OBSERVATION REPORT TO A/E WITH DEFICIENCIES SIGNED OFF. PROVIDE PHOTOGRAPHIC
AND/OR VIDEO EVIDENCE OF CORRECTED DEFICIENCIES IF REQUESTED BY THE ENGINEER.
10. PROVIDE CLOSEOUT DOCUMENTATION UPON COMPLETION OF PROJECT. SEE GENERAL
REQUIREMENTS SPEC FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
2021 INTERNATIONAL BUILDING CODE (IBC)
2024 NFPA 101 LIFE SAFETY CODE
2022 NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
2023 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2015 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISERESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2022.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2022.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
CODES AND STANDARDS:
POINT OF CONNECTION OR DISCONNECTION
KEYNOTE SYMBOL#
DETAIL CALL-OUT SYMBOL
###-# EQUIPMENT TAG
GENERAL LEGEND:
SYMBOL DESCRIPTION
SECTION CUT CALL-OUT SYMBOL
ENLARGED PLAN CALL-OUT SYMBOL
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW CONSTRUCTION
(E) EXISTING TO REMAIN
LINETYPE DESCRIPTION
(X) EXISTING TO BE REMOVED
1. FIRE ALARM WORK SHALL BE CONSTRUCTED IN A PROFESSIONAL MANNER. COMPONENTS
SHALL BE CLEANED PRIOR TO OWNER TURNOVER.
2. THE SCHEDULED EQUIPMENT SHALL BE USED AS THE BASIS OF DESIGN. MODEL NUMBERS
ARE PROVIDED FOR REFERENCE ONLY. EQUIPMENT SHALL MEET SPECIFIED PERFORMANCE.
THE CONTRACTOR SHALL IDENTIFY ALL SELECTED OPTIONS IN THE SUBMITTAL.
3. IF A CONTRACTOR PROVIDES EQUIPMENT OTHER THAN THE BASIS OF DESIGN, THAT
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED AS A RESULT. THAT
INCLUDES, BUT IS NOT LIMITED TO, STRUCTURAL MODIFICATIONS FOR INCREASED WEIGHT,
AND ELECTRICAL EQUIPMENT, WIRING, CONDUIT, AND BREAKER CHANGES FOR DIFFERENT
ELECTRICAL REQUIREMENTS.
4. COORDINATE POWER REQUIREMENTS WITH THE E.C. PRIOR TO PROVIDING SUBMITTALS TO
THE ENGINEER.
5. SEE SPEC SECTION 26 05 33 FOR CONDUIT/RACEWAY SYSTEM INSTALLATION, AND
CLEANING REQUIREMENTS.
6. PROVIDE CONDUIT OR RACEWAY EXPANSION JOINT THAT ACCOMMODATES THE BUILDING
MOVEMENT WHERE CONDUIT OR RACEWAY CROSSES BUILDING EXPANSION JOINT.
7. PAINT INTERIOR EXPOSED CONDUIT/RACEWAY, PULL BOXES, AND ASSOCIATED
HANGERS/SUPPORTS LOCATED IN OCCUPIED SPACES TO MATCH THE SURROUNDING
ARCHITECTURAL COLOR SCHEME. PAINT EXTERIOR CONDUIT, PULL BOXES AND ASSOCIATED
HANGERS/SUPPORTS ADJACENT TO EXTERIOR WALL TO MATCH WALL COLOR. FINAL
COLORS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. SEE SPEC SECTION 28 0500
FOR ADDITIONAL REQUIREMENTS.
8. PROVIDE IDENTIFICATION FOR CONDUIT, PULL BOXES, AND EQUIPMENT PER SPEC SECTION
26 0553.
9. CONDUIT/RACEWAY SHALL NOT PASS THRU NOR UNDER DATA ROOMS, ELEVATOR
MACHINE ROOMS, ELEVATOR HOISTWAYS, SKYLIGHTS, AND ROOF ACCESS HATCHES.
10. PULL BOXES SHALL BE ACCESSIBLE. PROVIDE KEYED ACCESS PANELS WHERE PULL BOXES
HAVE BEEN LOCATED IN CONCEALED AREAS. ACCESS PANEL SIZE SHALL BE LARGE ENOUGH
TO ACCESS EACH PULL BOX.
11. ALL FIRE ALARM LANDING ON PULL BOXES SHALL LAND IN TERMINAL BLOCKS. INSTALL
TERMINAL BLOCK ON THE INSIDE BACK PART OF BOX. LAND AND TERMINATE INCOMING
WIRES ON THE LEFT HAND SIDE. LAND AND TERMINATE OUTGOING WIRES ON THE RIGHT
HAND SIDE.
12. DEVICES SHALL NOT BE SET TO OUTPUT SIGNALS AT A MAXIMUM OF 110 dB. A VISUAL
DVICE SHALL BE INCLUDED FOR DEVICES WITH AMBIENT SOUND LEVELS ABOVE 105 dB.
13. WIRING SHALL BE TERMINATED ON EACH DEVICE AND AVOID LOOPING.
14. FIRE ALARM CONTRACTOR SHALL PASS TESTS REQUIRED BY LOCAL FIRE DEPARTMENTS.
CONTRACTOR IS RESPONSIBLE FOR ANY CORRECTIONS REQUIRED BY THE LOCAL FIRE
DEPARTMENT.
15. FIRE ALARM PANEL SHALL BE ACCESSIBLE TO FIRE DEPARTMENT PERSONNEL AND
AUTHORIZED MAINTENANCE DEPARTMENT.
16. ANNUNCIATION AT FIRE ALARM PANEL SHALL BE DIFFERENT BETWEEN A SUPERVISORY
SIGNAL & TROUBLE SIGNAL.
17. FIRE ALARM CONTROL PANEL SHALL SUPERVISE ANNUNCIATOR PANEL, FIRE ALARM
INITIATING DEVICES, AND NOTIFICATION DEVICES.
18. WIRING WITHIN EQUIPMENT AND TERMINAL CABINETS SHALL BE NUMBERED IN
SEQUENTIAL ORDER. THIS NUMBERING ORDER SHALL BE MAINTAINED ALL THE WAY TO
DEVICE FINAL CONNECTION.
19. ALL EXISTING FIRE ALARM DEVICES SHALL BE SALVAGED AND RETURNED BACK TO THE
OWNER.
20. DUCT TYPE SMOKE DETECTOR SHALL HAVE A MARKED LOCATION ON VISIBLE DUCTWORK
FOR ACCESS REQUIREMENTS.
21. INSTALL PANELS AT NO HIGHER THAN 6'-0" ABOVE FINISHED FLOOR.
FIRE ALARM NOTES:
LINETYPE/SYMBOL DESCRIPTION
NOTES:
1. NOT ALL SYMBOLS MAY APPLY.
2. SEE SPECS AND DRAWINGS FOR SPECIFIC COMPONENT REQUIREMENTS.
3. INITIATING/DETECTION DEVICE CIRCUITS SHALL BE WIRED WITH CLASS "B".
4. NOTIFICATION DEVICE CIRCUITS SHALL BE WIRED WITH CLASS "B".
FIRE ALARM-SYMBOLS:
FACP EXISTING FIRE ALARM CONTROL PANEL
DUCT SMOKE DETECTOR WITH TWO AUXILIARY CONTACTS -
MANUFACTURER TO BE COMPATIBLE WITH EXISTING SYSTEMD
SD
MR
MULTI - VOLTAGE CONTROL RELAY -
MANUFACTURER TO BE COMPATIBLE WITH EXISTING SYSTEM
INITIATING DEVICE DESCRIPTION:
FSD X = DATA CIRCUIT NUMBER
# = DEVICE NUMBER
X-#
NOTIFICATION DEVICE DESCRIPTION:
SS
XX CD
Y-#
A-#
#W
XX = CANDELA SIZE
Y = FACP/RPS # = CIRCUIT NUMBER
A = AMP. PANEL # = CIRCUIT NUMBER
# = WATTAGE SIZE
CONTRACTOR ABBREVIATIONS:
ABBREVIATION DESCRIPTION
C.M. CONSTRUCTION MANAGER
E.C. ELECTRICAL CONTRACTOR
F.A.C. FIRE ALARM CONTRACTOR
F.P.C. FIRE PROTECTION CONTRACTOR
G.C. GENERAL CONTRACTOR
M.C. MECHANICAL CONTRACTOR
P.C. PLUMBING CONTRACTOR
T.C. TECHNOLOGY CONTRACTOR
T.C.C. TEMPERATURE CONTROL CONTRACTOR
1. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID SUBMISSION TO VERIFY ALL FIELD
CONDITIONS INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
A. LOCATIONS OF EXISTING FIRE ALARM SYSTEMS.
B. LOCATIONS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL,
PLUMBING, TECHNOLOGY, AND FIRE PROTECTION.
C. EXISTING SURFACES WHICH REQUIRE ALTERING.
D. EXISTING FIRE ALARM CONTROL PANEL CONDITIONS.
2. NOTIFY OWNER & LOCAL FIRE PROTECTION JURISDICTION OF REQUIRED SYSTEM
SHUTDOWNS AT LEAST TWO WEEKS PRIOR TO SHUTDOWN. EXACT SHUTDOWN TIME AND
PROCEDURE SHALL BE COORDINATED WITH OWNER & LOCAL FIRE PROTECTION
JURISDICTION AT LEAST 96 HOURS PRIOR TO SHUTDOWN.
3. WHEN FIRE ALARM CONDUIT/RACEWAY SYSTEMS OR EQUIPMENT ARE NOTATED TO BE
PERMANENTLY REMOVED THEIR ASSOCIATED COMPONENTS SHALL ALSO BE REMOVED
INCLUDING HANGERS, SUPPORTS, AND ACCESSORIES.
4. COORDINATE THE DISCONNECTION AND REMOVAL OF THE POWERED SYSTEMS WITH THE
E.C. WHEN REMOVING POWERED FIRE ALARM EQUIPMENT.
5. REPAIR EXISTING FLOORS, WALLS, AND CEILINGS IN ALTERED AREAS TO MATCH EXISTING.
SEE ARCHITECTURAL PLANS FOR FINISH DETAILS IN REMODEL AREAS.
6. F.A.C SHALL GUARANTEE AFFECTED (E) TECHNOLOGY DEVICES REMAIN OPERATIONAL WITH
ADEQUATE SIGNAL CONTINUITY.
RENOVATION NOTES:
AFG ABOVE FINISHED GRADE
CM COUNTER MOUNTED
FBO FURNISHED BY OTHERS
FF FINISHED FLOOR
IG ISOLATED GROUND
INV EMERGENCY INVERTER
PED PEDESTAL MOUNTED
UNO UNLESS OTHERWISE NOTED
FIRE ALARM ABBREVIATIONS:
ABBREVIATION DESCRIPTION
+XX DIMENSIONED HEIGHT ABOVE FINISHED FLOOR
-XX DIMENSIONED HEIGHT BELOW FINISHED FLOOR
1W ONE WIRE
2W TWO WIRE
3W THREE WIRE
A AMPERE
AFG ABOVE FINISH GRADE
AWG AMERICAN WIRE GAUGE
C.O. CONDUIT ONLY
D DEDICATED DEVICE ON INDIVIDUAL BRANCH CIRCUIT. CIRCUIT CAN
BE COMBINED WITH OTHER CIRCUITS FOR HOMERUNNING TO PANEL.
DN DOWN
DISC DISCONNECT
DN DOWN
DTR DOWN THRU ROOF
EM EQUIPMENT POWERED WITH EMERGENCY SOURCE INTERNAL OR
EXTERNAL.
FACP FIRE ALARM CONTROL PANEL
FD FIRE DAMPER
FL FULL LOAD AMPS
FSD FIRE SMOKE DAMPER
FT, ' FOOT OR FEET
GFCI GROUND FAULT CIRCUIT INTERRUPTER
IN., " INCH OR INCHES
J-BOX JUNCTION BOX
KVA KILOVOLT AMPERE
KW KILOWATT
MAX MAXIMUM
MIN MINIMUM
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO., # NUMBER
NTS NOT TO SCALE
RPS REMOTE POWER SUPPLY
SPEC SPECIFICATION
SD SMOKE DETECTOR
TYP TYPICAL
U.C. UNDERGROUND CONDUIT
UNO UNLESS NOTED OTHERWISE
UTR UP THRU ROOF
W WIRES
WP WEATHERPROOF
NOTES:
1. NOT ALL ABBREVIATIONS MAY APPLY.
2. FIRE ALARM SCHEDULES CONTAIN EQUIPMENT TAG ABBREVIATIONS THAT ARE HEREBY
INCORPORATED INTO THE ABBREVIATION LIST.
3. SEE OTHER DISCIPLINE DRAWINGS WITHIN THE CONSTRUCTION DOCUMENTS FOR
ABBREVIATIONS NOT DEFINED ABOVE OR IN FIRE ALARM SCHEDULES.
1. THE PROJECT WILL BE CONSTRUCTED IN MULTIPLE PHASES. SEE ARCHITECTURAL &
PHASING DOCUMENTS FOR PHASING REQUIREMENTS.
2. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED IN ACTIVE PHASE DOES NOT
ADVERSELY AFFECT NORMAL OPERATIONS IN OTHER OCCUPIED SPACES.
3. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO MAINTAIN SERVICE TO OCCUPIED
SPACES.
4. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED STEP TO ACHIEVE PHASED
CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A CONSTRUCTION
PLAN TO INSTALL THE DESIGN WITHIN THE PHASING CONSTRAINTS.
5. HVAC SYSTEMS (EXCEPT ACA-AHU-1,-2,-3,-4) IMPACTED BY THE PROJECT SCOPE SHALL NOT
BE OFFLINE FOR LONGER THAN A 6-HOUR SPAN. PROVIDE TEMPORARY PORTABLE
HEATERS/COOLERS FOR SPACES IMPACTED BY HVAC SYSTEM OUTAGES TO MAINTAIN
ADEQUATE OCCUPIED SPACE CONDITIONS DURING CONSTRUCTION.
6. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE PERFORMED DURING
UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO
ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR PATIENTS ARRIVE.
7. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT HAVE ADVERSE EFFECTS
(EXCESSIVE NOISE, EXCESSIVE VIBRATION, ETC.) SHALL BE PERFORMED DURING
UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS).
8. COORDINATE SCHEDULE WITH THE VA TO DETERMINE EXACT ALLOWABLE TIMES OF
CONSTRUCTION ACTIVITIES IN EACH PROJECT AREA.
PHASING NOTES:
R EXISTING VOLTAGE RELAY
C EXISTING CONTROLS BOX
LINE TYPE /SYMBOL DESCRIPTION
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR SMOKE BARRIER
1-HOUR HAZARDOUS AREA FIRE BARRIER
FIRE-RATED ASSEMBLY LEGEND:
S S S S
HZ HZ HZ HZ
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
S
TATE OF CALIFORNIA
Exp. 06-30-26
SIGNED: 06/23/25
F I R
E
ROT EC T
IO
N
P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
06/26/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m…