This document is a Reflected Ceiling Plan (RCP) architectural drawing for a VA medical facility project located at 800 Hospital Drive in Columbia, Missouri. The drawing details the ceiling configurations for the fourth and sixth floors, showing existing and proposed ceiling treatments, including suspended acoustic tiles, gypsum wall board ceilings, and various ceiling-mounted equipment like light fixtures, air grilles, wireless access points, speakers, and smoke detectors.

The drawing is part of the "Correct Reusable Medical Equipment Storage" project (Solicitation Number 36C25525R0114) for the Department of Veterans Affairs Veterans Health Administration. Key technical notes indicate requirements for carefully removing and reinstalling ceiling tiles, replacing damaged tiles, and coordinating MEP (Mechanical, Electrical, Plumbing) work. The document is marked as "100% Final Bid Documents" with an issue date of 06/26/2025, and includes a revision for Amendment #1 dated 07/29/2025. The project is fully sprinklered and involves work across multiple building areas and floors.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Na N M La L K Jb J Hb H Ga G FEa

3.7

4.6

5.4

5.5

6.2

6.3

6.7

7.2

8.2

9.1

7.6

AE307

F3

CLEAN

STORAGE

Ja

C3

C39

C10PM&R EXAM

ROOM 2

PM&R EXAM

ROOM 3

PM&R EXAM

ROOM 4

EMG/SCI

NURSE

NAVIGATOR

PAIN& PRM

VVC/TM

PAIN BH

PAIN PHARM

PAIN EXAM

RM. 2

PAIN EXAM

RM. 3

PAIN EXAM

RM.

PROST.

CHEIF

PROST.

REP.

PT GYM

450 ELEC.

OT TRAIN.

RM.

OT TLT.

440A

PT/OT EXAM

PT/OT EXAM

ACUPUNCTURE

ACUPUNCTURE

CHIRO.

EXAM

CHIRO.

EXAM

STOR.

426A

PER. CLNC.

MASSAGE

PER. CLNC.

GROUP RM.

CLEAN LAB

PLASTER

FUME RM.

DUST RM.

ANTE

FITTING/

EXAM RM.

PROST.

ASST. CHIEF

PROST.

PURCHASING

D377

FITTING/

EXAM RM.

FITTING/

EXAM RM.

PROST.

WAIT.

STAIR #1

OI&T

PROCEDURE

ROOM

TLT

D385

WORKSTATION

CORRIDOR

C47

CORRIDOR

C498

PAIN EXAM

PM&R

SWAMP

TLT

SOILED

HOLDING

PAIN

SWAMP

TLT

CORRIDOR

C499

EXISTING

ELEC.

492A

CORRIDOR

C496

NURSES

472 PROCEDURE

ROOM

MSA

CHECKIN/OUT

MENS TLT

WOMENS

TLT

WAIT.

CORRIDOR

C42

WC

STOR./SHOP

HSKPG.

PM&R EXAM

ROOM 3

BREAK RM.

CHIEF PM&R

EXAM

REHAB

COOR.

STAFF TLT.

TELE

HEALTH

PSA

OT SUPER.

AO

PT/OT

SWAMP

CORRIDOR

C43

CORRIDOR

C41

LOBBY/

CORRIDOR

CLEAN

LINEN

450A

STG.

404A

ELEV.

LOBBY

PELVIC

PELVIC

PROST.

STOCK RM.

PROST.

CHECKIN

405A

SOILED DISP

401A

PT/OT EXAM

BARIATRIC

PT/OR

STOR.

STAIR #2

OIT/CLO.

439C

OIT/CLO.

439B CLO.

439A

EQUIP

PT TLT.

437A

CORRIDOR

C44

CORRIDOR

C45

CORRIDOR

C495

CORRIDOR

C46

MAINT.

421A

ELEC.

ELEVATOR

LOBBY

ELEVATOR

LOBBY

OPEN

OFFICE (QM)

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TLT.

632A

OFFICE

(HOSP. DIR.)

OFFICE

(CHF S/C)

625A

SPEC.

CARE,

SURG. SVC.

OFFICE

(OPS.

MGRR. S/C)

625B

OFFICE (DIR.

SRG)

625C

OFFICE (DIR.

SRG)

625D

OFFICE

(SECTY.

SRG)

625E

OFFICE

(PHYS. SRG)

612A

OFFICE

(PHYS. SRG)

612B

OFFICE

(PHYS. SRG)

612C

OFFICE

(PHYS. SRG)

612D

OFFICE

(PHYS. SRG)

612E

CONFERENCE

ROOM

612F

OFFICE

TEAM RM.

OFFICE

(PHYSICIAN

SURG. SVC.)

612G

CORRIDOR

C68

OFFICE

OFFICE

OFFICE

OFFICE

(OPRN

CRED)

OFFICE

(CRED

SUPV.)

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE (HR)

OFFICE (HR)

OFFICE

(EMPL.

HEALTH)

OFFICE (QM

CHIEF)

OFFICE

OFFICE

OFFICE

(PAT.

SAFETY

SUPV.

OFFICE

(EMPL.

HEALTH)

EXAM RM.

(EMPL

HEALTH)

OFFICE

OFFICE

OPEN

OFFICE (PIV)

OFFICE

OFFICE

STORAGE

(FILING)

TEAM RM.

OFFICE

CONF. RM.

CONF. RM.

UNKNOWN

652A

TEAM RM.

TEAM RM.

OFFICE

OFFICE

OFFICE

618 OFFICE

OFFICE

CENTRAL

JAN. STG.

601B

W/C STG.

601C

WOMEN TLT

MENS TLT.

UNKNOWN

SPOILED

DISPATCH

601A

ELEC.

CLOSET

PHYSICIAN

WK. RM.

TLT.

COPY RM.

623F

JAN.

Room

STR

#2

Room 613B

Room 613C

STOR.

650A

IT CLOSET

STAR #1

STOR.

(FILING)

ELEC.

CLOSET

670A

COPY ROOM

OPEN

OFFICE

CORRIDOR

C68

OPEN

OFFICE

CORRIDOR

C69

RCPT

626A

WAITING

AREA

BREAK RM.

CORRIDOR

C61

CORRIDOR

C62

CORRIDOR

C63

CORRIDOR

C63

CORRIDOR

C64

OPEN

OFFICE

OPEN

OFFICE

CORRIDOR

C71

OPEN

OFFICE

CORRIDOR

C66

CORRIDOR

C65

HALL

HALL

C004

OFFICE (HR)

Room C003

HALL

C002

COPY RM.

Room

OPEN

OFFICE

WAITING

AREA

660A

Room C001

COPY ROOM

OPEN

OFFICE

ALCOVE

656A

WRK. RM.

OFFICE

(OPRN

CRED)

656B

STAIR #2

Room

STR

#1

CLOSET

TLT.

HALL

C67

Na N M La L K Jb J Hb H Ga G FEa

2.8

3.7

4.6

5.4

5.5

6.2

6.3

6.7

7.2

8.2

9.1

7.6

Ja

AE307

F7

C39

C39

EXIST GYPSUM WALL BOARD CEILING

EXIST SUSPENDED ACOUSTICAL REMAIN

EXIST SUPPLY AIR GRILLE - SEE MECHANICAL

EXIST RETURN AIR GRILLE - SEE MECHANICAL

EXIST RECESSED 2x2 LIGHT FIXTURE - SEE ELECT

EXIST RECESSED 2x4 LIGHT FIXTURE - SEE ELECT

EXIST STRIP LIGHTING

EXIST CAN LIGHT

EXIST EXIT LIGHT

EXIST WIRELESS ACCESS POINT

EXIST SPEAKER

EXIST SMOKE DETECTOR

EXIST OCCUPANCY SENSOR

EXIST VIDEO SURVEILLANCE CAMERA

EXIST ACCESS PANEL

REFLECTED CEILING PLAN LEGEND

GYPSUM WALL BOARD CEILING

SUSPENDED ACOUSTICAL CEILING

SUPPLY AIR GRILLE - SEE MECHANICAL

RETURN AIR GRILLE TO - SEE MECHANICAL

RECESSED 2x2 LIGHT FIXTURE - SEE ELECT

RECESSED 2x4 LIGHT FIXTURE - SEE ELECT

STRIP LIGHTING

CAN LIGHT

EXIT LIGHT

WIRELESS ACCESS POINT

SPEAKER

SMOKE DETECTOR

OCCUPANCY SENSOR

VIDEO SURVEILLANCE CAMERA

ACCESS PANEL

S

S

SD

OS

OS

OS

WAP

WAP

CCTV

CCTV

AREAS OUTSIDE

SCOPE OF WORK

1. REFER TO ACHITECTURAL REFLECTED CEILING PLAN NOTES

ON SHEET GI003.

2. REFER TO AE300 SERIES SHEETS FOR ENLARGED CEILING

PLANS, RCP KEYNOTES AND ADDITIONAL INFORMATION .

3. SEE GI100 SERIES PHASING KEYNOTES FOR ALLOWABLE

WORK HOURS.

GENERAL REFLECTED CEILING

PLAN NOTES:

SYMBOL

FIRE WALL LEGEND

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR SMOKE BARRIER

1-HOUR HAZARDOUS AREA FIRE BARRIERHZ HZ HZ

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

6/23/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

100% FINAL BID

DOCUMENTS

CORRECT REUSABLE

MEDICAL EQUIP STORAGE

589A4-24-101

800 HOSPITAL DR, COLUMBIA, MO

Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

Astral Engineers P.O. box 190Omaha, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015

Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383

Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086

(412) 212-7515

STAMP

06/26/2025

FOURTH, FIFTH, & SIXTH

FLOOR KEYPLAN

NORTH

E & F

OR ADDITION B A

C & D

ACA BUILDING

AREAS

AREA AREA

AREAS

G

AREA

BUILDING 1

A u to d e s k D o c s /1

A

-2

-1

C o rr e c t R e u s a b le M e d ic a l E q u ip m e n t S to ra g e /5

A

-2

-1

.A rc h

R

-C o rr e c t R e u s a b le

M e d ic a l E q u ip m e n t

S to ra g e

.r v t

/2

/2

:3

:4

P

M

AC115

FOURTH AND SIXTH FLOOR - REFLECTED

CEILING PLAN

AHT SW

3/32" = 1'-0"1

FOURTH FLOOR - REFLECTED CEILING PLAN

3/32" = 1'-0"2

SIXTH FLOOR - REFLECTED CEILING PLAN

KEYNOTE LEGEND-CEILINGS

KEY KEYNOTE

C3 EXISTING SUSPENDED CEILING/TILE GRID IN

CORRIDOR AND COMMON SPACE;

COORDINATE REMOVAL AND

REINSTALLATION OF PORTIONS OF EXISTING

CEILING TILE/GRID WITH WORK FOR

INSTALLATION OF NEW MEP WORK; REPLACE

DAMAGED CEILING TILES WITH NEW TO

MATCH EXISTING; SEE ARCHITECTURAL

REFLECTED CEILING PLAN GENERAL NOTE 6.

C10 REMOVE PLASTER / GWB CEILING AS NEEDED

TO SUPPORT MEP SCOPE. REPAIR, PATCH

AND PAINT TO MATCH EXISTING. FIELD

VERIFY AND COORDINATE REMOVAL AND

REINSTALLATION OF CEILING EQUIPMENT.

SEE MEP DRAWINGS.

C39 EXISTING ACT CEILING TO REMAIN; REMOVE

PORTION OF CEILING/SOFFIT AS REQUIRED

FOR INSTALLATION OF MEP WORK; AT

SUSPENDED ACOUSTICAL CEILINGS,

REINSTALL CEILING GRID/TILE AFTER

COMPLETION OF ABOVE-CEILING WORK;

REPLACE DAMAGED/BROKEN TILES WITH

NEW TO MATCH EXISTING; PATCH AND

REFINISH EXISTING GWB CEILINGS/SOFFITS

AFTER COMPLETION OF ABOVE-CEILING

WORK TO RESTORE CEILING TO ORIGINAL

CONDTION; SEE ARCHITECTURAL REFLECTED

CEILING PLAN GENERAL NOTES 5 & 6.

C#

Mark Revisions: Date:

1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025

1____

Sheets
AC115 - FOURTH AND SIXTH FLOOR - REFLECTED CEILING PLAN

File details come from the government source that posted it. Updated .