598A4-24-101 -Drawing Bid set Vol I -52 pages.pdf

PDF 14 MB Posted

Attached to
Z2DA--Correct Reusable Medical Equipment Storage PN: 589A4-24-101
Solicitation number
36C25525R0114
Issued by

About this file

This document is a detailed architectural drawing set for a renovation project at Harry S. Truman Memorial Veterans' Hospital in Columbia, Missouri. The project, titled "Correct Reusable Medical Equipment Storage" (Project Number 589A4-24-101), involves comprehensive HVAC system renovations and upgrades across multiple building floors, focusing on the Ambulatory Care Addition (ACA) and Reusable Medical Equipment (RME) storage rooms.

The project includes three primary bid items with associated deduct alternatives: Bid Item #1 covers general construction for RME storage rooms, involving HVAC system renovations to meet temperature and humidity control requirements, including installation of new steam generators and humidification grids. Bid Item #2 and #3 provide options to delete specific work associated with ACA air handling units (AHUs 3 and 4). The renovation spans basement through sixth floors, with specific attention to infection control measures, phased construction sequencing, and maintaining hospital operations during construction. The project involves replacing AHUs, VAV boxes, reheat coils, heating water systems, and upgrading various mechanical, electrical, and plumbing infrastructure while adhering to strict VA infection control protocols.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT SIGNATURE BLOCK

DIRECTOR DATE

CHIEF OF STAFF DATE

ASSOCIATE DIRECTOR DATE

ASSISTANT DIRECTOR DATE

ASSOCIATE DIRECTOR OF PATIENT SERVICES DATE

EXECUTIVE OF HIGH RELIABILITY DATE

CHIEF OF LOGISTICS DATE

INFECTION CONTROL DATE

SAFETY OFFICER DATE

CHIEF FACILITIES MANAGEMENT DATE

CHIEF OF STERILE PROCESSING SERVICES DATE

BID ITEMS & DEDUCT ALTS:

REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS

A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT

RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN

THE DRAWINGS AND SPECIFICATIONS.

1. RME STORAGE ROOMS: WORK INCLUDES:

A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET

TEMPERATURE AND HUMIDITY CONTROL

REQUIREMENTS FOR RME STORAGE ROOMS.

INCLUDING INSTALLATION OF REPLACEMENT

AND/OR NEW STEAM GENERATORS AND

HUMIDIFICATION GRIDS.

B. REPLACEMENT OF NON-COMPLIANT SUSPENDED

ACOUSTICAL CEILING PANELS IN DESIGNATED RME

STORAGE ROOMS.

2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES

RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:

A. REPLACEMENT OF AHUs 1,2,3 AND 4.

B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE

AIR VOLUME (VAV) BOXES, REHEAT COILS AND

OTHER RELATED ITEMS.

C. REPLACEMENT OF HEATING WATER SYSTEM

INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION

TANK AND AIR SEPARATOR.

B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED

BELOW:

1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-

AHU-4 AND ASSOCIATED UTILITIES.

C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED

BELOW:

1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-

AHU-3 AND ASSOCIATED UTILITIES.

BID ITEMS & DEDUCT:

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:1

P

M

GI001

COVER SHEET - VOLUME I

AHT SW

HARRY S. TRUMAN MEMORIAL

VETERANS' HOSPITAL

C or re ct

R eu sa bl e M ed ic al E qu ip m en t S to ra ge

U

.S . D ep ar tm en t o f V et er an s

A ffa irs

Correct Reusable Medical Equipment Storage 800 Hospital Dr, Columbia, MO 65201

BLDG. 14 -

WAREHOUSE

BLDG. 1 -

HOSPITAL

PARKING

GARAGE 'A'

OR - SPS ADDITION

BLDG. 23 -

CHILLER

PLANT

STAFF/

CONTR

ENTRANCE

HOSPITAL

EAST

ENTRANCE

SOUTH STAFF PARKING

LOT 'D'

ACCESSIBLE PARKING

LOT 'B'

NORTH WEST PARKING

LOT 'C'

ACA BUILDING

ACA BLDG

PORTE

COCHERE

ORIGINAL

HOSPITAL

BLDG. 22 -

FACILITIES

MANAGEMENT

PARKING GARAGE ADD'N

NORTH EMERGENCY

ROOM ENTRANCE

EMERGENCY

ROOM

PATIENT

EDUCATION

CENTER

HOSPITAL

NORTH

ENTRANCE

BLDG. 16 -

GENERAL

STORAGE

HOSPITAL

MAIN

ENTRACE

WEST

EMERGENCY

ROOM

ENTRANCE

BLDG. 24 -

UPS

WAREHOUSE

BLDG. 14 -

WAREHOUSE

LOADING

DOCK

UNIV OF MISSOURI MEDICAL CENTER CAMPUS

UNIV OF MISSOURI

CAMPUS

E. STADIUM DRIVE

HOSPITAL DRIVE

M O

N K

D R

IV

E

T

IG

E R

A V

E N

U E

D E

A N

S ' D

R

IV

E

LOCATION MAP / PHOTO

NOT TO SCALE

VOLUME I

Mark Revisions: Date:

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:1

P

M

GI002

INDEX OF DRAWINGS

AHT SW

INDEX OF DRAWINGS

GENERAL INFORMATION - VOLUME I

GI001 COVER SHEET - VOLUME I

GI002 INDEX OF DRAWINGS

GI003 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

GI004 SITE PLAN

INFECTION CONTROL - PHASING

GI100 BASEMENT FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI101 FIRST FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI102 SECOND FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI103 THIRD FLOOR - FLOOR PLAN - OVERALL - INFECTION CONTROL - PHASING

GI104 FOURTH, FIFTH, SIXTH, MACH LVL & PH FLOOR PLANS - INFECTION CONTROL -

PHASING

GI601 NOTES AND DETAILS - INFECTION CONTROL

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SS100 BASEMENT FLOOR PLAN - OVERALL

SS101 FIRST FLOOR PLAN - OVERALL

SS102 SECOND FLOOR PLAN - OVERALL

SS103 THIRD FLOOR PLAN - OVERALL

SS104 BASEMENT FLOOR FRAMING PLAN, AREA E & F

SS105 FIRST FLOOR, ENLARGED PLANS

SS106 FIRST FLOOR FRAMING PLAN, AREAS E & F

SS107 ENLARGED FLOOR PLANS

SS108 SECOND FLOOR FRAMING PLAN, AREAS E & F

SS109 ELEVATOR MACHINE ROOM PLAN - LOWER LEVEL

SS601 DETAILS

ARCHITECTURAL

AE100 BASEMENT FLOOR - FLOOR PLAN - OVERALL

AE101 BASEMENT FLOOR PLAN - ACA BUILDING- AREAS E & F

AE102 FIRST FLOOR - FLOOR PLAN - OVERALL

AE103 SECOND FLOOR - FLOOR PLAN - OVERALL

AE104 THIRD FLOOR - FLOOR PLAN - OVERALL

AE105 FOURTH, FIFTH, SIXTH, MACH. LVL. & P.H. FLOOR PLANS-OVERALL

AC100 BASEMENT FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC101 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A

AC102 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC103 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C

AC104 FIRST FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D

AC105 FIRST FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC106 FIRST FLOOR REFLECTED CEILING PLAN, BUILDING 1 - AREA G

AC107 SECOND FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC108 SECOND FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC109 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA A

AC110 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA B

AC111 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA C

AC112 THIRD FLOOR - REFLECTED CEILING PLAN, BUILDING 1 - AREA D

AC113 THIRD FLOOR - REFLECTED CEILING PLAN, ACA BUILDING - AREAS E & F

AC114 THIRD FLOOR - REFLECTED CEILING PLAN - AREA G

AC115 FOURTH AND SIXTH FLOOR - REFLECTED CEILING PLAN

AE301 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS A,B,C

AE302 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA D

AE303 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS E,F,G

AE304 FIRST FLOOR - LARGE SCALE FLOOR & RCP'S, AREA G

AE305 SECOND FLOOR - LARGE SCALE FLOOR & RCP'S, AREAS B,D,E,F

AE306 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREAS A,B,C,D,E,F

AE307 THIRD FLOOR - LARGE SCALE FLOOR & RCP's, AREA G

AE601 ROOM FINISH SCHEDULE

GENERAL INFORMATION - VOLUME II

GI005 COVER SHEET - VOLUME II

GI006 INDEX OF DRAWINGS

GI007 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

FIRE ALARM

FA001 FIRE ALARM COVER SHEET

FA100 FIRE ALARM - BASEMENT FLOOR PLAN

FA101 FIRE ALARM - FIRST FLOOR PLAN

FA102 FIRE ALARM - SIXTH FLOOR PLAN

FAD201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

FAD202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION

FA201 FIRE ALARM - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

FA202 FIRE ALARM - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

FA203 FIRE ALARM - PENTHOUSE FLOOR PLAN

FA301 FIRE ALARM DETAILS

PLUMBING

P001 PLUMBING COVER SHEET

P100 PLUMBING - BASEMENT FLOOR PLAN

P101 PLUMBING - FIRST FLOOR PLAN

P102 PLUMBING - THIRD FLOOR PLAN

P103 PLUMBING - SIXTH FLOOR PLAN

PD201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

PD202 PLUMBING - ENALARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

PD203 PLUMBING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

P201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

P202 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

P203 PLUMBING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

P204 PLUMBING - PENTHOUSE FLOOR PLAN

P401 PLUMBING - DETAILS

VENTILATION

MH001 VENTILATION COVER SHEET

MH100 VENTILATION - BASEMENT FLOOR PLAN

MH101 VENTILATION - FIRST FLOOR PLAN

MH102 VENTILATION - SECOND FLOOR PLAN

MH103 VENTILATION - THIRD FLOOR PLAN

MH104 VENTILATION - FOURTH FLOOR PLAN

MHD201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

MHD202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION

MHD203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - DEMOLITION

MHD204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

MH201 VENTILATION - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

MH202 VENTILATION - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

MH203 VENTILATION - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

MH204 VENTILATION - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL

MH205 VENTILATION - ENLARGED BASEMENT FLOOR PLAN ROOMS

MH206 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH207 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH208 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH209 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH210 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH211 VENTILATION - ENLARGED FIRST FLOOR PLAN ROOMS

MH212 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS

MH213 VENTILATION - ENLARGED SECOND FLOOR PLAN ROOMS

MH214 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS

MH215 VENTILATION - ENLARGED THIRD FLOOR PLAN ROOMS

MH216 VENTILATION - ENLARGED FOURTH FLOOR PLAN ROOMS

MH301 VENTILATION SECTION VIEWS

MH401 VENTILATION DETAILS

MH402 VENTILATION DETAILS

MH501 VENTILATION SCHEDULES

MH502 VENTILATION SCHEDULES

MH701 VENTILATION CONTROLS

MH702 VENTILATION CONTROLS

MH703 VENTILATION CONTROLS

MH704 VENTILATION CONTROLS

MH705 VENTILATION CONTROLS

MH706 VENTILATION CONTROLS

MH707 VENTILATION CONTROLS

MH708 VENTILATION CONTROLS

PIPING

MP001 PIPING COVER SHEET

MP100 PIPING - BASEMENT FLOOR PLAN

MP101 PIPING - FIRST FLOOR PLAN

MP102 PIPING - SECOND FLOOR PLAN

MP103 PIPING - THIRD FLOOR PLAN

MP104 PIPING - SIXTH FLOOR PLAN

MPD201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

MPD202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - DEMOLITION

MPD203 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

MPD204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #1

MPD205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION - DEDUCT #2

MPD206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

MPD207 PIPING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION

MPD208 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - DEMOLITION

MPD209 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - DEMOLITION

MP201 PIPING - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

MP202 PIPING - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

MP203 PIPING - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

MP204 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP205 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #1

MP206 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL - DEDUCT #2

MP207 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP208 PIPING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

MP209 PIPING - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

MP210 PIPING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

MP211 PIPING - PENTHOUSE FLOOR PLAN - REMODEL

MP301 PIPING - SECTION VIEWS

MP401 PIPING DETAILS

MP402 PIPING DETAILS

MP403 PIPING DETAILS

MP501 PIPING SCHEDULES

MP601 PIPING FLOW DIAGRAMS - HYDRONIC

MP602 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #1

MP603 PIPING FLOW DIAGRAMS - HYDRONIC - DEDUCT #2

MP604 PIPING FLOW DIAGRAMS - STEAM

MP605 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #1

MP606 PIPING FLOW DIAGRAMS - STEAM - DEDUCT #2

ELECTRICAL

E001 ELECTRICAL COVER SHEET

E100 ELECTRICAL - BASEMENT FLOOR PLAN

E101 ELECTRICAL - FIRST FLOOR PLAN

E102 ELECTRICAL - SECOND FLOOR PLAN

E103 ELECTRICAL - THIRD FLOOR PLAN

E104 ELECTRICAL - SIXTH FLOOR PLAN

ED201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - DEMOLITION

ED202 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION

E201 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN - AREA E & F - REMODEL

E202 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - AREA E & F - REMODEL

E203 ELECTRICAL - ENLARGED SECOND FLOOR PLAN - AREA E & F - REMODEL

E204 ELECTRICAL - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - REMODEL

E205 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

E206 ELECTRICAL - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL

E207 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

E208 ELECTRICAL - ENLARGED FIRST FLOOR PLAN ROOMS - REMODEL

E209 ELECTRICAL - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL

E210 ELECTRICAL - PENTHOUSE FLOOR PLAN

E401 ELECTRICAL DETAILS

E501 ELECTRICAL SCHEDULES

E502 ELECTRICAL SCHEDULES

VOLUME I: VOLUME II:

ABBREVIATIONS

DET, DTL

DIAMETER

DIMENSION

DAMPER

DOWN

DISTRIBUTION PANEL

DOWNSPOUT, STORM DRAINAGE STRUCTURE

DOMESTIC WATER

DRAWING

EACH

EACH FACE, EXHAUST FAN

EXHAUST GRILLE

ELEVATION

ELECTRIC, ELECTRICAL CLOSET

EMER

EQ

EQUIP

EACH WAY

ELECTRIC WATER COOLER

EXH

EXIST

EXP

EXPANSION JOINT

EXPANSION JOINT

HEIGHT, HUMIDIFIER

HB

HANDICAPPED

HDW

HORIZ

HR

NA, N/A

NEC

NEUT

NIC

NOM

NTS

OA

OC

OD

OPNG

OPP

OH, OVHD

FRAME

FTG

T

T&B

TEL

TEMP

TERM

3/C

3/P

3 WAY

TO

TRANS

TS

TV

TW

TYP

WA

UH

V

VA

VAC

VCT

VENT

VERT

VEST

VS

VTR

VWC

W

W

W/

W/O

WC

WD

WP

WS

WT

WWF

SG

SAN

SCH

SD

SECT

SH

1 PH

SL

SP

SPDT

SPEC

SPST

SQ

SR

SS

ST

STA

STD

STL

SUP

SUSP

SV

SW

SWBD

SWGR

SIM

M

MAS

MATL

MAX

MECH

MET/MTL

MH

MIN

MISC

MM

MTD

MTG

MWP

MULL

KO

KVA

KW

L

LT

LAV

INT

INSUL

INV

JB

JC

JCT

JT

FXTR

GA

GALV

GFI, GFCI

GL

GWB

GYP

C

C

CAPACITY

CENTER TO CENTER

CEILING DIFFUSER

CEM

CAST IRON, COURTYARD INLET

CHILLER

CAST IRON PIPE

CIRCULATING

CONTROL JOINT

CIRCUIT

CENTERLINE

CEILING

CLEAR

CORRUGATED METAL PIPE

CORRUGATED METAL PIPE ARCH

CONCRETE MASONRY UNITS

CONDENSATE

CLEANOUT

COLUMN

COMMUNICATION

CONCRETE

CONDUCTOR

CONNECTION

CONSTRUCTION

CONTINUOUS

CONVERTER

NONREINFORCED CONCRETE PIPE

CONDUIT

CERAMIC TILE, CURRENT TRANSFORMER,

COOLING TOWER

CENTER, COOLING TOWER RETURN

COOLING TOWER SUPPLY

COLD WATER

CARPET

CONCRETE SEALER/SURFACE

BOARD

BUILDING

BLK

BEAM

BOTTOM

BEARING

BASEMENT

ACOUSTIC

ADJUSTABLE

ABOVE FINISHED FLOOR

ALTERNATE

AIR HANDLING UNIT

ANCHOR BOLT, AUGER BORING

AL

APPROXIMATE

ARCH

AUTOMATIC TRANSFER SWITCH

FA

FLOOR DRAIN, FIRE DAMPER

FOUNDATION

FEEDER

FIRE EXTINGUISHER

FINISHED FLOOR ELEVATION

FIG

FIN

FLOOR, FLASHING, FLOW LINE

FLUOR

P

PB

PIV

PL

PLYWD

PNL

PNT

CHAIR OR CRASH RAIL

CORNER GUARD

FIRE EXTINGUISHER CABINET

OF

WG

ALC

CUBICAL CURTAIN TRACK

CLEAN

ACOUSTIC TILE

L

EPDM ROOF MEMBRANE

HSKP

NEG

STRUC

R

RA

RAD

RB

RES

RECP

REINF

REG

REQD

REV

RF

RHC

RM

RPM

RWC

PRELIM

PRIM

PT

PTN

PVMT

PVC

PVC

AB

ACT

ACST

ADJ

AFF

AHU

ALT

ALUMINUM

ALCOVE

APPROX

ARCHITECTURAL

ATS

BD

BLDG

BLOCK

BM

BOT

BRG

BSMT

CELSIUS

CAP

CC

CD

CCT

CEMENT

CG

CH

CI

CIP

CIR

CJ

CKT

CLN

CLG

CLR

CMP

CMPA

CMU

CND,C

CNDS

CO

COL

COMM

CONC

COND

CONN

CONST

CONT

CONV

CP

CR

CS

CT

CT

CTR

CTS

CW

CPT

DETAIL

DIA

DIM

DMPR

DN

DP

DS

DW

DWG

EA

EF

EG

EJ

ELEV

ELEC

EMERGENCY

EPDM

EQUAL

EQUIPMENT

EW

EWC

EXHAUST

EXISTING

EXPANSION, EXPOSED

EXP JT

FIRE ALARM

FD

FDN

FDR

FE

FEC

FFE

FIGURE

FINISH

FL

FLUORESCENT

FRAME

FOOTING

FIXTURE

GAGE

GALVANIZED

GROUND FAULT INTERRUPT

GLASS

GYPSUM WALL BOARD

GYPSUM

HGT, H

HOSE BIBB

HC

HARDWARE

HORIZONTAL

HOUR, HAND RAIL

HOUSEKEEPING

INTERIOR

INSULATION, INSULATED

INVERT

JUNCTION BOX

JANITOR CLOSET

JUNCTION

JOINT

KNOCK OUT

KILOVOLT-AMPERE

KILOWATT

LOUVER, LENGTH, LENGTH OF CURVE

LIGHT

LAVATORY VERTICAL

METER, MEGA

MASONRY

MATERIAL

MAXIMUM

MECHANICAL

METAL

MANHOLE

MINIMUM, MINUTE

MISCELLANEOUS

MILLIMETER

MOUNTED

MOUNTING

MEMBRANE WATERPROOFING

MULLION

NOT APPLICABLE

NATIONAL ELECTRIC CODE

NEGATIVE

NEUTRAL

NOT IN CONTRACT

NOMINAL

NOT TO SCALE

OUTSIDE AIR

ON CENTER

OUTSIDE DIAMETER

OVERFLOW DRAIN

OPENING

OPPOSITE

PIPE, POLE

OVERHEAD

PULL BOX

POST INDICATOR VALVE

PLATE

PLYWOOD

PANEL

PAINT

PRELIMINARY

PRIMARY

POINT, POINT OF TANGENT

PARTITION

POINT OF VERTICAL CURVE

POLY VINYL CHLORIDE

PAVEMENT

RADIUS, RISER, RUBBER SHEATH

RETURN AIR

RADIUS

RESILIENT/RUBBER BASE

RCP

RECEPTACLE

REINFORCEMENT

REGULATOR, REGISTER

REQUIRED

REVISION

ROOF, RETURN FAN

REHEAT COIL

ROOM

REVOLUTIONS PER MINUTE

RESILIENT WALL COVERING

SANITARY SEWER

SCHEDULE

SPLITTER DAMPER, STORM DRAIN

SECTION

SUPPLY GRILLE

SHEET

SIMILAR

SINGLE PHASE

SLOPE

STATIC PRESSURE, SINGLE POLE

SINGLE POLE, DOUBLE THROW

SPECIFICATION

SINGLE POLE, SINGLE THROW

SQUARE

SUPPLY REGISTER

SANITARY SEWER

STEAM, SINGLE THROW, STREET, STAFF

STATION

STANDARD

STEEL

STRUCTURAL

SUPPORT

SUSPENDED

SHEET VINYL

SWITCH, SIDEWALK

SWITCHBOARD

SWITCHGEAR

TILE,TOP,TANGENT

TOP AND BOTTOM

TELEPHONE

TEMPERATURE, TEMPORARY

TERMINAL

THREE CONDUCTOR

THREE POLE

THREE WAY

TOP OF

TRANSITION

TOP OF STEEL, TOP OF STONE, TOP OF SLAB

TELEVISION

TOP OF WALL

TYPICAL

UNIT HEATER

VENT,VOLT,VALVE

VOLT AMPRE

VACUUM

VINYL COMPOSITION TILE

VENTILATING

VERTICAL

VESTIBULE

VENT STACK

VENT THRU ROOF

VINYL WALL COVERING

WIDTH,WASTE,WATER,WATT,WEST, WIRE,

WATER LINE STRUCTURE

WATT

WITH

WITHOUT

WATER CLOSET, WHEEL CHAIR

WIDTH, WINDOW DIMENSION

WALL GUARD

WATERPROOF, WEATHERPROOF

WASTE STACK, WATER SURFACE, WATERSTOP

WEIGHT

WELDED WIRE FABRIC

TA TOILET ACCESSORIES

WDW WINDOW

IR IMPACT RESISTANT, INFRARED

PEMB PRE-ENGINEERED METAL BUILDING

RESINOUS EPOXY SYSTEM

RIGID CONCRETE PIPE

IRWC IMPACT RESISTANT WALL COVERING

LVT LUXURY VINYL TILE

WRB WEATHER RESISTANT BARRIER

SC SEALED CONCRETE

UNO UNLESS NOTED OTHERWISE

BACKER ROD & SEALANTBR&S

RME REUSABLE MEDICAL EQUIPMENT

WAP WIRELESS (WIFI) ACCESS POINT

ARCHITECTURAL SYMBOLS

A101

DETAIL NUMBER

COLUMN NUMBER /

GRID LINE

SHEET NUMBER

ARCHITECTURAL

SECTION

WINDOW TYPE

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL

ELEVATION

X

X-XXX

DETAIL NUMBER

SHEET NUMBER

CENTER LINE

DIMENSION LINE

DOOR NUMBER

SYMBOL

x'- x"

EXISTING TO REMAIN

NEW CONSTRUCTION

EXISTING TO BE

REMOVED

EXISTING TO REMAIN

1i

KEYNOTE - RENOVATION

PLAN (U.N.O.)

WALL / PARTITION TYPE

KEYNOTE - DEMOLITION

PLAN

X

X

X

NOTE: NOT ALL SYMBOLS USED

ROOM NAME

W01

ROOM NAME

ROOM NUMBER

XX

X-XXX

SHEET DETAIL IS

DRAWN ON

DETAIL NUMBER

XX

X-XXX ARCHITECTURAL

ELEVATION - EXTERIOR

XX SP XX SP DESIGN SF

PROGRAM SF

ACT-X

X'-X" AFF

CEILING CODE

CEILING HEIGHT,

ABOVE FINISH FLOOR

X

NEW EXISTING

KEYNOTE - PHASING

PLAN

X

MATERIAL SYMBOLS

EARTH

CAST-IN-PLACE CONCRETE /

PRECAST CONCRETE

CONCRETE MASONRY

STEEL

CONTINUOUS WOOD

FRAMING

WOOD BLOCKING

FIBROUS INSULATION

GYPSUM BOARD

BRICK MASONRY

RIGID INSULATION

ROOF INSULATION

ALUMINUM

ARCHITECTURAL GENERAL NOTES:

1. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO CONSTRUCTION.

3. ALL EXISTING CONSTRUCTION, CABINETWORK, EQUIPMENT, ETC.

TO REMAIN IS INDICATED LIGHT OR HALF TONE.

4. ALL FURNITURE SHOWN HALF TONE WILL BE OWNER FURNISHED

AND OWNER INSTALLED.

5. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO

THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY

CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,

MATERIALS, OR ANY INVOLVED ACTIONS.

6. REFER TO AE100-SERIES BUILDING OVERALL FLOOR PLANS FOR

LOCATION OF EXISTING OR REQUIRED FIRE WALLS.

7. MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY AND

CONFIRM RATINGS WITH THE COR PRIOR TO BEGINNING OF

WORK.

8. VERIFY THAT EXISTING WALLS REQUIRING FIRE RATINGS ARE

MAINTAINED, REPAIRED AND EXTENDED TO STRUCTURE.

9. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT,

WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND

AT LEAST THE CORRIDOR SIDE OF NON-FIRE RATED CORRIDOR

WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE NOTED.

VERIFY AND CONFIRM RATINGS WITH THE COR PRIOR TO

BEGINNING OF WORK.

10. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATINGS

INTERSECT, THE HIGHEST-RATED PARTITION TAKES

PRECEDENT. MAINTAIN RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

11. PROVIDE FIRE RATED EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO AE100-SERIES OVERALL FLOOR PLAN SHEETS

FOR LOCATIONS OF FIRE RATED PARTITIONS.

12. A 1-HR FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL

OCCUPIED SPACE AND CONSTRUCTION AREAS. THIS

PROTECTION INCLUDES ANY EXISTING PENETRATIONS AND

OPENINGS.

13. REFER TO 'TEMPORARY CONSTRUCTION BARRIERS AND

ENCLOSURES' ON SHEET GI002 FOR INFORMATION RELATED TO

ENCLOSURE OF WORK AREAS AND PROTECTION OF EXISTING

AND NEW CONSTRUCTION.

14. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE

AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY

ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND

ON DIRECTION OF SUSPENDED ACOUSTICAL CEILING MAIN-TEES.

CONTRACTOR SHALL COORDINATE WORK AREA WITH MEP

DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS

RESPONSIBLE FOR WORK AS NECESSARY, FIELD VERIFY.

15. WORK AREAS SHOWN DO NOT DISTINGUISH BETWEEN PHASES

BUT ONLY SHOW AREAS TO BE REMOVED AND REINSTALLED.

CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING PHASING OF

WORK; SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN

MULTIPLE PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET

GI002.

16. ANY DISTURBED FINISHES MUST BE RESTORED TO MATCH

EXISTING FINISHES. COORDINATE WITH VA TO MATCH EXISTING

FINISHES.

17. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND CEILING-

MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO BE

CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK IN

ROOMS AND WORK AREA. CLEANING SHALL MEET THE

APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF WORK

BY THE VA.

ARCHITECTURAL GENERAL NOTES:

TEMP BARRIERS & ENCLOS

1. SEE SPECIFICATION SECTION 01 56 00 "TEMPORARY BARRIERS &

ENCLOSURES" FOR REQUIREMENTS RELATED TO ENCLOSURE OF

CONSTRUCTION IN PROGRESS.

2. SEE AE100-SERIES PLANS FOR NOTES AND INFORMATION

RELATED TO PHASING, TEMPORARY INTERIOR CONSTRUCTION

PARTITIONS AND OVERHEAD PROTECTION DURING

CONSTRUCTION.

3. ALL ENCLOSURES AND PENETRATIONS THROUGH EXISTING

STRUCTURE ARE TO BE MAINTAINED BY THE CONTRACTOR

DURING DEMOLITION AND NEW CONSTRUCTION TO PREVENT THE

INFILTRATION OF WATER INTO THE BUILDING DURING THE

COURSE OF THE PROJECT.

4. EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED

FROM DEMOLITION AND NEW CONSTRUCTION ACTIVITY.

PROTECTION METHODS SHALL BE APPROVED BY THE COR AT

LEAST ONE WEEK PRIOR TO INITIAL INSTALLATION.

5. ALL ENCLOSURES MUST BE INSPECTED AND APPROVED BY THE

COR BEFORE THE END OF EACH WORK DAY. UNSATISFACTORY

ENCLOSURE WORK SHALL BE CORRECTED BY THE CONTRACTOR

AND APPROVED BY THE COR BEFORE CESSATION OF THE DAY'S

WORK ACTIVITY.

TEMPORARY BARRIERS &

ENCLOSURES:

1. CONTRACTOR SHALL COMPLY WITH THE MOST-CURRENT

VERSION OF OSHA'S PUBLICATION 3142-12R "LEAD IN

CONSTRUCTION" (29 CFR 1926.62) FOR CONSTRUCTION

ACTIVITIES THAT DISTURB LEAD-BASED PAINTED SURFACES,

PAINT CONTAINING DETECTABLE LEVELS OF LEAD OR OTHER

MATERIALS CONTAINING LEAD..

2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF

ASBESTOS AND LEAD BASED PAINT (LBP) REPORTS.

3. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP

REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH

MATERIALS IN THE AREA OF THE FACILITY IN QUESTION. REFER

TO THE VA'S ABATEMENT SPECIFICATIONS FOR HANDLING OF

MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT

SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.

4. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS

CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.

5. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE

HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND

NOTIFY THE GOVT. IMMEDIATELY FOR DIRECTION.

6. ALL CONTRACTORS' PERSONNEL IN AREAS NEAR DISTURBANCE

OR ABATEMENT OF HAZARDOUS MATERIALS MUST BE NOTIFIED

OF ACTIVITIES.

7. ASBESTOS AND LEAD-BASED PAINT ABATEMENT, IF REQUIRED,

SHALL BE CONDUCTED IN ACCORDANCE WITH VA

SPECIFICATIONS AND ALL APPLICABLE REGULATIONS.

8. ABATEMENT CONTRACTORS SHALL SCHEDULE WORK IN

GENERAL ACCORDANCE WITH THE PROJECT'S PHASING

STRATEGY.

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL

PENETRATIONS - CONSTRUCTION IS TO CONFORM TO

MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS /

PARTITIONS AND FLOORS. CONFORM WITH THE TESTED /

SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND

LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS

SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING

STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS

UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED

DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING

RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND

THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-

LABEL EXISTING WALL IF NECESSARY.

HAZARDOUS MATERIALS:

FIREPROOFING GENERAL NOTES:

BID ITEMS & DEDUCT ALTS:

REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS

A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: CORRECT

RME STORAGE: INCLUDES ALL SCOPE COMMUNICATED IN

THE DRAWINGS AND SPECIFICATIONS.

1. RME STORAGE ROOMS: WORK INCLUDES:

A. RENOVATION OF EXISTING HVAC SYSTEM TO MEET

TEMPERATURE AND HUMIDITY CONTROL

REQUIREMENTS FOR RME STORAGE ROOMS.

INCLUDING INSTALLATION OF REPLACEMENT

AND/OR NEW STEAM GENERATORS AND

HUMIDIFICATION GRIDS.

B. REPLACEMENT OF NON-COMPLIANT SUSPENDED

ACOUSTICAL CEILING PANELS IN DESIGNATED RME

STORAGE ROOMS.

2. AMBULATORY CARE ADDITION (ACA): WORK INCLUDES

RENOVATION OF EXISTING HVAC SYSTEM INCLUDING:

A. REPLACEMENT OF AHUs 1,2,3 AND 4.

B. INSTALLATION OF REPLACEMENT OR NEW VARIABLE

AIR VOLUME (VAV) BOXES, REHEAT COILS AND

OTHER RELATED ITEMS.

C. REPLACEMENT OF HEATING WATER SYSTEM

INCLUDING HEAT EXCHANGES, PUMPS, EXPANSION

TANK AND AIR SEPARATOR.

B. BID ITEM #2, DEDUCT #1: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #1, EXCLUDING BID DEDUCT #1 DESCRIBED

BELOW:

1. DEDUCT #1: DELETE WORK ASSOCIATED WITH ACA-

AHU-4 AND ASSOCIATED UTILITIES.

C. BID ITEM #3, DEDUCT #2: INCLUDES ALL SCOPE DESCRIBED

IN BID ITEM #2, EXCLUDING BID DEDUCT #2 DESCRIBED

BELOW:

1. DEDUCT #2: DELETE WORK ASSOCIATED WITH ACA-

AHU-3 AND ASSOCIATED UTILITIES.

BID ITEMS & DEDUCT:

PHASING GENERAL NOTES:

1. REFER TO SECTION 01 00 00 FOR PHASING REQUIREMENTS.

2. PHASES SHOWN IN THE PHASING DESCRIPTION ARE PART

OF THE SCOPE OF WORK CONTAINED IN THIS SET OF

CONTRACT DOCUMENT DRAWINGS.

3. A CONSTRUCTION PHASING PLAN SHALL BE PROVIDED BY

THE CONTRACTOR TO THE COR FOR REVIEW AND

APPROVAL PRIOR TO COMMENCEMENT OF THE WORK.

4. CONTRACTOR SHALL PROVIDE ALL SUBMITTALS AND

RECEIVE APPROVALS BEFORE CONSTRUCTION CAN START.

5. CONTRACTOR IS TO SUBMIT COORDINATION DRAWINGS

BEFORE CONSTRUCTION CAN START.

6. ALL WORK SHALL BE PERFORMED IN A MANNER TO ALLOW

FOR FULL OPERATION OF THE MEDICAL CENTER AT ALL

TIMES.

7. A SEVEN DAY NOTICE SHALL BE PROVIDED PRIOR TO ANY

INTERRUPTION OF UTILITY SERVICES.

8. TIMING OF WORK HOURS SHALL BE COORDINATED WITH

THE COR AT LEAST 7 DAYS PRIOR TO START OF WORK.

9. AT THE COMPLETION OF EACH WORK DAY, ALL AREAS

SHALL BE CLEANED OF CONSTRUCTION MATERIALS AND

EQUIPMENT TO ALLOW FOR CONTINUED OCCUPANCY OF

THE SPACE. THIS REQUIREMENT IS SPECIFIC TO CLINICAL

ROOMS DESIGNATED IN THE CONSTRUCTION PHASING

DESCRIPTION.

10. AT THE COMPLETION OF ALL PHASED WORK, TEMPORARY

INSTALLATIONS SHALL BE REMOVED BY THE CONTRACTOR

AND ANY REQUIRED REPAIRS SHALL BE PERFORMED. ANY

MATERIALS NOT SALVAGED BY THE OWNER SHALL BE

REMOVED BY THE CONTRACTOR.

11. OFF / WEEKEND HOURS WILL BE REQ'D IN SOME AREAS.

12. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED

IN ACTIVE PHASE DOES NOT ADVERSELY AFFECT NORMAL

OPERATIONS IN OTHER OCCUPIED SPACES.

13. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO

MAINTAIN SERVICE TO OCCUPIED SPACES.

14. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED

STEP TO ACHIEVE PHASED CONSTRUCTION. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO DEVELOP A

CONSTRUCTION PLAN TO INSTALL THE DESIGN WITHIN THE

PHASING CONSTRAINTS.

15. HVAC SYSTEMS (EXCEPT ACA-AHU-1,-2,-3,-4) IMPACTED BY

THE PROJECT SCOPE SHALL NOT BE OFFLINE FOR LONGER

THAN A 6-HOUR SPAN. PROVIDE TEMPORARY PORTABLE

HEATERS/COOLERS FOR SPACES IMPACTED BY HVAC

SYSTEM OUTAGES TO MAINTAIN ADEQUATE OCCUPIED

SPACE CONDITIONS DURING CONSTRUCTION.

PHASING GENERAL NOTES:

1. SEE SHEET GI002 FOR ARCHITECTURAL GENERAL NOTES.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

EXTENTS OF CEILING REPLACEMENT PRIOR TO START OF

CONSTRUCTION. CONTRACTOR IS TO COORDINATE WITH ALL

TRADES IN ADJACENT SPACES TO ACCOMPLISH ABOVE-

CEILING ROUTING OF MECHANICAL AND ELECTRICAL ITEMS.

3. COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO

THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY

CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,

MATERIALS, OR ANY INVOLVED ACTIONS.

4. DEMO WORK AND NEW WORK INDICATED SHOW APPROXIMATE

AREAS TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY

ACTUAL AREAS TO BE REMOVED, AS LOCATIONS MAY DEPEND

ON DIRECTION OF CEILING GRID MAIN-TEES. CONTRACTOR

SHALL COORDINATE WORK AREA WITH MEP DRAWINGS FOR

FULL SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR

WORK AS NECESSARY FOR A FINISHED AND COMPLETED

INSTALLATION.

5. WORK AREA SHOWN ON REFLECTED CEILING PLANS DOES NOT

DISTINGUISH BETWEEN PHASES BUT ONLY SHOWS AREAS TO

BE REMOVED AND REINSTALLED. CONTRACTOR IS

RESPONSIBLE FOR IDENTIFYING PHASING OF WORK IN

COORDINATION WITH MECHANICAL AND RELATED WORK;

SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN MULTIPLE

PHASES. SEE 'PHASING GENERAL NOTES' ON SHEET GI002.

6. WHERE PORTIONS OF CEILINGS ARE SHOWN TO BE REMOVED

AND REINSTALLED, REMOVE AND REINSTALL ALL ITEMS

LOCATED IN CEILING, INCLUDING (BUT NOT LIMITED TO) LIGHTS,

DIFFUSERS, SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU,

ALARMS, ANTENNAS, OCCUPANCY SENSORS, SPEAKERS,

NURSE CALL, CODE LIGHTS, EMERGENCY SHOWER, CAMERA,

WIFI ACCESS POINT, CURTAIN TRACK, PATIENT LIFT OR

ACCESS HATCHES AS REQUIRED. ALL ITEMS MAY NOT BE

INDICATED ON DRAWINGS. FIELD VERIFY FOR FULL SCOPE OF

WORK.

7. REFER TO ROOM FINISH SCHEDULE FOR CEILING HEIGHTS /

MATERIAL AND LOCATIONS, UNLESS NOTED OR SHOWN

OTHERWISE. WHERE NOT SCHEDULED OR SHOWN, MATCH

EXISTING CEILING HEIGHTS AND MATERIALS.

8. REMOVE AND REPLACE CEILING SYSTEMS IN RME STORAGE

AND OTHER ROOMS WHERE DESIGNATED FOR MECHANICAL

WORK. REVIEW & COORDINATE EXISTING CONDITIONS W/ COR

FOR NEED TO REMOVE ALL OR PORTIONS OF EXISTING

CEILINGS AND MAINTAINING COMPLIANCE WITH VA OEHRM

REQ'TS. FOR PHYSICAL SECURITY.

9. IN RME STORAGE ROOMS, NOTIFY THE COR IF EXISTING WALL

CONSTRUCTION AND FINISHES DO NOT EXTEND TO

STRUCTURAL DECK ABOVE (APPLIES TO ALL SHEETS) UNLESS

NOTED OTHERWISE.

10. WHERE 1-HR-RATED CEILINGS ARE TO BE PROVIDED IN LIEU OF

EXTENDING WALLS TO STRUCTURE ABOVE FOR HORIZONTAL

ENCLOSURE OF ROOMS FOR SECURITY AND FIRE SEPARATION,

PROVIDE FIRE-RATED ASSEMBLIES OF GYPSUM WALLBOARD,

LIGHT-GAUGE METAL FRAMING AND CEILING SUSPENSION

SYSTEMS.

11. EXISTING CEILING TYPES, CEILING-MOUNTED FIXTURES AND

EQUIPMENT LOCATIONS OUTSIDE OF RME STORAGE ROOMS

OR OTHER ROOMS DESIGNATED FOR WORK SHOWN ON

ENLARGED REFLECTED CEILING PLANS ARE NOT FULLY

IDENTIFIED IN THE REFLECTED CEILING PLANS. FIELD VERIFY

EXISTING CEILING CONDITIONS IN CORRIDORS AND ROOMS

AFFECTED BY WORK PRIOR TO BIDDING AND BEFORE START

OF PROJECT WITH THE COR AND GENERAL CONTRACTOR.

12. FOR CEILINGS IN CORRIDORS AND ROOMS TO REMAIN

OCCUPIED AND FUNCTIONAL DURING NORMAL BUSINESS

HOURS, EXISTING SUSPENDED ACOUSTICAL CEILING TILES AND

GRID ARE TO BE REMOVED ONLY TO THE EXTENTS REQUIRED

TO PERMIT WORK DURING THE WORK SHIFT. REINSTALL GRID

AND CEILING TILES PRIOR TO THE END OF EVERY WORK SHIFT

UNLESS DIRECTED OTHERWISE BY THE COR.

13. MINIMIZE DISRUPTION TO ADJACENT SPACES. ACCESS ABOVE

CEILING SPACE AS NEEDED TO ACCOMPLISH SCOPE OF WORK.

REPLACE DAMAGED PADS AND SUSPENDED GRID MEMBERS

AS NEEED. RETURN ALL SYSTEMS TO PREVIOUS CONDITIONS.

14. REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY IN

INDIVIDUAL ROOMS UNLESS NOTED OTHERWISE. SEE

REFLECTED CEILING GENERAL NOTE ABOVE FOR CEILINGS IN

CORRDORS AND ROOMS TO REMAIN OCCUPIED AND

FUNCTIONAL DURING NORMAL BUISNESS HOURS.

15. COORDINATE SCHEDULING FOR REMOVAL AND

REINSTALLATION OF CEILINGS WITH THE COR.

16. CONTRACTOR IS TO REINSTALL ACOUSTICAL CEILING TILES

WHERE REMOVED IN ADJACENT ROOMS FOR PERFORMANCE

OF WORK AT THE END OF EVERY WORK SHIFT.

17. REMOVAL OF EXISTING CEILINGS AND TEMPORARY

MODIFICATION OF EXISTING SPRINKLER HEADS ARE TO BE

COORDINATED TO HAPPEN CONCURRENTLY.

18. ALTHOUGH NOT SPECIFICALLY SHOWN, THE ENTIRE PROJECT

HAS FIRE SPRINKLER HEADS IN CEILINGS. SCRIBE CEILING

MATERIALS CAREFULLY FOR A TIGHT FIT OF PENETRATIONS

THROUGH CEILING MATERIAL .

19. IN AREAS WHERE CONSTRUCTION WORK IS TO TAKE PLACE

OVER AN EXTENDED PERIOD OF TIME AND ACCESS TO WORK

AREA IS TO BE RESTRICTED TO THE CONTRACTOR AND

DESIGNATED PERSONNEL, A 1-HR FIRE-RATED SEPARATION IS

REQUIRED BETWEEN ALL OCCUPIED SPACE AND

CONSTRUCTION AREAS. THIS PROTECTION INCLUDES ANY

EXISTING PENETRATIONS AND OPENINGS. COORDINATE

PLACEMENT, SCHEDULING OF INSTALLATION AND REMOVAL

WITH THE COR. SEE 'TEMPORARY BARRIERS & ENCLOSURES'

ON SHEET GI002.

20. WHERE CEILINGS OF DIFFERENT HEIGHTS ABUT AND WHERE

EXISTING BULKHEADS ARE TO BE REMOVED FOR ACCESS TO

WORK, REPLACE WITH GYPSUM WALL BOARD AND METAL

STUD BULKHEADS TO MATCH EXISTING CONFIGURATIONS . DO

NOT BUILD BULKHEADS OF ACOUSTICAL CEILING MATERIALS

UNLESS SPECIFICALLY DETAILED.

21. EXISTING MECHANICAL CEILING COMPONENTS ARE TO BE

REUSED UNLESS NOTED OTHERWISE. REFER TO MECHANICAL

DRAWINGS FOR QUANTITY AND TYPE OF NEW / REPLACEMENT

DIFFUSERS, RETURN AIR GRILLES, AND EXHAUST GRILLES.

SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

22. FOR NEW MECHANICAL DIFFUSERS, GRILLES AND RELATED

CEILING-MOUNTED OR SUSPENDED ITEMS IN ROOMS TO BE

RENOVATED, SEE MECHANICAL DRAWINGS.

23. EXISTING ELECTRICAL DEVICES ARE TO BE REUSED UNLESS

OTHERWISE NOTED. REFER TO ELECTRICAL DRAWINGS FOR

QUANTITY AND TYPE OF NEW / REPLACEMENT LIGHTS,

SPEAKERS, DETECTORS, POWER OUTLETS, ETC. SCRIBE

CEILING MATERIALS CAREFULLY. WHERE NO DEVICES ARE

SHOWN ON PLANS, FIELD VERIFY LOCATION & QUANTITY OF

DEVICES IN EXISTING CEILING. THESE DEVICES WILL BE

RELOCATED TO THE NEW CEILING.

24. FOR NEW LIGHTING FIXTURE LAYOUTS IN ROOMS TO BE

RENOVATED, SEE ELECTRICAL DRAWINGS.

25. ALL EXISTING TO REMAIN AND REINSTALLED WALL- AND

CEILING-MOUNTED GRILLES, DIFFUSERS, LIGHTS, ETC. ARE TO

BE CLEANED IMMEDIATELY PRIOR TO COMPLETION OF WORK

IN ROOMS AND WORK AREA. CLEANING SHALL MEET THE

APPROVAL OF THE COR PRIOR TO FINAL ACCEPTANCE OF

WORK BY THE VA.

ARCHITECTURAL REFLECTED

CEILING PLAN NOTES:

1. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE

PERFORMED DURING UNOCCUPIED HOURS (NIGHTS,

WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO

ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR

PATIENTS ARRIVE.

2. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT

HAVE ADVERSE EFFECTS (EXCESSIVE NOISE, EXCESSIVE

VIBRATION, ETC.) SHALL BE PERFORMED DURING

UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR

HOLIDAYS).

3. COORDINATE SCHEDULE WITH THE VA TO DETERMINE

EXACT ALLOWABLE TIMES OF CONSTRUCTION ACTIVITIES IN

EACH PROJECT AREA.

CONSTRUCTION ACTIVITIES:

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:1

P

M

GI003

ABBREVIATIONS, SYMBOLS AND GENERAL

NOTES

AHT SW

x x x xxxxxx xxx x x x x x x x x x x x x x x x x x x x x x x

1. EXTENTS OF PROJECT AREA SHOWN HATCHED AREA

2. EXISTING PARKING AREA. CONTR. PARKING NOT

PERMITTED.

3. CONTRACTOR SITE ACCESS POINT.

4. LIMITED CONTRACTOR PARKING TO BE ARRANGED W/

COR - SEE SECTION 01 00 00 - GENERAL REQUIREMENTS.

5. ROADWAY TO REMAIN ACCESSIBLE AT ALL TIMES.

6. BUILDINGS TO REMAIN ACCESSIBLE AT ALL TIMES - DO

NOT BLOCK OFF.

7. SPACE IS NOT AVAILABLE FOR LONG-TERM ON-SITE

STORAGE OR LAY-DOWN AREAS. REFER TO THE

SPECIFICATIONS, SECTION 01 00 00.1.7-OPERATIONS AND

STORAGE, FOR ON-SITE SHORT-TERM STORAGE

ARRANGEMENTS. CONTRACTOR WILL NEED TO

COORDINATE WITH THE COR FOR AVAILABILITY OF

SHORT-TERM LAY - DOWN AND STORAGE

ARRANGEMENTS.

ARCHITECTURAL SITE PLAN

NOTES:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFICATION OF EXISTING CONDITIONS AND CHANGES MADE

TO THE SITE SINCE THE PUBLISHED DATE OF THE DRAWINGS.

2. CONTRACTOR SHALL PROTECT ALL SITE INFRASTRUCTURE

UNLESS DIRECTED OTHERWISE BY COR.

ARCHITECTURAL SITE PLAN

GENERAL NOTES:

HOSPITAL

BUILDING

PATIENT

EDUCATION

ER ENTRY

COMMUNITY

LIVING

CENTER

(CLC)

HR

BLDG.

ACA

BUILDING

HOSPITAL DRIVE

LOT B

OR ADDITION

SHIPPING

WAREHOUSE

CHILLER

PLANT

PARKING

GARAGE

(BAY 2)

FACILITIES

MANAGEMENT /

ENGINEER

FM STOR. /

MAINT.

SHED

GROUNDS

BLDG.

SIGN

SHOP

CONTRACTOR

PARKING

HAZMAT

STORAGE

STORAGE

BUTLER

BLDG.

SERVICE ROAD

LOT D - EMPLOYEE / STAFF PARKING

T

IG

E R

A V

E N

U E

M O

N K

D R

IV

E

HOSPITAL DRIVE

E. STADIUM BLVD. (HWY 740)

E. STA

D

IU

M B

LVD

. (H

W Y 740)

PHASE 2

(2 STORY

FUTURE

ADDITION)

1A

PARKING

GARAGE

(BAY 1)

G1

G1

FISHER HOUSE

PATIENT

TOWER

ORIGINAL

BUILDING

ADDN.

HOSPITAL

EAST

ENTRANCE

HOSPITAL / ACA NORTH ENTRANCEER NORTH ENTRANCE

EMERG. WEST ENT.

BULK OXYGEN

TANK

PENTHOUSE

FRONT ENTRY &

ADMISSION

EHRM TRAINING SPACE

(LONG TERM TBD)

SPEED BUMP

(TYP)

ROADWAY TO BE ACCESSIBLE AT ALL TIMES

MRI

ADDITION

FD CONNECTION

TRANSFORMERS

FUTURE

BUILDING

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

FIRST FLOOR KEYPLAN

E & F

SHIPPING

WAREHOUSE

OR ADDITION

NORTH

B A

ACA BUILDING

AREAS

AREA AREA

G

AREA

C & D

AREAS

BUILDING 1

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:0

:1

P

M

GI004

SITE PLAN

AHT SW

1" = 40'-0"1

SITE PLAN

T S R Q P

Na N M La L K Jb J Hb H Ga G F E D C B A1

1.9

2.8

3.7

4.6

5.4

5.5

6.2

6.3

6.7

7.2

8.2

9.1

10.4

2 3 1 4 5 5.6 6 6.3 7 8 9 10 10.6 11 11.5

11.5

12.5

13.5

H

G

F

B

C

D.1

D

E.1

E

A

Z X.2 V U.2 U T.8

4.1

4.7

6.1

7.1

8.3

8.9

9.8

10.2

1.6

2.7

3.2

3.6

DD CC.6 CC BB AA

Y X W

7.6

Ja

PROSTHETICS

STORAGE

W04

STAFF

TOILET

W08

MATERIAL

LIFT

LOBBY

W03C

MAT'L

LIFT

WE01

STAIR

WS01

NARCOTICS

STORAGE

CAGE

W03A1

DRUG

CACHE-STORAGE

W03A

BULK

ITEMS

STORAGE

W03

ELECT/FIRE

ROOM

W01

VETERANS

CANTEEN

SERVICE

(VCS)

STORAGE

W01A

LEVEL IV - HIGH RISK

LEVEL II - LOW RISK

LEVEL II - LOW RISK

LEVEL II - LOW RISK

T

T

I1

I3

I4I2

I4I6

I6

I6

I2

I6

I2

I2

I6

PA5PA5PA5

PA4

PA7

PA9

PA6

PA8

PA1

PA10

I5

PROSTHETICS

STORAGE

W04A

STERILE

CONSUMABLES

(SOFT

GOODS)

STORAGE

W05

EQUIPMENT

PREP &

STAGING

W05A

CORRIDOR

WC02

CORRIDOR

WC01A

STORAGE

W06

CORRIDOR

WC01

RECEIVING

DOCK

W02

BULK/UNIT

STORAGE

W03B

ROOM

E001J

Room E001L

Room E001K

Room E001C

ROOM

E001E

ROOM

E001F

ROOM

E001H

GENERATOR

D022B

PARALLELING

SWITCHGEAR

D022C

ELEC.

EQUIP

D022D

GENERATOR

D022A

ELEC.

CLOSET

D022

TRANSFORMER

ROOM

D023

LOGISTICS

STORAGE

C003E

PROGRAM

MANAGER

C003F

PHARMACY

STORAGE

C003D

LOGISTICS

VISN 15

SUPPLY

TECHS

C003

PHARMACY

STORAGE

C004

STORAGE

C004A

CANTEEN

STORAGE

C004B

PHARMACY

STORAGE

C004D

TECH

SUPERVISOR

OFFICE

C003C

OFFICE

C003B

ST. LNGE

C003A

CONTROL

CENTER

D019D

STORAGE

D019B

E.C.C.

OFFICE

D019A

OFFICE

D024

TOILET

D019C

A/C SHOP

D019C

CORRIDOR

D019 BOILER

D018

SWITCH

GEAR

ROOM

D020

CORRIDOR

CORR-1

EQUIP

ROOM

F023

RADIONUCLIDE

GENERATOR

LAB

F022

HOT CELL

F020

MRI

ROOM

F019

MRI

CONTROL

F017

IN VITRO

CELL

TEST LAB

F016

RADIO

PHARM./PHARKMAKINETIC

LAB

F014

VA-BIC

PET/SPECT/CT/MOLECULAR

IMAGING

SUITE

F012

JANITOR

F036SHARED

OFFICE

F011

OFFICE

F009

OFFICE

F008

OFFICE

F007

WORK

ROOM

F006

OFFICE

F003

WORK

ROOM

F002

OFFICE

F033

MICRO

DARK

ROOM

F032

CAMERA

DARK

ROOM

F031REFRIGERATOR

F030

FREEZER

F030A

TISSUE

CULTURE

(HOT)

F029A

TISSUE

PREP

(HOT)

F029

TISSUE

PREP

(COLD)

F028

TISSUE

CULTURE

(COLD)

F028A

OFFICE

F025

VESTIBULE

F025A

WORK

ROOM

F026

OFFICE

F034

VESTIBULE

F034A

IMMUNOLOGY

LAB

F027

CYLINDER

STORAGE

F027A

GLASS

WASH

F024

CONFERENCE

ROOM

F001A

RECEPTIONIST

F001

VESTIBULE

F002A

Room

GEN.

RADIOCHEMISTRY/REPTIDE

RADIOLABELING

F004

ELEC.

CLOSET

F001B

COLD LAB

F005

HOT LAB 1

F021

RADIOPHARMACEUTICAL

R&D F018

RADIOPHARMACEUTICAL

R&D F010

VESTIBULE

F009A

ELEC.

CLOSET

F035

F.A.

CONTROL

PANEL

F035A

CORRIDOR

CBF2

CORRIDOR

CBF4

Room

VESTIBULE

F023A

CYLINDER

STORAGE

F015

STORAGE

F013

CORRIDOR

CBF5

Room

STR #11

STORAGE

E001G

JANITOR

E012

PHARMACY

E001

STAGING

ROOM

E001D

STERILE

IV PREP.

E001B

NARCOTIC

VAULT

E001A

OFFICE

E002A CONFERENCE

ROOM

E002E

ROOM

E002F

PROGRAM

SUPPORT

R&D E002C

A.O. RAD

E002D

RESEARCH

SERVICE

CORRIDOR

E002

WORK

ROOM

E002B

OFFICE

E002H

R.C.O.

R&D E002I

CLINICAL

RESEARCH

E002J

M.F.M.R.

EXECUTIVE

DIRECTOR

E002K

ELEV.

MACHINE

ROOM

E004

STORAGE

E005

ELEV.

MACHINE

ROOM

E007

TELE./DATA

E006

MEN

TOILET

E008

WOMAN

TOILET

E010

ELEC.

ROOM

E009

CORRIDOR

CBE5

MECH

ROOM

E003

MECH

ROOM

E003A

TOILET

A001

TOILET

A002

Room A003

Room A007

Room A009

Room A009A Room

A010

Room

ENDOCRINE

HYPERTENSION

RSCH.

A019

ENDOCRINE

HYPERTENSION

A020

RSCH.

OFFICE

A020A

OFFICE

A022

STAIR #4

A024A

ANIMAL

WARD

A027A

ANIMAL

WARD

A027

PATHOGEN

FREE

SUITE

A026

Room

ANIMAL

WARD

A028

ANIMAL

WARD

A030

ANIMAL

WARD

A032

ANIMAL

WARD

A034

ANIMAL

WARD

A029

ANIMAL

WARD

A031

ANIMAL

WARD

A033

ANIMAL

WARD

A035STORAGE

A042

STORAGE

A042A

OFFICE

A023A

NEURO.

SLEEP

RSCH.

A023

SURG.

SUITE

A021

VMU

OFFICE

A043

ANIMAL

WARD

A045

ANIMAL

SURGERY

A045A

NEURO.

SLEEP

RSCH.

A018

Room A015A

Room A015

Room A017

Room A016

Room A016A

Room A013

Room A012

Room A008

RADIOPHARMACEUTICAL

SCIENCES

RESEARCH

A049

Room A008A

Room A006A

OFFICE

A051A

ONCOLOGY

RESEARCH

A051

Room A006

Room A005

Room A04A

Room A004

RADIOPHARMACY

RESEARCH

A055

RESEARCH

INVESTIGATOR

B022

OFFICE

B018

OFFICE

B016

OFFICE

B014

RESEARCH

INVESTIGATOR

B012

RESEARCH

INVESTIGATOR

B015

OFFICE

B017

RESEARCH

INVESTIGATOR

B021

RESEARCH

COMMON

ROOM

B045

RESEARCH

INVESTIGATOR

B047

RESEARCH

OFFICE

B046

OFFICE

B049 HEALTH

PHYSICS

LAB

B050

OFFICE

B006

OFFICE

B006C

OFFICE

B010A

OFFICE

B010

ASSOC.

CHIEF

B006B

CHIEF

B006A

OFFICE

B046ALAB

B023

LAB

B026

ELEC.

CLOSET

B030

PHARMACOLOGY

RESEARCH

B039

PHARMACOLOGY

RESEARCH

B042

OFFICE

B039A

GLASS

WASH

B051

PHARMACOLOGY

RESEARCH

B048

COLD

ROOM

B037

COLD

ROOM

B037A

STAIR #3

B036A

JANITOR

B034

SIGNAL

PANELS

B033A

STAIR

ACCESS

B036

OFFICE

B033

OPHTHALMOLOGY

RESEARCH

B032

OPHTHALMOLOGY

B031

PULMONARY

RESEARCH

B027

TRANS.

ROOM

B027A

Room

RHEUMATOLOGY

RESEARCH

B024OFFICE

B025B

Room

RESEARCH

CORE

AREA

B019

HAS

B013

FIRE

SPRINKLER

PUMP

ROOM

D017

PIPE &

MECHANICS

SHOP

D016

TELEPHONE

OPERATORS

D004L

LAUNDRY

STORAGE

D004F LAUNDRY

MENDING

D004C

PAINT

SHOP

D006

OFFICE

D005

SAFETY/EMERGENCY

D005A

ELEC.

SHOP

D007

FURNITURE

STORAGE

D009

CARPENTER

SHOP

D011

TRNG/BRK.

ROOM

B002D

DIETETICS

STORAGE

B002G

DIETETICS

OFFICE

B002A

WOMEN'S

B001D

MEN'S

B001C

FOOD

PREP

B001

Room C009F

DIRECTOR

C009I

ORDERING

C009H

CANTEEN

C009C

WIF

C009D

MECHANICAL

EQUIP.

C010

MOW

PREP

C009A

MOW

C009B

Room C008

CORRIDOR

CBD7

BIOMEDICAL

SUPERVISOR

C002B BIOMED

STORAGE

C002A

COLD

ROOM

D030

ELEV.

MACHINE

ROOM

D025

AUTOPSY

D031

GROSS

SPEC.

D028

CORRIDOR

D003

OFFICE

D004K

OFFICE

D004J

OFFICE

D004I

OFFICE

D004H

OFFICE

D004G

EQUIPMENT

STORAGE

D003B

EQUIPMENT

STORAGE

D003C

STORAGE

D003D

STORAGE

D003A

Room

STR #9

CORRIDOR

CBD5

JANITOR

D029

LKR./TLT.

ROOM

D027

BIOMED

C002

SUPERVISORS

C009J

CART

WASH

C001C

ENTRY

VESTIBULE

D004M

LOST AND

FOUND

D004N

REPRODUCTIVE

D002

TRASH

D001

TRASH

D001B

JANITOR

D001A

TELEPHONE

OPERATOR

SUPERVISOR

D004E

TOILET

D004B

STORAGE

D004A

STG.

RESEARCH

SERVICE

A033C

STG.

RESEARCH

A033A

STG.

A033B

MECH

ROOM

A038

FUTURE

ANIMAL

WARD

A037

EQUIP

STORAGE

A036

ANIMAL

WARD

A039

WOMAN'S

LOCKER

A063G

WOMAN'S

TOILET

A063E

WOMAN'S

SHOWER

A063F

MAKE-UP

A063H

LOUNGE

A063

FITNESS

A063A

MENS

SHOWER

A063D

MENS

TOILET

A063B

MENS

LOCKER

A063C

DMARC

A060

MAIL

ROOM

A059

CLOSET

A059A

RADIATION

LAB

A052

RADIOPHARMACEUTICAL

SCIENCES

RESEARCH

A050

RESEARCH

INVESTIGATOR

A048

RADIOPHARMACEUTICAL

SCIENCES

RESEARCH

A047

CART

WASH

(DIRTY)

A046

CAGE

WASH

A041

ANIMAL

WARD

A040

CORRIDOR

CBA9CORRIDOR

CBA10

Room

ELEC.

CLOSET

A053

CLOSET

A054B

RESEARCH

STORAGE

A054

BIOHAZARD

STORAGE

A057

Room B001K

CLASSROOM

B007

LACTATION

B009

ELEC.

ROOM

B011J

ELEC.

ROOM

G013

STORAGE

G050

OFFICE &

SUPPLY

G051

ELEV.

CONTROL

G016

EQUIPMENT

G052B

STERILIZER

ACCESS

ROOM

G052C

CLEAN

PROCESSING

G043

DIRTY

PROCESSING

G032

Room

ENDOSCOPE

PROCESS

G036

MECH

ROOM

G032A

FILTER

EQUIPMENT

G052A

ANTE

ROOM

G059

VESTIBULE

G031

STORAGE

G030

STORAGE

G029

MEN'S

SHOWER

G027A

MEN'S

LOCKER

G027

HALL

G023

WOMEN'S

TOILET

G024A WOMEN'S

SHOWER

G024B

WOMEN'S

LOCKER

G024

BREAK

ROOM

G018

CONFERENCE

ROOM

G017

OFFICE

G019A

ELEC.

ROOM

G008

STORAGE

G019B

SHOWER

G038A

SHOWER

G040A

LOCKERS

G040

LOCKERS

G038

OFFICE

G019C

OFFICE

G019

HALL

G037

CONTROL

ROOM

G042 CORRIDOR

CBG4

ELEV.

CONTROL

G015 STAIR #12

G060

ELEV.

LOBBY

G026

EQUIP

ROOM

G004

ELEV.

MACHINE

ROOM

G004A

CORRIDOR

CBG6

CORRIDOR

CBG3

Room

CORRIDOR

G055

CLEAN

RECEIVING

BREAKOUT

G048

BULK

STORE

ROOM

G047

ETO

STERILIZER

ACCESS

G045

STERILIZER

ACCESS

G043A

HALL

G046

CORRIDOR

G012

CORRIDOR

CBG2

MECH

ROOM

G001

CORRIDOR

CBG1

CORRIDOR

CBG5

MECHANICAL

C012

SHEET

METAL

SHOP

C013

Room

CORRIDOR

CBC2

CORRIDOR

CBC3

CORRIDOR

CBC1

OXYGEN

STORAGE

C005A

STAIR #7

C005

CORRIDOR

CBD3

CORRIDOR

CBD4

CORRIDOR

CBD3

STORAGE

D0040

CORRIDOR

CBD1 CORRIDOR

CBD1

LINEN

D004 TECH.

MED

REPAIR

D008

OFFICE

D010

KEY SHOP

D012

CLOSET

D010A

TOOL

STORAGE

D011A

VESTIBULE

D014

UNISEX

TOILET

D013

CORRIDOR

CBD2

CORRIDOR

CBA11

CORRIDOR

CBA11

ELEV.

LOBBY

A058

Room B001J

STORAGE

B001H

ON-CALL

ROOM #1

B011A

ON-CALL

ROOMS/LOUNGE

B011

ON-CALL

ROOM #5

B011G

TOILET

B011H

ON-CALL

ROOM #4

B011F

TOILET

B011E

ON-CALL

ROOM #3

B011D

ON-CALL

ROOM #2

B011C

TOILET

B011B

VTS/TRVL

SUPERVISOR

B013A

CORRIDOR

CBB4

CORRIDOR

CBB4

CORRIDOR

CBB3

Room

Room

Room

CORRIDOR

CBA1

CORRIDOR

CBA1

CORRIDOR

CBA8CORRIDOR

CBA8

CORRIDOR

CBA8

CORRIDOR

CBA6

CORRIDOR

CBA7

CORRIDOR

CBA4

CORRIDOR

CBA2

CORRIDOR

CBA5

Room A014

Room A011

CLOSET

A025B

JAN

CLOSET

A025

STAIR

CORRIDOR

A024

ELEC.

CLOSET

A047A

IT

CLOSET

A056A

STAIR #1

A056

ELEC.

CLOSET

B009A

ELEC.

CLOSET

B009B

CORRIDOR

CBE4

CORRIDOR

CBF1

CORRIDOR

CBE2

CORRIDOR

CBE3

STAIR #11

#11

CORRIDOR

CBE1

CORRIDOR

CBA3

STAIR #5

D015

STAIR #6

#6

STAIR #7

C006

OFFICE

D004D

STAIR #9

D02C

WAREWASH

C009K

TRAY

MAKE

LINE

B001I

COOKLINE

C009L

LOCKER

ROOM

B001E

CORRIDOR

B001B

HOUSEKEEPING

B001F

BREAKROOM

B001G

CHEMICAL

CLOSET

B001A

CORRIDOR

C009

WIC

C009E

I.T.

C007

ELEV

#11

ELEV

#10

ELEV

#09

DRUG

CACHE/STORAGE

W03A

BULK/UNIT

STORAGE

W03

PROSTHETICS

STORAGE

W04

OIT

W05B

VCS

STORAGE

W01

CORRIDOR

WC03

SUPERVISOR

OFFICE

W09

STAFF

TLT

W08

BREAK

ROOM

W07

RECEIVE/ISSUE

W10B

RECEIVE/ISSUE

W10C

RECEIVE/ISSUE

W10A

STORAGE

W10

RELIEF

AIR

AREAWAY

G00Y

STORAGE

C014

MECHANICAL

C011

CHILLED

WATER

PIPING

AREAWAY

G00X

CORRIDOR

CBG1

CHASE

C00Z

HOSPITAL

LOADING

DOCK

CBC3A

PHASING NOTES:

1. REFER TO PHASING GENERAL NOTES ON GI003.

2. REFER TO MECHANICAL, PLUMBING AND ELECTRCIAL

DRAWINGS FOR WORK ASSOCIATED WITH HVAC RENOVATION

WORK.

3. PHASE 1 – ACA HVAC RENOVATION WORK.

A. WORK INCLUDES - BUT IS NOT LIMITED TO - THE REMOVAL

AND REPLACEMENT OF AIR HANDLING UNITS (AHU),

REPLACEMENT OF EXISTING VARIABLE AIR VOLUME (VAV)

BOXES AND REPLACEMENT WITH NEW VARIABLE AIR

VOLUME (VAV) BOXES AND REHEAT COILS, REPLACEMENT

AND INSTALLATION OF STEAM GENERATORS AND

HUMIDIFICATION EQUIPMENT.

B. AIR HANDLING UNITS ARE TO BE REPLACED ONE AT A

TIME. MODIFICATION OF DUCTWORK, HUMIDIFICATION

DEVICES, VAV BOXES, REHEAT COILS AND RELATED

CONTROL WORK ASSOCIATED WITH THE AHU BEING

REPLACED SHALL BE COMPLETED AT THE SAME TIME

THAT THE AHU IS OUT OF SERVICE.

C. WHERE REQUIRED FOR ACCESS TO ABOVE-CEILING-

MOUNTED EQUIPMENT IN ROOMS AND CORRIDORS

OUTSIDE OF THE MECHANICAL ROOMS, REMOVAL OF

EXISTING CEILING GRID, CEILING TILES, AND OTHER

CEILING MOUNTED ITEMS FOR ACCESS TO ABOVE-

CEILING-MOUNTED ITEMS, INCLUDING - BUT NOT LIMITED

TO - VARIABLE AIR VOLUME (VAV) BOXES, REHEAT COILS

AND HUMIDIFIER GRIDS IS TO BE INCLUDED. SEE

MECHANICAL FOR LOCATIONS AND ADDITIONAL

REQUIREMENTS.

D. CEILING MOUNTED SPEAKERS, WIRELESS ACCESS POINTS

(WAPS), OCCUPANCY SENSORS, EXISTING LIGHT

FIXTURES AND OTHER RELATED ITEMS SHALL BE

REMOVED AS NEEDED AND REUSED. SEE ELECTRICAL

DRAWINGS FOR FOR ADDITIONAL REQUIREMENTS.

E. SPRINKLER HEADS SHALL BE MOVED AS NEEDED TO

AVOID CONFLICTS WITH NEW DUCTWORK AND/OR

EQUIPMENT INSTALLATION. SEE FIRE PROTECTION

DRAWINGS FOR ADDITIONAL REQUIREMENTS.

F. EXIT SIGNAGE SHALL BE REMOVED AS NEEDED DURING

CEILING WORK AND REINSTALLED AT THE ORIGINAL

LOCATION FOR EACH.

G. REINSTALL CEILING GRIDS AND ACOUSTICAL CEILING

PANELS OR INSTALL NEW ACOUSTICAL CEILING PANELS

AS SCHEDULED, WHERE EXISTING CEILING GRIDS ARE

REMOVED. REPLACE DAMAGED CEILING GRIDS WITH NEW.

H. REINSTALL EXISTING LIGHT FIXTURES, SPEAKERS, EXIT

SIGNS AND ANY OTHER REMOVED CEILING MOUNTED

ITEMS.

1. PHASE 2 – RMC STORAGE ROOM WORK –

A. RMC STORAGE ROOM WORK SHALL BE SCHEDULED TO

MINIMIZE DISRUPTION OF THE DEPARTMENT / SERVICE IN

WHICH THE ROOM IS LOCATED.

B. WORK SHALL BE PERFORMED SUCH THAT ALL ACTIVITIES

SCHEDULED FOR THE ROOM WILL BE STARTED AND

FOLLOWED THROUGH TO COMPLETION BEFORE MOVING

TO THE NEXT ROOM.

C. WORK ON MULTIPLE ROOMS SHALL BE PROPOSED TO THE

COR AS PART OF A CONTRACTOR-GENERATED PHASING

PLAN. APPROVAL, MODIFICATION OR REJECTION OF

PROPOSED MULTIPLE ROOM WORK SHALL BE AT THE

DIRECTION OF THE COR AND MEDICAL CENTER.

D. REMOVE AND REPLACE EXISTING DOOR HARDWARE TO

FACILITATE INSTALLATION OF NEW HARDWARE TO BE

TIED INTO THE EXISTING PHYSICAL ACCESS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .