This document is a Reflected Ceiling Plan (RCP) architectural drawing for a VA medical facility project located at 800 Hospital Drive in Columbia, Missouri. The drawing details the ceiling configurations for the fourth and sixth floors, showing existing and proposed ceiling treatments, including suspended acoustic tiles, gypsum wall board ceilings, and various ceiling-mounted equipment like light fixtures, air grilles, wireless access points, speakers, and smoke detectors.
The drawing is part of the "Correct Reusable Medical Equipment Storage" project (Solicitation Number 36C25525R0114) for the Department of Veterans Affairs Veterans Health Administration. Key technical notes indicate requirements for carefully removing and reinstalling ceiling tiles, replacing damaged tiles, and coordinating MEP (Mechanical, Electrical, Plumbing) work. The document is marked as "100% Final Bid Documents" with an issue date of 06/26/2025, and includes a revision for Amendment #1 dated 07/29/2025. The project is fully sprinklered and involves work across multiple building areas and floors.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Na N M La L K Jb J Hb H Ga G FEa
3.7
4.6
5.4
5.5
6.2
6.3
6.7
7.2
8.2
9.1
7.6
AE307
F3
CLEAN
STORAGE
Ja
C3
C39
C10PM&R EXAM
ROOM 2
PM&R EXAM
ROOM 3
PM&R EXAM
ROOM 4
EMG/SCI
NURSE
NAVIGATOR
PAIN& PRM
VVC/TM
PAIN BH
PAIN PHARM
PAIN EXAM
RM. 2
PAIN EXAM
RM. 3
PAIN EXAM
RM.
PROST.
CHEIF
PROST.
REP.
PT GYM
450 ELEC.
OT TRAIN.
RM.
OT TLT.
440A
PT/OT EXAM
PT/OT EXAM
ACUPUNCTURE
ACUPUNCTURE
CHIRO.
EXAM
CHIRO.
EXAM
STOR.
426A
PER. CLNC.
MASSAGE
PER. CLNC.
GROUP RM.
CLEAN LAB
PLASTER
FUME RM.
DUST RM.
ANTE
FITTING/
EXAM RM.
PROST.
ASST. CHIEF
PROST.
PURCHASING
D377
FITTING/
EXAM RM.
FITTING/
EXAM RM.
PROST.
WAIT.
STAIR #1
OI&T
PROCEDURE
ROOM
TLT
D385
WORKSTATION
CORRIDOR
C47
CORRIDOR
C498
PAIN EXAM
PM&R
SWAMP
TLT
SOILED
HOLDING
PAIN
SWAMP
TLT
CORRIDOR
C499
EXISTING
ELEC.
492A
CORRIDOR
C496
NURSES
472 PROCEDURE
ROOM
MSA
CHECKIN/OUT
MENS TLT
WOMENS
TLT
WAIT.
CORRIDOR
C42
WC
STOR./SHOP
HSKPG.
PM&R EXAM
ROOM 3
BREAK RM.
CHIEF PM&R
EXAM
REHAB
COOR.
STAFF TLT.
TELE
HEALTH
PSA
OT SUPER.
AO
PT/OT
SWAMP
CORRIDOR
C43
CORRIDOR
C41
LOBBY/
CORRIDOR
CLEAN
LINEN
450A
STG.
404A
ELEV.
LOBBY
PELVIC
PELVIC
PROST.
STOCK RM.
PROST.
CHECKIN
405A
SOILED DISP
401A
PT/OT EXAM
BARIATRIC
PT/OR
STOR.
STAIR #2
OIT/CLO.
439C
OIT/CLO.
439B CLO.
439A
EQUIP
PT TLT.
437A
CORRIDOR
C44
CORRIDOR
C45
CORRIDOR
C495
CORRIDOR
C46
MAINT.
421A
ELEC.
ELEVATOR
LOBBY
ELEVATOR
LOBBY
OPEN
OFFICE (QM)
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TLT.
632A
OFFICE
(HOSP. DIR.)
OFFICE
(CHF S/C)
625A
SPEC.
CARE,
SURG. SVC.
OFFICE
(OPS.
MGRR. S/C)
625B
OFFICE (DIR.
SRG)
625C
OFFICE (DIR.
SRG)
625D
OFFICE
(SECTY.
SRG)
625E
OFFICE
(PHYS. SRG)
612A
OFFICE
(PHYS. SRG)
612B
OFFICE
(PHYS. SRG)
612C
OFFICE
(PHYS. SRG)
612D
OFFICE
(PHYS. SRG)
612E
CONFERENCE
ROOM
612F
OFFICE
TEAM RM.
OFFICE
(PHYSICIAN
SURG. SVC.)
612G
CORRIDOR
C68
OFFICE
OFFICE
OFFICE
OFFICE
(OPRN
CRED)
OFFICE
(CRED
SUPV.)
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE (HR)
OFFICE (HR)
OFFICE
(EMPL.
HEALTH)
OFFICE (QM
CHIEF)
OFFICE
OFFICE
OFFICE
(PAT.
SAFETY
SUPV.
OFFICE
(EMPL.
HEALTH)
EXAM RM.
(EMPL
HEALTH)
OFFICE
OFFICE
OPEN
OFFICE (PIV)
OFFICE
OFFICE
STORAGE
(FILING)
TEAM RM.
OFFICE
CONF. RM.
CONF. RM.
UNKNOWN
652A
TEAM RM.
TEAM RM.
OFFICE
OFFICE
OFFICE
618 OFFICE
OFFICE
CENTRAL
JAN. STG.
601B
W/C STG.
601C
WOMEN TLT
MENS TLT.
UNKNOWN
SPOILED
DISPATCH
601A
ELEC.
CLOSET
PHYSICIAN
WK. RM.
TLT.
COPY RM.
623F
JAN.
Room
STR
#2
Room 613B
Room 613C
STOR.
650A
IT CLOSET
STAR #1
STOR.
(FILING)
ELEC.
CLOSET
670A
COPY ROOM
OPEN
OFFICE
CORRIDOR
C68
OPEN
OFFICE
CORRIDOR
C69
RCPT
626A
WAITING
AREA
BREAK RM.
CORRIDOR
C61
CORRIDOR
C62
CORRIDOR
C63
CORRIDOR
C63
CORRIDOR
C64
OPEN
OFFICE
OPEN
OFFICE
CORRIDOR
C71
OPEN
OFFICE
CORRIDOR
C66
CORRIDOR
C65
HALL
HALL
C004
OFFICE (HR)
Room C003
HALL
C002
COPY RM.
Room
OPEN
OFFICE
WAITING
AREA
660A
Room C001
COPY ROOM
OPEN
OFFICE
ALCOVE
656A
WRK. RM.
OFFICE
(OPRN
CRED)
656B
STAIR #2
Room
STR
#1
CLOSET
TLT.
HALL
C67
Na N M La L K Jb J Hb H Ga G FEa
2.8
3.7
4.6
5.4
5.5
6.2
6.3
6.7
7.2
8.2
9.1
7.6
Ja
AE307
F7
C39
C39
EXIST GYPSUM WALL BOARD CEILING
EXIST SUSPENDED ACOUSTICAL REMAIN
EXIST SUPPLY AIR GRILLE - SEE MECHANICAL
EXIST RETURN AIR GRILLE - SEE MECHANICAL
EXIST RECESSED 2x2 LIGHT FIXTURE - SEE ELECT
EXIST RECESSED 2x4 LIGHT FIXTURE - SEE ELECT
EXIST STRIP LIGHTING
EXIST CAN LIGHT
EXIST EXIT LIGHT
EXIST WIRELESS ACCESS POINT
EXIST SPEAKER
EXIST SMOKE DETECTOR
EXIST OCCUPANCY SENSOR
EXIST VIDEO SURVEILLANCE CAMERA
EXIST ACCESS PANEL
REFLECTED CEILING PLAN LEGEND
GYPSUM WALL BOARD CEILING
SUSPENDED ACOUSTICAL CEILING
SUPPLY AIR GRILLE - SEE MECHANICAL
RETURN AIR GRILLE TO - SEE MECHANICAL
RECESSED 2x2 LIGHT FIXTURE - SEE ELECT
RECESSED 2x4 LIGHT FIXTURE - SEE ELECT
STRIP LIGHTING
CAN LIGHT
EXIT LIGHT
WIRELESS ACCESS POINT
SPEAKER
SMOKE DETECTOR
OCCUPANCY SENSOR
VIDEO SURVEILLANCE CAMERA
ACCESS PANEL
S
S
SD
OS
OS
OS
WAP
WAP
CCTV
CCTV
AREAS OUTSIDE
SCOPE OF WORK
1. REFER TO ACHITECTURAL REFLECTED CEILING PLAN NOTES
ON SHEET GI003.
2. REFER TO AE300 SERIES SHEETS FOR ENLARGED CEILING
PLANS, RCP KEYNOTES AND ADDITIONAL INFORMATION .
3. SEE GI100 SERIES PHASING KEYNOTES FOR ALLOWABLE
WORK HOURS.
GENERAL REFLECTED CEILING
PLAN NOTES:
SYMBOL
FIRE WALL LEGEND
DESCRIPTION
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR SMOKE BARRIER
1-HOUR HAZARDOUS AREA FIRE BARRIERHZ HZ HZ
RICHARD
JOSEPH
ONKEN
A-5125
A
R C H I T E
C
T
S T
A T
E
O F N E B
R A
S K
A
6/23/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
100% FINAL BID
DOCUMENTS
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
06/26/2025
FOURTH, FIFTH, & SIXTH
FLOOR KEYPLAN
NORTH
E & F
OR ADDITION B A
C & D
ACA BUILDING
AREAS
AREA AREA
AREAS
G
AREA
BUILDING 1
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5
A
-2
-1
.A rc h
R
-C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t
S to ra g e
.r v t
/2
/2
:3
:4
P
M
AC115
FOURTH AND SIXTH FLOOR - REFLECTED
CEILING PLAN
AHT SW
3/32" = 1'-0"1
FOURTH FLOOR - REFLECTED CEILING PLAN
3/32" = 1'-0"2
SIXTH FLOOR - REFLECTED CEILING PLAN
KEYNOTE LEGEND-CEILINGS
KEY KEYNOTE
C3 EXISTING SUSPENDED CEILING/TILE GRID IN
CORRIDOR AND COMMON SPACE;
COORDINATE REMOVAL AND
REINSTALLATION OF PORTIONS OF EXISTING
CEILING TILE/GRID WITH WORK FOR
INSTALLATION OF NEW MEP WORK; REPLACE
DAMAGED CEILING TILES WITH NEW TO
MATCH EXISTING; SEE ARCHITECTURAL
REFLECTED CEILING PLAN GENERAL NOTE 6.
C10 REMOVE PLASTER / GWB CEILING AS NEEDED
TO SUPPORT MEP SCOPE. REPAIR, PATCH
AND PAINT TO MATCH EXISTING. FIELD
VERIFY AND COORDINATE REMOVAL AND
REINSTALLATION OF CEILING EQUIPMENT.
SEE MEP DRAWINGS.
C39 EXISTING ACT CEILING TO REMAIN; REMOVE
PORTION OF CEILING/SOFFIT AS REQUIRED
FOR INSTALLATION OF MEP WORK; AT
SUSPENDED ACOUSTICAL CEILINGS,
REINSTALL CEILING GRID/TILE AFTER
COMPLETION OF ABOVE-CEILING WORK;
REPLACE DAMAGED/BROKEN TILES WITH
NEW TO MATCH EXISTING; PATCH AND
REFINISH EXISTING GWB CEILINGS/SOFFITS
AFTER COMPLETION OF ABOVE-CEILING
WORK TO RESTORE CEILING TO ORIGINAL
CONDTION; SEE ARCHITECTURAL REFLECTED
CEILING PLAN GENERAL NOTES 5 & 6.
C#
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
1____
| Sheets |
| AC115 - FOURTH AND SIXTH FLOOR - REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .